KR100869969B1 - Manhole repair method - Google Patents
Manhole repair method Download PDFInfo
- Publication number
- KR100869969B1 KR100869969B1 KR1020070067851A KR20070067851A KR100869969B1 KR 100869969 B1 KR100869969 B1 KR 100869969B1 KR 1020070067851 A KR1020070067851 A KR 1020070067851A KR 20070067851 A KR20070067851 A KR 20070067851A KR 100869969 B1 KR100869969 B1 KR 100869969B1
- Authority
- KR
- South Korea
- Prior art keywords
- manhole cover
- manhole
- height
- road surface
- base
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
- E02D29/128—Repairs of manhole shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/11—Height being adjustable
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/0021—Mortar
Abstract
Description
도 1은 일반적인 맨홀 시공법에 의해 시공된 맨홀의 단면도.1 is a cross-sectional view of a manhole constructed by a general manhole construction method.
도 2는 도 1의 맨홀에 오버레이 시공된 상태를 보여주는 단면도.Figure 2 is a cross-sectional view showing a state in which the overlay construction on the manhole of FIG.
도 3은 본 발명의 맨홀인상 보수를 위한 맨홀뚜껑 받침대에 높이조절재인 너트브라켓과 조절볼트를 설치한 종단면도.Figure 3 is a longitudinal sectional view of the height adjustment material nut bracket and the adjustment bolt installed in the manhole cover support for repairing the manhole of the present invention.
도 4는 본 발명에 이용되는 높이조절 확인용 스탠드를 설치한 종단면도.Figure 4 is a longitudinal cross-sectional view of the height adjustment check stand used in the present invention.
도 5는 본 발명에 이용되는 탄성팩커가 설치되고 기초 채움재 초속경 몰탈을 타설하여 경화시킨 상태의 단면도.Figure 5 is a cross-sectional view of a state in which the elastic packer used in the present invention is installed and hardened by pouring a mortar of the basic filler material.
도 6은 본 발명에 맨홀인상 보수를 위한 기초 채움재 초속경 몰탈을 타설하여 경화시킨 상태 사시도.Figure 6 is a perspective view of the state hardened by pouring mortar mortar for filling the basic filler material for repairing the manhole in the present invention.
도 7은 본 발명의 노면 채움재 수지 콘크리트를 타설 경화시킨 상태의 단면도.Fig. 7 is a cross-sectional view of a state in which the road-filling material resin concrete of the present invention is poured and hardened.
도 8은 본 발명에서 노면 채움재 수지 콘크리트를 타설 경화시킨 상태의 사시도.Figure 8 is a perspective view of the state in which the road surface filling material resin concrete is poured in the present invention.
도 9는 본 발명의 제2실시예의 단면도.9 is a sectional view of a second embodiment of the present invention.
도 10은 본 발명의 제3실시예의 단면도. Fig. 10 is a sectional view of a third embodiment of the present invention.
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
10. 맨홀슬라브 20. 맨홀뚜껑 받침대10. Manhole Slab 20. Manhole Cover Base
40. 너트브라켓 50. 조절볼트40.
60. 높이확인용 스탠드 70. 지지통체60.
72. 탄성팩커 M. 초속경 몰탈72. Elastic Packer M. Carbide Mortar
C. 수지 콘크리트 P. 수지 몰탈C. Resin Concrete P. Resin Mortar
본 발명은 맨홀인상보수공법에 관한 것으로서, 보다 상세하게는 맨홀인상 보수 공사시에 사용되는 기초 채움재와 노면 채움재의 내구성이 상대적으로 높아서 맨홀 보수 작업 횟수가 현저히 줄어들어 경제적이고, 기초 채움재와 노면 채움재의 경화 양생 시간이 현저히 줄어들어 장기간 동안 교통을 통제해야 하는 불편을 해소하며, 맨홀 보수 작업도 용이하고 맨홀 보수 작업자의 안전을 보장하고, 맨홀 보수 완료 후의 내구성 및 노면의 평탄성과 통행 차량의 안전을 보장하며, 맨홀뚜껑 받침대의 강도가 저하되는 것 등을 방지하도록 된 맨홀인상보수공법에 관한 것이다.The present invention relates to a manhole raising repair method, and more particularly, the durability of the base filling material and the road surface filling material used in the manhole raising repair work is relatively high, so that the number of manhole repair works is considerably reduced and economical. Significantly reduced curing time eliminates the inconvenience of long-term traffic control, facilitates manhole repair work, guarantees safety for manhole repair workers, ensures durability after manhole repair, road surface flatness and traffic vehicle safety. And a manhole lift repair method for preventing the strength of the manhole cover base from being lowered.
일반적으로, 도로의 지하에는 상수관, 하수관, 전력 케이블, 통신 케이블 등의 각종 시설물이 수없이 많이 매설되어 있고, 이러한 각종 시설물 등은 필요에 따라 수시로 보수를 행하여야 한다. 따라서, 도로의 지하에 각종 시설물의 유지 보수 를 위해 일정간격을 두고 맨홀이 시공되어 있다.In general, numerous facilities such as water pipes, sewer pipes, electric power cables, and communication cables are buried underground, and such various facilities must be repaired from time to time as necessary. Therefore, manholes are constructed at regular intervals in the basement of the road for maintenance of various facilities.
도 1은 도로의 건설시 최초에 시공되어 있는 상태의 맨홀 구조를 보여준다. 도 1에 의하면, 지하 관로와 연통되게 원형의 중공부(12)가 형성된 맨홀슬라브(10)가 지중에 매설되고, 맨홀슬라브(10) 위에는 금속재의 원통형 맨홀뚜껑 받침대(20)가 올려져 있으며, 맨홀뚜껑 받침대(20)의 상단에는 금속재의 맨홀뚜껑(22)이 얹혀져 있다. 그리고, 맨홀뚜껑 받침대(20) 외측에는 기층재와 표층재가 순차적으로 포장되어 도로의 노면층(24)을 이루고 있다.Figure 1 shows the manhole structure of the state initially constructed during the construction of the road. 1, a
이때, 도로는 시공된 후 자동차의 주행에 따른 반복적인 하중이 작용하여 지반이 침하되므로, 도로 노면이 갈라지거나 파손된다. 따라서, 대략 5년 주기로 덧씌우기 작업(오버레이 시공)을 실시하며, 이로 인해, 도로의 노면층(24) 위에 오버레이층(16)이 형성되어, 맨홀뚜껑 받침대(20)의 상단이 오버레이층(16)의 표면보다 낮아지게 되고, 이 경우 맨홀 부분이 도로면 보다 움푹 들어가게 되므로 노면층(24)을 덧씌우기 전에 맨홀의 높이를 노면층(24) 위의 오버레이층(16)과 일치되도록 인상 조정하기 위한 맨홀 보수 공사를 수행한다.At this time, since the ground is settled by the repeated load according to the driving of the vehicle after the road is constructed, the road surface is cracked or broken. Therefore, the overlay operation (overlay construction) is performed at a period of approximately 5 years, and thus, the
또한, 도로에 시공된 맨홀은 이후 도로를 통해 차량 또는 사람이 통행하면, 계속적인 진동과 하중으로 인해 맨홀을 구성하는 벽돌(14)이 깨지거나 서로 대향되는 안쪽으로 밀리면서 침하가 일어나서 도로면의 일부분이 내려앉게 되며, 이 경우에도 맨홀의 높이를 인상 조정하기 위한 맨홀 보수 공사를 수행한다. 특히, 경사진 도로에 설치된 맨홀의 경우, 맨홀의 침하 현상이 더 심하게 나타나므로, 경사진 도로에는 맨홀 보수 공사를 더 자주 시행한다.In addition, the manhole constructed on the road after the vehicle or a person passes through the road, due to the continuous vibration and load, the
이러한 맨홀인상 보수 공사를 수행하는 과정을 설명하면, 침하된 맨홀커버 받침대의 주면을 컷팅기나 굴착기 등의 장비를 이용하여 굴착하여 제거한다. 이어서, 맨홀커버 받침대의 상단 높이를 높이조절장비를 이용하여 맨홀커버 받침대의 상단 높이를 노면층의 높이와 동일하도록 조절한다. 다음으로, 이렇게 맨홀커버 받침대의 높이를 노면층의 높이와 맞춘 상태에서 맨홀커버 받침대의 주위에 기초 채움재를 충진 경화시킨 다음, 기초 채움재 위에 마감재를 충진 경화시켜 맨홀 보수 작업을 완료한다.Referring to the process of performing such a manhole lift repair work, the main surface of the manhole cover base subsided is excavated and removed using equipment such as a cutting machine or an excavator. Subsequently, the top height of the manhole cover base is adjusted to be the same as the height of the road surface layer using the height adjusting device. Next, the base filling material is filled and cured around the manhole cover stand while the height of the manhole cover base is aligned with the height of the road surface layer, and then the finish material is filled and cured on the base filling material to complete the manhole repair work.
