KR102176457B1 - Soil nailing Device and soil nailing method using the same - Google Patents

Soil nailing Device and soil nailing method using the same Download PDF

Info

Publication number
KR102176457B1
KR102176457B1 KR1020180026179A KR20180026179A KR102176457B1 KR 102176457 B1 KR102176457 B1 KR 102176457B1 KR 1020180026179 A KR1020180026179 A KR 1020180026179A KR 20180026179 A KR20180026179 A KR 20180026179A KR 102176457 B1 KR102176457 B1 KR 102176457B1
Authority
KR
South Korea
Prior art keywords
nail
hole
grout material
packer
soil
Prior art date
Application number
KR1020180026179A
Other languages
Korean (ko)
Other versions
KR20190105735A (en
Inventor
문승정
Original Assignee
주식회사동림이엔지
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사동림이엔지 filed Critical 주식회사동림이엔지
Priority to KR1020180026179A priority Critical patent/KR102176457B1/en
Publication of KR20190105735A publication Critical patent/KR20190105735A/en
Application granted granted Critical
Publication of KR102176457B1 publication Critical patent/KR102176457B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/808Ground anchors anchored by using exclusively a bonding material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Abstract

본 발명은 소일 네일 장치 및 이를 이용한 소일네일링 공법에 관한 것으로, 보다 상세하게는 사면의 천공홀 내부로 네일을 삽입한 상태에서 천공홀의 최내측에서 네일의 말단부에 결합된 정착구를 통해 네일에 인발저항력을 높일 수 있도록 함으로써 견고한 시공이 가능하고, 그라우팅 작업시 주입관 및 배출관이 찌그러지거나 꺾이는 등의 현상을 방지함으로써 그라우팅 작업의 품질을 높일 수 있는 소일 네일 장치 및 이를 이용한 소일네일링 공법에 관한 것이다.
본 발명에 따른 소일 네일 장치는, 사면에 천공된 천공홀에 삽입된 네일을 고정시키도록 주입관을 통해 그라우트재를 충진하는 소일 네일 장치에 있어서, 상기 천공홀의 내부를 따라 길게 삽입되기 위한 네일과; 상기 네일이 상기 천공홀에 삽입된 경우 상기 천공홀의 내부 입구 부분에 배치되어 내부에 공급되는 그라우트재의 주입에 따라 팽창되어 상기 천공홀의 내벽을 가압하도록 상기 네일과 체결되어 고정되는 패커와; 외부에서 상기 패커의 내부와 상기 천공홀 내부 일정 깊이로 그라우트재를 충진할 수 있고, 상기 천공홀 내부에 그라우트재가 가득 채워지는 경우 채워진 그라우트재 일부가 외부로 오버플로우 되도록 하는 복수의 그라우팅 파이프와; 상기 네일의 길이방향 일측 말단부에 나사 결합될 수 있는 나사결합부가 형성되고, 길이방향으로 다수의 요철이 일정 간격으로 형성된 정착구와; 상기 천공홀의 입구 부분을 개폐하도록 상기 네일에 삽입된 상태에서 체결수단을 통해 가압되며 상기 정착구에 인장력을 가하는 지압판을; 포함하는 것을 특징으로 한다.
또한, 본 발명에 따른 소일네일링 공법은, 소일네일링 공법으로서, (a) 지반을 굴착하여 천공홀을 형성하는 단계와; (b) 상기 천공홀의 입구 부분에서 가압식으로 팽창할 수 있도록 상기 네일의 길이 방향을 따라 소정 위치에 패커를 배치하고, 상기 패커의 내부공간으로 그라우트재를 충진할 수 있는 1차 주입관, 상기 천공홀의 내부 일정 깊이로 그라우트재를 충진할 수 있는 2차 주입관 및 외부에서 상기 패커의 내측 공간을 통과하여 상기 천공홀 내부로 연장된 배출관을 각각 네일과 나란하게 배치하여 소일 네일 장치의 체결을 준비하는 단계와; (c) 네일의 길이방향을 따라 중공형의 호스보호관 다수개를 일정 간격으로 배치하여 상기 1차 주입관, 2차 주입관 및 상기 배출관이 상기 다수개의 호스보호관을 따라 일정 간격으로 연속되게 끼워지며 상기 네일과 나란하게 연장된 상태에서 상기 1차 주입관, 2차 주입관 및 상기 배출관 각각을 상기 호스보호관을 매개로 네일에 일체로 체결하여 고정시키는 단계와; (d) 상기 패커의 양단부를 상기 호스보호관을 매개로 상기 주입관 및 배출관과 일체로 네일에 고정시켜 소일 네일 장치를 준비하는 단계와; (e) 상기 소일 네일 장치를 상기 천공홀에 삽입하는 단계와; (f) 상기 1차 주입관을 통해 상기 패커 내부로 그라우트재를 공급하여 상기 패커가 팽창하면서 상기 천공홀의 천공 면을 가압하는 단계와; (g) 상기 2차 주입관을 통해 상기 천공홀 내부 일정 깊이로 그라우트재를 공급하여 상기 배출관으로 그라우트재가 오버플로우하는 경우 지압판을 천공홀 입구 지반에 압착시키면서 네일을 지압판에 고정시키는 단계를; 포함하는 것을 특징으로 한다.
The present invention relates to a soil nail device and a soil nailing method using the same, and more particularly, in a state in which the nail is inserted into the drilled hole on the slope, and drawn to the nail through a fixing unit coupled to the distal end of the nail from the innermost side of the drilled hole The present invention relates to a soil nail device capable of enhancing the quality of grouting by preventing phenomena such as crushing or bending of the injection pipe and discharge pipe during grouting, and a soil nailing method using the same. .
In the soil nail device according to the present invention, in the soil nail device filling a grout material through an injection pipe to fix a nail inserted into a perforated hole drilled on a slope, a nail for long insertion along the inside of the perforated hole and ; A packer that is disposed at the inner inlet of the perforated hole when the nail is inserted into the perforated hole and is expanded according to the injection of the grout material supplied therein to press the inner wall of the perforated hole. A plurality of grouting pipes capable of filling the grout material from the outside to a predetermined depth inside the packer and inside the perforation hole, and allowing a part of the filled grout material to overflow to the outside when the grout material is filled inside the perforated hole; A fixing tool having a screw coupling portion that can be screwed to one end portion in the length direction of the nail, and a plurality of irregularities formed at regular intervals in the length direction; An acupressure plate that is pressed through a fastening means while being inserted into the nail so as to open and close the inlet portion of the perforated hole and applies a tensile force to the anchorage; It characterized in that it includes.
In addition, the soil nailing method according to the present invention comprises the steps of: (a) forming a perforated hole by excavating the ground; (b) a first injection pipe capable of placing a packer in a predetermined position along the length direction of the nail so that it can be expanded in a pressurized manner at the inlet of the perforation hole, and filling the grout material into the inner space of the packer, A secondary injection pipe capable of filling the grout material to a certain depth inside the hole and a discharge pipe extending into the perforated hole through the inner space of the packer from the outside are arranged in parallel with the nail to prepare for fastening of the soil nail device. And; (c) A plurality of hollow hose protection tubes are arranged at regular intervals along the longitudinal direction of the nail, so that the primary injection tube, the secondary injection tube and the discharge tube are continuously inserted at regular intervals along the plurality of hose protection tubes. A step of integrally fastening and fixing each of the primary injection pipe, the secondary injection pipe, and the discharge pipe to the nail via the hose protection pipe while extending parallel to the nail; (d) preparing a soil nail device by fixing both ends of the packer to the nail integrally with the injection pipe and the discharge pipe via the hose protection pipe; (e) inserting the soil nail device into the perforation hole; (f) supplying a grout material into the packer through the primary injection tube to expand the packer and press the perforated surface of the perforated hole; (g) supplying the grout material to a predetermined depth inside the perforated hole through the secondary injection pipe and fixing the nail to the pressure plate while pressing the pressure plate to the ground at the entrance of the perforation hole when the grout material overflows to the discharge pipe; It characterized in that it includes.

Description

소일 네일 장치 및 이를 이용한 소일네일링 공법{Soil nailing Device and soil nailing method using the same}Soil nailing device and soil nailing method using the same

본 발명은 소일 네일 장치 및 이를 이용한 소일네일링 공법에 관한 것으로, 보다 상세하게는 사면의 천공홀 내부로 네일을 삽입한 상태에서 천공홀의 최내측에서 네일의 말단부에 결합된 정착구를 통해 네일에 인발저항력을 높일 수 있도록 함으로써 견고한 시공이 가능하고, 그라우팅 작업시 주입관 및 배출관이 찌그러지거나 꺾이는 등의 현상을 방지함으로써 그라우팅 작업의 품질을 높일 수 있는 소일 네일 장치 및 이를 이용한 소일네일링 공법에 관한 것이다.The present invention relates to a soil nail device and a soil nailing method using the same, and more particularly, in a state in which the nail is inserted into the drilled hole on the slope, and drawn to the nail through a fixing unit coupled to the distal end of the nail from the innermost side of the drilled hole The present invention relates to a soil nail device capable of enhancing the quality of grouting by preventing phenomena such as crushing or bending of the injection pipe and discharge pipe during grouting, and a soil nailing method using the same. .

소일네일링 공법은 소일네일의 전단저항을 이용하는 공법으로서, 사면 등의 지반에 소일네일을 비교적 촘촘한 간격으로 복수 설치하여 지반 자체의 전체적인 전단강도를 증대시키고, 또한 공사도중 및 공사 완료 후에 예상되는 지반의 변위를 억제하는데 많이 이용된다.Soil nailing method is a method that uses the shear resistance of the soil nails, and increases the overall shear strength of the ground itself by installing a plurality of soil nails at relatively tight intervals on the ground, such as slopes, and the expected ground during and after construction It is widely used to suppress the displacement of.

소일네일링 공법은 통상적으로 널리 이용되고 있는 굴착지보 구조물과 비교해 볼 때 다음과 같은 특성을 지니고 있다.The soil nailing method has the following characteristics when compared to the commonly used excavation support structures.

첫째, 원지반 자체를 주된 구조적 요소로 이용하고 있어 가시설 비용이 들지 않으며 건물외벽과 합벽시공이 가능하여 거푸집 및 되메우기 작업이 생략된다. 그 밖의 주요소인 네일도 상대적으로 가격이 저렴하다. 또한 쇼크리트와 전면판도 단지 전면에 존재하여 흙의 붕괴를 방지하기 위한 국부적인 역할을 수행하므로 두께가 상대적으로 얇아 경제적이다.First, since the original ground itself is used as the main structural element, there is no temporary facility cost, and the exterior wall and the combined wall construction are possible, so that the formwork and backfill work are omitted. The other major element, nail, is also relatively inexpensive. In addition, shockcrete and front plate are also present on the front side of the complex and play a local role to prevent the collapse of the soil, so it is relatively thin and economical.

