KR100965976B1 - 빌레트의 중심편석이 저감되는 연속주조방법 - Google Patents
빌레트의 중심편석이 저감되는 연속주조방법 Download PDFInfo
- Publication number
- KR100965976B1 KR100965976B1 KR1020020082621A KR20020082621A KR100965976B1 KR 100965976 B1 KR100965976 B1 KR 100965976B1 KR 1020020082621 A KR1020020082621 A KR 1020020082621A KR 20020082621 A KR20020082621 A KR 20020082621A KR 100965976 B1 KR100965976 B1 KR 100965976B1
- Authority
- KR
- South Korea
- Prior art keywords
- billet
- roll
- segregation
- casting speed
- continuous casting
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/128—Accessories for subsequent treating or working cast stock in situ for removing
- B22D11/1287—Rolls; Lubricating, cooling or heating rolls while in use
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/16—Controlling or regulating processes or operations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/04—Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Continuous Casting (AREA)
Abstract
Description
Claims (3)
- 삭제
- 연주기에서 빌레트 주편을 제조하는 빌레트의 중심편석이 저감되는 연속주조방법에 있어서,주편을 열전달 해석하여 상기 연주기의 응고완료 위치를 산정하는 단계;상기 해석 결과를 기초로 하여 인발롤의 설치 위치에서 잔류용강의 존재하도록 주조 속도를 산정하는 단계; 및상기 응고완료 위치가 상기 인발롤 이전에 위치하도록 상기 산정된 주조 속도 이하로 상기 연주기의 주조 속도를 조절하는 단계를 포함하며,상기 연주기는 160X160mm의 단면 크기를 가지며 인발롤이 탕면으로부터 15.1m에 위치되되, 탄소농도가 0.7%이고, 상기 인발롤의 압력이 30바일 때 상기 주조속도가 1.4 내지 1.5m/min.으로 조절되며 편석지수가 1.15 내지 1.16 범위 내로 제한되는 것을 특징으로 하는 빌레트의 중심편석이 저감되는 연속주조방법.
- 연주기에서 빌레트 주편을 제조하는 빌레트의 중심편석이 저감되는 연속주조방법에 있어서,주편을 열전달 해석하여 상기 연주기의 응고완료 위치를 산정하는 단계;상기 해석 결과를 기초로 하여 인발롤의 설치 위치에서 잔류용강의 존재하도록 주조 속도를 산정하는 단계; 및상기 응고완료 위치가 상기 인발롤 이전에 위치하도록 상기 산정된 주조 속도 이하로 상기 연주기의 주조 속도를 조절하는 단계를 포함하며,상기 연주기는 160X160mm의 단면 크기를 가지며 인발롤이 탕면으로부터 15.1m에 위치되되, 탄소농도가 0.6%이고, 상기 인발롤의 압력이 40바일 때 상기 주조속도가 1.5 내지 1.6m/min.으로 조절되며 편석지수가 1.11 내지 1.13 범위 내로 제한되는 것을 특징으로 하는 빌레트의 중심편석이 저감되는 연속주조방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020082621A KR100965976B1 (ko) | 2002-12-23 | 2002-12-23 | 빌레트의 중심편석이 저감되는 연속주조방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020020082621A KR100965976B1 (ko) | 2002-12-23 | 2002-12-23 | 빌레트의 중심편석이 저감되는 연속주조방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20040056084A KR20040056084A (ko) | 2004-06-30 |
KR100965976B1 true KR100965976B1 (ko) | 2010-06-24 |
Family
ID=37348509
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020020082621A KR100965976B1 (ko) | 2002-12-23 | 2002-12-23 | 빌레트의 중심편석이 저감되는 연속주조방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100965976B1 (ko) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102335733A (zh) * | 2011-10-21 | 2012-02-01 | 上海亚新连铸技术工程有限公司 | 一种利用鼓肚进行轻压下的方法 |
CN113145816B (zh) * | 2021-01-28 | 2022-11-18 | 吉林建龙钢铁有限责任公司 | 一种减轻中碳钢组织缺陷的控制方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR19980047223A (ko) * | 1996-12-14 | 1998-09-15 | 김종진 | 고탄소 소단면 빌레트(billet) 주편의 냉각방법 |
JP2001071102A (ja) | 1999-08-31 | 2001-03-21 | Kawasaki Steel Corp | 鋼鋳片の連続鋳造方法 |
KR20010045770A (ko) * | 1999-11-08 | 2001-06-05 | 신현준 | 연속주조 슬라브의 경압하방법 |
-
2002
- 2002-12-23 KR KR1020020082621A patent/KR100965976B1/ko active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR19980047223A (ko) * | 1996-12-14 | 1998-09-15 | 김종진 | 고탄소 소단면 빌레트(billet) 주편의 냉각방법 |
JP2001071102A (ja) | 1999-08-31 | 2001-03-21 | Kawasaki Steel Corp | 鋼鋳片の連続鋳造方法 |
KR20010045770A (ko) * | 1999-11-08 | 2001-06-05 | 신현준 | 연속주조 슬라브의 경압하방법 |
Also Published As
Publication number | Publication date |
---|---|
KR20040056084A (ko) | 2004-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6115735B2 (ja) | 鋼の連続鋳造方法 | |
KR102635630B1 (ko) | 강의 연속 주조 방법 | |
JP6384679B2 (ja) | 熱延鋼板の製造方法 | |
KR100965976B1 (ko) | 빌레트의 중심편석이 저감되는 연속주조방법 | |
CN106536085A (zh) | 钢的连续铸造方法 | |
JP3427794B2 (ja) | 連続鋳造方法 | |
JP2002307149A (ja) | 連続鋳造方法 | |
JP4205652B2 (ja) | 割れの少ないブルーム鋳片の製造方法 | |
JP7226043B2 (ja) | 連続鋳造方法 | |
JP3275835B2 (ja) | 連続鋳造方法および連続鋳造機 | |
JP2950152B2 (ja) | スラブ用連続鋳造鋳型 | |
KR20170068645A (ko) | 주편 제조방법 | |
JP3111954B2 (ja) | 連続鋳造方法 | |
RU2779384C1 (ru) | Способ непрерывной разливки стали | |
JP3633573B2 (ja) | 連続鋳造方法 | |
JP7273307B2 (ja) | 鋼の連続鋳造方法 | |
JP2009233703A (ja) | 連続鋳造方法 | |
JP5958036B2 (ja) | 鋳片の凝固状態推定装置及び連続鋳造方法 | |
JP2000117405A (ja) | ビレットの連続鋳造方法及び装置 | |
JP2000218350A (ja) | 連続鋳造方法 | |
JP3297802B2 (ja) | 連続鋳造方法 | |
JP2002178113A (ja) | 優れた凝固組織を有する鋳片及びそれを加工した鋼材 | |
KR101545937B1 (ko) | 주편 표면크랙 발생 판정 방법 | |
JP2003136208A (ja) | 鋼の連続鋳造方法 | |
JP2024004032A (ja) | 連続鋳造方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E90F | Notification of reason for final refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130614 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20140422 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20150421 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20160614 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20170510 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20180419 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20190611 Year of fee payment: 10 |