그런데, 종래의 맨홀 보수방법의 경우, 기초 채움재와 마감재의 내구성이 상대적으로 낮기 때문에, 맨홀 보수 작업을 상대적으로 자주 시행해야 하는 단점이 있다. 또한, 기초 채움재와 마감재의 경화 양생 시간이 상대적으로 길어서 비교적 장기간 동안 교통을 통제해야 하는 등의 불편을 초래하는 문제점이 있으며, 아울러, 충진과 다짐용 진동 장비가 요구되어 맨홀 보수 작업도 번거로운 등의 문제점이 있다.However, in the conventional manhole repair method, since the durability of the base filling material and the finishing material is relatively low, there is a disadvantage that the manhole repair work must be performed relatively frequently. In addition, there is a problem that the curing time of the base filling material and the finishing material is relatively long, causing inconveniences such as traffic control for a relatively long period of time, and in addition, manhole maintenance work is also cumbersome as the filling and compacting vibration equipment is required. There is a problem.
한편, 종래 맨홀의 높이를 조절하기 위한 맨홀 인상 작업에는 높이조절 링을 사용하는 방법, 맨홀뚜껑 받침대(20)를 아래쪽에서 스프링으로 떠받치며 위에서 너트를 조여서 조절하는 방법 또는 벽돌이나 돌맹이 등을 맨홀 뚜껑받침 밑에 고이고 수지 콘크리트를 채워 넣어 조절하는 방법, 노면을 굴착하지 않고 맨홀뚜껑 받침대(20)대의 상단에 철제로 만든 높이조절 링을 고정시켜 조절하는 방법 등이 있다.On the other hand, in the conventional manhole raising work for adjusting the height of the manhole, using a height adjustment ring, the
그러나, 상기와 같은 종래 맨홀의 보수 시공법은 다수의 작업자가 중량물인 맨홀뚜껑(22)과 받침대(10) 전부를 노면층(24) 위로 들어 올리는 위험한 작업을 거 쳐야 한다. 그리고, 맨홀슬라브(10) 위에 쌓여있는 벽돌(14)을 모두 제거하여 맨홀슬라브(10)의 중공부(12)측 상부면이 외부로 노출되게 한 다음, 맨홀슬라브(10) 위를 깨끗하게 청소하는 공정을 더 거친 이후에 규격화된 높이조절링을 설치하게 된다. 이러한 경우에도 일정하게 만들어진 높이조절링의 두께만큼의 조절이 이루어지므로 인상된 맨홀이 노면보다 높거나 또는 낮은 경우가 발생되기 때문에, 맨홀이 보수 시공 되었다 해도 도로의 평탄성이 떨어졌고, 맨홀 뚜껑받침에 나사 조임 된 높이조절 링과 조임 볼트 및 너트가 통행 차량의 충격하중 및 진동으로 쉽게 파손되어 높이조절 링이 움직이며, 이는 노면층(24)의 크랙이나 파손의 원인이 되었다.However, the conventional manhole repair method as described above has to undergo a dangerous operation of lifting the
또한, 스프링으로 맨홀뚜껑 받침대(20)를 받치며 위에서 너트를 조여서 조절하는 방법의 경우, 스프링을 맨홀 뚜껑 받침 밑에 설치하기 위해서는 중량물인 맨홀뚜껑 받침대(20)를 스프링 높이 이상으로 들어 올려야 하는 위험이 따르며, 최소 인상 높이가 스프링 두께 이상이 되어야만 스프링의 사용이 가능하게 되는 제한적인 문제점이 있다.In addition, in the case of adjusting the method by tightening the nut from the top of the
그리고, 노면을 굴착할 필요 없이 맨홀뚜껑 받침대(20)의 상단에 철제로 만든 높이조절 링을 삽입 고정하여 맨홀의 높이를 조절하는 방법 또한 규격화된 높이조절 링을 사용하여 설치하게 되므로 이 경우에도 높이 조절링의 일정한 두께만큼의 맨홀의 높이 조절이 이루어지므로 인상된 맨홀이 노면보다 높거나 또는 낮은 경우가 발생되어 도로의 경사면과의 평탄성이 떨어지는 등의 문제가 발생한다.In addition, the height adjustment ring is made by inserting and fixing the height adjustment ring made of steel on the top of the
한편, 높이 조절 후에 맨홀 뚜껑받침의 저면과 맨홀 맨홀슬라브(10)와의 사이에 생기는 빈 공간이 생기며, 이러한 빈 공간에 몰탈이나 기타 채움재를 충진할 때 얇은 합판이나 프라스틱 판재 또는 자동차 타이어에 공기를 채워서 거푸집으로 사용하고 있다.On the other hand, after adjusting the height there is an empty space between the bottom of the manhole cover and the
그런데, 채움재를 채울 때에 거푸집으로 얇은 판재나 자동차 타이어를 사용 할 경우, 맨홀슬라브(10)나 맨홀뚜껑 받침대(20)의 표면에 있는 요철부분이 완전히 막히지 않아 채움재가 이 틈으로 새어나오는 경우가 많이 발생하여, 채움재가 치밀하게 채워지지 않기 때문에, 강도가 저하되어 맨홀뚜껑 받침대(20)의 고정력이 저하되는 문제가 발생한다.By the way, when using thin plate or automobile tire as a formwork when filling the filling material, the uneven portion on the surface of the
본 발명은 전술한 바와 같은 맨홀 보수에 있어서의 제반 문제점을 해소하고자 발명된 것으로, 본 발명의 목적은 맨홀인상 보수시에 사용되는 기초 채움재와 노면 채움재의 내구성이 상대적으로 높아서 맨홀 보수 작업 횟수가 현저히 줄어들어 경제적이고, 기초 채움재와 노면채움재의 경화 양생 시간이 현저히 줄어들어 장기간 동안 교통을 통제해야 하는 불편을 해소하며, 충진과 다짐용 진동 장비가 요구되지 않아 맨홀 보수 작업도 용이한 맨홀인상보수공법을 제공하는 것이다.The present invention has been invented to solve all the problems in the manhole repair as described above, the object of the present invention is that the number of manhole repair work is remarkably high due to the relatively high durability of the base fill material and road surface fill material used in the manhole lift repair It is economical due to the reduction, curing time of the base filling material and road filling material is remarkably reduced, which eliminates the inconvenience of controlling traffic for a long time, and provides the manhole lifting repair method that is easy to repair the manhole because no vibration equipment for filling and compacting is required. It is.
또한, 본 발명은 맨홀 보수를 위하여 중량물인 맨홀뚜껑 받침대를 위험하게 들어올리지 않고 편리한 방법으로 도로의 노면과 정밀하게 맞도록 맨홀의 인상 높이를 조절할 수 있도록 된 맨홀인상보수공법을 제공하고자 하는 것이다.In addition, the present invention is to provide a manhole lift repair method that can adjust the height of the manhole to precisely fit the road surface of the road in a convenient way without dangerously lifting the heavy manhole cover base for manhole repair.