둘째, 소일네일링은 간단한 천공 및 그라우팅 장비로 시공이 가능하다.Second, soil nailing can be constructed with simple drilling and grouting equipment.

셋째, 상부에서 하부로 지반굴착과 병행하여 작업이 이루어지므로 설계시와 상이한 지층특성이 나타날 경우 즉각적으로 네일의 설치간격과 길이 등을 조정이 가능하므로 현장적응성이 뛰어나다.Third, since the work is carried out in parallel with the ground excavation from the top to the bottom, if the stratum characteristics different from the design time appear, it is possible to immediately adjust the installation spacing and length of the nail, so the site adaptability is excellent.

넷째, 네일이 설치되어 있는 하나하나가 블록형태로 외압에 대해 지지토록 되어 있으므로, 주변지반의 거동에 적절하게 대응되게 된다. 특히, 수직 및 부등침하에 효과적이므로, 지진이 자주 발생되는 지역에서도 매우 적합한 공법을 보고되고 있다.Fourth, since each of the nails is installed in a block form to support external pressure, it is appropriate to the behavior of the surrounding ground. In particular, since it is effective for vertical and differential settlement, a very suitable construction method has been reported even in areas where earthquakes occur frequently.

한편, 소일네일링 공법은 중력식 공법과 가압식 공법으로 구분된다. 상기 중력식 공법은 몰탈(M)을 홀(H)에 단순 주입해서 양생하는 방법이고, 상기 가압식 공법은 몰탈(M)을 홀(H)에 강제로 밀어넣어 주입 및 양생하는 방법이다.On the other hand, the soil nailing method is divided into a gravity method and a pressurization method. The gravity method is a method of simply injecting mortar (M) into the hole (H) for curing, and the pressurizing method is a method of injecting and curing by forcibly pushing the mortar (M) into the hole (H).

이를 좀더 구체적으로 설명하면, 소일네일링 공법이 적용되는 사면(S)에 네일(11)을 삽입할 홀(H)을 천공하고, 네일(11)을 삽입한 후 패커(12)를 이용해 홀(H)의 선단을 폐구한다. 이렇게 폐구된 홀(H)에 몰탈(M)을 주입하고, 이를 양생한다.To explain this in more detail, a hole (H) into which the nail 11 is to be inserted is drilled in the slope (S) to which the soil nailing method is applied, and after inserting the nail 11, the hole ( Close the tip of H). In this way, mortar (M) is injected into the closed hole (H), and it is cured.

한편, 가압식 공법에 의한 몰탈(M) 주입은 고압으로 몰탈(M)을 공급하는 몰탈공급수단에 의해 몰탈(M)을 홀(H)에 주입하므로, 몰탈(M)과 홀(H) 간의 결속이 견고해지는 효과가 있다.On the other hand, in the injection of mortar (M) by the pressurized method, since the mortar (M) is injected into the hole (H) by the mortar supply means that supplies the mortar (M) at high pressure, the binding between the mortar (M) and the hole (H) This has the effect of strengthening.

또한, 가압식 공법을 사면(S) 보강에 적용하기 위해서는 몰탈공급수단이 가하는 압력에 저항해 홀(H)의 폐구 상태를 유지할 수 있는 고효율 패커가 요구된다.In addition, in order to apply the pressurized method to the reinforcement of the slope (S), a highly efficient packer capable of maintaining the closed state of the hole (H) is required by resisting the pressure applied by the mortar supply means.

이에, 종래에는 상기와 같은 가압식 공법을 적용한 기술이 일부 개시되어 있는데, 일예로 대한민국 등록특허공보 제10-1815320호(2017.12.28 등록) "원스텝 전 구간 일시 주입형 쏘일 네일링 장치 및 공법"과 같은 기술에서는 내측에 폐쇄된 공간을 형성한 패커를 다수개 설치하여 외부로부터 내측으로 공급되는 그라우트재의 주입에 따라 팽창하면서 인서트홀의 내벽을 가압하도록 함으로써 인서트홀의 뼈대를 견고하게 하고, 인서트홀 전 구간에 한꺼번에 그라우트재를 주입하여 지반으로부터 인서트홀에 물기가 스며들기 전에 지반의 크랩 부분으로 그라우트재가 스며들어 경화되도록 하는 기술이 개시되어 있다.Thus, in the related art, some techniques to which the above-described pressurization method is applied have been disclosed. For example, Korean Patent Publication No. 10-1815320 (registered on Dec. 28, 2017) "one-step temporary injection type soil nailing device and method" and In the same technology, a plurality of packers forming a closed space inside are installed to expand and pressurize the inner wall of the insert hole according to the injection of the grout material supplied from the outside to the inside, thereby strengthening the frame of the insert hole. A technique is disclosed in which a grout material is injected into the ground so that the grout material permeates and hardens into a crab portion of the ground before moisture permeates the insert hole from the ground.

한편, 종래의 쏘일네일링 공법에서는 그라우트재를 충진하는 과정에서 그라우트재의 안정적인 공급을 위해 주입관과 배출관 등을 일자로 길게 배치되도록 한 상태에서 체결부재를 이용하여 네일 등에 고정된 상태가 유지되어야 하는데, 상기와 같은 종래의 패커를 이용한 가압식 공법에서와 같이 코킹주입관과 홀주입관을 별도로 고정하지 않은 상태에서 그라우팅 충진 작업을 하는 경우 내부에서 관들이 유동하여 인서트홀 내에 공기의 발생이 많아지고, 그라우트재가 균일하게 충진되지 못하게 되는 등의 문제가 있었던 것이다.On the other hand, in the conventional soil nailing method, in the process of filling the grout material, the injection pipe and the discharge pipe are arranged in a long straight line for a stable supply of the grout material, and the state fixed to the nail using a fastening member must be maintained. , In the case of grouting filling operation without separately fixing the caulking injection pipe and the hole injection pipe as in the conventional pressurization method using a packer as described above, the pipes flow inside and the generation of air in the insert hole increases, There was a problem such as that the grout material could not be filled evenly.

또한, 종래에는 그라우트재의 주입호스나 배출관이 연질의 투명 고무 재질이나 수지로 형성되어 있는데, 이와 같은 주입호스나 배출관을 네일에 바로 체결하는 경우 주입호스나 배출관이 꺾이거나 찌그러지는 문제로 인해 그라우트재의 공급이 원활하지 못하고, 그로 인한 그라우트재의 경화가 제대로 이루어지지 못하게 되는 등 그라우팅의 품질이 저하되는 문제가 발생되었던 것이다.In addition, conventionally, the injection hose or discharge pipe of the grout material is formed of a soft transparent rubber material or resin. When the injection hose or discharge pipe is directly connected to the nail, the injection hose or discharge pipe is bent or crushed. There was a problem in that the quality of grouting was deteriorated, such as poor supply and the resulting inability to properly harden the grout material.

본 발명은 상기와 같은 문제점을 해결하고자 안출된 것으로, 사면의 천공홀 내부로 네일을 삽입한 상태에서 천공홀의 최내측에서 네일의 말단부에 결합된 정착구를 통해 네일에 인장력을 높일 수 있도록 함으로써 견고한 시공이 가능함과 동시에 그라우팅 시 천공홀의 입구 부분으로 그라우트재가 흘러나오지 않으면서 천공홀 내면과 교란 지반에서 그라우트재가 견고하게 경화되어 그라우트재의 충전 작업이 신속하고 정확하게 진행될 수 있어 그라우팅의 시공 품질 향상으로 옹벽 구축 등에 따른 내구성을 높일 수 있는 소일 네일 장치 및 이를 이용한 소일네일링 공법을 제공하는데에 있다.The present invention was conceived to solve the above problems, and it is possible to increase the tensile force to the nail through the anchorage coupled to the distal end of the nail at the innermost side of the drilling hole while the nail is inserted into the drilling hole on the slope. At the same time, during grouting, the grout material does not flow out to the entrance of the perforated hole, and the grout material is firmly hardened on the inside of the perforated hole and in the disturbing ground, so that the filling of the grout material can proceed quickly and accurately. It is to provide a soil nail device that can increase durability and a soil nailing method using the same.

또한, 본 발명의 다른 목적은, 특히 그라우트재를 공급하는 과정에서 주입관 및 배출관이 찌그러지거나 손상되는 현상을 방지함으로써 그라우팅의 품질이 저하되는 문제를 예방할 수 있는 소일 네일 장치 및 이를 이용한 소일네일링 공법을 제공하는데에 있다.In addition, another object of the present invention is a soil nail device capable of preventing the problem of deteriorating the quality of grouting by preventing the phenomenon that the injection pipe and the discharge pipe are crushed or damaged in the process of supplying a grout material, and a soil nailing device using the same. It is in providing a construction method.

상기와 같은 목적을 달성하기 위하여 본 발명에 따른 소일 네일 장치는, 사면에 천공된 천공홀에 삽입된 네일을 고정시키도록 주입관을 통해 그라우트재를 충진하는 소일 네일 장치에 있어서, 상기 천공홀의 내부를 따라 길게 삽입되기 위한 네일과; 상기 네일이 상기 천공홀에 삽입된 경우 상기 천공홀의 내부 입구 부분에 배치되어 내부에 공급되는 그라우트재의 주입에 따라 팽창되어 상기 천공홀의 내벽을 가압하도록 상기 네일과 체결되어 고정되는 패커와; 외부에서 상기 패커의 내부와 상기 천공홀 내부 일정 깊이로 그라우트재를 충진할 수 있고, 상기 천공홀 내부에 그라우트재가 가득 채워지는 경우 채워진 그라우트재 일부가 외부로 오버플로우 되도록 하는 복수의 그라우팅 파이프와; 상기 네일의 길이방향 일측 말단부에 나사 결합될 수 있는 나사결합부가 형성되고, 길이방향으로 다수의 요철이 일정 간격으로 형성된 정착구와; 상기 천공홀의 입구 부분을 개폐하도록 상기 네일에 삽입된 상태에서 체결수단을 통해 가압되며 상기 정착구에 인장력을 가하는 지압판을; 포함하는 것을 특징으로 한다.In order to achieve the above object, in the soil nail device according to the present invention, in the soil nail device filling the grout material through an injection pipe to fix the nail inserted into the perforated hole drilled on the slope, the inside of the perforated hole A nail for long insertion along the line; A packer that is disposed at the inner inlet of the perforated hole when the nail is inserted into the perforated hole and is expanded according to the injection of the grout material supplied therein to press the inner wall of the perforated hole. A plurality of grouting pipes capable of filling the grout material from the outside to a predetermined depth inside the packer and inside the perforation hole, and allowing a part of the filled grout material to overflow to the outside when the grout material is filled inside the perforated hole; A fixing unit having a screw coupling portion that can be screwed to one end portion in the length direction of the nail, and a plurality of irregularities formed at regular intervals in the length direction; An acupressure plate that is pressed through a fastening means while being inserted into the nail so as to open and close the entrance portion of the perforated hole and apply a tensile force to the anchorage; It characterized in that it includes.

