KR101547674B1 - Nail apparatus for reinforcing slope and - Google Patents

Nail apparatus for reinforcing slope and Download PDF

Info

Publication number
KR101547674B1
KR101547674B1 KR1020140079227A KR20140079227A KR101547674B1 KR 101547674 B1 KR101547674 B1 KR 101547674B1 KR 1020140079227 A KR1020140079227 A KR 1020140079227A KR 20140079227 A KR20140079227 A KR 20140079227A KR 101547674 B1 KR101547674 B1 KR 101547674B1
Authority
KR
South Korea
Prior art keywords
reinforcing
perforation hole
slope
plate
hole
Prior art date
Application number
KR1020140079227A
Other languages
Korean (ko)
Inventor
서동수
Original Assignee
트윈이엔지 주식회사
트윈보강기술(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 트윈이엔지 주식회사, 트윈보강기술(주) filed Critical 트윈이엔지 주식회사
Priority to KR1020140079227A priority Critical patent/KR101547674B1/en
Application granted granted Critical
Publication of KR101547674B1 publication Critical patent/KR101547674B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/13Geometrical or physical properties having at least a mesh portion
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/40Miscellaneous comprising stabilising elements

Abstract

The present invention relates to a nail apparatus for slope reinforcement, comprising: a plate seated on a slope to cover a borehole on a slope; a reinforcing material joined to the plate to be inserted into the borehole; a manual uneven portion installed in the reinforcing material, and inserted into the borehole; a sealing unit installed in the reinforcing material to expand to close the borehole with an injection of a filler; a grout material filling up the borehole through the sealing unit; and a wire mesh installed between the plates placed on the slope at intervals, and engaged with the plates.

