KR100875488B1 - 무지주 거푸집시스템 및 이를 이용한 철근콘크리트공사방법 - Google Patents
무지주 거푸집시스템 및 이를 이용한 철근콘크리트공사방법 Download PDFInfo
- Publication number
- KR100875488B1 KR100875488B1 KR1020070070722A KR20070070722A KR100875488B1 KR 100875488 B1 KR100875488 B1 KR 100875488B1 KR 1020070070722 A KR1020070070722 A KR 1020070070722A KR 20070070722 A KR20070070722 A KR 20070070722A KR 100875488 B1 KR100875488 B1 KR 100875488B1
- Authority
- KR
- South Korea
- Prior art keywords
- formwork
- concrete
- reinforcing
- reinforcement
- assembly
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/065—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
- E04G17/0655—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
- E04G17/0658—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts remaining completely or partially embedded in the cast material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/40—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for coffered or ribbed ceilings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/04—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Reinforcement Elements For Buildings (AREA)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070070722A KR100875488B1 (ko) | 2007-07-13 | 2007-07-13 | 무지주 거푸집시스템 및 이를 이용한 철근콘크리트공사방법 |
PCT/KR2008/004065 WO2009011516A2 (fr) | 2007-07-13 | 2008-07-10 | Coffrage à barres de renfort, système de coffrage sans support et procédé de construction sans support utilisant un tel système |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070070722A KR100875488B1 (ko) | 2007-07-13 | 2007-07-13 | 무지주 거푸집시스템 및 이를 이용한 철근콘크리트공사방법 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100875488B1 true KR100875488B1 (ko) | 2008-12-22 |
Family
ID=40260207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070070722A KR100875488B1 (ko) | 2007-07-13 | 2007-07-13 | 무지주 거푸집시스템 및 이를 이용한 철근콘크리트공사방법 |
Country Status (2)
Country | Link |
---|---|
KR (1) | KR100875488B1 (fr) |
WO (1) | WO2009011516A2 (fr) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101184511B1 (ko) | 2010-07-06 | 2012-09-19 | 이창남 | 두꺼운 벽체 철근프레임을 공장 용접하여 현장 배근하는 공법 |
CN103758342A (zh) * | 2014-01-07 | 2014-04-30 | 山东新港国际模板工程技术有限公司 | 建筑用工具式顶模 |
US9518388B1 (en) * | 2015-09-24 | 2016-12-13 | Guangzhou Construction Engineering Co., Ltd. | Construction method for producing beam and slab made of compound concrete containing demolished concrete |
KR101722084B1 (ko) * | 2016-05-10 | 2017-04-03 | 김범준 | 입체 격자 철근조립체의 제작방법 |
CN106760492A (zh) * | 2016-12-09 | 2017-05-31 | 中航天建设工程有限公司 | 一种一次成型后浇带混凝土施工工艺 |
CN108915246A (zh) * | 2018-06-25 | 2018-11-30 | 中国建筑第八工程局有限公司 | 键槽脚手架顶部悬挑杆加强结构 |
CN109252661A (zh) * | 2018-11-20 | 2019-01-22 | 中建三局第建设工程有限责任公司 | 洁净厂房格构梁和高大梁板支模架快拆快转的施工方法 |