또한, 본 발명에 따른 소일 네일 장치는, 상기 그라우팅 파이프가 길이방향으로 삽입될 수 있는 중공이 형성되고, 상기 네일의 길이방향을 따라 일정 간격으로 다수개 배치되어 체결수단을 통해 상기 그라우팅 파이프와 상기 네일 상에 일체로 체결될 수 있는 호스보호관을; 더 포함하는 것을 특징으로 한다.In addition, in the soil nail device according to the present invention, a plurality of hollows into which the grouting pipe can be inserted in the longitudinal direction are formed, and a plurality of the grouting pipes and the grouting pipe and the grouting pipe are disposed at regular intervals along the length direction of the nail. A hose protection tube that can be integrally fastened on the nail; It characterized in that it further includes.

또한, 본 발명에 따른 소일 네일 장치는, 상기 호스보호관이 삽입되어 내재할 수 있는 호스삽입공이 형성되고, 중공을 통해 상기 네일을 감싸도록 삽입되어 상기 호스보호관이 내재된 상태로 체결수단을 통해 상기 패커와 함께 상기 네일상에 일체로 고정되는 필터관을; 더 포함하는 것을 특징으로 한다.In addition, in the soil nail device according to the present invention, a hose insertion hole is formed through which the hose protection tube is inserted, and is inserted to surround the nail through a hollow, so that the hose protection tube is embedded in the state through the fastening means. A filter tube integrally fixed on the nail together with a packer; It characterized in that it further includes.

또한, 본 발명에 따른 소일 네일 장치를 이용한 소일네일링 공법은, 소일네일링 공법에 있어서, (a) 지반을 굴착하여 천공홀을 형성하는 단계와; (b) 다수의 요철 돌기가 일정 길이만큼 형성된 정착구를 네일의 일측 말단부에 결합시키고, 상기 네일의 소정 위치에 패커를 배치한 후, 상기 패커의 내부공간과 상기 천공홀의 내부 일정 깊이에 그라우트재를 충진하고, 상기 천공홀 내부의 이물질과 공기를 외부로 배출하기 위한 배출관을 설치하여 소일 네일 장치를 준비하는 단계와; (c) 네일의 길이방향을 따라 중공형의 호스보호관 다수개를 일정 간격으로 배치하고, 상기 1차 주입관, 2차 주입관 및 상기 배출관이 상기 다수개의 호스보호관을 따라 일정 간격으로 연속되게 삽입되어 상기 네일과 나란하게 연장된 상태에서 상기 1차 주입관, 2차 주입관 및 상기 배출관 각각을 상기 호스보호관을 매개로 네일에 일체로 체결하여 고정시키는 단계와; (d) 상기 패커의 양단부를 상기 호스보호관을 매개로 상기 1차 주입관, 2차 주입관 및 상기 배출관과 일체로 네일에 고정시켜 소일 네일 장치를 준비하는 단계와; (e) 상기 정착구, 호스보호관 및 패커를 포함하여 설치된 소일 네일 장치를 상기 천공홀에 삽입하는 단계와; (f) 상기 패커가 팽창하여 상기 천공홀의 천공 면을 가압하도록 상기 패커 내부로 그라우트재를 1차로 공급하는 단계; 및 상기 패커에 의해 상기 천공홀의 입구가 막힌 상태에서 상기 천공홀 내부 일정 깊이로 그라우트재를 2차로 공급하는 단계와; (g) 상기 그라우트재의 공급을 수 회 반복하여 상기 배출관으로 그라우트재가 오버플로우하는 경우 지압판을 천공홀 입구 지반에 압착시키면서 네일의 선단부를 지압판에 고정시키는 단계를; 포함하는 것을 특징으로 한다.In addition, the soil nailing method using the soil nail device according to the present invention includes the steps of: (a) forming a perforated hole by excavating the ground; (b) A fixing tool in which a plurality of uneven protrusions are formed by a predetermined length is coupled to one end of the nail, and a packer is placed at a predetermined position of the nail, and then a grout material is applied to the inner space of the packer and a predetermined depth inside the perforated hole. Filling and preparing a soil nail device by installing a discharge pipe for discharging foreign substances and air inside the perforated hole to the outside; (c) A plurality of hollow hose protection tubes are arranged at regular intervals along the length of the nail, and the primary injection tube, the secondary injection tube and the discharge tube are continuously inserted at regular intervals along the plurality of hose protection tubes. A step of integrally fastening and fixing each of the first injection pipe, the second injection pipe, and the discharge pipe to the nail through the hose protection pipe while extending parallel to the nail; (d) preparing a soil nail device by fixing both ends of the packer to a nail integrally with the first injection pipe, the second injection pipe, and the discharge pipe via the hose protection pipe; (e) inserting a soil nail device installed including the anchorage, hose protection pipe, and packer into the perforation hole; (f) firstly supplying a grout material into the packer so that the packer expands and presses the perforated surface of the perforated hole; And secondly supplying a grout material to a predetermined depth inside the perforated hole while the inlet of the perforated hole is blocked by the packer. (g) when the grout material overflows to the discharge pipe by repeating the supply of the grout material several times, fixing the tip of the nail to the pressure plate while pressing the pressure plate to the ground at the entrance of the perforation hole; It characterized in that it includes.

또한, 본 발명에 따른 소일 네일 장치를 이용한 소일네일링 공법은, 상기 패커 내부로 그라우트재를 공급하는 경우 상기 호스보호관을 내재할 수 있는 통기성 재질의 필터관을 매개로 상기 패커의 내측 일단부를 네일에 고정시켜 상기 천공홀의 내부와 상기 패커의 내부공간에 공기를 유통시키는 것을 특징으로 한다.In addition, in the soil nailing method using the soil nail device according to the present invention, when the grout material is supplied to the inside of the packer, the inner end of the packer is nailed through a filter tube made of a breathable material capable of incorporating the hose protection tube. It is fixed to the hole and characterized in that air flows in the inner space of the packer.

상기와 같은 구성에 의하여 본 발명에 따른 소일 네일 장치 및 이를 이용한 소일네일링 공법은 사면의 천공홀 내부로 네일을 삽입한 상태에서 천공홀의 최내측에서 네일의 말단부에 결합된 정착구를 통해 네일에 인장력을 높일 수 있도록 함으로써 견고한 시공이 가능함과 동시에 그라우팅 시 천공홀의 입구 부분으로 그라우트재가 흘러나오지 않으면서 천공홀 내면과 교란 지반에서 그라우트재가 견고하게 경화되어 그라우트재의 충전 작업이 신속하고 정확하게 진행될 수 있어 그라우팅의 시공 품질 향상으로 옹벽 구축 등에 따른 내구성을 높일 수 있는 장점을 갖는다.The soil nail device according to the present invention and the soil nailing method using the same according to the configuration as described above, in a state in which the nail is inserted into the drilling hole on the slope, and the tension force on the nail through the anchorage coupled to the distal end of the nail from the innermost side of the drilling hole The grout material is hardened firmly in the perforated hole and in the disturbing ground while the grout material does not flow out to the entrance of the hole during grouting, and the grout material can be filled quickly and accurately. It has the advantage of improving the durability according to the construction of retaining walls by improving the construction quality.

또한, 본 발명에 따른 소일 네일 장치 및 이를 이용한 소일네일링 공법은 특히, 그라우팅 작업시 그라우트재를 공급하는 과정에서 주입관 및 배출관이 찌그러지거나 손상되는 현상을 방지함으로써 그라우팅의 품질이 저하되는 문제를 예방함으로써 옹벽 구축 등에 따른 내구성을 향상시킬 수 있는 장점을 갖는다.In addition, the soil nail device and the soil nailing method using the same according to the present invention prevents the problem of deteriorating the quality of grouting by preventing the injection pipe and the discharge pipe from being crushed or damaged in the process of supplying the grout material during the grouting operation. By preventing it, it has the advantage of improving the durability according to the construction of retaining walls.

도 1은 종래의 소일네일링 공법에 의해 시공된 사면 모습을 개략적으로 도시한 단면도.
도 2는 본 발명의 일실시예에 따른 소일 네일 장치가 시공되는 상태 예를 도시한 사용상태단면도.
도 3은 본 발명의 일실시예에 따른 소일 네일 장치의 정착구를 상세 도시한 측단면도.
도 4는 본 발명의 일실시예에 따른 소일 네일 장치의 스페이서를 상세 도시한 측단면도.
도 5는 본 발명의 일실시예에 따른 소일 네일 장치의 주요 구성을 도시한 분해사시도.
도 6 내지 도 8은 본 발명의 일실시예에 따른 소일 네일 장치 및 이를 이용한 소일네일링 공법을 이용하여 시공되는 모습을 순차 도시한 단면상태도.
도 9는 본 발명의 일실시예에 따른 소일네일링 공법을 도시한 블럭도.
1 is a cross-sectional view schematically showing a slope constructed by a conventional soil nailing method.
Figure 2 is a cross-sectional view showing an example of a state in which a soil nail device is constructed according to an embodiment of the present invention.
Figure 3 is a side cross-sectional view showing in detail the anchorage of the soil nail device according to an embodiment of the present invention.
Figure 4 is a side cross-sectional view showing in detail the spacer of the soil nail device according to an embodiment of the present invention.
5 is an exploded perspective view showing the main configuration of a soil nail device according to an embodiment of the present invention.
6 to 8 are cross-sectional state views sequentially showing a state that is constructed using a soil nail device and a soil nailing method using the same according to an embodiment of the present invention.
9 is a block diagram showing a soil nailing method according to an embodiment of the present invention.

이하에서는 도면에 도시된 실시예를 참조하여 본 발명에 따른 소일 네일 장치(100)를 보다 상세하게 설명하기로 한다.Hereinafter, the soil nail device 100 according to the present invention will be described in more detail with reference to the embodiments shown in the drawings.

도 2는 본 발명의 일실시예에 따른 소일 네일 장치가 시공되는 상태 예를 도시한 사용상태단면도이고, 도 3은 본 발명의 일실시예에 따른 소일 네일 장치의 정착구를 상세 도시한 측단면도이며, 도 4는 본 발명의 일실시예에 따른 소일 네일 장치의 주요 구성을 도시한 분해사시도이다.2 is a cross-sectional view showing a state in which a soil nail device is constructed according to an embodiment of the present invention, and FIG. 3 is a side cross-sectional view showing a fixture of the soil nail device according to an embodiment of the present invention. , Figure 4 is an exploded perspective view showing the main configuration of a soil nail device according to an embodiment of the present invention.