Description

사면보강용 네일장치 및 이의 시공방법 {NAIL APPARATUS FOR REINFORCING SLOPE AND }TECHNICAL FIELD [0001] The present invention relates to a nail device for reinforcing a slope and a method of constructing the same.
본 발명은 사면보강용 네일장치 및 이의 시공방법에 관한 것으로서, 보다 상세하게는, 수동요철을 보강재에 체결하여 설치할 수 있고, 수동요철이 보강재로부터 유동되는 것을 방지할 수 있으며, 사면으로부터 그라우팅재가 유실되는 것을 억제하며, 사면에 시공되는 철망을 걸림결합시켜 사면에 안착시킬 수 있는 사면보강용 네일장치 및 이의 시공방법에 관한 것이다.
The present invention relates to a nail device for reinforcing slopes and a method of manufacturing the same. More specifically, the present invention relates to a nail device for reinforcing slopes and a method of manufacturing the same, To a slope, and a method of constructing the slope reinforcement device.
일반적인 지반보강공사는 철도 및 고속도로공사에서 인접사면을 보강하거나, 지하구조물 및 터널 등과 같은 굴착이 수반되는 토목관련 시설물 축조공사에서 굴착 주변 지반의 붕괴를 방지하기 위한 경우에 수반된다.Typical ground reinforcement works to reinforce adjacent slopes in railway and highway construction, or to prevent the collapse of the ground around excavation in the construction of civil engineering facilities accompanied by excavation such as underground structures and tunnels.
소일네일링공법은 보강재를 원지반에 삽입하여 원지반 자체의 전체적인 전단강도를 증대시키고 공사 중이나 공사가 끝난 뒤에 예상되는 지반의 변위를 가능한 억제하는 지반보강공법이다.Soil nailing method is a ground reinforcement method that inserts reinforcing material into a paperboard to increase the overall shear strength of the paperboard itself and suppresses the displacement of the ground as expected during construction or after construction.
이와 같은 소일네일링공법은 사면경사를 급경사로 할 수 있어 토지이용효율을 높일 수 있고, 원지반 자체를 벽체로 이용하기 때문에 안정성이 높은 옹벽을 구축할 있고, 신속성, 단순성, 경제성, 경장비의 사용 면에서 타공법에 비해 유리하다는 장점 때문에 사면보강과 굴착면에 대한 유연한 지반보강공법으로 널리 활용되고 있다.This kind of soil nailing method can increase the efficiency of land use by making steep slope of the slope and it is possible to construct a retaining wall with high stability because the paper sheet itself is used as a wall, and it is possible to use quick, simple, economical, It is widely used as reinforcement for slope reinforcement and flexible ground reinforcement method for excavation surface.
종래기술에 따른 소일네일링공법은, 지반을 천공하여 형성된 천공홀에 보강재(네일)를 삽입한 후 천공홀 내부를 그라우팅하는 방법으로 소일네일링공법을 수행하여 왔다.The soil nailing method according to the prior art has performed the soil nailing method by inserting a reinforcing material (nail) into the perforation hole formed by perforating the ground, and then grouting the inside of the perforation hole.
이때, 네일 설치간격은 네일의 내력이 미치는 범위를 기준으로 설정하게 되는데, 종래의 소일네일링공법은 네일에 그라우트재의 인장강도가 특별히 보강된 것이 아니고, 천공홀 내에 하나의 네일만을 삽입하여 완성되므로 충분한 지반보강효과를 위해서 네일은 비교적 촘촘한 간격으로 설치될 수밖에 없었다.At this time, the interval of the nail installation is set based on the range of the strength of the nail. In the conventional soil nailing method, the tensile strength of the grout material is not particularly reinforced by the nail, and only one nail is inserted into the hole For sufficient ground reinforcement effect, the nails were forced to be installed at relatively tight intervals.
이러한 문제는 네일 설치량의 증대로 이어져 소일네일링공법의 경제성을 떨어뜨리는 원인으로 작용하였다.These problems lead to an increase in the amount of nail installation, which is a cause of lowering the economical efficiency of the soilless nailing method.
한편, 지반굴착과 같은 연직벽체에 수평에 가까운 각도로 보강된 네일에는 휨 및 전단력의 영향이 전체 안정에 미치는 영향이 10% 미만으로 통상 이를 무시하고 설계해왔다.On the other hand, nail reinforced with a horizontal angle close to a vertical wall, such as a ground excavation, has been designed with negligible impact of bending and shear force on overall stability less than 10%.
그러나 비탈면에서는 원호파괴거동에 대하여 저항할 수 있도록 인장 및 인발력은 물론 전단 및 휨에 대해서도 충분한 저항력을 발휘할 수 있도록 설계 적용되어야 함에도 기존에는 이에 대한 고려가 충분히 이루어지지 않았다.However, in order to resist the arc fracture behavior on the slope surface, the design should be applied so as to exhibit sufficient resistance against both tensile and pulling forces as well as shearing and bending.
실내실험 및 파괴사례를 볼 때 전단변형이 발생함에 따라 상대적으로 강도가 취약한 그라우트체가 파괴되고, 전단면 주변의 주면마찰저항력이 극감하는 과정을 거쳐 비탈면이 붕괴되는 것으로 판단된다.As the shear deformation occurs, the grout body with relatively weak strength is destroyed and the slope resistance is weakened around the shear surface, and the slope is collapsed.
이때 그라우트체는 전단면을 경계로 활동지반과 부착된 상태로 보강재와 분리되어 붕괴되는 것으로 보인다.
At this time, it seems that the grout body is separated from the stiffener in the state of attaching to the active ground with the frontal boundary as the boundary.
본 발명의 배경기술은 대한민국 등록특허공보 제10-1131766호(2012년 4월 2일 공고, 발명의 명칭 : 섬유보강 시멘트 그라우트재를 이용한 강화 매트릭스 소일네일링공법)에 개시되어 있다.
BACKGROUND ART [0002] The background art of the present invention is disclosed in Korean Registered Patent No. 10-1131766 (published on Apr. 2, 2012, entitled Enhanced Matrix Soil Nailing Method Using Fiber Reinforced Cement Grout).
일반적인 소일네일링공법은, 사면에 삽입되는 보강재에 저항체를 설치할 때에 용접 또는 복잡한 결합구조에 의해 저항체가 설치되므로 소일네일링공법을 행하는데 소요되는 시간 및 비용을 절감하기 어려운 문제점이 있다.In general, the soil nailing method has a problem that it is difficult to reduce the time and cost required to perform the soil nailing method because a resistor is installed by welding or a complex joining structure when a resistor is installed on a slab inserted into a slope.
또한, 일반적인 소일네일링공법은, 그라우트재를 밀봉시키는 별도의 기술구성이 구비되지 않기 때문에 그라우트재를 주입한 후에 천공홀 외부로 그라우트재가 유실될 수 있는 문제점이 있다.In addition, the general soil nailing method has a problem in that the grout material may be lost to the outside of the perforation hole after the grout material is injected because there is no separate technical structure for sealing the grout material.
또한, 일반적인 소일네일링공법은, 보강재의 시공이 완료된 후에 사면에 설치되는 철망과 보강재를 용접하여 연결하기 때문에 철망을 설치하는데 소요되는 시간 및 비용을 절감하기 어려운 문제점이 있다.In addition, the general soil nailing method has a problem that it is difficult to reduce the time and cost required for installing the wire netting because the wire netting installed on the slope is welded to the reinforcement after welding of the reinforcement is completed.
따라서 이를 개선할 필요성이 요청된다.Therefore, there is a need for improvement.
본 발명은 수동요철을 보강재에 체결하여 설치할 수 있고, 수동요철이 보강재로부터 유동되는 것을 방지할 수 있으며, 사면으로부터 그라우팅재가 유실되는 것을 억제하며, 사면에 시공되는 철망을 걸림결합시켜 사면에 안착시킬 수 있는 사면보강용 네일장치 및 이의 시공방법을 제공하는데 그 목적이 있다.
In the present invention, the manual unevenness can be fixed to the reinforcing member, the passive unevenness can be prevented from flowing from the stiffener, the leakage of the grouting material from the slope can be prevented, The present invention provides a nail device for reinforcing a slope and a method of constructing the same.
본 발명은, 사면에 성형되는 천공홀을 덮도록 사면에 안착되는 플레이트; 상기 플레이트에 결합되고 상기 천공홀에 삽입되는 보강재; 상기 보강재에 설치되고 상기 천공홀 내부에 삽입되는 수동요철; 상기 보강재에 설치되고 충진재의 주입되면 부피가 팽창되어 상기 천공홀을 폐쇄하는 밀폐부; 상기 밀폐부를 통과하여 상기 천공홀에 충진되는 그라우트재; 및 사면에 간격을 유지하며 배치되는 복수 개의 상기 플레이트 사이에 설치되고 상기 플레이트와 걸림결합되는 철망을 포함하는 것을 특징으로 한다.According to the present invention, there is provided a plate for a flat plate, comprising: a plate which is seated on a slope so as to cover a perforation hole formed on a slope; A reinforcing member coupled to the plate and inserted into the perforation hole; A manual unevenness installed in the reinforcing member and inserted into the perforation hole; A sealing part installed on the reinforcing material and expanding in volume when the filling material is injected to close the perforation hole; A grout material passing through the closed portion to be filled in the perforation hole; And a wire net installed between the plurality of the plates arranged to be spaced apart from each other on the oblique surface and engaged with the plate.
또한, 본 발명의 상기 수동요철은, 상기 보강재가 삽입되는 관통홀부에 경사면이 형성되는 요철패널; 및 상기 경사면을 가압하여 상기 요철패널을 지지하고 상기 요철패널을 상기 보강재에 결합시키는 고정부를 포함하는 것을 특징으로 한다.The manual unevenness of the present invention is characterized in that the uneven panel has an inclined surface formed in a through hole through which the reinforcing member is inserted; And a fixing unit for supporting the concave / convex panel by pressing the inclined surface and coupling the concave / convex panel to the reinforcing member.
또한, 본 발명의 상기 고정부는, 상기 경사면을 가압하며 상기 요철패널을 지지하고 상기 보강재가 관통되는 웨지부재; 상기 요철패널을 관통한 상기 웨지부재의 단부에 형성되는 나사산에 체결되고 상기 웨지부재가 유동되는 것을 방지하는 너트부재; 및 상기 웨지부재에 형성되는 안착홈부에 삽입되고 상기 요철패널이 유동되는 것을 방지하는 마감링을 포함하는 것을 특징으로 한다.The fixing portion of the present invention may further comprise: a wedge member which presses the inclined surface and supports the concave-convex panel and the reinforcing member penetrates; A nut member fastened to a thread formed at an end of the wedge member penetrating the concavo-convex panel to prevent the wedge member from flowing; And a finishing ring inserted in the seating groove portion formed in the wedge member and preventing the irregular panel from flowing.
또한, 본 발명의 상기 요철패널은, 상기 천공홀의 입구에 대향되는 면에 상기 그라우트재와 간섭되는 지지면이 형성되는 것을 특징으로 한다.The concavo-convex panel of the present invention is characterized in that a supporting surface for interfering with the grout material is formed on a surface facing the inlet of the perforation hole.
또한, 본 발명의 상기 요철패널은, 상기 천공홀의 입구에 대향되는 면에 상기 그라우트재가 삽입되는 간섭홈부가 형성되는 것을 특징으로 한다.The concavo-convex panel of the present invention is characterized in that an interference groove portion into which the grout material is inserted is formed on a surface facing the inlet of the perforation hole.