KR20200113892A (ko) * | 2019-03-27 | 2020-10-07 | 주식회사 포스코 | 벽체모듈 및, 벽체구조물 |
CN114054994A (zh) * | 2021-10-26 | 2022-02-18 | 国网福建省电力有限公司 | 一种输电塔角钢交界面腐蚀焊接修复方法 |
CN114232484A (zh) * | 2021-12-13 | 2022-03-25 | 上海绿地建设(集团)有限公司 | 跨交通繁忙路段市政高架桥梁施工方法 |
KR20220055831A (ko) | 2020-10-27 | 2022-05-04 | 고미순 | 무해체 거푸집과 호리빔 결합구조 |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201502135U (zh) * | 2009-08-20 | 2010-06-09 | 谢英俊 | 设有连续双梁结构的轻钢屋架 |
WO2013044433A1 (fr) * | 2011-09-26 | 2013-04-04 | Empire Technology Development Llc | Moule à suspension |
CN105155675B (zh) * | 2015-08-27 | 2017-08-29 | 浙江大泰科技股份有限公司 | 一种钢筋桁架楼层板整体安装的节点结构 |
CN108867873B (zh) * | 2017-05-16 | 2021-05-11 | 吴方华 | 螺栓钢筋插销预制装配木结构梁柱边节点 |
CN107476583A (zh) * | 2017-08-18 | 2017-12-15 | 国网上海市电力公司 | 一种混凝土装配式楼房建造施工方法 |
CN108952455B (zh) * | 2018-08-03 | 2023-12-05 | 新疆建咨昆仑工程建设有限责任公司 | 一种预制飘窗及其安装方法 |
CN112065035A (zh) * | 2020-09-10 | 2020-12-11 | 李德良 | 一种木方及其制备方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5136218U (fr) * | 1974-09-10 | 1976-03-17 | ||
KR200372661Y1 (ko) | 2004-10-14 | 2005-01-15 | 박무용 | 거푸집 분리형 트러스 데크 |
KR100498815B1 (ko) | 2005-01-29 | 2005-07-01 | 주식회사 일호 | 거푸집조립체를 이용한 슬라브용 트러스 골조시스템 |
KR200426525Y1 (ko) | 2006-06-22 | 2006-09-19 | 주식회사에이비엠이앤씨 | 건축물의 슬래브 시공을 위한 철근 구조 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5549377Y2 (fr) * | 1975-11-12 | 1980-11-18 | ||
JPS57171046U (fr) * | 1981-04-23 | 1982-10-28 | ||
KR20060121667A (ko) * | 2006-02-08 | 2006-11-29 | 반재경 | 건축물의 슬라브 시공을 위한 철근구조 |
-
2007
- 2007-07-13 KR KR1020070070722A patent/KR100875488B1/ko not_active IP Right Cessation
-
2008
- 2008-07-10 WO PCT/KR2008/004065 patent/WO2009011516A2/fr active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5136218U (fr) * | 1974-09-10 | 1976-03-17 | ||
KR200372661Y1 (ko) | 2004-10-14 | 2005-01-15 | 박무용 | 거푸집 분리형 트러스 데크 |
KR100498815B1 (ko) | 2005-01-29 | 2005-07-01 | 주식회사 일호 | 거푸집조립체를 이용한 슬라브용 트러스 골조시스템 |
KR200426525Y1 (ko) | 2006-06-22 | 2006-09-19 | 주식회사에이비엠이앤씨 | 건축물의 슬래브 시공을 위한 철근 구조 |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101184511B1 (ko) | 2010-07-06 | 2012-09-19 | 이창남 | 두꺼운 벽체 철근프레임을 공장 용접하여 현장 배근하는 공법 |
CN103758342A (zh) * | 2014-01-07 | 2014-04-30 | 山东新港国际模板工程技术有限公司 | 建筑用工具式顶模 |
CN103758342B (zh) * | 2014-01-07 | 2016-06-15 | 山东新港模板工程技术股份有限公司 | 建筑用工具式顶模 |
US9518388B1 (en) * | 2015-09-24 | 2016-12-13 | Guangzhou Construction Engineering Co., Ltd. | Construction method for producing beam and slab made of compound concrete containing demolished concrete |
KR101722084B1 (ko) * | 2016-05-10 | 2017-04-03 | 김범준 | 입체 격자 철근조립체의 제작방법 |
CN106760492A (zh) * | 2016-12-09 | 2017-05-31 | 中航天建设工程有限公司 | 一种一次成型后浇带混凝土施工工艺 |
CN108915246B (zh) * | 2018-06-25 | 2020-06-09 | 中国建筑第八工程局有限公司 | 键槽脚手架顶部悬挑杆加强结构 |