도면을 참조하면, 본 발명의 일실시예에 따른 소일 네일 장치(100)는, 프리스트레스(Prestress)를 도입하기 위해 지반의 천공홀(10)에 삽입되는 장치로서, 네일(110)과, 패커(120)와, 그라우팅 파이프(130)와, 정착구(140)와, 스페이서(150)와, 호스보호관(160) 및 지압판(170)을 포함하여 구성된다.Referring to the drawings, a soil nail device 100 according to an embodiment of the present invention is a device inserted into the perforation hole 10 of the ground to introduce prestress, and includes a nail 110 and a packer. 120, a grouting pipe 130, a fixing unit 140, a spacer 150, a hose protection pipe 160, and a pressure plate 170.

상기 네일(110)은 상기 천공홀(10)의 내부로 길게 삽입될 수 있도록 구성된 것으로, 상기 천공홀(10)의 길이에 대응하여 적절한 길이로 이루어질 수 있다.The nail 110 is configured to be longly inserted into the perforation hole 10 and may have an appropriate length corresponding to the length of the perforation hole 10.

상기 네일(110)은 그라우팅 공법에 사용되는 소일 네일(Soil nail)인 것으로, 종래의 소일 네일 장치 및 공법에 사용되는 철근이 사용될 수 있으며, 상기 철근에 상응하는 물리적 성질을 갖는 재질의 것이라면 다양하게 변형실시될 수 있을 것이다.The nail 110 is a soil nail used in the grouting method, and a conventional soil nail device and reinforcement used in the construction method may be used, and if it is made of a material having a physical property corresponding to the reinforcement, variously Variations could be implemented.

또한, 상기 네일(110)은 외주면을 따라 수나사산이 형성되어 후술되는 상기 정착구(140) 및 지압판(170)과의 결합이 용이하게 이루어질 수 있다.In addition, the nail 110 is formed with a male thread along the outer circumferential surface, so that it can be easily combined with the fixing unit 140 and the pressure plate 170 to be described later.

상기 패커(120)는 가압식 그라우팅 작업시 내부로 그라우트재가 채워짐에 따라 팽창하여 상기 천공홀(10)의 개구된 선단을 폐구하기 위한 구성이다.The packer 120 is configured to expand as the grout material is filled inside during the pressurized grouting operation to close the opened tip of the perforated hole 10.

상기 패커(120)는 상기 중공 즉, 내부공간을 갖는 입체 형상으로 이루어질 수 있으며, 상기 네일(110)을 감싸는 형태로 상기 네일(110) 상에 끼워지는 폐쇄된 내부공간을 형성하여 외부로부터 내측으로 공급되는 그라우트재의 주입에 따라 팽창하면서 상기 천공홀(10)의 내벽을 가압하게 된다.The packer 120 may be formed in a three-dimensional shape having the hollow, that is, an inner space, and forms a closed inner space that is fitted onto the nail 110 in a form surrounding the nail 110 to form a closed inner space from the outside to the inside. The inner wall of the perforated hole 10 is pressed while expanding according to the injection of the supplied grout material.

이에, 도 2를 참조하면, 상기 패커(120)는 상기 천공홀(10) 내부로 상기 네일(110)이 삽입된 상태에서 상기 천공홀(10)의 내부 입구 부분에 배치되어 체결수단(T)을 통해 상기 네일(110) 상에 양단부가 고정된다.Accordingly, referring to FIG. 2, the packer 120 is disposed at the inner entrance portion of the perforated hole 10 in a state in which the nail 110 is inserted into the perforated hole 10, and a fastening means (T) Both ends are fixed on the nail 110 through.

이때, 상기 체결수단(T)은 철재 링, 케이블 타이 또는 클램프와 같은 고정부재가 사용될 수 있다.At this time, the fastening means (T) may be a fixing member such as a steel ring, cable tie or clamp.

또한, 상기 패커(120)는 통기성 재질의 부직포가 적용될 수 있으며, 이와 같은 경우 상기 패커(120) 내부로 그라우트재가 충진되는 과정에서 공기가 외부로 원활하게 배출될 수 있다. 또한, 본 발명의 일실시예에서는 상기 패커(120)가 밀폐형 구조로 이루어지는 경우 공기의 유통을 위한 별도의 필터관이 구성될 수 있는데, 이와 같은 필터관의 구성은 이하에서 다시 설명하기로 한다.In addition, the packer 120 may be formed of a nonwoven fabric made of a breathable material, and in this case, air may be smoothly discharged to the outside while the grout material is filled into the packer 120. In addition, in an embodiment of the present invention, when the packer 120 has a closed structure, a separate filter tube for circulation of air may be configured, and the configuration of such a filter tube will be described again below.

도 2를 참조하면, 상기 그라우팅 파이프(130)는 상기 천공홀(10) 내부 일정 깊이로 그라우트재를 충진할 수 있도록 복수의 주입관 및 배출관으로 구성된다.Referring to FIG. 2, the grouting pipe 130 includes a plurality of injection pipes and discharge pipes to fill the grout material to a predetermined depth inside the perforated hole 10.

한편, 상기 그라우팅 파이프(130)는 현장 상황에 따라 상기 천공홀(10)의 깊이에 대응할 수 있도록 적어도 2개 이상 다수개의 주입관이 설치될 수 있으나, 본 발명의 일실시예에서는 통상적으로 시공될 수 있는 천공홀의 깊이에 바람직하게 대응할 수 있도록 상기 그라우팅 파이프(130)가 제1 주입관(131), 제2 주입관(132) 및 배출관(133)을 포함하여 구성된다.On the other hand, the grouting pipe 130 may have at least two or more injection pipes installed to correspond to the depth of the perforated hole 10 according to the site situation, but in one embodiment of the present invention, it is usually constructed. The grouting pipe 130 is configured to include a first injection pipe 131, a second injection pipe 132 and a discharge pipe 133 to suitably correspond to the depth of the perforated hole.

또한, 본 발명의 일실시예에서는 상기 그라우팅 파이프(130) 즉, 상기 제1 주입관(131), 제2 주입관(132) 및 배출관(133)이 연성으로 유연성을 갖는 고무 재질의 호스로 이루어질 수 있다.In addition, in an embodiment of the present invention, the grouting pipe 130, that is, the first injection pipe 131, the second injection pipe 132, and the discharge pipe 133 are made of a flexible rubber hose. I can.

상기 제1 주입관(131)은 외부자재인 그라우팅 펌프와 같은 공급수단에 의해 외부에서 그라우트재를 상기 패커(120) 내부로 공급할 수 있도록 상기 네일과 나란하게 배치되고, 별도의 체결수단(T)을 통해 후술되는 상기 호스보호관(160)과 일체로 네일(110) 상에 결합된다.The first injection pipe 131 is disposed parallel to the nail so that the grout material can be supplied into the packer 120 from the outside by a supply means such as a grouting pump, which is an external material, and a separate fastening means (T) Through the hose protection tube 160 and integrally coupled to the nail 110 to be described later.

이에 따라, 상기 제1 주입관(131)은 일단부가 외부로 일정 길이만큼 연장되어 외부로 노출된 상태에서 타단부가 상기 패커(120)의 내측공간까지 연장될 수 있는 정도의 길이로 형성되면 충분할 것이다.Accordingly, it may be sufficient if the first injection pipe 131 has one end extended to the outside by a certain length and exposed to the outside, and the other end is formed to have a length such that the other end extends to the inner space of the packer 120. will be.

상기 제2 주입관(132)은 외부에서 상기 천공홀(10)의 심부 즉, 내부 최내측 깊이에서부터 그라우트재를 충진할 수 있도록 구성된다.The second injection pipe 132 is configured to fill the grout material from the deep part of the perforated hole 10, that is, the innermost depth from the outside.

즉, 상기 천공홀(10)은 프리스트레스를 가하기 위해 경사 방향으로 천공 형성되는 것이 바람직한데, 이와 같은 경우 외부로부터 공급되는 그라우트재가 상기 천공홀(10)의 내부 안쪽 즉, 최내측 깊이에서부터 채워지면서 상기 패커(120)가 설치된 방향을 향하여 점차적으로 그라우트재가 충진될 수 있도록 하는 것이다.That is, it is preferable that the perforated hole 10 is perforated in an oblique direction to apply prestress. In this case, the grout material supplied from the outside is filled from the inside of the perforated hole 10, that is, from the innermost depth. The grout material can be gradually filled in the direction in which the packer 120 is installed.

도면을 참조하면, 상기 제2 주입관(132)은 일단부가 외부로 일정 길이만큼 노출되게 연장되고, 타단부가 상기 천공홀(10)의 최내측 깊이만큼 연장되게 상기 네일(110)과 나란하게 배치되며, 상기 제1 주입관(132)과 같이 후술되는 상기 호스보호관(160)과 일체로 네일(110) 상에 결합된다.Referring to the drawing, the second injection pipe 132 extends so that one end is exposed to the outside by a predetermined length, and the other end is parallel with the nail 110 so that the other end is extended by the innermost depth of the perforated hole 10. It is disposed, and is coupled to the nail 110 integrally with the hose protection tube 160 to be described later like the first injection tube 132.

상기 배출관(133)은 상기 제1 주입관(131) 및 제2 주입관(132)을 통해 상기 천공홀(10) 내부에 그라우트재가 가득 채워지는 경우 그 채워진 그라우트재 일부가 외부로 오버플로우 되도록 하는 구성이다.When the grout material is filled in the perforation hole 10 through the first injection tube 131 and the second injection tube 132, the discharge pipe 133 allows a portion of the filled grout material to overflow to the outside. Configuration.

이에, 상기 배출관(133)은 일단부가 외부로 일정 길이만큼 연장되어 외부로 노출된 상태에서 타단부가 상기 패커(120)를 관통하여 상기 천공홀(10)의 내측으로 연통될 수 있는 길이로 형성된다.Accordingly, the discharge pipe 133 has one end extending to the outside by a certain length and exposed to the outside, and the other end is formed to have a length such that the other end can pass through the packer 120 and communicate with the inside of the perforated hole 10 do.

즉, 상기 배출관(133)은 외부에서 천공홀(10)의 상기 패커(120) 안쪽까지 연장되게 상기 네일(110)과 나란하게 배치된 상태에서 후술되는 상기 호스보호관(160)을 매개로 상기 네일(110) 상에 일체로 결합될 수 있다.That is, the discharge pipe 133 is disposed in parallel with the nail 110 so as to extend from the outside to the inside of the packer 120 of the perforated hole 10, and the nail through the hose protection pipe 160 to be described later. It can be integrally combined on the (110).

따라서, 본 발명 소일 네일 장치(100)를 이용하여 그라우팅 작업을 하는 경우 상기 제2 주입관(132)을 통해 공급되는 그라우트재가 상기 천공홀(10)의 심부부터 점차적으로 충진되는 과정에서 상기 천공홀(10) 내부에 존재하는 공기 및 이물질이 상기 배출관(133)을 통해 외부로 밀려나올 수 있게 된다.Therefore, when grouting is performed using the soil nail device 100 of the present invention, the perforated hole is gradually filled from the deep portion of the perforated hole 10 through the grout material supplied through the second injection pipe 132. (10) Air and foreign substances existing inside can be pushed out through the discharge pipe 133.