또한, 본 발명의 상기 밀폐부는, 상기 보강재가 통과되고 상기 천공홀 내부에 배치되며 충진 공간을 제공하는 팩부재; 상기 팩부재를 밀봉하도록 상기 팩부재의 단부를 구속하여 상기 보강재에 설치되는 패킹부재; 상기 패킹부재의 결합홈부에 설치되고 상기 패킹부재를 상기 보강재 측으로 가압하는 밴드; 상기 밀폐부를 통과하여 상기 천공홀 내부에 그라우트재를 공급하도록 상기 패킹부재를 통과하여 상기 천공홀 내부에 삽입되는 그라우팅주입구; 상기 밀폐부를 통과하여 상기 천공홀 내부의 공기를 상기 천공홀 외부로 배출시키도록 상기 패킹부재를 통과하여 상기 천공홀 내부에 삽입되는 공기배출구; 상기 천공홀 외부로부터 상기 팩부재 내측으로 삽입되고 상기 그라우트재를 상기 팩부재 내부로 안내하는 충진재주입구; 및 상기 팩부재의 단부에 배치되도록 상기 패킹부재에 설치되고 상기 충진재가 상기 팩부재 외부로 배출되는 것을 방지하는 실링부재를 포함하는 것을 특징으로 한다.The enclosure of the present invention may further include: a pack member passing through the reinforcing member and disposed in the perforation hole to provide a filling space; A packing member installed on the stiffener for restraining an end portion of the pack member to seal the pack member; A band which is provided in an engaging groove portion of the packing member and presses the packing member toward the reinforcing member; A grouting inlet through which the grouting material passes through the sealing portion and is inserted into the perforation hole to supply the grout material into the perforation hole; An air discharge port passing through the sealing member and being inserted into the perforation hole so as to discharge the air inside the perforation hole to the outside of the perforation hole; A filling material injection port inserted into the pack member from the outside of the perforation hole and guiding the grout material into the pack member; And a sealing member installed on the packing member so as to be disposed at an end of the pack member and preventing the filling member from being discharged to the outside of the pack member.
또한, 본 발명의 상기 플레이트에는 상기 철망을 이루는 제1철근이 걸림결합되도록 고리부가 구비되는 결합부재가 압입되는 것을 특징으로 한다.Further, in the plate of the present invention, a coupling member having a hook portion is inserted into the plate so that the first reinforcing bar made of the wire net is engaged.
또한, 본 발명의 상기 플레이트에는 상기 철망을 이루는 제2철근이 삽입되도록 삽입홀부를 구비하는 클래프가 설치되는 것을 특징으로 한다.Further, the plate of the present invention is characterized in that a clasp having an insertion hole portion is installed to insert the second reinforcing bar made of the wire net.
또한, 본 발명은, (a) 사면에 천공홀을 성형하고, 상기 천공홀에 삽입될 보강재에 복수 개의 수동요철 및 밀폐부를 설치하는 단계; (b) 상기 보강재를 상기 천공홀에 삽입하고, 상기 밀폐부에 충진재를 주입하여 상기 천공홀을 폐쇄하는 단계; (c) 상기 밀폐부에 구비되는 그라우팅주입구를 통해 상기 천공홀에 그라우트재를 주입하는 단계; 및 (d) 상기 천공홀을 덮도록 플레이트를 사면에 안착시켜 상기 고정부재에 상기 플레이트를 설치하는 단계를 포함하는 것을 특징으로 한다.(A) forming a perforation hole in a slope, installing a plurality of passive protrusions and a sealing portion on a stiffener to be inserted into the perforation hole, (b) inserting the reinforcing material into the perforation hole and injecting a filler into the enclosure to close the perforation hole; (c) injecting a grout material into the perforation hole through a grouting inlet provided in the closed portion; And (d) placing the plate on the slope so as to cover the perforation hole to thereby install the plate on the fixing member.
또한, 본 발명의 상기 (b) 단계는, 충진재가 유실되는 것을 방지하도록 상기 밀폐부를 이루는 팩부재의 단부에 충진재를 흡수하는 실링부재가 설치되어 상기 팩부재에 주입되는 충진재가 상기 실링부재에 흡수되면서 상기 팩부재를 밀폐시키는 것을 특징으로 한다.Further, in the step (b) of the present invention, a sealing member for absorbing the filling material is provided at an end of the packing member constituting the sealing part so as to prevent the filling material from being lost, so that the filling material injected into the packing member is absorbed Thereby sealing the pack member.
또한, 본 발명은, (e) 사면에 안착된 복수 개의 상기 플레이트에 고리부를 구비하는 결합부재를 설치하고, 상기 고리부에 제1철근을 걸림결합시켜 복수 개의 상기 플레이트 사이에 상기 제1철근을 연결하는 단계; (f) 상기 플레이트에 삽입홀부를 구비하는 클램프를 설치하고, 상기 삽입홀부에 제2철근을 압입하여 복수 개의 상기 플레이트 사이에 상기 제2철근을 연결하는 단계; 및 (g) 상기 제1철근 및 상기 제2철근으로 이루어지는 철망이 설치되는 사면에 마감재를 도포하는 단계를 더 포함하는 것을 특징으로 한다.According to the present invention, there is also provided a method of manufacturing a steel plate, comprising the steps of: (e) providing an engaging member having a ring portion on a plurality of plates seated on a slope, engaging a first steel bar with the ring portion, Connecting; (f) providing a clamp having an insertion hole portion in the plate, and connecting the second reinforcing bar between the plurality of plates by press-fitting the second reinforcing bar into the insertion hole portion; And (g) applying a finishing material to a slope provided with a wire net made of the first reinforcing bar and the second reinforcing bar.
또한, 본 발명은, (e) 사면에 안착된 복수 개의 상기 플레이트에 고리부를 구비하는 결합부재를 설치하고, 상기 고리부에 제1철근을 걸림결합시켜 복수 개의 상기 플레이트 사이에 상기 제1철근을 연결하는 단계; (f) 상기 제1철근에 보강시트를 권취시키고, 사면과 거리를 유지하도록 옹벽블록을 안착시켜 상기 보강시트를 상기 옹벽블록에 권취시키는 단계; (g) 상기 옹벽블록과 사면 사이에 보강토를 포설하는 단계; 및 (h) 상기 (f) 단계 및 상기 (g) 단계를 반복하여 사면의 전방에 옹벽을 설치하는 단계를 더 포함하는 것을 특징으로 한다.
According to the present invention, there is also provided a method of manufacturing a steel plate, comprising the steps of: (e) providing an engaging member having a ring portion on a plurality of plates seated on a slope, engaging a first steel bar with the ring portion, Connecting; (f) winding a reinforcing sheet on the first reinforcing bar and placing the reinforcing block on the retaining wall block so as to maintain a distance from the slope; (g) installing a reinforcement soil between the retaining wall block and the slope; And (h) repeating the steps (f) and (g) to provide a retaining wall in front of the slope.
본 발명에 따른 사면보강용 네일장치 및 이의 시공방법은, 보강재에 설치되는 수동요철이 별도의 용접작업 없이 보강재에 체결되어 이루어지므로 수동요철 설치에 소요되는 시간 및 비용을 절감할 수 있는 이점이 있다.The slope reinforcement nail device and method of the present invention are advantageous in that the manual irregularities provided on the reinforcing member are fastened to the reinforcing member without additional welding work, .
또한, 본 발명에 따른 사면보강용 네일장치 및 이의 시공방법은, 요철패널을 보강재에 체결시키며, 요철패널의 유동을 방지하는 고정부가 구비되므로 그라우트재의 주입이나 사면에 발생되는 외력에 의해 요철패널이 유동되는 것을 방지할 수 있어 보강재의 사면 지지력이 약화되는 것을 억제할 수 있는 이점이 있다.In addition, since the nail device for reinforcing slopes according to the present invention and the method of constructing the same have a fixing part for fastening the concave-convex panel to the stiffener and preventing the flow of the concave-convex panel, So that it is possible to prevent the slope supporting force of the reinforcing member from being weakened.
또한, 본 발명에 따른 사면보강용 네일장치 및 이의 시공방법은, 천공홀의 입구부에 위치되도록 보강재에 밀폐부가 구비되므로 그라우트재가 주입된 후에 천공홀을 밀폐할 수 있게 되어 사면 외부로 그라우트재가 유실되는 것을 방지할 수 있는 이점이 있다.In addition, the present invention provides a nail device for reinforcing slopes and a method of constructing the same, wherein the reinforcing material is provided with a hermetically sealed portion so as to be positioned at the entrance of the hole, so that the perforation hole can be sealed after the grout material is injected, There is an advantage that it can be prevented.
또한, 본 발명에 따른 사면보강용 네일장치 및 이의 시공방법은, 사면에 안착되는 플레이트와 철망이 걸림결합되면서 연결되므로 별도의 용접작업이 생략되고, 철망의 시공에 소요되는 시간 및 비용을 절감할 수 있는 이점이 있다.
In addition, since the slope reinforcement nail device and the method of the present invention are connected to each other by engaging the plate and the wire mesh, the welding operation is omitted and the time and cost required for the construction of the wire mesh are reduced There is an advantage to be able to.
도 1은 본 발명의 제1실시예에 따른 사면보강용 네일장치가 도시된 구성도이다.
도 2는 본 발명의 제1실시예에 따른 사면보강용 네일장치의 보강재, 수동요철 및 밀폐부의 장착구조가 도시된 단면도이다.
도 3은 본 발명의 제1실시예에 따른 사면보강용 네일장치의 수동요철 장착구조가 도시된 분해 사시도이다.
도 4는 본 발명의 제1실시예에 따른 사면보강용 네일장치의 밀폐부가 도시된 단면도이다.
도 5는 본 발명의 제2실시예에 따른 사면보강용 네일장치의 수동요철 장착구조가 도시된 분해 사시도이다.
도 6은 본 발명의 제3실시예에 따른 사면보강용 네일장치의 시공상태가 도시된 단면도이다.
도 7은 본 발명의 제4실시예에 따른 사면보강용 네일장치의 시공상태가 도시된 사시도이다.
FIG. 1 is a configuration diagram showing a slope reinforcement nail device according to a first embodiment of the present invention.
2 is a cross-sectional view illustrating a mounting structure of a reinforcing member, a passive concavity, and a sealing portion of a slope reinforcing nail apparatus according to a first embodiment of the present invention.
3 is an exploded perspective view illustrating a manual uneven mounting structure of a nail device for reinforcing slopes according to a first embodiment of the present invention.
4 is a cross-sectional view of a sealing part of a slope reinforcement nail device according to the first embodiment of the present invention.
5 is an exploded perspective view illustrating a manual uneven mounting structure of a nail device for reinforcing slopes according to a second embodiment of the present invention.
6 is a cross-sectional view showing a construction state of a slope reinforcement nail apparatus according to a third embodiment of the present invention.
FIG. 7 is a perspective view showing a construction state of a slope reinforcement nail device according to a fourth embodiment of the present invention. FIG.
이하, 첨부된 도면들을 참조하여 본 발명에 따른 사면보강용 네일장치 및 이의 시공방법의 일 실시예를 설명한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of a slope reinforcement nail apparatus and a method of constructing the same according to the present invention will be described with reference to the accompanying drawings.
이러한 과정에서 도면에 도시된 선들의 두께나 구성요소의 크기 등은 설명의 명료성과 편의상 과장되게 도시되어 있을 수 있다.In this process, the thicknesses of the lines and the sizes of the components shown in the drawings may be exaggerated for clarity and convenience of explanation.
또한, 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의된 용어들로써, 이는 사용자, 운용자의 의도 또는 관례에 따라 달라질 수 있다.In addition, the terms described below are terms defined in consideration of the functions of the present invention, which may vary depending on the intention or custom of the user, the operator.
그러므로 이러한 용어들에 대한 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.