CN108915246A (zh) * | 2018-06-25 | 2018-11-30 | 中国建筑第八工程局有限公司 | 键槽脚手架顶部悬挑杆加强结构 |
CN109252661A (zh) * | 2018-11-20 | 2019-01-22 | 中建三局第建设工程有限责任公司 | 洁净厂房格构梁和高大梁板支模架快拆快转的施工方法 |
CN109252661B (zh) * | 2018-11-20 | 2021-01-19 | 中建三局第一建设工程有限责任公司 | 洁净厂房格构梁和高大梁板支模架快拆快转的施工方法 |
KR20200113892A (ko) * | 2019-03-27 | 2020-10-07 | 주식회사 포스코 | 벽체모듈 및, 벽체구조물 |
KR102200236B1 (ko) * | 2019-03-27 | 2021-01-07 | 주식회사 포스코 | 벽체모듈 및, 벽체구조물 |
KR20220055831A (ko) | 2020-10-27 | 2022-05-04 | 고미순 | 무해체 거푸집과 호리빔 결합구조 |
CN114054994A (zh) * | 2021-10-26 | 2022-02-18 | 国网福建省电力有限公司 | 一种输电塔角钢交界面腐蚀焊接修复方法 |
CN114232484A (zh) * | 2021-12-13 | 2022-03-25 | 上海绿地建设(集团)有限公司 | 跨交通繁忙路段市政高架桥梁施工方法 |
CN114232484B (zh) * | 2021-12-13 | 2024-04-12 | 上海绿地建设(集团)有限公司 | 跨交通繁忙路段市政高架桥梁施工方法 |
Also Published As
Publication number | Publication date |
---|---|
WO2009011516A2 (fr) | 2009-01-22 |
WO2009011516A3 (fr) | 2009-03-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100875488B1 (ko) | 무지주 거푸집시스템 및 이를 이용한 철근콘크리트공사방법 | |
KR101584008B1 (ko) | 성형강판을 이용한 기둥 영구거푸집 | |
US20100031605A1 (en) | Composite concrete column and construction method using the same | |
KR100882464B1 (ko) | 지지구가 보강된 데크플레이트 | |
US20120210669A1 (en) | Method of constructing prefabricated steel reinforced concrete (psrc) column using angle steels and psrc column using angle steels | |
KR101301076B1 (ko) | 프리캐스트 전면 및 배면벽체를 이용한 벽체구조물 시공방법 | |
KR100731593B1 (ko) | 선조립 콘크리트구조물용 거푸집 구조체 및 이를 이용한 시공방법 | |
KR101533576B1 (ko) | 반채움 pc 트러스보강재 합성보 | |
KR20020011706A (ko) | 조립식 교각 및 이에 대한 시공방법 | |
KR100903211B1 (ko) | 지지구가 보강된 데크플레이트 | |
KR20140109587A (ko) | 블록을 이용한 조립식 교각의 시공방법 | |
KR100343960B1 (ko) | 강콘크리트 구조시스템 | |
KR101432087B1 (ko) | 프리플렉스 빔과 수평전단연결재를 이용한 합성형 라멘교 및 그의 시공방법 | |
KR20120085641A (ko) | 보 및 슬래브 거푸집 조립 구조 및 이를 이용한 보 및 슬래브 구조물 시공 방법 | |
KR100894650B1 (ko) | 프리플렉션 하중이 도입된 라멘교 및 그 시공방법 | |
KR100865133B1 (ko) | 결속구, 선조립 콘크리트 구조물용 거푸집 구조체 및 이를이용한 시공방법 | |
KR102197107B1 (ko) | 임플란트식 파일압입구가 이식된 슬래브단위체 및 이를 이용한 철근콘크리트기둥 시공방법 | |
KR102570377B1 (ko) | 트러스거더가 합성된 기둥 거푸집 구조재 및 그 시공방법 | |
KR101323140B1 (ko) | 공장 조립 철근 프레임 어셈블리를 이용한 보-기동 골조 | |
KR20090007085A (ko) | 철근조립거푸집, 이의 제작방법 및 이를 이용한철근콘크리트공사방법 | |
KR100695491B1 (ko) | 결속구, 선조립 콘크리트 구조물용 거푸집 구조체 및 이를이용한 시공방법 | |
KR102296982B1 (ko) | 트랜스퍼보 타설용 철골보를 이용한 트랜스퍼층 시공방법 | |
KR101078292B1 (ko) | 슬래브 거푸집 조립체 및 슬래브 시공 방법 | |
CN209837321U (zh) | 一种叠合梁与预制柱的连接节点 | |
KR101576224B1 (ko) | 건축물 시공용 조립식 프리캐스트 콘크리트 거더 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130215 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20131227 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20141128 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20151210 Year of fee payment: 8 |
|
LAPS | Lapse due to unpaid annual fee |