한편, 본 발명 소일 네일 장치(100)는 상기 천공홀(10) 내부에 그라우트재의 충진이 완료된 경우 인발저항력을 향상시킬 수 있도록 상기 네일(110)의 일측 말단부에 결합되는 정착구(140)가 구성된 것이 특징이다.On the other hand, the present invention soil nail device 100 is configured with a fixing unit 140 coupled to one end of the nail 110 so as to improve the pull-out resistance when the grout material is filled in the perforated hole 10 It is a feature.

도 3을 참조하면, 본 발명의 일실시예에서는 상기 정착구(140)가 정착체(141)와, 스크류너트(142)를 포함하여 구성될 수 있다.Referring to FIG. 3, in an embodiment of the present invention, the fixing unit 140 may include a fixing unit 141 and a screw nut 142.

상기 정착체(141)는 상기 천공홀(10) 내부에 그라우트재가 채워져 경화된 경우 상기 네일(110)에 가해지는 인장 강도를 높일 수 있도록 구성된 것이다.The fixing body 141 is configured to increase the tensile strength applied to the nail 110 when the grout material is filled and cured in the perforation hole 10.

이에 상기 정착체(141)는 상기 네일(110)의 길이방향 일측 말단부에 너트수용부(141a)가 형성된다. 상기 너트수용부(141a)는 상기 스크류너트(142)가 수용될 수 있는 원형 공간을 이룬다.Accordingly, the fixing body 141 has a nut receiving portion 141a formed at one end portion of the nail 110 in the longitudinal direction. The nut receiving part 141a forms a circular space in which the screw nut 142 can be accommodated.

상기 스크류너트(142)는 상기 네일(110)의 외주면에 대응하는 원호형을 이루도록 한 쌍이 구성되되, 각각 상기 네일(110)의 수나사산에 대응하는 암나사산이 내주면을 따라 형성되어 상기 네일(110)과의 결합에 의해 한 쌍의 스크류너트(142) 간격이 상호 벌어지며 확관됨으로써 외면이 상기 너트수용부(141a) 내면에 압착되면서 상기 네일(110)과 일체로 견고하게 고정된다.The screw nut 142 is configured to form an arc shape corresponding to the outer peripheral surface of the nail 110, each female thread corresponding to the male thread of the nail 110 is formed along the inner circumferential surface of the nail 110 By coupling with the pair of screw nuts 142, the gap is widened and expanded, so that the outer surface is pressed against the inner surface of the nut receiving portion 141a, and is integrally and firmly fixed with the nail 110.

또한, 상기 정착체(141)는 길이방향으로 다수의 요철이 일정 간격으로 형성된다. 이와 같은 상기 정착체(141)는 상기 천공홀(10) 내부에 충진된 그라우트재가 견고하게 경화된 경우 외주면에 형성된 다수의 요철(141b)에 의해 상기 네일(110)에 가해지는 인장력의 유지 강도를 높일 수 있도록 한다.In addition, the fixing body 141 has a plurality of irregularities formed at regular intervals in the longitudinal direction. When the grout material filled in the perforation hole 10 is firmly hardened, the fixing body 141 has a tensile strength applied to the nail 110 by a plurality of irregularities 141b formed on the outer circumferential surface thereof. To increase it.

이때, 상기 정착구(141)의 외부 표면에 형성된 요철은 쐐기형으로 돌출 형성되게 이루어질 수 있을 것이며, 이와 같은 경우 경화된 그라우트에 의해 인발저항력을 더욱 향상될 수 있도록 하는 실시예도 가능하게 된다.At this time, the irregularities formed on the outer surface of the fixing unit 141 may be formed to protrude in a wedge shape, and in this case, an embodiment in which the pull-out resistance can be further improved by the hardened grout is also possible.

또한, 상기 정착구(140)는 상기 스크류너트(142)의 구성 없이 상기 정착체(141)로만 이루어지는 실시예도 충분히 가능한 것으로, 이와 같은 경우 상기 정착체(141)는 상기 너트수용부(141a)가 형성된 위치에 상기 네일(110)의 수나사산에 대응하여 나사 결합될 수 있는 나사결합부로 이루어지는 실시예가 가능할 것이다.In addition, the fixing unit 140 can be an embodiment consisting only of the fixing unit 141 without the configuration of the screw nut 142, in this case, the fixing unit 141 is the nut receiving portion (141a) is formed An embodiment consisting of a screw coupling portion that can be screwed to correspond to the male thread of the nail 110 may be possible.

상기 스페이서(150)는 상기 네일(110)이 상기 천공홀(10)의 내면에서 소정 이격된 상태로 유지시키기 위한 구성으로, 상기 네일(110)의 길이방향을 따라 일정 간격으로 다수개 설치될 수 있다.The spacer 150 is a configuration for maintaining the nail 110 to be spaced apart from the inner surface of the perforated hole 10 by a predetermined distance, and a plurality of spacers 150 may be installed at regular intervals along the length direction of the nail 110. have.

또한, 상기 스페이서(150)는 상기 그라우팅 파이프(130)가 상기 네일(110)과 상호 나란하게 고정 배치될 수 있도록 일측이 개구되어 상기 네일(110)이 개구를 통해 억지 끼움되어 중앙으로 안착될 수 있도록 하는 네일고정홈(151)이 형성되고, 상기 네일고정홈(151)을 중심으로 방사상 방향으로 복수의 호스통과공(152)이 형성되어 상기 그라우팅 파이프(130) 복수개가 상기 네일(110)과 나란한 상태로 지지될 수 있도록 한다.In addition, one side of the spacer 150 is opened so that the grouting pipe 130 can be fixedly disposed in parallel with the nail 110 so that the nail 110 is forcibly fitted through the opening to be seated in the center. A nail fixing groove 151 is formed so that a plurality of hose passage holes 152 are formed in a radial direction around the nail fixing groove 151 so that a plurality of grouting pipes 130 are formed with the nail 110 Be supported side by side.

또한, 본 발명의 일실시예에 따른 소일 네일 장치(100)는 상기 그라우팅 파이프(130) 즉, 상기 제1 주입관(131), 제2 주입관(132) 및 배출관(133)이 상기 호스보호관(160)을 매개로 상기 네일(110) 상에 고정되게 구성된 것이 특징이다.In addition, the soil nail device 100 according to an embodiment of the present invention includes the grouting pipe 130, that is, the first injection pipe 131, the second injection pipe 132, and the discharge pipe 133. It is characterized in that it is configured to be fixed on the nail 110 via 160.

한편, 종래에는 상기 천공홀(10) 내부를 밀폐시키도록 압력식 그라우팅을 실시하는 경우 또는 체결수단에 의해 체결되는 과정에서 연질로 형성된 주입관과 배출관이 찌그러지거나 손상되는 문제가 발생되었다. 이로 인해 관 내부가 막히거나 정체되어 그라우팅의 시공 품질이 저하되는 문제가 있었으며, 또한, 이와 같은 문제가 발생된 경우에도 상기 천공홀(10) 내부에서의 그라우팅 품질 확인이 어려울 뿐만 아니라, 품질 불량으로 확인된 경우 재시공이 불가능한 문제 또한 발생되었던 것이다.On the other hand, conventionally, in the case of performing pressure grouting to seal the inside of the perforated hole 10 or in the process of being fastened by a fastening means, there has been a problem that the injection pipe and the discharge pipe formed of soft material are crushed or damaged. Due to this, there was a problem that the construction quality of grouting was deteriorated due to clogging or congestion inside the pipe.In addition, even when such a problem occurs, it is difficult to check the quality of grouting inside the perforated hole 10, as well as due to poor quality. If confirmed, a problem that cannot be rebuilt also occurred.

이에, 본 발명의 일실시예에서는 압력식 그라우팅의 작업시 복수의 상기 그라우팅 파이프(130)가 상기 호스보호관(160)에 의해 상기 네일(110)과 나란한 상태에서 안정적으로 고정된 상태를 유지할 수 있도록 함과 동시에 상기 네일(110) 상에 일체로 체결시 표면이 찌그러지는 현상 등을 방지할 수 있는 효과가 발생된다.Accordingly, in an embodiment of the present invention, a plurality of grouting pipes 130 may be stably fixed in a state in parallel with the nail 110 by the hose protection pipe 160 during pressure grouting operation. At the same time, when it is integrally fastened to the nail 110, the effect of preventing the surface from being distorted is generated.

상기 호스보호관(160)은 바람직하게는 경질의 수지재로 이루어질 수 있으나, 강관과 같은 견고한 재질로도 이루어질 수 있을 것이다.The hose protection pipe 160 may preferably be made of a hard resin material, but may also be made of a solid material such as a steel pipe.

도 3 및 도 4를 참조하면, 상기 호스보호관(160)은 상기 그라우팅 파이프(130)의 구경에 대응하여 끼워질 수 있는 원통형 형상으로 제작되는 것이 바람직하다. 즉, 상기 그라우팅 파이프(130)가 길이방향으로 삽입될 수 있는 중공이 형성되고, 상기 네일(110)의 길이방향을 따라 일정 간격으로 다수개 배치되어 체결부재(T)를 통해 상기 그라우팅 파이프(130)와 상기 네일(110) 상에 일체로 체결될 수 있게 된다.3 and 4, the hose protection pipe 160 is preferably manufactured in a cylindrical shape that can be fitted corresponding to the diameter of the grouting pipe 130. That is, a plurality of hollows into which the grouting pipe 130 can be inserted in the longitudinal direction is formed, and a plurality of the grouting pipes 130 are disposed at regular intervals along the length direction of the nail 110 and through the fastening member T. ) And the nail 110 can be integrally fastened.

이에 따라, 본 발명 소일 네일 장치(100)는 상기 그라우팅 파이프(130) 즉, 상기 제1 주입관(131), 제2 주입관(132) 및 배출관(133) 각각이 상기 네일(110)을 따라 일정 간격으로 배치되는 다수개의 호스보호관(160)을 매개로 상기 네일(110) 상에 일체로 체결되어 고정됨으로써 그라우팅 작업시 관 내부를 통과하는 그라우트재가 막히거나 손상된 부위를 통해 그라우트재가 세어 나와 그라우팅의 품질에 영향을 미치는 문제 등이 발생하지 않도록 할 수 있다.Accordingly, the soil nail device 100 of the present invention includes the grouting pipe 130, that is, the first injection pipe 131, the second injection pipe 132, and the discharge pipe 133, respectively, along the nail 110. By being integrally fastened and fixed on the nail 110 through a plurality of hose protection pipes 160 arranged at regular intervals, the grout material passing through the pipe during grouting is blocked or the grout material is counted through the damaged area. It is possible to prevent problems affecting the quality from occurring.

상기 지압판(170)은 상기 천공홀(10)의 입구 부분을 개폐하도록 상기 네일(110)에 삽입된 상태에서 고정부재(N)를 통해 가압되며 상기 정착구(140)에 인장력을 가하는 구성이다.The acupressure plate 170 is pressed through the fixing member N while being inserted into the nail 110 so as to open and close the inlet portion of the perforated hole 10 and applies a tensile force to the fixing unit 140.