Therefore, definitions of these terms should be made based on the contents throughout this specification.
도 1은 본 발명의 제1실시예에 따른 사면보강용 네일장치가 도시된 구성도이고, 도 2는 본 발명의 제1실시예에 따른 사면보강용 네일장치의 보강재, 수동요철 및 밀폐부의 장착구조가 도시된 단면도이고, 도 3은 본 발명의 제1실시예에 따른 사면보강용 네일장치의 수동요철 장착구조가 도시된 분해 사시도이고, 도 4는 본 발명의 제1실시예에 따른 사면보강용 네일장치의 밀폐부가 도시된 단면도이다.FIG. 1 is a structural view illustrating a slope reinforcement nail device according to a first embodiment of the present invention. FIG. 2 is a perspective view of a slope reinforcement nail device according to a first embodiment of the present invention, FIG. 3 is an exploded perspective view illustrating a manual uneven mounting structure of a nail device for reinforcing a slope according to the first embodiment of the present invention, and FIG. 4 is a perspective view of a slope reinforcement according to the first embodiment of the present invention Sectional view of the sealing portion of the dragon nail device.
도 1 내지 도 4를 참조하면, 본 발명의 일 실시예에 따른 사면보강용 네일장치는, 사면에 성형되는 천공홀을 덮도록 사면에 안착되는 플레이트(10)와, 플레이트(10)에 결합되고 천공홀에 삽입되는 보강재(30)와, 보강재(30)에 설치되고 천공홀 내부에 삽입되는 수동요철(50)과, 보강재(30)에 설치되고 충진재의 주입되면 부피가 팽창되어 천공홀을 폐쇄하는 밀폐부(70)와, 밀폐부(70)를 통과하여 천공홀에 충진되는 그라우트재(80)와, 사면에 간격을 유지하며 배치되는 복수 개의 플레이트(10) 사이에 설치되고 플레이트(10)와 걸림결합되는 철망(20)을 포함한다.1 to 4, a slope reinforcement nail device according to an embodiment of the present invention includes a plate 10 that is mounted on a slope so as to cover a perforation hole formed in a slope, A stiffener 30 inserted in the perforation hole 30 and a passive protrusion 50 provided in the stiffener 30 and inserted into the perforation hole 30 and a stiffener 30 provided in the stiffener 30. When the filler is injected, A grout material 80 passing through the hermetically sealed part 70 to be filled in the perforation hole and a plurality of plates 10 arranged so as to be spaced apart from each other on the oblique surface, And a wire mesh 20 to be engaged with the wire mesh 20.
사면에 일정한 간격을 유지하도록 천공홀을 성형하고, 천공홀에 삽입되는 보강재(30)에는 수동요철(50), 걸림부재(32) 및 밀폐부(70)를 설치한다.A perforation hole is formed so as to maintain a constant gap on the slope and passive unevenness 50, an engaging member 32 and a sealing portion 70 are provided on the reinforcing member 30 inserted into the perforation hole.
수동요철(50), 걸림부재(32) 및 밀폐부(70)가 설치되는 보강재(30)를 천공홀 내부에 삽입한 후에 밀폐부(70)에 충진재를 주입하면 밀폐부(70)가 팽창되면서 천공홀의 입구를 밀폐하게 된다.When the filler is injected into the sealing portion 70 after the insertion of the reinforcing member 30 in which the passive protrusion 50, the engaging member 32 and the sealing portion 70 are installed into the perforation hole, the sealing portion 70 is expanded Thereby sealing the opening of the perforation hole.
따라서 천공홀에 주입되는 그라우트재(80)가 천공홀 외부로 유실되는 것을 방지할 수 있게 된다.Therefore, the grout material 80 injected into the perforation hole can be prevented from being lost to the outside of the perforation hole.
그라우트재(80)의 주입이 완료되면 보강재(30) 단부에 플레이트(10)를 결합하여 플레이트(10)가 천공홀의 입구를 덮으면서 사면에 안착되도록 플레이트(10)의 설치를 행한다.When the grout material 80 is injected, the plate 10 is attached to the end portion of the reinforcing material 30, and the plate 10 is installed so that the plate 10 is seated on the slope while covering the inlet of the perforation hole.
상기한 바와 같이 사면에 다수 개의 플레이트(10)가 일정한 간격을 유지하도록 시공된 후에는 철망(20)을 이루는 제1철근(22) 및 제2철근(24)을 플레이트(10) 사이에 설치하여 철망(20)의 시공을 완료하게 된다.The first reinforcing bars 22 and the second reinforcing bars 24 constituting the wire mesh 20 are installed between the plates 10 after the plurality of plates 10 are installed on the slopes so as to maintain a predetermined distance The construction of the wire mesh 20 is completed.
플레이트(10)에는 철망(20)을 이루는 제1철근(22)이 걸림결합되도록 고리부(14)가 구비되는 결합부재(12)가 압입되므로 제1철근(22)은 별도의 용접작업 없이 플레이트(10)와 플레이트(10)를 연결하도록 사면에 안착된다.The joining member 12 having the ring portion 14 is press-fitted into the plate 10 so that the first reinforcing bar 22 constituting the wire mesh 20 is engaged with the first reinforcing bar 22, (10) and the plate (10).
결합부재(12)는 플레이트(10)의 양단부에 수직방향으로 길게 배치되도록 플레이트(10)의 양단부로부터 중앙부 측으로 삽입되어 결합되고, 결합부재(12)의 상단 및 하단은 플레이트(10)가 배면 측으로 굴곡되면서 고리부(14)를 형성하게 된다.The upper and lower ends of the engaging member 12 are engaged with the plate 10 so that the plate 10 is engaged with the rear side of the plate 10 So that the annular portion 14 is formed.
하나의 플레이트(10)에는 양단부에 각각 한 쌍의 제1철근(22)이 연결되며, 한 쌍의 제1철근(22)는 결합부재(12)의 상단에 형성되는 고리부(14)와, 결합부재(12)의 하단에 형성되는 고리부(14)에 삽입되어 플레이트(10)와 제1철근(22)은 결합부재(12)에 의해 걸림결합된다.A pair of first reinforcing bars 22 are connected to both ends of one plate 10 and a pair of first reinforcing bars 22 are connected to a loop 14 formed at an upper end of the engaging member 12, The plate 10 and the first reinforcing bar 22 are engaged with each other by the engaging member 12. The plate 10 and the first reinforcing bar 22 are engaged with each other.
플레이트(10)에는 철망(20)을 이루는 제2철근(24)이 삽입되도록 삽입홀부(16a)를 구비하는 클램프(16)가 설치되므로 제2철근(24)에 의해 다수 개의 플레이트(10)는 수직방향으로 연결될 수 있게 된다.Since the clamp 16 having the insertion hole portion 16a is installed in the plate 10 so that the second reinforcing bar 24 constituting the wire mesh 20 is inserted into the plate 10, So that they can be connected in the vertical direction.
플레이트(10)의 상면 및 저면에 삽입홀부(16a)가 형성되는 클램프가 압입되고, 플레이트(10)와 플레이트(10)를 수직방향으로 연결하는 제2철근(24)이 삽입홀부(16a)에 압입되면서 플레이트(10)를 수직방향으로 연결하게 된다.The clamp having the insertion hole portion 16a is press-fitted into the upper surface and the lower surface of the plate 10 and the second reinforcing bar 24 connecting the plate 10 and the plate 10 in the vertical direction is inserted into the insertion hole portion 16a The plate 10 is vertically connected while being press-fitted.
이때, 제2철근(24)의 단부에는 경사면이 구비되는 압입부재(16b)가 설치되므로 압입부재(16b)가 삽입홀부(16a)에 압입되면서 삽입홀부(16a)로부터 제2철근(24)이 이탈되는 것을 방지하게 된다.Since the pressing member 16b having the inclined surface is provided at the end of the second reinforcing bar 24, the pressing member 16b is pressed into the insertion hole 16a and the second reinforcing bar 24 is inserted from the insertion hole 16a. So that it is prevented from being separated.
수동요철(50)은, 보강재(30)가 삽입되는 관통홀부에 경사면이 형성되는 요철패널(52)과, 경사면을 가압하여 요철패널(52)을 지지하고 요철패널(52)을 보강재(30)에 결합시키는 고정부(54)를 포함한다.The manual unevenness 50 includes a concave and convex panel 52 on which an inclined surface is formed in a through hole through which the reinforcing member 30 is inserted and a concave and convex panel 52 which supports the concave and convex panel 52 by pressing the inclined surface, (Not shown).
요철패널(52)은 보강재(30)가 관통되도록 중앙부에 관통홀부가 형성되는 원판 모양으로 형성되고, 고정부(54)에 의해 보강재(30)의 둘레면에 고정되므로 보강재(30)를 천공홀에 삽입하고 천공홀에 그라우트재가 주입되면 요철패널(52)이 그라우트재에 함침되면서 보강재(30)와 그라우트재 사이의 저항체 역할을 행하게 된다.The concave and convex panel 52 is formed in a circular plate shape having a through hole at the center so as to penetrate the reinforcing member 30 and is fixed to the circumferential surface of the reinforcing member 30 by the fixing portion 54, And when the grout material is injected into the perforation hole, the concave and convex panel 52 is impregnated in the grout material, thereby acting as a resistor between the reinforcing material 30 and the grout material.
또한, 본 실시예는 고정부(54)에 의해 요철패널(52)이 보강재(30) 둘레면에 체결되므로 별도의 용접작업 없이 요철패널(52)을 보강재(30) 둘레면에 설치할 수 있게 되어 요철패널(52) 설치에 소요되는 시간 및 비용을 절감할 수 있게 된다.In this embodiment, since the concave / convex panel 52 is fastened to the circumferential surface of the reinforcing member 30 by the fixing portion 54, the concave / convex panel 52 can be installed on the circumferential surface of the reinforcing member 30 without performing any welding work The time and cost required for installing the concave / convex panel 52 can be reduced.
고정부(54)는, 경사면을 가압하며 요철패널(52)을 지지하고 보강재(30)가 관통되는 웨지부재(56)와, 요철패널(52)을 관통한 웨지부재(56)의 단부에 형성되는 나사산(56a)에 체결되고 웨지부재(56)가 유동되는 것을 방지하는 너트부재(57)와, 웨지부재(56)에 형성되는 안착홈부(56b)에 삽입되고 요철패널(52)이 유동되는 것을 방지하는 마감링(58)을 포함한다.The fixing portion 54 is formed on the end portion of the wedge member 56 which penetrates the concave and convex panel 52 and the wedge member 56 that presses the inclined surface and supports the concave and convex panel 52 and through which the stiffener 30 penetrates, A nut member 57 which is fastened to the threaded portion 56a and prevents the wedge member 56 from flowing, and a nut member 57 which is inserted into the seating groove portion 56b formed in the wedge member 56, (58).
웨지부재(56)는 요철패널(52)의 관통홀부 내벽에 형성되는 경사면과 동일하거나 유사한 각도로 이루어지는 경사면을 구비하는 원통 모양의 부재로 이루어진다.The wedge member 56 is formed of a cylindrical member having an inclined face formed at the same or similar angle as the inclined face formed on the inner wall of the through hole portion of the concave and convex panel 52.
웨지부재(56)는 일단부터 타단까지 보강재(30)가 관통되는 홀부가 형성되고, 둘레면에 길이 방향으로 다수 개의 간격홈부(56c)가 형성되어 보강재(30)가 삽입되면 간격홈부(56c)가 벌어지면서 웨지부재(56)를 보강재(30)가 관통하게 된다.The wedge member 56 is formed with a hole portion through which the reinforcing member 30 passes from one end to the other end and a plurality of spacing grooves 56c are formed on the circumference of the wedge member 56 in the longitudinal direction. The stiffener 30 penetrates the wedge member 56. As a result,
웨지부재(56)의 일단에는 나사산(56a)이 형성되고, 나사산(56a)에 너트부재(57)가 체결되어 간격홈부(56c)를 좁히면서 웨지부재(56)가 보강재(30)의 둘레면에 밀착되도록 구속하게 된다.A thread 56a is formed at one end of the wedge member 56 and the nut member 57 is fastened to the thread 56a to narrow the gap groove 56c so that the wedge member 56 is inserted into the peripheral surface of the stiffener 30 As shown in FIG.