또한, 본 발명은 맨홀 높이조절시 맨홀의 높이를 육안으로 확인하면서 작업할 수 있으므로, 신속하고 간편하게 높이 조절을 하여 도로면과의 요철이 생기지 않는 정확한 맨홀 보수를 할 수 있도록 된 맨홀인상보수공법을 제공하고자 한다.In addition, the present invention can work while visually confirming the height of the manhole when adjusting the height of the manhole, the manhole enhancement repair method that can be quickly and easily adjust the height to make accurate manhole repair without the irregularities of the road surface To provide.
상기한 목적을 달성하기 위한 본 발명은 맨홀뚜껑(22)이 얹혀져서 지중에 매설되는 맨홀뚜껑 받침대(20)의 인상높이를 조절하여 맨홀의 높이를 도로 노면과 일치되도록 조절하는 맨홀인상보수공법에 있어서, 상기 맨홀뚜껑 받침대(20) 주위의 도로층을 집진 장치가 부착된 노면 커터기를 사용하여 노면을 절단하는 제1공정과, 상기 커터기에 의해 커팅된 부분의 노면을 굴착제거하는 제2공정과, 상기 맨홀뚜껑 받침대(20)의 상단부를 도로 노면과 일치시키기 위해 맨홀뚜껑 받침대(20)의 하부플랜지(21)에 높이조절재를 설치하는 제3공정과, 상기 맨홀뚜껑 받침대(20)의 상부에 위치되게 노면에 높이확인용 스탠드(60)를 설치하는 제4공정과, 상기 높이조절재와 높이확인용 스탠드(60)를 이용하여 맨홀뚜껑 받침대(20)의 상단부를 도로 노면과 일치하도록 높이를 조절하는 제5공정과, 상기 맨홀뚜껑 받침대(20) 주위의 굴착된 공간부에 기초 채움재 초속경 몰탈(M)을 타설하여 경화시키는 제6공정과, 상기 기초 채움재 초속경 몰탈(M)의 상부에 노면 채움재 수지 콘크리트(상온아스콘)(C)를 도로 노면과 동일 높이로 타설하여 경화시키는 제7공정으로 이루어진 것을 특징으로 한다.The present invention for achieving the above object is a manhole cover repair method for adjusting the height of the manhole to match the road surface by adjusting the height of the
상기 기초 채움재 초속경 몰탈(M)은 포틀랜드 시멘트에 급결성 재료(CaO, SO₃, AI2O3를 주재료로 사용하는 미분말재료)와 응결 경화 시간 등과 같은 물성을 조 절하는 화학재료를 혼합한 재료로 구성된 것을 특징으로 하는 무수축 시멘트인 것을 특징으로 한다.The basic filler superhard mortar (M) is a material in which portland cement is mixed with a chemical material for adjusting physical properties such as a fastening material (a fine powder material using CaO, SO₃, AI 2 O 3 as a main material) and a setting hardening time. Characterized in that it is a non-condensing cement, characterized in that consisting of.
상기 기초 채움재 초속경 몰탈(M)은 SiO₂15.8 중량%와, AI2O₃9.6 중량%와, Fe2O₃2.2 중량%와, CaO 59.1 중량%와, MgO 1.0 중량%와, SO₃9.8 중량%와, TiO 0.3 중량%와, Ig.Ioss 1.6 중량%와, InsoI 0.6 중량% 비율로 혼합하여 구성된 것이다.The basic filler superhard mortar (M) is 15.8% by weight SiO2, 9.6% by weight AI 2 O₃, 2.2% by weight Fe 2 O₃, 59.1% by weight CaO, 1.0% by weight MgO, SO₃9.8 % By weight, 0.3% by weight of TiO, 1.6% by weight of Ig.Ioss, and 0.6% by weight of InsoI.
상기 노면 채움재 수지 콘크리트(상온아스콘)(C)는 일반적으로 골재, 결합재(비가열 아스팔트), 채움재가 혼합되어져 있고, 상기 골재중 입경 6㎜가 차지하는 골재와 입경 3㎜ 가 차지하는 골재로 이루어 지며, 상기 채움재는 석회석과 폴리프로필렌 섬유, 1종 포틀랜트 시멘트, 골재로 이루어진 것이다.The road surface filler resin concrete (room temperature ascon) (C) is generally composed of aggregates, binders (non-heated asphalt), fillers are mixed, aggregates having a particle size of 6 mm and aggregates having a particle size of 3 mm of the aggregate, The filler is made of limestone and polypropylene fiber, one Portland cement, aggregate.
상기 제3공정에서 높이조절재는 맨홀뚜껑 받침대(20)의 하부플랜지(21)의 하단에 설치되며 외측단에 접촉되게 일측에 측벽(42)과 중앙에 나사공(46)이 관통된 수평받침편(44)을 갖는 형상으로 이루어진 너트브라켓(40)과, 상기 하부플랜지(21)에 형성된 고정공(21a)에서 상기 너트브라켓(40)의 나사공(46)에 나사 결합하는 조절볼트(50)를 이용하여 맨홀뚜껑 받침대(20)의 높이를 조절할수 있는 것이다.In the third process, the height adjusting member is installed at the lower end of the
상기 조절볼트(50)의 상단부에는 오목한 랜치홈이 형성되어, 상기 랜치홈에 랜치를 삽입하여 상기 조절볼트(50)를 작동시킬 수 있도록 된 것이다.The upper end of the
상기 제5공정 후 상기 맨홀뚜껑 받침대(20)의 하부플랜지(21)와 맨홀슬라브(10) 상면 사이의 측방 개구부(S)에 위치되도록 상기 맨홀뚜껑 받침대(20)의 내부에 링형상의 탄성팩커(72)를 설치하는 공정을 더 포함하며, 상기 탄성팩커(72)의 내측에는 통형상의 팩커드럼(70)이 결합된 것이다.Ring-shaped elastic packer inside the
상기 높이 확인부는 상기 맨홀뚜껑 받침대(20)의 상단부와 마주하는 부분에 상하로 관통 형성된 승강홀(66)과, 상기 승강홀(66)에 상단부가 끼워지고 하단부는 상기 맨홀뚜껑 받침대(20)의 상단부에 접촉되는 승강블록(68)을 포함하여 구성된 것이다.The height confirmation part is a lifting
상기 제4공정에 이용되는 상기 높이 확인용 스탠드(60)는 상기 맨홀뚜껑 받침대(20)의 상단부와 마주하는 부분에 상기 높이 확인부가 구비된 링체(62)와, 상기 링체(62)의 둘레부에 방사 방향 외측으로 돌출된 복수개의 수평대(64)를 포함하여 구성된 것이다.The height checking stand 60 used in the fourth step includes a
상기 높이확인용 스탠드(60)의 링체(62)에는 복수개의 걸림편(61)이 하향 연장되어, 상기 맨홀뚜껑 받침대(20)의 출입구(23)의 내벽면 또는 외벽면에 상기 걸림편(61)을 걸어서 상기 높이확인용 스탠드(60)를 유동되지 않도록 설치하는 것이다.A plurality of locking
이하, 본 발명의 바람직한 제1실시예를 첨부한 도면에 의거하여 설명하면 다음과 같다. Hereinafter, a first embodiment of the present invention will be described with reference to the accompanying drawings.