상기 지압판(170)은 소정 두께를 갖는 금속 등의 견고한 재질로 이루어진 판형 부재로서, 상기 천공홀(10)의 구경보다 큰 너비를 갖도록 제작되는 것이 바람직하며, 전후면으로 관통되는 중공 및 통공이 형성되어 상기 네일(110)과 상기 그라우팅 파이프(130)가 삽입 통과되어 상기 천공홀(10) 내부로 설치될 수 있도록 한다.The acupressure plate 170 is a plate-shaped member made of a solid material such as metal having a predetermined thickness, and is preferably manufactured to have a width larger than the aperture of the perforated hole 10, and hollows and through holes penetrating through the front and rear surfaces are formed. As a result, the nail 110 and the grouting pipe 130 are inserted so that they can be installed into the perforated hole 10.

이에, 상기 지압판(170)은 상기 네일(110)의 선단부에 고정부재(N)를 통해 압입되게 체결됨에 따라 강한 지압력으로 지반표면을 구조적으로 보강하는 역할을 함과 동시에 상기 네일(110) 및 정착구(140)에 인장력을 가하고, 상기 천공홀(10) 입구를 폐쇄하게 된다.Accordingly, the acupressure plate 170 serves to structurally reinforce the ground surface with strong acupressure as it is fastened to be press-fit to the tip of the nail 110 through the fixing member N, and at the same time, the nail 110 and the A tensile force is applied to the anchorage 140 and the entrance of the perforation hole 10 is closed.

이때, 상기 고정부재(N)는 상기 네일(110)의 선단부에 나사 체결되는 웨지볼트, 쐐기형 너트, 볼트 및 캡부재 등 공지되어 있는 다양한 고정부재가 사용될 수 있다.In this case, as the fixing member N, various known fixing members such as a wedge bolt, a wedge-shaped nut, a bolt and a cap member that are screwed to the tip of the nail 110 may be used.

또한, 본 발명의 일실시예에 따른 소일 네일 장치(100)는, 상술한 바와 같이 상기 패커(120)가 밀폐형 구조로 이루어지는 경우 상기 패커(120)와 상기 네일(110) 상에 개재되어 결합되는 필터관(180)을 더 포함하여 구성된 것이 특징이다.In addition, the soil nail device 100 according to an embodiment of the present invention is interposed and coupled on the packer 120 and the nail 110 when the packer 120 has a sealed structure as described above. It is characterized in that it is configured to further include a filter tube (180).

도면을 참조하면, 상기 필터관(180)은 원형 구조로 이루어지는 것이 바람직하며, 상기 네일(110)이 중앙으로 삽입될 수 있는 중공(181)이 형성된다.Referring to the drawings, it is preferable that the filter tube 180 has a circular structure, and a hollow 181 into which the nail 110 can be inserted is formed.

이때, 상기 필터관(180)은 상기 중공(181)을 중심으로 다수의 호스삽입공(182)이 형성되어 상기 호스보호관(160)이 삽입된 상태로 고정될 수 있다.At this time, the filter tube 180 may be fixed in a state in which the hose protection tube 160 is inserted by forming a plurality of hose insertion holes 182 around the hollow 181.

이에, 상기 필터관(180)은 상기 중공을 통해 상기 네일(110)을 감싸는 형태로 삽입될 수 있으며, 상기 호스삽입공(181)에 의해 상기 다수의 호스보호관(160)이 방사상 방향으로 내재될 수 있다.Accordingly, the filter pipe 180 may be inserted in a form surrounding the nail 110 through the hollow, and the plurality of hose protection pipes 160 may be embedded in a radial direction by the hose insertion hole 181. I can.

따라서, 상기 천공홀(10)의 심부 방향을 향하는 상기 패커(120)의 일단부 와 상기 필터관(180)의 외주면을 상기 체결수단(T)으로 함께 체결하여 상기 네일(110) 상에 고정시킬 수 있게 된다.Therefore, one end of the packer 120 and the outer circumferential surface of the filter tube 180 facing the deep direction of the perforation hole 10 are fastened together with the fastening means (T) to be fixed on the nail 110. You will be able to.

또한, 이와 같은 상기 필터관(180)은 공기가 유통될 수 있는 통기성 재질로 형성되는데, 본 발명의 일실시예에서는 상기 필터관(180)이 스폰지 재질로 형성되어 그라우트재가 상기 패커(120) 내부에 채워질 수 있으면서 상기 천공홀(10) 내부로 공기의 순환이 원활하게 이루어지게 된다.In addition, the filter tube 180 is formed of a breathable material through which air can flow. In one embodiment of the present invention, the filter tube 180 is formed of a sponge material, so that the grout material is inside the packer 120. While being able to be filled in, the circulation of air into the perforated hole 10 is made smoothly.

이에 따라, 본 발명 소일 네일 장치(100)는 상기 패커(120) 내부로 그라우트재를 충진하는 과정에서 상기 필터관(180)을 통해 상기 패커(120) 내부에서 공기는 배출되면서 그라우트재의 충진만으로 팽창하여 가압력을 높일 수 있도록 할 수 있다.Accordingly, the soil nail device 100 of the present invention expands only by filling the grout material while air is discharged from the inside of the packer 120 through the filter tube 180 in the process of filling the grout material into the packer 120 This can be done to increase the pressing force.

한편, 이하에서는 상기와 같이 구성된 소일 네일 장치를 이용한 소일네일링 공법을 설명하기로 한다.On the other hand, hereinafter, a soil nailing method using the soil nail device configured as described above will be described.

도 6 내지 도 8은 본 발명의 일실시예에 따른 소일 네일 장치 및 이를 이용한 소일네일링 공법을 이용하여 시공되는 모습을 순차 도시한 단면상태도이고, 도 9는 본 발명의 일실시예에 따른 소일네일링 공법을 도시한 블럭도이다.6 to 8 are cross-sectional state diagrams sequentially showing a soil nail device according to an embodiment of the present invention and a state constructed using a soil nailing method using the same, and FIG. 9 is a soil nail device according to an embodiment of the present invention. It is a block diagram showing the nailing method.

본 발명의 소일 네일 장치를 이용한 소일네일링 공법은,Soil nailing method using the soil nail device of the present invention,

(a) 지반을 굴착하여 천공홀을 형성하는 단계(S10)와;(a) excavating the ground to form a perforated hole (S10);

(b) 상기 천공홀의 입구 부분에서 가압식으로 팽창할 수 있도록 상기 네일의 길이 방향을 따라 소정 위치에 패커를 배치하고, 상기 패커의 내부공간으로 그라우트재를 충진할 수 있는 1차 주입관, 상기 천공홀의 내부 일정 깊이로 그라우트재를 충진할 수 있는 2차 주입관 및 외부에서 상기 패커의 내측 공간을 통과하여 상기 천공홀 내부로 연장된 배출관을 각각 네일과 나란하게 배치하여 소일 네일 장치의 체결을 준비하는 단계(S20)와;(b) a first injection pipe capable of placing a packer in a predetermined position along the length direction of the nail so that it can be expanded in a pressurized manner at the inlet of the perforation hole, and filling the grout material into the inner space of the packer, the perforation A secondary injection pipe capable of filling the grout material to a certain depth inside the hole and a discharge pipe extending from the outside through the inner space of the packer to the inside of the perforated hole are arranged in parallel with the nail to prepare for fastening of the soil nail device. Step (S20) and;

(c) 네일의 길이방향을 따라 중공형의 호스보호관 다수개를 일정 간격으로 배치하여 상기 1차 주입관, 2차 주입관 및 상기 배출관이 상기 다수개의 호스보호관을 따라 일정 간격으로 연속되게 끼워지며 상기 네일과 나란하게 연장된 상태에서 상기 1차 주입관, 2차 주입관 및 상기 배출관 각각을 상기 호스보호관을 매개로 네일에 일체로 체결하여 고정시키는 단계(S30)와;(c) A plurality of hollow hose protection tubes are arranged at regular intervals along the longitudinal direction of the nail, so that the primary injection tube, the secondary injection tube and the discharge tube are continuously inserted at regular intervals along the plurality of hose protection tubes. A step (S30) of integrally fastening and fixing each of the primary injection pipe, the secondary injection pipe, and the discharge pipe to the nail through the hose protection pipe while extending parallel to the nail;

(d) 상기 패커의 양단부를 상기 호스보호관을 매개로 상기 1차 주입관, 2차 주입관 및 상기 배출관과 일체로 네일에 고정시켜 소일 네일 장치를 준비하는 단계(S40)와;(d) preparing a soil nail device by fixing both ends of the packer to the nail integrally with the first injection pipe, the second injection pipe and the discharge pipe via the hose protection pipe (S40);

(e) 상기 소일 네일 장치를 상기 천공홀에 삽입하는 단계(S50)와;(e) inserting the soil nail device into the perforation hole (S50);

(f) 상기 1차 주입관을 통해 상기 패커 내부로 그라우트재를 공급하여 상기 패커가 팽창하면서 상기 천공홀의 천공 면을 가압하는 단계(S60)와;(f) supplying a grout material into the packer through the primary injection pipe to pressurize the perforated surface of the perforated hole while the packer expands (S60);

(g) 상기 2차 주입관을 통해 상기 천공홀 내부 일정 깊이로 그라우트재를 공급하여 상기 배출관으로 그라우트재가 오버플로우하는 경우 지압판을 천공홀 입구 지반에 압착시키면서 네일을 지압판에 고정시키는 단계(S70)를; 포함하는 순서로 진행된다.(g) In case the grout material overflows to the discharge pipe by supplying the grout material to a predetermined depth inside the perforated hole through the secondary injection pipe, fixing the nail to the pressure plate while pressing the pressure plate to the ground at the entrance of the perforation hole (S70) To; It proceeds in the order of inclusion.

우선, (a)단계에서는 소일 네일 장치가 삽입될 사면(S)의 일 지점을 천공하여 천공홀을 형성시킨다.First, in step (a), a hole is formed by drilling a point on the slope S where the soil nail device is to be inserted.

이때, 지반을 천공시에는 현장조건에 맞는 공지된 천공장비를 선택하여 천공하여야 하며, 일반적으로 압축공기를 이용하는 공압식을 사용하는 것이 효과적이나 점성토 지반이나 느슨한 매립토 지반의 경우 유압식 드릴을 이용하거나 Nailing 전용 천공장비를 이용할 수 있다.At this time, when drilling the ground, it is necessary to select a well-known drilling equipment suitable for the site conditions and drill it. In general, it is effective to use a pneumatic type using compressed air, but in the case of a clay ground or loose buried soil, use a hydraulic drill or dedicated nailing. Drilling equipment can be used.