따라서 웨지부재(56)의 경사면이 요철패널(52)의 경사면에 밀착되도록 웨지부재(56)를 요철패널(52)에 삽입한 후에 요철패널(52)을 통과한 웨지부재(56)의 단부에 너트부재(57)를 체결하면 웨지부재(56)가 요철패널(52)을 구속하게 된다.The wedge member 56 is inserted into the concave / convex panel 52 so that the inclined surface of the wedge member 56 is brought into close contact with the inclined surface of the concave / When the nut member 57 is fastened, the wedge member 56 restrains the concave / convex panel 52.
웨지부재(56)의 타단부에는 금속재질 또는 합성수지재질로 이루어지는 마감링(58)이 삽입되도록 안착홈부(56b)가 형성되고, 안착홈부(56b)로부터 돌출되는 마감링(58)은 요철패널(52)의 홀부에 간섭되면서 웨지부재(56)가 요철패널(52)로부터 분리되는 것을 방지하게 된다.A seating groove 56b is formed at the other end of the wedge member 56 so as to insert a closing ring 58 made of a metal or synthetic resin material and a closing ring 58 protruding from the seating groove 56b is connected to the concave / 52 to prevent the wedge member 56 from being separated from the concave / convex panel 52.
요철패널(52)은, 천공홀의 입구에 대향되는 면에 그라우트재(80)와 간섭되는 지지면(53)이 형성되므로 그라우트재(80)가 천공홀에 주입되면 요철패널(52)의 지지면(53)이 그라우트재(80)의 하중에 의해 가압되면서 수동요철(50) 및 보강재(30)가 천공홀 외측으로 분리되는 것을 방지하는 저항체 역할을 행하게 된다.The concave and convex panel 52 is provided with a support surface 53 interfering with the grout material 80 on the surface opposed to the entrance of the perforation hole so that when the grout material 80 is injected into the perforation hole, The reinforcing member 30 is pressed by the load of the grout material 80 to prevent the passive protrusion 50 and the reinforcing member 30 from being separated from the perforation hole.
밀폐부(70)는, 보강재(30)가 통과되고 천공홀 내부에 배치되며 충진 공간을 제공하는 팩부재(72)와, 팩부재(72)를 밀봉하도록 팩부재(72)의 단부를 구속하여 보강재(30)에 설치되는 패킹부재(74)와, 패킹부재(74)의 결합홈부에 설치되고 패킹부재(74)를 보강재(30) 측으로 가압하는 밴드(76)와, 밀폐부(70)를 통과하여 천공홀 내부에 그라우트재(80)를 공급하도록 패킹부재(74)를 통과하여 천공홀 내부에 삽입되는 그라우팅주입구(77a)와, 밀폐부(70)를 통과하여 천공홀 내부의 공기를 천공홀 외부로 배출시키도록 패킹부재(74)를 통과하여 천공홀 내부에 삽입되는 공기배출구(77b)와, 천공홀 외부로부터 팩부재(72) 내측으로 삽입되고 그라우트재(80)를 팩부재(72) 내부로 안내하는 충진재주입구(77c)와, 팩부재(72)의 단부에 배치되도록 패킹부재(74)에 설치되고 충진재가 팩부재(72) 외부로 배출되는 것을 방지하는 실링부재(78)를 포함한다.The closure 70 includes a pack member 72 through which the stiffener 30 passes and which is disposed within the perforation hole and provides a filling space and an end portion of the pack member 72 to seal the pack member 72 A band 76 which is provided in the engaging groove portion of the packing member 74 and presses the packing member 74 toward the side of the reinforcing member 30; A grouting inlet 77a passing through the packing member 74 to feed the grout material 80 into the perforation hole so as to be inserted into the perforation hole; An air outlet 77b inserted through the packing member 74 to be discharged outside the hole and inserted into the perforation hole and an air outlet 77b inserted into the pack member 72 from the outside of the perforation hole, And a packing member 74 which is disposed on the packing member 74 so as to be disposed at an end of the packing member 72, 72 includes a sealing member 78 to prevent the discharge to the outside.
보강재(30)의 외측 단부에는 한 쌍의 패킹부재(74)에 의해 양단부가 구속되도록 팩부재(72)가 설치되고, 패킹부재(74)에는 각각 밴드(76)가 설치되어 패킹부재(74)에 의해 구속되는 팩부재(72)가 패킹부재(74) 외측으로 이격되는 것을 방지하게 된다.A pack member 72 is provided on the outer end of the reinforcing member 30 so that both ends are constrained by a pair of packing members 74. A band 76 is provided on each of the packing members 74, The packing member 72 can be prevented from being separated from the packing member 74. [
패킹부재(74)는 팩부재(72)의 내부와 외부를 연결하는 3개의 홀부가 형성되고, 각각의 홀부에는 그라우팅주입구(77a), 공기배출구(77b) 및 충진재주입구(77c)가 삽입된다.The packing member 74 is formed with three holes for connecting the inside and the outside of the pack member 72. A grouting inlet 77a, an air outlet 77b and a filler inlet 77c are inserted into the respective holes.
또한, 패킹부재(74)의 내벽에는 실링부재(78)가 설치되는데, 실링부재(78)는 다공성재질로 이루어지는 섬유재 또는 합성수지재로 이루어지기 때문에 팩부재(72)에 충진재가 주입되면 충진재가 실링부재(78) 내부로 흡수되면서 실링부재(78)의 실링 능력을 향상시키게 된다.The sealing member 78 is formed on the inner wall of the packing member 74. Since the sealing member 78 is made of a fiber material or a synthetic resin material made of a porous material, when the filling material is injected into the packing member 72, So that the sealing ability of the sealing member 78 is improved while being absorbed into the sealing member 78.
따라서 팩부재(72) 내부로 주입된 충진재가 팩부재(72)의 단부를 통해 외부로 유실되는 것을 방지할 수 있게 된다.
Therefore, it becomes possible to prevent the filling material injected into the pack member 72 from being lost to the outside through the end of the pack member 72.
상기와 같이 구성된 본 발명의 일 실시예에 따른 사면보강용 네일장치의 시공방법을 살펴보면 다음과 같다.A method of constructing the slope reinforcement nail apparatus according to an embodiment of the present invention will now be described.
본 발명의 일 실시예에 따른 사면보강용 네일장치의 시공방법은, 사면에 천공홀을 성형하고, 천공홀에 삽입될 보강재(30)에 복수 개의 수동요철(50) 및 밀폐부(70)를 설치하는 단계와, 보강재(30)를 천공홀에 삽입하고, 밀폐부(70)에 충진재를 주입하여 천공홀을 폐쇄하는 단계와, 밀폐부(70)에 구비되는 그라우팅주입구(77a)를 통해 천공홀에 그라우트재(80)를 주입하는 단계와, 사면에 플레이트(10)가 안착되며 천공홀을 덮도록 고정부(54)재에 플레이트(10)를 설치하는 단계와, 사면에 안착된 복수 개의 플레이트(10)에 고리부(14)를 구비하는 결합부재(12)를 설치하고, 고리부(14)에 제1철근(22)를 걸림결합시키는 복수 개의 플레이트(10) 사이에 제1철근(22)를 연결하는 단계와, 플레이트(10)에 삽입홀부(16a)를 구비하는 클램프(16)를 설치하고, 삽입홀부(16a)에 제2철근(24)를 압입하여 복수 개의 플레이트(10) 사이에 제2철근(24)를 연결하는 단계를 포함한다.A method of constructing a slope reinforcement nail device according to an embodiment of the present invention includes forming a perforation hole in a slope and inserting a plurality of passive protrusions 50 and a sealing portion 70 into a reinforcement 30 to be inserted into the perforation hole A step of inserting the reinforcing member 30 into the perforation hole and closing the perforation hole by injecting the filler into the encapsulation member 70 and a step of inserting the perforation hole through the grouting injection port 77a provided in the sealing member 70, (10) on the slope and mounting the plate (10) on the stationary part (54) so as to cover the perforation hole; a step of inserting the grooves (80) A plate 10 is provided with a coupling member 12 having a ring 14 and a plurality of plates 10 for fastening the first reinforcing bars 22 to the ring 14, A clamp 16 having an insertion hole portion 16a is provided on the plate 10 and a second reinforcing bar 24 is inserted into the insertion hole portion 16a, By press-fitting and a step of connecting the second reinforcement (24) between a plurality of plates (10).
사면에 천공홀을 형성하고, 보강재(30)의 둘레면에 다수 개의 수동요철(50), 걸림부재(32) 및 밀폐부(70)를 설치하여 보강재(30)를 천공홀에 삽입한다.A plurality of passive protrusions 50, an engaging member 32 and a sealing member 70 are provided on the circumferential surface of the reinforcing member 30 to insert the reinforcing member 30 into the perforation hole.
이후에, 충진재주입구(77c)를 통해 팩부재(72) 내부에 충진재를 충진시키면 팩부재(72)가 팽창되면서 천공홀의 입구를 폐쇄하게 된다.Thereafter, when the filler material is filled in the pack member 72 through the filler material inlet 77c, the pack member 72 is expanded and the inlet of the perforation hole is closed.
이때, 본 실시예의 천공홀을 밀폐하는 단계는, 충진재가 유실되는 것을 방지하도록 밀폐부(70)를 이루는 팩부재(72)의 단부에 충진재를 흡수하는 실링부재(78)가 설치되어 팩부재(72)에 주입되는 충진재가 실링부재(78)에 흡수되면서 팩부재(72)를 밀폐시키게 된다.At this time, in the step of sealing the perforation hole of the present embodiment, a sealing member 78 for absorbing the filler material is provided at the end of the pack member 72 constituting the sealing part 70 to prevent the filler material from being lost, 72 are absorbed by the sealing member 78 to seal the pack member 72. [
그라우팅주입구(77a)를 통해 그라우트재(80)를 천공홀 내부로 주입하면 공기배출구(77b)를 통해 천공홀 내부의 공기가 배출되면서 천공홀 내부에 그라우트재(80)가 충진된다.When the grout material 80 is injected into the perforation hole through the grouting injection port 77a, the air inside the perforation hole is discharged through the air discharge port 77b, and the grout material 80 is filled in the perforation hole.
이때, 그라우트재(80)는 천공홀에 충진되면서 요철패널(52)의 지지면(53)을 천공홀 내측으로 가압하게 되므로 보강재(30)가 천공홀 외부로 배출되는 것을 방지하는 저항체의 역할을 행하게 된다.Since the grout material 80 is filled in the perforation hole and presses the support surface 53 of the concave and convex panel 52 inside the perforation hole, the grout material 80 serves as a resistor for preventing the reinforcement 30 from being discharged to the outside of the perforation hole .
또한, 보강재(30)와 그라우트재(80) 사이의 마찰력을 향상시켜 외력에 의해 보강재(30)가 사면으로부터 유동되는 것을 방지할 수 있게 된다.Further, the frictional force between the reinforcement 30 and the grout material 80 can be improved, and the reinforcement 30 can be prevented from being moved from the slope due to external force.
그라우트재(80)를 충진시킨 후에는 보강재(30) 단부에 플레이트(10)를 결합하여 플레이트(10)를 사면에 안착시키고, 플레이트(10)의 양단부에 한 쌍의 결합부재(12)를 압입한다.After the grout material 80 is filled, the plate 10 is attached to the end of the stiffener 30 to seat the plate 10 on the oblique surface, and a pair of engaging members 12 are inserted into both ends of the plate 10 do.
결합부재(12)의 상단 및 하단에 형성되는 고리부(14)에는 제1철근(22)의 단부를 삽입하여 제1철근(22)과 플레이트(10)를 결합시키고, 플레이트(10)의 상면 및 저면에 설치되는 클램프(16)의 삽입홀부(16a)에 압입부재(16b)가 설치된 제2철근(24)을 압입하여 제1철근(22) 및 제2철근(24)로 이루어지는 철망(20)의 시공을 완료하게 된다.The end of the first reinforcing bar 22 is inserted into the loop 14 formed at the upper and lower ends of the engaging member 12 to engage the first reinforcing bar 22 and the plate 10, And a second reinforcing bar 24 provided with a press-in member 16b is inserted into the insertion hole 16a of the clamp 16 provided on the bottom surface of the first reinforcing bar 22 and the second reinforcing bar 24, ) Is completed.