도 3은 본 발명의 맨홀인상 보수를 위한 맨홀뚜껑 받침대에 높이조절재인 너트브라켓과 조절볼트를 설치한 종단면도이며, 도 4는 본 발명에 이용되는 높이조절 확인용 스탠드를 설치한 종단면도이고, 도 5는 본 발명에 이용되는 탄성팩커가 설치되고 기초 채움재 초속경 몰탈을 타설하여 경화시킨 상태의 단면도이며, 도 6은 본 발명에 맨홀인상 보수를 위한 기초 채움재 초속경 몰탈을 타설하여 경화시킨 상 태 사시도이다. 그리고, 도 7은 본 발명의 노면 채움재 수지 콘크리트를 타설 경화시킨 상태의 단면도이며, 도 8은 본 발명에서 노면 채움재 수지 콘크리트를 타설 경화시킨 상태의 사시도이다.Figure 3 is a longitudinal sectional view of the height adjustment material of the nut bracket and the adjustment bolt installed on the manhole cover base for repairing the manhole lift of the present invention, Figure 4 is a longitudinal sectional view of the height adjustment check stand used in the present invention, 5 is a cross-sectional view of a state in which the elastic packer used in the present invention is installed and hardened by placing the base filler cemented carbide mortar, and FIG. 6 is an image of the base filler cemented carbide mortar for repairing a manhole impression in the present invention. It is a perspective view. And, Figure 7 is a cross-sectional view of the state in which the road-filling resin concrete of the present invention is poured and hardened, Figure 8 is a perspective view of the state of the road-filling resin concrete in the present invention.
이를 참조하면, 본 발명은 본 발명은 맨홀뚜껑(22)이 얹혀져서 지중에 매설되는 맨홀뚜껑 받침대(20)의 인상높이를 조절하여 맨홀의 높이를 도로 노면과 일치되도록 조절하는 맨홀인상보수공법에 있어서, 상기 맨홀뚜껑 받침대(20) 주위의 도로층을 집진 장치가 부착된 노면 커터기를 사용하여 노면을 절단하는 제1공정과, 상기 커터기에 의해 커팅된 부분의 노면을 굴착제거하는 제2공정과, 상기 맨홀뚜껑 받침대(20)의 상단부를 도로 노면과 일치시키기 위해 맨홀뚜껑 받침대(20)의 하부플랜지(21)에 높이조절재를 설치하는 제3공정과, 상기 맨홀뚜껑 받침대(20)의 상부에 위치되게 노면에 높이확인용 스탠드를 설치하는 제4공정과, 상기 높이조절재와 높이확인용 스탠드(60)를 이용하여 맨홀뚜껑 받침대(20)의 상단부를 도로 노면과 일치하도록 높이를 조절하는 제5공정과, 상기 맨홀뚜껑 받침대(20) 주위의 굴착된 공간부에 기초 채움재 초속경 몰탈(M)을 타설하여 경화시키는 제6공정과, 상기 기초 채움재 초속경 몰탈(M)의 상부에 노면 채움재 수지 콘크리트(상온아스콘)(C)를 도로 노면과 동일 높이로 타설하여 경화시키는 제7공정으로 이루어진 것이다.Referring to this, the present invention is a manhole cover repair method for adjusting the height of the manhole to match the road surface by adjusting the height of the
상기 제1공정은 커터기에 의해 맨홀커버 받침대(20)의 주위를 절단하는 공정이다. 이러한 커터기는 고속으로 회전함과 동시에 공전하는 커팅날과 집진기를 갖는 건식의 노면 커터기이다.The first step is a step of cutting the periphery of the
이어서, 제2공정은 맨홀커버 받침대(20)의 주위를 커팅한 상태에서 유압 브 레이커(미도시)를 이용하여 커팅 부분의 포장체를 굴착하여 제거한다.Subsequently, in the second step, the package of the cutting portion is excavated and removed using a hydraulic breaker (not shown) in the state of cutting around the
그리고, 제3공정은 상기 맨홀뚜껑 받침대(20)의 상단부를 도로 노면과 일치시키기 위해 맨홀뚜껑 받침대(20)의 하부플랜지(21)에 높이조절재를 설치한다. 이후 제4공정과 같이 노면에 높이확인용 스탠드(60)를 설치한다.And, in the third process, the height adjusting material is installed on the
상기 높이조절재는 맨홀뚜껑 받침대(20)의 상단부를 도로 노면과 일치시키는 공정이다. 이 제3공정에는 너트브라켓(40)과 조절볼트(50)를 이용한다. 상기 너트브라켓(40)은 맨홀뚜껑 받침대(20)의 하부플랜지(21) 외측단에 접촉되는 측벽(42)과, 이 측벽(42)의 일측에서 직각 방향으로 연장된 수평받침편(44)을 갖는다. 또한, 수평받침편(44)에는 암나사공(46)이 상면에서 저면으로 관통되도록 형성된다. 이 너트브라켓(40)은 맨홀 높이 인상 시공시에 맨홀뚜껑 받침대(20)의 하부플랜지(21) 저면 3개의 지점에 설치되는 것으로, 구체적으로, 너트브라켓(40)의 수평받침편(44)은 맨홀뚜껑 받침대(20)의 하부플랜지(21) 저면에 접촉되고, 측벽(42)은 하부플랜지(21)의 외측단에 접촉된다.The height adjusting material is a process of matching the upper end of the
상기 조절볼트(50)는 일자형 볼트 형상으로 구성된 것으로, 맨홀뚜껑 받침대(20)의 하부플랜지(21)의 고정공(21a) 상측에서 너트브라켓(40)의 암나사공(46)에 나사 결합된다. 이 조절볼트(50)의 하단부는 맨홀뚜껑 받침대(20)를 지지하는 맨홀슬라브(10)의 상단부에 접촉된다. 바람직하게, 조절볼트(50)의 상단 둘레부에 별도의 헤드부가 구비되어 있지 않다. 또한, 조절볼트(50)의 상단부에는 육각의 오목한 랜치홈이 형성되어, 이 랜치홈에 랜치를 끼워서 조절볼트(50)를 회전 작동시킬 수 있다.The
상기 너트브라켓(40)의 암나사공(46)에 결합된 조절볼트(50)를 조금씩 체결하면, 너트브라켓(40)과 맨홀커버 받침대(20)가 함께 상승하게 되어 맨홀뚜껑 받침대(10)의 높이를 도로의 노면과 일치 되도록 정확하게 조절할 수 있다.When tightening the
따라서, 제3공정에서는 높이조절제를 설치하기 위하여 무거운 맨홀커버 받침대(20)를 높이 들어올리거나 이동하는 등의 위험이 따르는 공정을 생략하고 맨홀커버 받침대(20)를 약 5Cm 정도만 들고도 맨홀커버 받침대(20)의 하부에 설치가능한 너트브라켓(40)과 조절볼트(50)에 의해 맨홀커버 받침대(20)의 높이를 안전하고 간편하게 조절할 수 있게 된다.Therefore, in the third process, the manhole cover pedestal (20) is only about 5 cm and the manhole cover pedestal (20) is omitted while eliminating the process of lifting or moving the heavy
상기 제4공정에서 높이 확인용 스탠드(60)는 원형링체(62)와, 이 원형링체(62)의 둘레부에 방사 방향 외측으로 돌출된 복수개의 수평대(64)를 갖는 형상으로 구성된다. 바람직하게, 수평대(64)는 삼각형을 이루도록 원형링체(62)의 둘레부에 세 방향으로 돌출된다. 이러한 수평대(64)는 맨홀 인상 작업시 도로의 굴착된 절단면 외측까지 걸쳐진다.In the fourth step, the
또한, 상기 높이 확인용 스탠드(60)는 인상높이 확인부가 구비된다. 즉, 인상높이 확인부는 원형링체(62)에 상하로 관통 형성된 승강홀(66)과, 이 승강홀(66)에 승강 가능하게 설치된 승강블록(68)으로 구성된다. 이때, 승강홀(66)은 수평대(64)와 인접된 위치에 형성되어, 세 개의 승강홀(66)로 구성된다.In addition, the stand for confirming the
이에 의하면, 너트브라켓(40)의 암나사공(46)에 결합된 조절볼트(50)를 작동시켜서 맨홀 인상높이 확인부의 승강블록(68)이 높이확인용 스탠드(60)의 승강홀(66) 상단과 일치할 때, 맨홀의 높이가 도로 노면과 맞게 된다. 따라서, 작업자 는 승강블록(68)의 상단부와 높이확인용 스탠드(60)의 승강홀(66) 상단부가 일치했는지의 여부만 확인하면 되므로, 손쉬우면서도 미세하게 맨홀뚜껑 받침대(20)의 높이를 도로의 노면과 일치시킬 수 있다.According to this, by operating the
상기와 같이 높이조절재와 높이확인용 스탠드(60)를 이용하여 맨홀뚜껑 받침대(20)의 상단부를 도로 노면과 일치하도록 높이를 조절하는 제5공정이다.The fifth step of adjusting the height of the upper end of the
상기 제6공정은 맨홀뚜껑 받침대(20) 주위의 굴착된 공간부에 기초 채움용 초속경 몰탈(M)을 타설하여 경화시키는 공정이다. 즉, 도 5에 도시된 바와 같이, 상기 맨홀뚜껑 받침대(20) 주위의 굴착된 공간부에 기초 채움용 초속경 몰탈(M)(QMR 초속경 몰탈)을 타설하여 경화시킨다. 이때, 상기 기초 채움재 초속경 몰탈(M)은 포틀랜드 시멘트에 급결성 재료(CaO, SO3, AI2O3를 주재료로 사용하는 미분말재료)와 응결 경화 시간 등과 같은 물성을 조절하는 화학재료를 혼합한 재료로 구성된 것을 특징으로 하는 무수축 시멘트인 것이다.The sixth step is a step of pouring and curing hard-curing mortar (M) for foundation filling on the excavated space around the
상기 기초 채움재 초속경 몰탈(M)은 SiO₂15.8 중량%와, AI2O₃9.6 중량%와, Fe2O₃2.2 중량%와, CaO 59.1 중량%와, MgO 1.0 중량%와, SO₃9.8 중량%와, TiO 0.3 중량%와, Ig.Ioss 1.6 중량%와, InsoI 0.6 중량% 비율로 혼합하여 구성된 것이다.The basic filler superhard mortar (M) is 15.8% by weight SiO2, 9.6% by weight AI 2 O₃, 2.2% by weight Fe 2 O₃, 59.1% by weight CaO, 1.0% by weight MgO, SO₃9.8 % By weight, 0.3% by weight of TiO, 1.6% by weight of Ig.Ioss, and 0.6% by weight of InsoI.
상기 기초 채움재 초속경 몰탈(M)의 상부에 노면 채움재 수지 콘크리트(상온아스콘)(C)를 도로 노면과 동일 높이로 타설하여 경화시키는 제7공정으로 이루어진다.The seventh step of hardening by pouring the road surface filler resin concrete (room temperature ascon) (C) on the same height as the road road surface on the top of the base filler super mortar (M).
상기 노면 채움재 수지 콘크리트(상온아스콘)(C)는 일반적으로 골재, 결합 재(비가열 아스팔트), 채움재가 혼합되어져 있고, 상기 골재중 입경 6㎜가 자치하는 골재와 입경 3㎜ 가 차지하는 골재로 이루어 지며, 상기 채움재는 석회석과 폴리프로필렌 섬유, 1종 포틀랜트 시멘트, 골재로 이루어진 것이다.The road surface filler resin concrete (room temperature ascon) (C) is generally composed of aggregates, binders (non-heated asphalt), fillers are mixed, aggregates having a particle size of 6 mm autonomous and the aggregate occupies a particle size of 3 mm The filler is made of limestone and polypropylene fiber, one Portland cement, aggregate.
기초 채움재로 사용되는 초속경 몰탈(M)(QMR-M)은 도로 교통량이 많은 곳에서의 공사에서 우선적으로 고려하여야 할 최단시간 내의 교통 개방이 필요한 긴급 공사에 적합하도록 개발한 재료이다. Ultrasonic Carbide Mortar (QMR-M), which is used as a base fill material, is a material developed for emergency construction that requires the opening of traffic within the shortest time that should be considered first in construction where there is a lot of road traffic.
따라서, 본 발명의 맨홀보수공법은 기초 채움재로는 기초 채움용 초속경 몰탈(M)을 충진 경화시키고, 노면 채움재로서는 수지 콘크리트(상온아스콘)(C)을 도로 노면과 동일 높이로 타설하여 경화시키는 것이다.Therefore, the manhole repair method of the present invention is to fill and harden the cemented carbide mortar (M) for the basic filling as a base filling material, and to pour the resin concrete (at room temperature ascon) (C) to the same height as the road surface hardening as road surface filling material. will be.
제 제5공정 후 상기 맨홀뚜껑 받침대(20)의 하부플랜지(21)와 맨홀슬라브(10) 상면 사이의 측방 개구부(S)에 위치되도록 상기 맨홀뚜껑 받침대(20)의 내부에 링형상의 탄성팩커(72)를 설치하는 공정을 더 포함하며, 상기 탄성팩커(72)의 내측에는 통형상의 팩커드럼(70)이 결합된 것이다.Ring-shaped elastic packer inside the
상기 탄성팩커(72)는 맨홀뚜껑 받침대(20)의 내부 출입구(23) 형상과 대응되는 링형상으로 구성되며, 탄성팩커(72)의 내측에는 원통형상의 팩커드럼(70)이 결합된다. 그리고, 부호 73은 탄성팩커(72)의 내부에 압축공기를 주입하는 공기주입노즐이다.The
이러한 공정에 의하면, 탄성팩커(72)에 형성된 공기주입노즐(73)을 통하여 압축공기를 주입하여 탄성팩커(72)가 팽창시켜서 맨홀커버 받침대의 하단부와 맨홀슬라브 사이의 공간부(S) 측면을 빈틈없이 막은 다음, 상기 무수축성의 기초 채움 용 초속경 몰탈(M)을 주입하여 빈틈이 없는 초속경 몰탈(M)층을 형성한다.According to this process, the compressed air is injected through the
도 9는 본 발명의 제 2 실시예의 단면도로서, 이를 상세히 설명하면 상기 제1 실시예의 맨홀인상보수공법에서 설명한 공정중 나머지 공정은 동일하고 제 6공정에서 기초 채움재 초속경 몰탈(M)을 사용하던 것은 수지 몰탈(P)을 타설하여 경화시키는 것이 제 2 실시예에서 차이가 있는 것입니다.9 is a cross-sectional view of a second embodiment of the present invention, which will be described in detail. The remaining steps of the process described in the manhole raising and repairing method of the first embodiment are the same, and the base filler cemented carbide mortar (M) was used in the sixth process. The difference is that the resin mortar (P) is poured and cured in the second embodiment.
이를 좀더 상세히 설명하면, 맨홀뚜껑(22)이 얹혀져서 지중에 매설되는 맨홀뚜껑 받침대(20)의 인상높이를 조절하여 맨홀의 높이를 도로 노면과 일치되도록 조절하는 맨홀인상보수공법에 있어서,In more detail, in the manhole lift repair method that adjusts the height of the manhole to match the road surface by adjusting the height of the
상기 맨홀뚜껑 받침대(20) 주위의 도로층을 집진 장치가 부착된 노면 커터기를 사용하여 노면을 절단하는 제1공정과, 상기 커터기에 의해 커팅된 부분의 노면을 굴착제거하는 제2공정과, 상기 맨홀뚜껑 받침대(20)의 상단부를 도로 노면과 일치시키기 위해 맨홀뚜껑 받침대(20)의 하부플랜지(21)에 높이조절재를 설치하는 제3공정과, 상기 맨홀뚜껑 받침대(20)의 상부에 위치되게 노면에 높이확인용 스탠드(60)를 설치하는 제4공정과, 상기 높이조절재와 높이확인용 스탠드를 이용하여 맨홀뚜껑 받침대(20)의 상단부를 도로 노면과 일치하도록 높이를 조절하는 제5공정과, 상기 맨홀뚜껑 받침대(20) 주위의 굴착된 공간부에 기초 채움재 수지 몰탈(P)을 타설하여 경화시키는 제6공정과, 상기 기초 채움재 수지 몰탈(P)의 상부에 노면 채움재 수지 콘크리트(상온아스콘)(C)를 도로 노면과 동일 높이로 타설하여 경화시키는 제7공정으로 이루어진 것이다.A first step of cutting the road surface using a road cutter equipped with a dust collecting device on the road layer around the
상기 기초 채움재 수지 몰탈(P)은 모래와 수지의 혼합물로된 것이다.The base filler resin mortar (P) is a mixture of sand and resin.
상기 제3공정에서 도 3과 같이 높이조절재는 맨홀뚜껑 받침대(20)의 하부플랜지(21)의 하단에 설치되며 외측단에 접촉되게 일측에 측벽(42)과 중앙에 나사공(46)이 관통된 수평받침편(44)을 갖는 형상으로 이루어진 너트브라켓(40)과, 상기 하부플랜지(21)에 형성된 고정공(21a)에서 상기 너트브라켓(40)의 나사공(46)에 나사 결합하는 조절볼트(50)를 이용하여 맨홀뚜껑 받침대(20)의 높이를 조절할 수 있는 것이다.In the third process, as shown in FIG. 3, the height adjusting material is installed at the lower end of the
제 제5공정 후 상기 맨홀뚜껑 받침대(20)의 하부플랜지(21)와 맨홀슬라브(10) 상면 사이의 측방 개구부(S)에 위치되도록 상기 맨홀뚜껑 받침대(20)의 내부에 링형상의 탄성팩커(72)를 설치하는 공정을 더 포함하며, 상기 탄성팩커(72)의 내측에는 통형상의 팩커드럼(70)이 결합된 것이다.Ring-shaped elastic packer inside the
도 10은 본 발명의 제 3 실시예의 단면도로서, 이를 상세히 설명하면 하기와 같다.10 is a cross-sectional view of a third embodiment of the present invention, which will be described in detail below.
맨홀뚜껑(22)이 얹혀져서 지중에 매설되는 맨홀뚜껑 받침대(20)의 인상높이를 조절하여 맨홀의 높이를 도로 노면과 일치되도록 조절하는 맨홀인상보수공법에 있어서,In the manhole lift repair method to adjust the height of the manhole to match the road surface by adjusting the height of the
상기 맨홀뚜껑 받침대(20) 주위의 도로층을 집진 장치가 부착된 노면 커터기를 사용하여 노면을 절단하는 제1공정과, 상기 커터기에 의해 커팅된 부분의 노면을 굴착제거 하는 제2공정과, 상기 맨홀뚜껑 받침대(20)의 상단부를 도로 노면과 일치시키기 위해 맨홀뚜껑 받침대(20)의 상부에 위치되게 노면에 높이확인용 스탠드(60)를 설치하고 상기 높이확인용 스탠드(60)에 설치된 결합볼트(63) 하측에 연결고리(67)를 연결하여 맨홀뚜껑 받침대(20)의 하부플랜지(21) 하단에 연결고리가 걸리게 설치하는 제3공정과, 상기 높이확인용 스탠드(60)의 결합볼트(63)를 상부에서 너트(65)를 조여 맨홀뚜껑 받침대(20)의 상단부가 높이확인용 스탠드(60)의 밑면과 접촉되어 도로 노면과 일치하도록 높이를 조절하는 제4공정과, 상기 맨홀뚜껑 받침대(20)의 하부플랜지(21)와 맨홀슬라브(10) 상면 사이의 측방 개구부(S)에 위치되도록 상기 맨홀뚜껑 받침대(20)의 내부에 내측이 통형상의 팩커드럼(70)이 결합된 링형상의 탄성팩커(72)를 설치하는 제5공정과, 상기 맨홀뚜껑 받침대(20) 주위의 굴착된 공간부에 기초 채움재(A)을 타설하여 경화시키는 제6공정과, 상기 높이확인용 스탠드(60)의 결합볼트(63)와 연결고리(65)의 결합핀(69)을 분리하고 나서 상기 기초 채움재(A)의 상부에 노면 채움재(B)를 도로 노면과 동일 높이로 타설하여 경화시키는 제7공정으로 이루어진 것이다.A first step of cutting the road surface using a road cutter equipped with a dust collecting device on the road layer around the
상기 기초 채움재(A)는 초속경몰탈 이고, 상기 노면 채움재(B)는 초속경 콘크리트인 것이다.The base filling material (A) is a super speed mortar, and the road surface filling material (B) is super fast concrete.
상기 기초 채움재(A)는 수지 몰탈 이고, 상기 노면 채움재(B)는 초속경 콘크리트인 것이다.The base filling material (A) is a resin mortar, and the road surface filling material (B) is superhard concrete.
상기 기초 채움재(A)는 초속경몰탈 이고, 상기 노면 채움재(B)는 수지콘크리트(상온아스콘)인 것이다.The base filling material (A) is ultrafast mortar, and the road surface filling material (B) is a resin concrete (room temperature ascon).
상기 기초 채움재(A)는 수지 몰탈 이고, 상기 노면 채움재(B)는 수지콘크리 트(상온아스콘)인 것이다.The base filling material (A) is a resin mortar, the road surface filling material (B) is a resin concrete (room temperature ascon).
상기 높이 확인용 스탠드(60)는 맨홀 인상 작업시 도로의 굴착된 절단면 외측까지 걸쳐지며, 직선 형태의 수평대(64)의 맨홀틀의 상부면과 접촉되는 위치에는 수개의 수직으로 홀을 형성하며, 상기 홀에는 하측에 핀홀이 형성된 결합볼트(63)을 끼워 상부에서 너트(65)가 결합되고, 상기 결합볼트(63)의 하측 핀홀에는 절곡된 연결고리(67)의 상측과 핀홀을 통해 결합핀(69)으로 결합되고, 상기 연결고리(67)는 맨홀뚜껑 받침대(20)의 하부플랜지(21) 하단에 걸리게 설치하는 것이다.The
상기 제1공정은 커터기에 의해 맨홀커버 받침대(20)의 주위를 절단하여 제거하는 공정이다. 이러한 커터기는 고속으로 회전함과 동시에 공전하는 커팅날과 집진기를 갖는 건식의 노면 커터기이다,The first step is a step of cutting and removing the periphery of the
상기 제2공정은 맨홀커버 받침대(20)의 주위를 커팅한 상태에서 유압 브레이커(미도시)를 이용하여 커팅 부분의 포장재를 굴착하여 제거한다.The second step is to excavate and remove the packaging material of the cutting portion using a hydraulic breaker (not shown) in the state of cutting around the
상기 제3공정에서 높이 확인용 스탠드(60)는 원형링체의 둘레부에 방사 방향 외측으로 돌출된 복수개의 수평대(64)를 갖는 형상으로 구성된다. 바람직하게, 수평대(64)는 삼각형을 이루도록 원형링체의 둘레부에 세 방향으로 돌출된다. 이러한 수평대(64)는 맨홀 인상 작업시 도로의 굴착된 절단면 외측까지 걸쳐진다.In the third process, the
상기 높이 확인용 스탠드(60)의 수평대(64)에는 각각 수직으로 홀을 형성하며, 상기 홀에는 하측에 핀홀이 형성된 결합볼트(63)을 끼워 상부에서 너트(65)가 결합된 것이다. The
상기 결합볼트(63)의 하측 핀홀에는 절곡된 연결고리(67)의 상측과 핀홀을 통해 결합핀(69)로 결합하는 것이다. 이때 연결고리(67)는 맨홀뚜껑 받침대(20)의 하부플랜지(21) 하단에 걸리게 설치한다.The lower pinhole of the
상기와 같은 상태에서 제 4공정과 같이 상기 높이 확인용 스탠드(60)의 수평대(64)에 설치된 결합볼트(63)의 상측 너트(65)를 조이게 되면 너트(65)의 조임에 의해 결합볼트(63)가 상향으로 이동되면서 하측에 연결된 연결고리(67)도 상향으로 이동하게 된다. 이때 연결고리(67)가 맨홀뚜껑 받침대(20)의 하부플랜지(21)하단에 걸려 있어 맨홀뚜껑 받침대(20)도 같이 상향으로 이동한다.When the
이때 높이확인용 스탠드(60)의 하단에 맨홀뚜껑 받침대(20)가 맞닿게 되면 맨홀뚜껑 받침대(20)의 상단부의 높이가 도로의 노면과 일치하게 되는 것이다.At this time, if the
상기 제5공정에서 맨홀뚜껑 받침대(20)의 하부플랜지(21)와 맨홀슬라브(10) 상면 사이의 측방 개구부(S)에 위치되도록 상기 맨홀뚜껑 받침대(20)의 내부에 링형상의 탄성팩커(72)를 설치하하며, 상기 탄성팩커(72)의 내측에는 통형상의 팩커드럼(70)이 결합된 것이다.In the fifth process, a ring-shaped elastic packer inside the
상기 탄성팩커(72)는 맨홀뚜껑 받침대(20)의 내부 출입구(23) 형상과 대응되는 링형상으로 구성되며, 탄성팩커(72)의 내측에는 원통형상의 팩커드럼(70)이 결합된다. 그리고, 부호 73은 탄성팩커(72)의 내부에 압축공기를 주입하는 공기주입노즐이다.The
이러한 공정에 의하면, 탄성팩커(72)에 형성된 공기주입노즐(73)을 통하여 압축공기를 주입하여 탄성팩커(72)가 팽창시켜서 맨홀커버 받침대의 하단부와 맨홀슬라브 사이의 공간부(S) 측면을 빈틈없이 막아 주는 것이다.According to this process, the compressed air is injected through the
제6공정에서 상기 맨홀뚜껑 받침대(20) 주위의 굴착된 공간부에 기초 채움재(A)을 타설하여 경화시키다. 제7공정에서 상기 높이확인용 스탠드(60)의 결합볼트(63)와 연결고리(65)의 결합핀(69)을 분리하고 나서 상기 기초 채움재(A)의 상부에 노면 채움재(B)를 도로 노면과 동일 높이로 타설하여 경화시켜 이루지는 것이다.In the sixth step, the base filling material A is poured into the excavated space around the
이상에서 설명한 본 발명은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것이 아니고, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 변형 및 변경이 가능하다는 점이 이 분야의 통상의 지식을 가진 자에게 명백할 것이다.The present invention described above is not limited to the above-described embodiments and the accompanying drawings, and various permutations, modifications, and changes can be made without departing from the spirit of the present invention. It will be apparent to those who have it.
이상에서와 같은 본 발명은 첫째, 기존 공법의 높이조절링이나 높이 조절용 스프링을 맨홀 뚜껑받침의 밑에 설치하기 위해서 중량물인 맨홀 뚜껑받침을 노면 위로 들어 올려야하는 위험한 공정이 생략되어, 안전하게 작업을 할 수 있는 효과가 있다. 또한, 둘째, 규격화된 높이 조절링을 사용할 때와 달리 3개의 지점에서 높이 조절볼트를 각각 체결하여 높이를 조절함으로써 도로면의 경사 정도에 전혀 제한 없이 안전하면서도 간단하게 맨홀을 도로 경사면에 정확하게 일치되게 맞출 수 있다.The present invention as described above, first, to eliminate the dangerous process of lifting the heavy manhole cover of the heavy weight on the road surface in order to install the height adjustment ring or height adjustment spring of the existing method under the manhole cover, it can be safely operated It has an effect. Second, unlike when using the standardized height adjustment ring, the height adjustment bolts are fastened to each other at three points to adjust the height so that the manhole is accurately and accurately matched to the road slope without any limitation on the degree of inclination of the road surface. Can be adjusted.
셋째, 높이조절재의 너트브라켓과 높이 조절볼트에 의해 손쉽게 맨홀뚜껑 받침대를 위로 떠받쳐 올려 맨홀을 도로 경사면에 정확하게 일치되게 맞추고 맨홀슬 라브 사이의 공간에 고유동성의 무수축 기초 채움재 초속경 몰탈(M) 또는 수지 몰탈(P) 타설하여 경화시키는 공정에서 거푸집 대용 탄성팩커를 사용하여 채움재의 누출을 완전히 차단하여 빈틈이 없는 하부 몰탈층을 형성하기 때문에, 맨홀뚜껑 받침대가 맨홀슬라브와 완전히 일체화가 되어 시공 완료 후의 맨홀 위의 통행 차량의 충격하중 및 진동에도 충분히 견딜 수 있도록 견고하게 고정되며, 이로 인해, 내구성이 향상되는 효과가 있다. Third, the manhole cover is easily lifted up by the nut bracket of the height adjusting material and the height adjusting bolt to align the manhole exactly on the slope of the road, and the highly flexible non-shrinkable base filler super mortar in the space between the manhole slabs (M) In the process of pouring and curing resin mortar (P), the mold substitute elastic packer is used to completely block the leakage of the filling material to form a lower mortar layer without gap, so the manhole cover base is completely integrated with the manhole slab It is firmly fixed to withstand the shock load and vibration of the traffic vehicle on the manhole after completion, thereby improving the durability.
넷째, 높이확인용 스탠드를 맨홀뚜껑 받침대의 바로 위에서 도로의 절단면 외측까지 걸쳐지게 설치하고 1인의 작업자가 높이 조절볼트를 체결하면서 높이 확인부를 통하여 맨홀뚜껑 받침대의 인상 과정을 육안으로 쉽게 확인할 수 있으므로, 1인의 작업자라 해도 맨홀 인상 작업을 매우 손쉬우면서도 정밀하게 수행할 수 있는 효과가 있다.Fourth, the height checking stand is installed so as to extend from the top of the manhole cover to the outside of the cut surface of the road, and one worker can easily check the lifting process of the manhole cover through the height checking part while tightening the height adjustment bolt. Even one worker has the effect of making manhole raising work very easy and precise.
다섯째, 맨홀인상보수에서 맨홀뚜껑 받침대 주위의 굴착된 공간부에 기초 채움재 초속경 몰탈(M)을 타설하여 경화시키고, 상기 기초 채움재 초속경 몰탈(M)의 상부에 노면 채움재 수지 콘크리트(상온아스콘)(C)를 도로 노면과 동일 높이로 타설하여 경화시켜 사용할 수 있는 효과가 있다.Fifth, the base filler material mortar (M) is poured into the excavated space around the manhole cover base in the manhole enhancement repair, and hardened, and the road surface filler resin concrete (room temperature ascon) on top of the base filler material mortar (M). There is an effect that can be used by curing (C) to the same height as the road surface.
여섯째, 맨홀인상보수에서 맨홀뚜껑 받침대 주위의 굴착된 공간부에 기초 채움재 수지 몰탈(P)을 타설하여 경화시키고, 상기 기초 채움재 초속경 몰탈(P)의 상부에 노면 채움재 수지 콘크리트(상온아스콘)(C)를 도로 노면과 동일 높이로 타설하여 경화시켜 사용할 수 있는 효과가 있다.Sixth, the base filler resin mortar (P) is poured into the excavated space around the manhole cover base in the manhole enhancement repair, and hardened, and the road filler material concrete (room temperature ascon) on the top of the base filler cement mortar (P) ( C) can be used to harden by pouring the same height as the road surface.
Claims (13)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070067851A KR100869969B1 (en) | 2007-07-06 | 2007-07-06 | Manhole repair method |
CNA2007101637799A CN101338568A (en) | 2007-07-06 | 2007-11-01 | upper maintenance method for overhauling well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070067851A KR100869969B1 (en) | 2007-07-06 | 2007-07-06 | Manhole repair method |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100869969B1 true KR100869969B1 (en) | 2008-11-21 |
Family
ID=40212726
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070067851A KR100869969B1 (en) | 2007-07-06 | 2007-07-06 | Manhole repair method |
Country Status (2)
Country | Link |
---|---|
KR (1) | KR100869969B1 (en) |
CN (1) | CN101338568A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101279152B1 (en) | 2013-05-06 | 2013-06-26 | (주)드림이앤지 | Manhole repair device and repair method by using manhole repair device |
KR101302454B1 (en) | 2013-07-09 | 2013-09-02 | (주)드림이앤지 | Manhole repair device and repair method by using manhole repair device |
KR101417834B1 (en) * | 2014-01-27 | 2014-07-09 | 민원 | Method for Rehabilitatian of Manhole |
KR101561969B1 (en) * | 2014-03-11 | 2015-10-20 | 태평림건설 주식회사 | A cast for the repair work of a manhole |
KR20150142303A (en) | 2014-06-11 | 2015-12-22 | 김해영 | Raise the pressure bag to using tube manhole structures and methods |
CN107130677A (en) * | 2017-05-26 | 2017-09-05 | 广州展亚土木工程技术有限公司 | A kind of well lid quick maintenance method |
KR102101268B1 (en) * | 2020-02-04 | 2020-04-16 | 신흥이엔지 주식회사 | Packing device installed in the manhole housing |
KR102101269B1 (en) * | 2020-02-11 | 2020-04-16 | 신흥이엔지 주식회사 | Manhole repair method using packing device installed in manhole housing |
CN112047707A (en) * | 2020-09-15 | 2020-12-08 | 江西龙正科技发展有限公司 | Municipal RPC floor tile cover plate and preparation method thereof |
CN112047696A (en) * | 2020-09-15 | 2020-12-08 | 江西龙正科技发展有限公司 | Tunnel cable trench RPC cover plate and preparation method thereof |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102720212B (en) * | 2012-06-11 | 2015-12-09 | 贵阳市云岩区市政工程管理所 | A kind of method of quick-replaceable highway inspection well cover base and structure |
CN108502824B (en) * | 2018-04-16 | 2019-09-03 | 安徽瑞瑶环保科技有限公司 | A kind of dedicated upper downhole device of inspection shaft |
CN109826235B (en) * | 2019-03-05 | 2024-04-09 | 湖北乾奥建设工程有限公司 | Replacement method for municipal well lid mounting frame |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040033551A (en) * | 2002-10-15 | 2004-04-28 | 황의철 | Execution method for repairing manhole and manhole structure repaired by the same execution method |
KR100661049B1 (en) * | 2006-01-23 | 2006-12-22 | (주)우암건설 | Manhole height adjustment device and manhole repair construction method utilizing manhole height adjustment method |
KR100718513B1 (en) | 2006-11-13 | 2007-05-16 | (주)우암건설 | Water collection implement pull-up device and repair method utilizing the same |
KR100773122B1 (en) | 2006-07-11 | 2007-11-02 | (주)우암건설 | Manhole repair method |
-
2007
- 2007-07-06 KR KR1020070067851A patent/KR100869969B1/en active IP Right Grant
- 2007-11-01 CN CNA2007101637799A patent/CN101338568A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040033551A (en) * | 2002-10-15 | 2004-04-28 | 황의철 | Execution method for repairing manhole and manhole structure repaired by the same execution method |
KR100661049B1 (en) * | 2006-01-23 | 2006-12-22 | (주)우암건설 | Manhole height adjustment device and manhole repair construction method utilizing manhole height adjustment method |
KR100773122B1 (en) | 2006-07-11 | 2007-11-02 | (주)우암건설 | Manhole repair method |
KR100718513B1 (en) | 2006-11-13 | 2007-05-16 | (주)우암건설 | Water collection implement pull-up device and repair method utilizing the same |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101279152B1 (en) | 2013-05-06 | 2013-06-26 | (주)드림이앤지 | Manhole repair device and repair method by using manhole repair device |
KR101302454B1 (en) | 2013-07-09 | 2013-09-02 | (주)드림이앤지 | Manhole repair device and repair method by using manhole repair device |
KR101417834B1 (en) * | 2014-01-27 | 2014-07-09 | 민원 | Method for Rehabilitatian of Manhole |
KR101561969B1 (en) * | 2014-03-11 | 2015-10-20 | 태평림건설 주식회사 | A cast for the repair work of a manhole |
KR20150142303A (en) | 2014-06-11 | 2015-12-22 | 김해영 | Raise the pressure bag to using tube manhole structures and methods |
CN107130677A (en) * | 2017-05-26 | 2017-09-05 | 广州展亚土木工程技术有限公司 | A kind of well lid quick maintenance method |
KR102101268B1 (en) * | 2020-02-04 | 2020-04-16 | 신흥이엔지 주식회사 | Packing device installed in the manhole housing |
KR102101269B1 (en) * | 2020-02-11 | 2020-04-16 | 신흥이엔지 주식회사 | Manhole repair method using packing device installed in manhole housing |
CN112047707A (en) * | 2020-09-15 | 2020-12-08 | 江西龙正科技发展有限公司 | Municipal RPC floor tile cover plate and preparation method thereof |
CN112047696A (en) * | 2020-09-15 | 2020-12-08 | 江西龙正科技发展有限公司 | Tunnel cable trench RPC cover plate and preparation method thereof |
CN112047696B (en) * | 2020-09-15 | 2022-04-26 | 江西龙正科技发展有限公司 | Tunnel cable trench RPC cover plate and preparation method thereof |
CN112047707B (en) * | 2020-09-15 | 2022-07-15 | 江西龙正科技发展有限公司 | Municipal RPC floor tile cover plate and preparation method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN101338568A (en) | 2009-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100869969B1 (en) | Manhole repair method | |
KR100773122B1 (en) | Manhole repair method | |
KR100661049B1 (en) | Manhole height adjustment device and manhole repair construction method utilizing manhole height adjustment method | |
US8875471B2 (en) | Method and apparatus for lifting and leveling a concrete panel | |
KR101544988B1 (en) | Precast concrete panel and its manufacturing and paving method using the same | |
US20150167260A1 (en) | Method and apparatus for lifting and securing a concrete panel in place above a road bed | |
US4536103A (en) | Adjustable manhole frame and method of construction and installation | |
US5318376A (en) | Manhole frame | |
KR101279152B1 (en) | Manhole repair device and repair method by using manhole repair device | |
KR101732670B1 (en) | Manhole mending device and conctruction method thereof | |
CN112144342A (en) | Damaged pavement repairing plate structure and repairing method | |
KR100966639B1 (en) | Manhole repair method | |
KR101125089B1 (en) | Construction of manholes method | |
KR102358264B1 (en) | Apparatus for adjusting iron lid and manhole construction method using the same | |
EP3394346B1 (en) | Adapter | |
KR100374540B1 (en) | Method of Manhole Repair and Used the Method of Equipment | |
KR200316568Y1 (en) | Device for installation of manhole housing | |
KR100959402B1 (en) | The manhole which a height control of the lid is possible | |
CA1204317A (en) | Adjustable manhole frame and method of construction and installation | |
KR101756965B1 (en) | Height adjusting type maintanable rail track construction method and maintanance method using the same | |
CN220565274U (en) | Cutting leveling type inspection well cover assembly | |
JP2004332522A (en) | Overlay construction method, cutting overlay construction method, and paving construction method | |
CN110359493B (en) | Construction method for integrally pouring and rapidly installing and detaching lifting die system of inspection well curb | |
KR101252656B1 (en) | Apparatus adjustable level of the manhole cover assembly and construction method of the same | |
KR100881438B1 (en) | Manhole repairing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121115 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20131106 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20141017 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20151117 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20161116 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20200129 Year of fee payment: 12 |