그리고 (b)단계에서는 가압식으로 팽창할 수 있는 패커(120)를 네일(110)의 길이 방향을 따라 소정 위치에 배치하고, 복수의 그라우팅 파이프(130)를 상기 네일(110)과 나란하게 배치한다.And in step (b), the packer 120, which can be expanded by a pressure type, is disposed at a predetermined position along the length direction of the nail 110, and a plurality of grouting pipes 130 are disposed in parallel with the nail 110. .

즉, 패커(120)의 내부공간으로 그라우트재를 충진하기 위한 1차 주입관(131)과, 상기 천공홀(10)의 내부 일정 깊이 즉, 심부인 최내측 깊이로 그라우트재를 충진할 수 있는 2차 주입관(132) 및, 외부에서 상기 패커(120)의 내측 공간을 통과하여 상기 천공홀(10) 내부로 연장된 배출관(133)을 각각 네일과 나란하게 배치하여 소일 네일 장치(100)의 체결 즉, 조립을 준비한다.That is, the first injection pipe 131 for filling the grout material into the inner space of the packer 120, and 2 capable of filling the grout material to a predetermined inner depth of the perforation hole 10, that is, the deepest innermost depth. The tea injection pipe 132 and the discharge pipe 133 extending from the outside through the inner space of the packer 120 and extending into the perforation hole 10 are disposed in parallel with the nail to Prepare for fastening, that is, assembly.

다음으로 (c)단계에서는 상기 소일 네일 장치의 주요 구성을 조립하여 체결 고정시키는 단계로, 네일(110)의 길이방향을 따라 중공형의 호스보호관(160) 다수개를 일정 간격으로 배치하여 상기 1차 주입관(131), 2차 주입관(132) 및 배출관(133)이 상기 다수개의 호스보호관(160)을 따라 일정 간격으로 연속되게 끼워지며 상기 네일(110)과 나란하게 연장된 상태에서 체결수단으로 체결하여 고정시키게 된다.Next, step (c) is a step of assembling and fixing the main components of the soil nail device. A plurality of hollow hose protection pipes 160 are arranged at regular intervals along the length direction of the nail 110 and the first The primary injection pipe 131, the secondary injection pipe 132, and the discharge pipe 133 are continuously inserted at predetermined intervals along the plurality of hose protection pipes 160 and are connected in a state extending parallel to the nail 110. It is fixed by fastening by means.

이에, 복수의 그라우팅 파이프(130) 즉, 상기 1차 주입관(131), 2차 주입관(132) 및 배출관(133) 각각은 상기 호스보호관(160)을 매개로 네일(110) 상에 일체로 고정되어 압력식의 그라우팅 작업시 각각의 주입관 및 배출관이 안정적으로 고정될 수 있도록 함과 동시에 체결수단(T)으로 상기 그라우팅 파이프(130)를 네일(110)에 체결하는 경우 그라우팅 파이프(130)가 찌그러지거나 손상되지 않도록 한다.Accordingly, a plurality of grouting pipes 130, that is, the primary injection pipe 131, the secondary injection pipe 132, and the discharge pipe 133, are integrated on the nail 110 via the hose protection pipe 160 When the grouting pipe 130 is fastened to the nail 110 by a fastening means (T) while being fixed to each of the injection pipes and the discharge pipes to be stably fixed during the pressure-type grouting operation, the grouting pipe 130 ) Are not crushed or damaged.

계속하여 (d)단계에서는 상기 패커(120)의 양단부를 상기 호스보호관(160)을 매개로 상기 1차 주입관(131), 2차 주입관(132) 및 상기 배출관(133)과 일체로 네일(110) 상에 고정시켜 소일 네일 장치(100)의 설치를 준비하게 된다.Subsequently, in step (d), both ends of the packer 120 are integrated with the first injection pipe 131, the second injection pipe 132 and the discharge pipe 133 via the hose protection pipe 160. It is fixed on the 110 to prepare the installation of the soil nail device 100.

이어지는 (e)단계에서는 상기 패커(120), 그라우팅 파이프(130) 및 상기 호스보호관(160)을 포함하여 조립된 소일 네일 장치(100)를 상기 천공홀(10)에 삽입하게 된다. 본 발명의 일실시예에서는 상기 패커(120), 그라우팅 파이프(130) 및 상기 호스보호관(160)와 같은 구성요소들이 일체로 결합되어야 하므로 조립이 완료된 상태의 소일 네일 장치(100)가 상기 천공홀(10)에 쉽게 삽입될 수 있다.In the following step (e), the assembled soil nail device 100 including the packer 120, the grouting pipe 130 and the hose protection pipe 160 is inserted into the perforation hole 10. In an embodiment of the present invention, components such as the packer 120, the grouting pipe 130, and the hose protection pipe 160 must be integrally combined, so that the soil nail device 100 in a state in which the assembly is completed is used as the perforation hole. Can be easily inserted into (10).

이때 상기 네일(110)은 이음매가 없이 하나의 네일(110)을 사용하는 것이 바람직하지만 불가피하게 연결을 할 경우 커플러를 이용하거나, 용접으로 연결할 경우 강재의 성질이 변화되지 않는 특수 접합 용접을 실시하여야 할 것이다.At this time, it is preferable to use one nail 110 without a seam for the nail 110, but if it is unavoidably connected, a coupler must be used, or a special joint welding must be performed that does not change the properties of the steel when connecting by welding. something to do.

다음으로 (f)단계에서는 상기 1차 주입관(131)을 통해 상기 패커(120) 내부로 그라우트재를 공급하여 상기 패커(120)가 팽창하면서 상기 천공홀(10)의 입구 부분에 인접한 위치에서 천공 면을 가압하도록 한다.Next, in step (f), a grout material is supplied to the inside of the packer 120 through the primary injection pipe 131 so that the packer 120 expands at a position adjacent to the inlet portion of the perforation hole 10. Press the perforated surface.

이와 같은 패커(120)의 그라우팅 작업은 상술한 소일 네일 장치(100)에서 자세히 기술하였으므로 보다 상세한 설명은 생략한다.Since the grouting operation of the packer 120 has been described in detail in the above-described soil nail device 100, a more detailed description will be omitted.

다만, 본 발명 소일 네일 장치를 이용한 소일네일링 공법은, 상술한 바와 같이 상기 패커(120)가 밀폐형 구조로 이루어지는 경우 공기의 유통을 위한 필터관(180)이 구성되어 그라우팅 작업시 그라우트재가 상기 패커(120) 내부에 채워지는 과정에서 공기의 순환이 이루어지도록 하고, 상기 패커(120)의 내부로 채워지는 그라우트재만으로 전체적으로 팽창이 이루어지며 상기 천공홀(10)의 천공 면을 가압할 수 있도록 하는 것이다.However, in the soil nailing method using the soil nail device of the present invention, as described above, when the packer 120 has a closed structure, a filter tube 180 for air circulation is configured so that the grout material is used as the packer. (120) In the process of filling the inside, air is circulated, and the entire expansion is made only with the grout material filled into the inside of the packer 120, and the perforated surface of the perforated hole 10 is pressurized. will be.

계속되는 (g)단계에서는 상기 2차 주입관(132)을 통해 상기 천공홀(10) 내부 일정 깊이 즉, 심부로 그라우트재를 공급하게 된다. 이때 그라우트재는 주변 지반에 침투되는 상황에 따라 2회 내지 6회 정도 수회 실시하게 되는데, 건조한 토사 지반일수록 주입회수를 충분히 하고, 상기 천공홀(10) 입구로 그라우트재가 흘러넘치지 않도록 마개 등을 막고 주입하여야 한다.In the subsequent step (g), the grout material is supplied to a predetermined depth, that is, a deep portion of the perforated hole 10 through the secondary injection pipe 132. At this time, the grout material is carried out 2 to 6 times depending on the situation in which the grout material penetrates the surrounding ground.The more dry soil ground, the more sufficient number of injections are made. shall.

마지막으로, 그라우팅 작업은 상기 배출관(133)으로 그라우트재가 오버플로우 할 때까지 실시하며, 상기 배출관(133)으로 공기 및 이물질이 배출되며 오버플로우가 충분히 이루어진 경우 상기 지압판(170)을 상기 천공홀(10) 입구 지반에 압착시키면서 상기 네일(110)을 지압판(170)에 견고하게 고정시키게 된다.Finally, the grouting operation is carried out until the grout material overflows into the discharge pipe 133, and air and foreign substances are discharged to the discharge pipe 133, and when the overflow is sufficiently made, the acupressure plate 170 is inserted into the perforation hole ( 10) The nail 110 is firmly fixed to the acupressure plate 170 while being pressed against the entrance ground.

이에 따라, 상기 지압판(170)은 상술한 바와 같이 강한 지압력으로 지반표면을 구조적으로 보강하는 역할을 함과 동시에 상기 네일(110) 및 정착구(140)에 인장력을 가하고, 상기 천공홀(10) 입구를 폐쇄하게 된다.Accordingly, the acupressure plate 170 serves to structurally reinforce the ground surface with strong acupressure as described above, and at the same time apply a tensile force to the nail 110 and the anchorage 140, and the perforation hole 10 The entrance is closed.

이때, 본 발명 소일 네일 장치를 이용한 소일네일링 공법은, 상기 그라우팅 파이프(130)가 연질의 고무 재질 등으로 이루어지는 경우 상기 제1 주입관(131), 제2 주입관(132) 및 배출관(133)이 상기 호스보호관(160)을 매개로 상기 네일(110) 상에 일체로 고정되게 하는 시공으로, 그라우팅 파이프(130) 즉, 그라우트재를 공급 및 배출하는 호스가 꺾이는 등의 문제를 해소하고, 그로 인해 관 내부가 막히거나 정체되어 그라우팅의 시공 품질이 저하되는 문제 등이 발생되지 않아 안정적인 그라우팅 작업이 가능해지게 된다.At this time, the soil nailing method using the soil nail device according to the present invention, when the grouting pipe 130 is made of a soft rubber material, the first injection pipe 131, the second injection pipe 132, and the discharge pipe 133 ) Is a construction in which the hose protection pipe 160 is integrally fixed on the nail 110, and the grouting pipe 130, that is, the hose for supplying and discharging the grout material, is bent, and the like, As a result, the inside of the pipe is clogged or congested, and there is no problem of deteriorating the construction quality of grouting, so that a stable grouting operation becomes possible.

또한, 본 발명 소일 네일 장치를 이용한 소일네일링 공법은, 상기 패커(120) 내부로 그라우트재를 공급하는 경우 상기 호스보호관(160)을 내재할 수 있는 통기성 재질의 필터관(180)을 매개로 상기 패커(120)의 내측 일단부를 네일(110)에 고정시키게 된다.In addition, the soil nailing method using the soil nail device of the present invention, when supplying the grout material into the packer 120, through a filter tube 180 made of a breathable material capable of incorporating the hose protection tube 160 The inner end of the packer 120 is fixed to the nail 110.