본 실시예에 따른 사면보강용 네일장치의 시공방법은, 제1철근(22) 및 제2철근(24)으로 이루어지는 철망(20)이 설치되는 사면에 마감재를 도포하는 단계를 더 포함하고, 마감재는 숏크리트 또는 콘크리트 등의 포함하는 마감재가 포설되고 경화되어 이루어진다.The method of constructing the slope reinforcement nail device according to the present embodiment further includes the step of applying a finishing material to the slope on which the wire mesh 20 composed of the first reinforcing bars 22 and the second reinforcing bars 24 is installed, Is formed by placing and hardening a finish material containing shotcrete or concrete.
따라서 보강재(30), 플레이트(10) 및 철망(20)이 서치되는 사면에 마감재가 포설되고 경화되면서 사면이 유실되거나 붕괴되는 것을 보다 효과적으로 방지할 수 있게 된다.
Therefore, it is possible to more effectively prevent the slope from being lost or collapsed due to the provision of the finishing material on the slopes on which the reinforcing member 30, the plate 10, and the wire mesh 20 are searched.
도 5는 본 발명의 제2실시예에 따른 사면보강용 네일장치의 수동요철 장착구조가 도시된 분해 사시도이다.5 is an exploded perspective view illustrating a manual uneven mounting structure of a nail device for reinforcing slopes according to a second embodiment of the present invention.
도 5를 참조하면, 본 발명의 다른 실시예에 따른 사면보강용 네일장치의 요철패널(52)은, 천공홀의 입구에 대향되는 면에 상기 그라우트재(80)가 삽입되는 간섭홈부가 형성된다.Referring to FIG. 5, the concavo-convex panel 52 of the slope reinforcement nail device according to another embodiment of the present invention is formed with an interference groove portion into which the grout material 80 is inserted, on a surface facing the entrance of the perforation hole.
본 실시예는 요철패널(52)의 지지면(53)에 하측으로 오목하게 간섭홈부가 형성되므로 천공홀에 그라우트재(80)가 주입될 때에 요철패널(52)의 지지면(53)에 의해 지지되는 그라우트재(80)가 간섭홈부에 담겨지면서 요철패널(52)을 보다 효과적으로 구속하게 된다.Since the interference grooves are formed in the lower surface of the support surface 53 of the concave and convex panel 52, the concave and convex panels 52 are supported by the support surface 53 of the concave and convex panel 52 when the grout material 80 is injected into the perforation hole The grout material 80 to be supported is contained in the interference groove portion, thereby restraining the concave-convex panel 52 more effectively.
따라서 본 실시예는 요철패널(52)에 형성되는 간섭홈부에 의해 그라우트재(80)와 요철패널(52) 사이의 마찰력이 향상되고, 요철패널(52)의 구속이 보다 효과적으로 이루어지게 되어 보강재(30)가 천공홀부터 배출되거나 이격되는 것을 방지할 수 있게 된다.
Therefore, in this embodiment, frictional force between the grout material 80 and the relief panel 52 is improved by the interference groove portion formed in the relief panel 52, the relief of the relief panel 52 becomes more effective, 30 can be prevented from being discharged or spaced apart from the perforation hole.
도 6은 본 발명의 제3실시예에 따른 사면보강용 네일장치의 시공상태가 도시된 단면도이다.6 is a cross-sectional view showing a construction state of a slope reinforcement nail apparatus according to a third embodiment of the present invention.
도 6을 참조하면, 본 발명의 제3실시예에 따른 사면보강용 네일장치의 시공방법은, 사면에 천공홀을 성형하고, 천공홀에 삽입될 보강재에 복수 개의 수동요철 및 밀폐부를 설치하는 단계와, 보강재를 천공홀에 삽입하고, 밀폐부에 충진재를 주입하여 천공홀을 폐쇄하는 단계와, 밀폐부에 구비되는 그라우팅주입구를 통해 천공홀에 그라우트재를 주입하는 단계와, 천공홀을 덮도록 플레이트를 사면에 안착시켜 고정부재에 플레이트를 설치하는 단계를 포함한다.Referring to FIG. 6, a method of constructing a slope reinforcement nail apparatus according to a third embodiment of the present invention includes forming a perforation hole on a slope, installing a plurality of passive protrusions and a sealing unit on a stiffener to be inserted into the perforation hole Inserting the reinforcing material into the perforation hole, closing the perforation hole by injecting the filler into the closed portion, injecting the grout material into the perforation hole through the grouting inlet provided in the closed portion, And placing the plate on a slope so as to fix the plate to the fixing member.
본 실시예는 제1실시예와 비교하여 철망을 설치하는 단계가 생략된 것이며, 사면의 보강재의 설치만을 행하여 사면의 보강이 충분히 이루어지는 경우에는 사면에 설치되는 보강재에 플레이트를 설치하여 천공홀을 덮고 사면 보강공사를 완료할 수 있다.In the present embodiment, the step of installing the wire netting is omitted in comparison with the first embodiment. In the case where the reinforcing material of the slope is only installed and the slope is sufficiently reinforced, a plate is provided on the reinforcing material provided on the slope, Slope reinforcement work can be completed.
물론, 보강재가 설치된 사면에는 식생토가 포설되어 식물의 성장을 촉진시킬 수 있으며, 이는 본 발명의 기술구성을 인지한 당업자가 용이하게 실시할 수 있는 것이므로 구체적인 도면이나 설명은 생략하기로 한다.
As a matter of course, a vegetated soil can be installed on the slope where the reinforcing material is installed, and the growth of the plant can be promoted, and a person skilled in the art recognizing the technical composition of the present invention can easily carry out.
도 7은 본 발명의 제4실시예에 따른 사면보강용 네일장치의 시공상태가 도시된 사시도이다.FIG. 7 is a perspective view showing a construction state of a slope reinforcement nail device according to a fourth embodiment of the present invention. FIG.
도 7을 참조하면, 본 발명의 제4실시예에 따른 사면보강용 네일장치의 시공방법은, 제1실시예와 비교하여 사면에 안착된 복수 개의 플레이트(10)에 고리부(14)를 구비하는 결합부재(12)를 설치하고, 고리부(14)에 제1철근(22)을 걸림결합시켜 복수 개의 플레이트(10) 사이에 제1철근(22)을 연결하는 단계와, 제1철근(22)에 보강시트(92)를 권취시키고, 사면과 거리를 유지하도록 옹벽블록(90)을 안착시켜 보강시트(92)를 옹벽블록(90)에 권취시키는 단계와, 옹벽블록(90)과 사면 사이에 보강토를 포설하는 단계와, 보강시트(92)를 옹벽블록(90)에 권취시키는 단계와 보강토를 포설하는 단계를 반복하여 사면의 전방에 옹벽을 설치하는 단계를 더 포함한다.Referring to FIG. 7, a method of constructing a slope reinforcement nail apparatus according to a fourth embodiment of the present invention includes a plurality of plates 10 mounted on a slope in comparison with the first embodiment, Connecting a first reinforcing bar (22) between a plurality of plates (10) by fastening a first reinforcing bar (22) to a ring (14) Winding the reinforcing sheet 92 on the retaining wall block 90 by placing the retaining wall block 90 on the retaining wall block 90 so as to maintain the distance from the slope and winding the reinforcing sheet 92 on the retaining wall block 90, The step of winding the reinforcing sheet 92 on the retaining wall block 90 and the step of installing the reinforcing soil are repeated to provide a retaining wall in front of the slope.
본 실시예는 사면에 보강재(30)와 플레이트(10)를 설치하고, 다수 개의 플레이트(10) 사이에 제1철근(22)을 결합부재(12)를 사용하여 걸림결합시킨 후에 제1철근(22)에 보강시트(92)를 권취시키고, 사면과 거리를 유지하도록 옹벽블록(90)을 적층시키면서 보강시트(92)가 옹벽블록 사이에 개재되도록 보강시트(92)를 옹벽블록(90)에 권취시킨다.In this embodiment, the reinforcing member 30 and the plate 10 are provided on the slope, and the first reinforcing bars 22 are fastened between the plurality of plates 10 using the engaging member 12, The reinforcing sheet 92 is wound around the retaining wall block 90 such that the reinforcing sheet 92 is interposed between the retaining wall blocks while the retaining wall block 90 is laminated so as to maintain the distance from the slope Wind it.
이후에, 옹벽블록(90)과 사면 사이에 보강토를 포설하여 다짐하고 이러한 작업을 반복하여 사면의 전방에 옹벽을 시공한다.Thereafter, reinforcement soil is laid between the retaining wall block 90 and the slope, and this operation is repeated to construct a retaining wall in front of the slope.
따라서 사면의 전방에 옹벽이 시공되어 사면을 보다 효과적으로 보강시킬 수 있게 된다.Therefore, a retaining wall is installed in front of the slope so as to more effectively reinforce the slope.
이로써, 수동요철을 보강재에 체결하여 설치할 수 있고, 수동요철이 보강재로부터 유동되는 것을 방지할 수 있으며, 사면으로부터 그라우팅재가 유실되는 것을 억제하며, 사면에 시공되는 철망을 걸림결합시켜 사면에 안착시킬 수 있는 사면보강용 네일장치 및 이의 시공방법을 제공할 수 있게 된다.
As a result, the manual unevenness can be fixed to the stiffener, the passive unevenness can be prevented from flowing from the stiffener, the leakage of the grouting material from the slope can be prevented, The present invention provides a nail device for reinforcing a slope and a method of constructing the same.
본 발명은 도면에 도시되는 일 실시예를 참고로 하여 설명되었으나, 이는 예시적인 것에 불과하며, 당해 기술이 속하는 분야에서 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하다는 점을 이해할 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but, on the contrary, is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims. .
또한, 사면보강용 네일장치 및 이의 시공방법을 예로 들어 설명하였으나, 이는 예시적인 것에 불과하며, 사면보강용 네일장치 및 이의 시공방법이 아닌 다른 제품에도 본 발명의 네일장치 및 이의 시공방법이 사용될 수 있다.Although the present invention has been described with respect to a nail device for reinforcing a slope and an application method thereof, the present invention is merely an example, and the nail device of the present invention and its construction method may be used in other products than the nail device for reinforcing slopes have.
따라서 본 발명의 진정한 기술적 보호범위는 아래의 특허청구범위에 의해서 정하여져야 할 것이다.
Accordingly, the true scope of the present invention should be determined by the following claims.
10 : 플레이트 12 : 결합부재
14 : 고리부 16 : 삽입홀부
20 : 철망 22 : 제1철근
24 : 제2철근 30 : 보강재
32 : 걸림부재 50 : 수동요철
52 : 요철패널 54 : 고정부
56 : 웨지부재 56a : 나사산
56b : 안착홈부 56c : 간격홈부
57 : 너트부재 58 : 마감링
70 : 밀폐부 72 : 팩부재
74 : 패킹부재 74a : 결합홈부
76 : 밴드 77a : 그라우팅주입구
77b : 공기배출구 77c : 충진재주입구
78 : 실링부재 80 : 그라우트재
90 : 옹벽블록 92 : 보강시트
10: plate 12: engaging member
14: Ring portion 16: Insertion hole portion
20: wire net 22: first reinforcing bar
24: second reinforcing bar 30: reinforcing material
32: latching member 50: manual unevenness
52: concave / convex panel 54:
56: wedge member 56a: threaded
56b: seating groove portion 56c:
57: Nut member 58: Finishing ring
70: sealing part 72: pack member
74: packing member 74a: engaging groove
76: band 77a: grouting inlet
77b: Air outlet 77c: Filler inlet
78: sealing member 80: grout material
90: retaining wall block 92: reinforcing sheet

Claims (12)

  1. 사면에 성형되는 천공홀을 덮도록 사면에 안착되는 플레이트; 상기 플레이트에 결합되고 상기 천공홀에 삽입되는 보강재; 상기 보강재에 설치되고 상기 천공홀 내부에 삽입되는 수동요철; 상기 보강재에 설치되고 충진재의 주입되면 부피가 팽창되어 상기 천공홀을 폐쇄하는 밀폐부; 상기 밀폐부를 통과하여 상기 천공홀에 충진되는 그라우트재; 및 사면에 간격을 유지하며 배치되는 복수 개의 상기 플레이트 사이에 설치되고 상기 플레이트와 걸림결합되는 철망을 포함하는 사면보강용 네일장치에 있어서,
    상기 철망은,
    복수 개의 상기 플레이트를 연결하도록 사면에 좌우 방향으로 길게 배치되는 복수 개의 제1철근을 포함하고,
    사면과 거리를 유지하도록 안착되는 옹벽블록과 상기 제1철근에 보강시트가 권취되고, 상기 옹벽블록과 상기 플레이트 사이에 보강토가 포설되고,
    상기 수동요철은,
    상기 보강재가 삽입되는 관통홀부에 경사면이 형성되는 요철패널;
    상기 경사면을 가압하여 상기 요철패널을 지지하고 상기 요철패널을 상기 보강재에 결합시키는 고정부를 포함하고,
    상기 플레이트에는 상기 제1철근이 걸림결합되도록 고리부가 구비되는 결합부재가 압입되고,
    상기 결합부재는 상기 플레이트의 양단부에 수직방향으로 길게 배치되도록 상기 결합부재의 상단 및 하단이 굴곡되면서 상기 고리부를 형성하고, 상기 결합부재는 상기 플레이트의 양단부로부터 중앙부 측으로 삽입되어 결합되고,
    상기 플레이트에는 상기 철망을 이루는 제2철근이 삽입되도록 삽입홀부를 구비하는 클램프가 설치되고,
    복수 개의 상기 플레이트를 수직방향으로 연결하도록 상기 플레이트의 상면 및 저면에 상기 클램프가 압입되고, 복수 개의 상기 플레이트를 수직방향으로 연결하는 상기 제2철근이 상기 삽입홀부에 압입되고,
    상기 삽입홀부로부터 상기 제2철근이 이탈되는 것을 방지하도록 상기 제2철근의 단부에는 경사면이 구비되는 압입부재가 설치되는 것을 특징으로 하는 사면보강용 네일장치.
    A plate resting on the slope to cover the perforation hole formed in the slope; A reinforcing member coupled to the plate and inserted into the perforation hole; A manual unevenness installed in the reinforcing member and inserted into the perforation hole; A sealing part installed on the reinforcing material and expanding in volume when the filling material is injected to close the perforation hole; A grout material passing through the closed portion to be filled in the perforation hole; And a wire net installed between a plurality of the plates disposed to be spaced apart from each other on the oblique surface and engaged with the plate,
    The above-
    And a plurality of first reinforcing bars arranged long in the left-right direction on the slopes so as to connect the plurality of plates,
    And a reinforcing sheet is wound around the first reinforcing bars, a reinforcing layer is disposed between the reinforcing block and the plate,
    The manual concavo-
    A concavo-convex panel in which an inclined surface is formed in a through hole through which the reinforcing material is inserted;
    And a fixing unit for pressing the inclined surface to support the concave / convex panel and coupling the concave / convex panel to the reinforcing member,
    A coupling member having a hook portion is inserted into the plate so that the first reinforcing bar is engaged,
    Wherein the coupling member is formed by bending an upper end and a lower end of the coupling member so as to be arranged in a vertical direction at both ends of the plate so that the coupling member is inserted and coupled from both ends of the plate to the center,
    A clamp having an insertion hole for inserting a second reinforcing bar made of the wire net is installed on the plate,
    The clamp is press-fitted into the upper surface and the lower surface of the plate so as to connect the plurality of plates in the vertical direction, the second reinforcing bars connecting the plurality of plates in the vertical direction are press-
    And a press-fit member having an inclined surface at an end of the second reinforcing bar to prevent the second reinforcing bar from being detached from the insertion hole.
  2. 삭제delete
  3. 제1항에 있어서, 상기 고정부는,
    상기 경사면을 가압하며 상기 요철패널을 지지하고 상기 보강재가 관통되는 웨지부재;
    상기 요철패널을 관통한 상기 웨지부재의 단부에 형성되는 나사산에 체결되고 상기 웨지부재가 유동되는 것을 방지하는 너트부재; 및
    상기 웨지부재에 형성되는 안착홈부에 삽입되고 상기 요철패널이 유동되는 것을 방지하는 마감링을 포함하는 것을 특징으로 하는 사면보강용 네일장치.
    The apparatus according to claim 1,
    A wedge member which presses the inclined surface and supports the concave / convex panel and through which the reinforcing member penetrates;
    A nut member fastened to a thread formed at an end of the wedge member penetrating the concavo-convex panel to prevent the wedge member from flowing; And
    And a finishing ring inserted in the seating groove portion formed in the wedge member and preventing the convex-and-concave panel from flowing.
  4. 제1항에 있어서,
    상기 요철패널은, 상기 천공홀의 입구에 대향되는 면에 상기 그라우트재와 간섭되는 지지면이 형성되는 것을 특징으로 하는 사면보강용 네일장치.
    The method according to claim 1,
    Wherein the concave and convex panel has a supporting surface for interfering with the grout material on the surface facing the inlet of the perforation hole.
  5. 제1항에 있어서,
    상기 요철패널은, 상기 천공홀의 입구에 대향되는 면에 상기 그라우트재가 삽입되는 간섭홈부가 형성되는 것을 특징으로 하는 사면보강용 네일장치.
    The method according to claim 1,
    Wherein the concave and convex panel has an interference groove portion into which the grout material is inserted on a surface facing the entrance of the perforation hole.
  6. 제1항에 있어서, 상기 밀폐부는,
    상기 보강재가 통과되고 상기 천공홀 내부에 배치되며 충진 공간을 제공하는 팩부재;
    상기 팩부재를 밀봉하도록 상기 팩부재의 단부를 구속하여 상기 보강재에 설치되는 패킹부재;
    상기 패킹부재의 결합홈부에 설치되고 상기 패킹부재를 상기 보강재 측으로 가압하는 밴드;
    상기 밀폐부를 통과하여 상기 천공홀 내부에 그라우트재를 공급하도록 상기 패킹부재를 통과하여 상기 천공홀 내부에 삽입되는 그라우팅주입구;
    상기 밀폐부를 통과하여 상기 천공홀 내부의 공기를 상기 천공홀 외부로 배출시키도록 상기 패킹부재를 통과하여 상기 천공홀 내부에 삽입되는 공기배출구;
    상기 천공홀 외부로부터 상기 팩부재 내측으로 삽입되고 상기 그라우트재를 상기 팩부재 내부로 안내하는 충진재주입구; 및
    상기 팩부재의 단부에 배치되도록 상기 패킹부재에 설치되고 상기 충진재가 상기 팩부재 외부로 배출되는 것을 방지하는 실링부재를 포함하는 것을 특징으로 하는 사면보강용 네일장치.
    The apparatus according to claim 1,
    A pack member through which the reinforcing member is passed and which is disposed inside the perforation hole and provides a filling space;
    A packing member installed on the stiffener for restraining an end portion of the pack member to seal the pack member;
    A band which is provided in an engaging groove portion of the packing member and presses the packing member toward the reinforcing member;
    A grouting inlet through which the grouting material passes through the sealing portion and is inserted into the perforation hole to supply the grout material into the perforation hole;
    An air discharge port passing through the sealing member and being inserted into the perforation hole so as to discharge the air inside the perforation hole to the outside of the perforation hole;
    A filling material injection port inserted into the pack member from the outside of the perforation hole and guiding the grout material into the pack member; And
    And a sealing member installed on the packing member so as to be disposed at the end of the pack member and preventing the filler from being discharged to the outside of the pack member.
  7. 삭제delete
  8. 삭제delete
  9. (a) 사면에 천공홀을 성형하고, 상기 천공홀에 삽입될 보강재에 복수 개의 수동요철 및 밀폐부를 설치하는 단계; (b) 상기 보강재를 상기 천공홀에 삽입하고, 상기 밀폐부에 충진재를 주입하여 상기 천공홀을 폐쇄하는 단계; (c) 상기 밀폐부에 구비되는 그라우팅주입구를 통해 상기 천공홀에 그라우트재를 주입하는 단계; 및 (d) 상기 천공홀을 덮도록 플레이트를 사면에 안착시켜 고정부에 상기 플레이트를 설치하는 단계를 포함하는 사면보강용 네일장치의 시공방법에 있어서,
    (e) 사면에 안착된 복수 개의 상기 플레이트에 고리부를 구비하는 결합부재를 설치하고, 상기 고리부에 제1철근을 걸림결합시켜 복수 개의 상기 플레이트 사이에 상기 제1철근을 연결하는 단계;
    (f) 상기 제1철근에 보강시트를 권취시키고, 사면과 거리를 유지하도록 옹벽블록을 안착시켜 상기 보강시트를 상기 옹벽블록에 권취시키는 단계;
    (g) 상기 옹벽블록과 사면 사이에 보강토를 포설하는 단계; 및
    (h) 상기 (f) 단계 및 상기 (g) 단계를 반복하여 사면의 전방에 옹벽을 설치하는 단계를 더 포함하고,
    복수 개의 상기 플레이트를 연결하도록 사면에 좌우 방향으로 길게 복수 개의 상기 제1철근이 배치되고,
    사면과 거리를 유지하도록 안착되는 옹벽블록과 상기 제1철근에 보강시트가 권취되고, 상기 옹벽블록과 상기 플레이트 사이에 보강토가 포설되고,
    상기 (b) 단계는, 충진재가 유실되는 것을 방지하도록 상기 밀폐부를 이루는 팩부재의 단부에 충진재를 흡수하는 실링부재가 설치되어 상기 팩부재에 주입되는 충진재가 상기 실링부재에 흡수되면서 상기 팩부재를 밀폐시키고,
    상기 플레이트에는 상기 제1철근이 걸림결합되도록 상기 고리부가 구비되는 상기 결합부재가 압입되고,
    상기 결합부재는 상기 플레이트의 양단부에 수직방향으로 길게 배치되도록 상기 결합부재의 상단 및 하단이 굴곡되면서 상기 고리부를 형성하고, 상기 결합부재는 상기 플레이트의 양단부로부터 중앙부 측으로 삽입되어 결합되고,
    상기 플레이트에는 철망을 이루는 제2철근이 삽입되도록 삽입홀부를 구비하는 클램프가 설치되고,
    복수 개의 상기 플레이트를 수직방향으로 연결하도록 상기 플레이트의 상면 및 저면에 상기 클램프가 압입되고, 복수 개의 상기 플레이트를 수직방향으로 연결하는 상기 제2철근이 상기 삽입홀부에 압입되고,
    상기 삽입홀부로부터 상기 제2철근이 이탈되는 것을 방지하도록 상기 제2철근의 단부에는 경사면이 구비되는 압입부재가 설치되는 것을 특징으로 하는 사면보강용 네일장치의 시공방법.
    (a) forming a perforation hole in a slope and providing a plurality of passive protrusions and seals in a stiffener to be inserted into the perforation hole; (b) inserting the reinforcing material into the perforation hole and injecting a filler into the enclosure to close the perforation hole; (c) injecting a grout material into the perforation hole through a grouting inlet provided in the closed portion; And (d) placing the plate on a slope so as to cover the perforation hole to thereby install the plate on the stationary part, the method comprising:
    (e) providing an engaging member having a ring portion on a plurality of the plates mounted on the slope, and connecting the first reinforcing bars between the plurality of plates by engaging the first reinforcing bars with the ring portions;
    (f) winding a reinforcing sheet on the first reinforcing bar and placing the reinforcing block on the retaining wall block so as to maintain a distance from the slope;
    (g) installing a reinforcement soil between the retaining wall block and the slope; And
    (h) repeating the step (f) and the step (g), further comprising the step of installing a retaining wall in front of the slope,
    A plurality of the first reinforcing bars are disposed on the oblique surface so as to connect the plurality of plates,
    And a reinforcing sheet is wound around the first reinforcing bars, a reinforcing layer is disposed between the reinforcing block and the plate,
    In the step (b), a sealing member for absorbing a filling material is provided at an end of the packing member constituting the sealing part so as to prevent the filling material from being lost, so that the filling material injected into the packing member is absorbed by the sealing member, Closed,
    The engaging member having the annular portion is press-fitted into the plate so that the first reinforcing bar is engaged,
    Wherein the coupling member is formed by bending an upper end and a lower end of the coupling member so as to be arranged in a vertical direction at both ends of the plate so that the coupling member is inserted and coupled from both ends of the plate to the center,
    A clamp having an insertion hole for inserting a second reinforcing bar made of a wire net is installed on the plate,
    The clamp is press-fitted into the upper surface and the lower surface of the plate so as to connect the plurality of plates in the vertical direction, the second reinforcing bars connecting the plurality of plates in the vertical direction are press-
    Wherein a press-in member having an inclined surface is provided at an end of the second reinforcing bar to prevent the second reinforcing bar from being detached from the insertion hole.
  10. 삭제delete
  11. 삭제delete
  12. 제9항에 있어서,
    (e) 사면에 안착된 복수 개의 상기 플레이트에 고리부를 구비하는 결합부재를 설치하고, 상기 고리부에 제1철근을 걸림결합시켜 복수 개의 상기 플레이트 사이에 상기 제1철근을 연결하는 단계;
    (f) 상기 제1철근에 보강시트를 권취시키고, 사면과 거리를 유지하도록 옹벽블록을 안착시켜 상기 보강시트를 상기 옹벽블록에 권취시키는 단계;
    (g) 상기 옹벽블록과 사면 사이에 보강토를 포설하는 단계; 및
    (h) 상기 (f) 단계 및 상기 (g) 단계를 반복하여 사면의 전방에 옹벽을 설치하는 단계를 더 포함하는 것을 특징으로 하는 사면보강용 네일장치의 시공방법.
    10. The method of claim 9,
    (e) providing an engaging member having a ring portion on a plurality of the plates mounted on the slope, and connecting the first reinforcing bars between the plurality of plates by engaging the first reinforcing bars with the ring portions;
    (f) winding a reinforcing sheet on the first reinforcing bar and placing the reinforcing block on the retaining wall block so as to maintain a distance from the slope;
    (g) installing a reinforcement soil between the retaining wall block and the slope; And
    (h) repeating the step (f) and the step (g), further comprising the step of installing a retaining wall in front of the slope.
KR1020140079227A 2014-06-26 2014-06-26 Nail apparatus for reinforcing slope and KR101547674B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140079227A KR101547674B1 (en) 2014-06-26 2014-06-26 Nail apparatus for reinforcing slope and

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140079227A KR101547674B1 (en) 2014-06-26 2014-06-26 Nail apparatus for reinforcing slope and

Publications (1)

Publication Number Publication Date
KR101547674B1 true KR101547674B1 (en) 2015-09-04

Family

ID=54246672

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140079227A KR101547674B1 (en) 2014-06-26 2014-06-26 Nail apparatus for reinforcing slope and

Country Status (1)

Country Link
KR (1) KR101547674B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190105735A (en) * 2018-03-06 2019-09-18 주식회사동림이엔지 Soil nailing Device and soil nailing method using the same

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100448039B1 (en) * 2003-06-25 2004-09-18 곽윤형 Soil-nail Structure and Soilr-nailing method for slope-reinforcement-construction
KR100505329B1 (en) * 2004-12-27 2005-08-03 전승희 Tension nail method of construction
KR100978006B1 (en) * 2010-01-19 2010-08-25 하리기술이십이 주식회사 Soil nailing method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100448039B1 (en) * 2003-06-25 2004-09-18 곽윤형 Soil-nail Structure and Soilr-nailing method for slope-reinforcement-construction
KR100505329B1 (en) * 2004-12-27 2005-08-03 전승희 Tension nail method of construction
KR100978006B1 (en) * 2010-01-19 2010-08-25 하리기술이십이 주식회사 Soil nailing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190105735A (en) * 2018-03-06 2019-09-18 주식회사동림이엔지 Soil nailing Device and soil nailing method using the same
KR102176457B1 (en) * 2018-03-06 2020-11-09 주식회사동림이엔지 Soil nailing Device and soil nailing method using the same

Similar Documents

Publication Publication Date Title
JP2004027813A (en) Packer for pressure type soil nailing and method of soil nailing using it
KR101539031B1 (en) Pack-mounted Reinforcing Structure
JP2004027813A5 (en)
KR20060032905A (en) The pressure type grouting equipment for ground reinforcement, and a method of construction
KR101353882B1 (en) Method of reinforcement and construction of pillar of neighboring tunnel
KR101276572B1 (en) Pressurizing grouting type soil nailing and method for reinforcing slope using thereof
KR20180103776A (en) Reinforcing structures for inclined plane using steel pipe and steel bar and, reinforcing methods for the same
KR102093071B1 (en) A seismic portal structures attached out-plane square framed type strengthened by level-gap plates and sleeve-cap anchors
KR101547674B1 (en) Nail apparatus for reinforcing slope and
KR101024604B1 (en) Pressure type reinforced unit soil nailing using inclined member and wrinkle-pipe
KR100715098B1 (en) Shoring structure
KR20170125457A (en) A soil nailing method to have the functions of the shearing resistance force improvement and retaining wall panel cutting the ground
KR102083382B1 (en) Reinforced steel pipe one shot grouting
KR101577639B1 (en) Distributed compression-type anchor structure and retaining wall construction method
KR102110992B1 (en) Internal packer pressure structure of steel pipe multi-stage grouting device
KR102098938B1 (en) A pressure distributing device of a grating block for slope reinforcement, an anchoring structure for slope reinforcement including the same, and an anchor type slope reinforcement method
KR100862387B1 (en) Tensional kit for top-down constructing of acupressure lasting anchor and top-down constructing method of acupressure lasting anchor using this
KR101175741B1 (en) Double grouting injection module and earth reinforcing method using the same
KR100781492B1 (en) Structure of retaining wall, and construction methods for the same
KR102110260B1 (en) Mold assembly for manufacturing phc pile for soil retaining wall
KR101110274B1 (en) Calking assembly for recycling and tunnel reinforcement method using it
KR20050030095A (en) Pressure-type grouting apparatus for reinforcing the ground and hybrid-type nailing method by pressurized using the apparatus
KR101757975B1 (en) Anchor having a fixing device at a side of pressure plate to depress the land slope and method of installing the same
KR101734781B1 (en) Earth retaining self-reliance structure and earth retaining construction method using it
KR100869369B1 (en) The ground reinforcement apparatus and method grouting type using bundle steel pipe

Legal Events

Date Code Title Description
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20180705

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20190618

Year of fee payment: 5