따라서, 그라우팅 작업시 상기 패커(120)의 내부공간에서 공기가 용이하게 배출될 수 있어 상기 패커(120) 내부로 그라우트재를 충진하는 경우 상기 필터관(180)을 통해 상기 패커(120) 내부에서 공기는 배출되면서 그라우트재의 충진만으로 팽창하여 천공홀(10)의 천공 면을 가압할 수 있도록 하는 기밀하고 견고한 시공이 가능하게 된다.Therefore, air can be easily discharged from the inner space of the packer 120 during grouting, so that when the grout material is filled into the packer 120, the inside of the packer 120 through the filter tube 180 As air is discharged, it expands only by filling the grout material, thereby enabling airtight and robust construction to pressurize the perforated surface of the perforated hole 10.

앞에서 설명되고 도면에 도시된 소일 네일 장치 및 이를 이용한 소일네일링 공법은 본 발명을 실시하기 위한 하나의 실시예에 불과하며, 본 발명의 기술적 사상을 한정하는 것으로 해석되어서는 안된다. 본 발명의 보호범위는 이하의 특허청구범위에 기재된 사항에 의해서만 정하여지며, 본 발명의 요지를 벗어남이 없이 개량 및 변경된 실시예는 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 자명한 것인 한 본 발명의 보호범위에 속한다고 할 것이다.The soil nail device described above and illustrated in the drawings and the soil nailing method using the same are only one embodiment for carrying out the present invention, and should not be construed as limiting the technical idea of the present invention. The scope of protection of the present invention is determined only by the matters described in the following claims, and the improved and modified embodiments without departing from the gist of the present invention will be apparent to those of ordinary skill in the technical field to which the present invention belongs. It will be said that it belongs to the scope of protection of the present invention.

10 천공홀 100 소일 네일 장치
110 네일 120 패커
130 그라우팅 파이프 131 제1 주입관
132 제2 주입관 133 배출관
140 정착구 150 스페이서
160 호스보호관 170 지압판
180 필터관 181 중공
182 호스삽입공
10 Drilling hole 100 Soil nail device
110 Nails 120 Packers
130 Grouting pipe 131 1st injection pipe
132 2nd injection pipe 133 Discharge pipe
140 anchorage 150 spacer
160 Hose protection pipe 170 Acupressure plate
180 filter tube 181 hollow
182 Hose Insertion

Claims (5)

사면에 천공된 천공홀에 삽입된 네일을 고정시키도록 그라우팅 파이프를 통해 그라우트재를 충진하는 소일 네일 장치에 있어서,
상기 천공홀의 내부를 따라 길게 삽입되기 위한 네일과; 상기 네일이 상기 천공홀에 삽입된 경우 상기 천공홀의 내부 입구 부분에 배치되어 내부에 공급되는 그라우트재의 주입에 따라 팽창되어 상기 천공홀의 내벽을 가압하도록 상기 네일과 체결되어 고정되는 패커와; 외부에서 상기 패커의 내부와 상기 천공홀 내부 일정 깊이로 그라우트재를 충진할 수 있고, 상기 천공홀 내부에 그라우트재가 가득 채워지는 경우 채워진 그라우트재 일부가 외부로 오버플로우 되도록 하는 복수의 그라우팅 파이프와; 상기 네일의 길이방향 일측 말단부에 나사 결합될 수 있는 나사결합부가 형성되고, 길이방향으로 다수의 요철이 일정 간격으로 형성된 정착구와; 상기 천공홀의 입구 부분을 개폐하도록 상기 네일에 삽입된 상태에서 체결수단을 통해 가압되며 상기 정착구에 인장력을 가하는 지압판을; 포함하되,
상기 네일의 길이방향을 따라 일정 간격으로 다수개 배치되어 상기 그라우팅 파이프가 상기 네일과 나란한 상태로 고정 유지되고, 상기 그라우팅 파이프와 함께 상기 네일 상에 일체로 체결되어 상기 그라우팅 파이프의 표면이 찌그러지거나 손상되는 것을 방지하기 위한 호스보호관과;
상기 네일이 삽입될 수 있는 중공이 형성되고 상기 호스보호관이 삽입되어 내재될 수 있는 호스삽입공이 형성되며 상기 호스보호관이 내재된 상태로 체결수단을 통해 상기 패커와 함께 상기 네일상에 일체로 고정되되, 통기성 재질로 형성되어 상기 패커 내부로 그라우트재를 충진하는 경우 상기 패커 내부에서 공기가 배출되게 하는 필터관을; 더 포함하고,
상기 호스보호관은, 경질의 수지재 또는 강관 재질로 이루어진 것을 특징으로 하는 소일 네일 장치.
In the soil nail device for filling a grout material through a grouting pipe to fix a nail inserted into a perforation hole drilled on a slope,
A nail for long insertion along the inside of the perforated hole; A packer that is disposed at the inner inlet of the perforated hole when the nail is inserted into the perforated hole and is expanded according to the injection of the grout material supplied therein to press the inner wall of the perforated hole. A plurality of grouting pipes capable of filling the grout material from the outside to a predetermined depth inside the packer and inside the perforation hole, and allowing a part of the filled grout material to overflow to the outside when the grout material is filled inside the perforated hole; A fixing tool having a screw coupling portion that can be screwed to one end portion in the length direction of the nail, and a plurality of irregularities formed at regular intervals in the length direction; An acupressure plate that is pressed through a fastening means while being inserted into the nail so as to open and close the entrance portion of the perforated hole and apply a tensile force to the fixing unit; Include,
A plurality of grouting pipes are arranged at regular intervals along the length of the nail to be fixed and maintained in parallel with the nail, and the grouting pipe is integrally fastened to the nail together with the grouting pipe to crush or damage the surface of the grouting pipe. A hose protection pipe for preventing it from becoming;
A hollow into which the nail can be inserted is formed, and a hose insertion hole is formed in which the hose protection tube is inserted, and the hose protection tube is integrally fixed on the nail together with the packer through a fastening means in an internal state. And a filter tube formed of a breathable material to allow air to be discharged from the inside of the packer when the grout material is filled into the packer; Including more,
The hose protection pipe, Soil nail device, characterized in that made of a hard resin material or a steel pipe material.
제1항에 있어서,
상기 네일이 상기 천공홀의 내면에서 소정 이격된 상태로 유지되게 상기 네일의 길이방향을 따라 일정 간격으로 다수개 설치되는 스페이서를; 더 포함하되,
상기 스페이서는 상기 네일이 억지 끼움되어 중앙으로 안착될 수 있는 네일고정홈이 형성되고, 상기 그라우팅 파이프 복수개가 상기 네일과 나란한 상태로 지지되게 상기 네일고정홈을 중심으로 방사상 방향으로 배치되는 복수의 호스통과공이 형성된 것을 특징으로 하는 소일 네일 장치.
The method of claim 1,
A plurality of spacers installed at regular intervals along the length direction of the nail so that the nail is maintained at a predetermined distance from the inner surface of the perforation hole; Further include,
The spacer is a plurality of hoses arranged in a radial direction around the nail fixing groove so that the nail is forcibly fitted to form a nail fixing groove that can be seated in the center, and the grouting pipes are supported in a state parallel to the nail Soil nail device, characterized in that the through hole is formed.
삭제delete 삭제delete 삭제delete
KR1020180026179A 2018-03-06 2018-03-06 Soil nailing Device and soil nailing method using the same KR102176457B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180026179A KR102176457B1 (en) 2018-03-06 2018-03-06 Soil nailing Device and soil nailing method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180026179A KR102176457B1 (en) 2018-03-06 2018-03-06 Soil nailing Device and soil nailing method using the same

Publications (2)

Publication Number Publication Date
KR20190105735A KR20190105735A (en) 2019-09-18
KR102176457B1 true KR102176457B1 (en) 2020-11-09

Family

ID=68070574

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180026179A KR102176457B1 (en) 2018-03-06 2018-03-06 Soil nailing Device and soil nailing method using the same

Country Status (1)

Country Link
KR (1) KR102176457B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101259364B1 (en) * 2012-12-03 2013-04-30 기찬토건(주) Ground reinforcing apparatus
KR101547674B1 (en) * 2014-06-26 2015-09-04 트윈이엔지 주식회사 Nail apparatus for reinforcing slope and

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102305512B1 (en) * 2016-06-30 2021-09-24 서민규 Method and device for sealing the drilled holes for the pressure injection of the cement milk

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101259364B1 (en) * 2012-12-03 2013-04-30 기찬토건(주) Ground reinforcing apparatus
KR101547674B1 (en) * 2014-06-26 2015-09-04 트윈이엔지 주식회사 Nail apparatus for reinforcing slope and

Also Published As

Publication number Publication date
KR20190105735A (en) 2019-09-18

Similar Documents

Publication Publication Date Title
KR101070072B1 (en) A multistaged equipment of pipe grouting by double packer system and its construction
KR101353882B1 (en) Method of reinforcement and construction of pillar of neighboring tunnel
KR101781475B1 (en) Reinforcing member for ground and timbering method using the same thing
KR102088963B1 (en) Reinforced steel pipe one shot grouting
KR101236765B1 (en) Method for placing adhesive filling into the expanded drill hole to increase bearing capacity of piles and tention members and apparatus therefor
KR101078080B1 (en) Earth retaining wall and it's construction method using the precast pile and ground reinforcement
KR102083383B1 (en) Reinforced steel pipe one shot grouting
KR101488721B1 (en) Construction method for extending bulb of the ground anchor by post grouting and bulb extending apparatus being used for the same
KR100770250B1 (en) Construnction method of retaining wall and retaining wall structure using the same
KR102110992B1 (en) Internal packer pressure structure of steel pipe multi-stage grouting device
KR102176457B1 (en) Soil nailing Device and soil nailing method using the same
KR101241351B1 (en) The nail with high anchorage and the nailing construction method thereof
KR102455059B1 (en) Caulking packer simultaneous injection steel pipe and construction method using it
KR100991248B1 (en) Foundation construction method of micro pile using pack and pile used in the same
KR100862387B1 (en) Tensional kit for top-down constructing of acupressure lasting anchor and top-down constructing method of acupressure lasting anchor using this
KR102522769B1 (en) Fixing construction method of high-strength GFRP hollow bar for tunnel and ground reinforcement and its construction device
KR102115509B1 (en) Reinforced steel pipe one shot grouting
KR102083382B1 (en) Reinforced steel pipe one shot grouting
KR101757975B1 (en) Anchor having a fixing device at a side of pressure plate to depress the land slope and method of installing the same
KR102103791B1 (en) Reinforced steel pipe one shot grouting using double packer
KR20060115157A (en) Step-by-step pressurized soil nailing device using double casing
KR20180131042A (en) Pile and method for constucting same
KR101175741B1 (en) Double grouting injection module and earth reinforcing method using the same
KR102028393B1 (en) Construction method of reinforcing anchor for corrugated pipe type
JP3647798B2 (en) Construction method of mountain retaining work and bag body therefor

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant