JPWO2006123394A1 - 板厚制御装置 - Google Patents
板厚制御装置 Download PDFInfo
- Publication number
- JPWO2006123394A1 JPWO2006123394A1 JP2006520613A JP2006520613A JPWO2006123394A1 JP WO2006123394 A1 JPWO2006123394 A1 JP WO2006123394A1 JP 2006520613 A JP2006520613 A JP 2006520613A JP 2006520613 A JP2006520613 A JP 2006520613A JP WO2006123394 A1 JPWO2006123394 A1 JP WO2006123394A1
- Authority
- JP
- Japan
- Prior art keywords
- roll
- rolling
- rolling load
- rotation
- fluctuation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005096 rolling process Methods 0.000 claims abstract description 207
- 239000007769 metal material Substances 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 description 18
- 230000009467 reduction Effects 0.000 description 15
- 239000000463 material Substances 0.000 description 11
- 230000008859 change Effects 0.000 description 9
- 230000000694 effects Effects 0.000 description 6
- 238000007792 addition Methods 0.000 description 3
- 238000001514 detection method Methods 0.000 description 3
- 230000004044 response Effects 0.000 description 3
- 230000002411 adverse Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005098 hot rolling Methods 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000005097 cold rolling Methods 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000005498 polishing Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/16—Control of thickness, width, diameter or other transverse dimensions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/58—Roll-force control; Roll-gap control
- B21B37/66—Roll eccentricity compensation systems
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B38/00—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product
- B21B38/08—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product for measuring roll-force
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control Of Metal Rolling (AREA)
Abstract
Description
(A)圧延する前に上下圧延ロールを接触させ、一定の荷重をかけて(キスロール状態で)ロールを回転させ、検出荷重を高速フーリエ変換するなどしてロール偏芯周波数を分析する。圧延中は分析した周波数のロール偏芯が発生するものとして、これを低減するようなロールギャップ操作量を出力する(特許文献1,2)。
(B)圧延機出側に板厚計が設置されている場合、板厚変動は板厚計で測定することができる。このため、板厚計で測定した値がロールのどの回転位置で圧延されたかを関連付けて、板厚偏差に応じてロールギャップを操作すれば、ロール偏芯による板厚変動を低減することができる(特許文献3)。
上述したように、ロール偏芯といえども原因が特定できない場合がある。一般に、ロール偏芯は、支持ロールが原因であることが多いが、圧延ロールの研磨状態などによっても起こり得る。また、ロール回転位置に関連して発生する荷重の変動成分は、正弦波であると仮定している。最も低次の周波数、いわゆる基本周波数の2倍若しくは3倍以上の周波数成分が現れる場合があり、どの周波数の外乱を低減するかが難しい。また一般に、キスロール状態で検出される荷重変動量の振幅は、圧延時に検出される荷重変動量の振幅とは異なる。
方法(B)の制御を適用できる圧延機は、出側に板厚計が設置されている必要がある。例えば7スタンドで構成される熱間薄板タンデム圧延機は、後段である5,6,7スタンドのロール偏芯による板厚変動が製品板厚変動として現れ易いが、一般には板厚計は7スタンド出側にしか設置されない。
このため、5,6スタンドのロール偏芯は制御できない。さらに、圧延スタンドからその出側の板厚計まで圧延材のトラッキングを正確に行う必要があり、圧延材速度を正確に採取する必要がある。圧延材速度は、ロール周速に先進率を考慮して計算することができるが、実測できるロール周速に対して先進率は予測値であり、誤差が含まれる。このため、圧延材速度には誤差が含まれ、トラッキング誤差が生じ易い。
金属材料を圧延するための圧延スタンドに組み込まれた圧延ロール又は支持ロールの回転位置に関連して発生する、ロール偏芯などに起因する板厚変動を制御する板厚制御装置において、
前記ロールの圧延荷重及び回転位置から、前記ロールの回転位置に関連して発生する圧延荷重の変動成分を算出し、算出された圧延荷重の変動成分を前記ロールの回転位置毎に加算・記録する圧延荷重変動算出手段と、
前記圧延荷重変動算出手段から与えられる前記ロールの回転位置毎の圧延荷重の変動成分を用いて、板厚変動を低減するような圧延ロールギャップ指令値を演算し、前記ロールの回転に応じて選んだタイミングで圧延ロールギャップ指令値を出力する操作量演算手段と、
前記操作量演算手段からの圧延ロールギャップ指令値に基づいて、当該圧延スタンドの圧延ロールギャップを操作するロールギャップ操作手段と
を備えたことを特徴とする板厚制御装置、
を提供するものである。
2 圧延機ハウジング
3 圧延ロール
4 支持ロール
5 圧下装置
6 圧延荷重検出器
7 ロール回転数検出器
8 ロール基準位置検出器
9 ロールギャップ検出器
11 圧延荷重変動算出手段
12 操作量演算手段
13 ロールギャップ操作手段
111 圧延荷重保持手段
112 平均値算出手段
113 減算器
LM リミッタ
SS,SW スイッチ
Σ 加算器
P 圧延荷重
ΔPA 圧延荷重の偏差
ΔS ロールギャップ修正量
θB3=3×360/n[度]
である。そして、図3における圧延ロール3の位置は、θwoが支持ロール4の基準位置に相当する圧延ロール位置であり、θwが圧延ロール3及び支持ロール4が同時に回転した後の、支持ロール4の位置θBに対応する位置である。
Z[k+1]=Z[k]+ΔPj (3)
ここで、
Z:加算
k:加算回数
j=1〜n−1
加算器Σは、当該圧延材が圧延される前にゼロクリアされ、支持ロールが1回転し平均値の演算が終了する毎に、その都度圧延荷重の偏差を加算する。この手順が、リミッタLM1、スイッチSS及び加算器Σにより実施される。
Z[k+1]=bZ[k]+ΔPj (4)
スイッチSWは、加算器Σから支持ロールの回転位置に対応して加算された圧延荷重の偏差を1つずつ取り出す。例えば、基準位置0をみれば、支持ロールが基準位置0を通過した時点で、スイッチSW0のみがonされて加算器Σ0から圧延荷重の偏差ΔPA0が取り出される。
2 圧延機ハウジング
3 圧延ロール
4 支持ロール
5 圧下装置
6 圧延荷重検出器
7 ロール回転数検出器
9 ロールギャップ検出器
11 圧延荷重変動算出手段
12 操作量演算手段
13 ロールギャップ操作手段
111 圧延荷重保持手段
112 平均値算出手段
113 減算器
LM リミッタ
SS,SW スイッチ
Σ 加算器
P 圧延荷重
ΔPA 圧延荷重の偏差
ΔS ロールギャップ修正量
これにより、ロール回転角を検出するセンサや、ロール角の基準位置を検出するセンサがない場合にロール回転角がずれていたとしても、過去に積算した圧延荷重変動値の影響を小さくし、最新の圧延荷重変動値の影響を大きくすることにより、そのずれによる悪影響を最小限に抑えることができる。」
Z[k+1]=bZ[k]+ΔP j (4)
これにより、ロール回転角を検出するセンサや、ロール角の基準位置を検出するセンサがない場合にロール回転角がずれていたとしても、過去に積算した圧延荷重変動値の影響を小さくし、最新の圧延荷重変動値の影響を大きくすることにより、そのずれによる悪影響を最小限に抑えることができる。」
Claims (8)
- 金属材料を圧延するための圧延スタンドに組み込まれた圧延ロール又は支持ロールの回転位置に関連して発生する、ロール偏芯などに起因する板厚変動を制御する板厚制御装置において、
前記ロールの圧延荷重及び回転位置から、前記ロールの回転位置に関連して発生する圧延荷重の変動成分を算出し、算出された圧延荷重の変動成分を前記ロールの回転位置毎に加算・記録する圧延荷重変動算出手段と、
前記圧延荷重変動算出手段から与えられる前記ロールの回転位置毎の圧延荷重の変動成分を用いて、板厚変動を低減するような圧延ロールギャップ指令値を演算し、前記ロールの回転に応じて選んだタイミングで圧延ロールギャップ指令値を出力する操作量演算手段と、
前記操作量演算手段からの圧延ロールギャップ指令値に基づいて、当該圧延スタンドの圧延ロールギャップを操作するロールギャップ操作手段と
を備えたことを特徴とする板厚制御装置。 - 請求項1記載の板厚制御装置において、
前記圧延荷重変動算出手段は、前記ロールの回転位置を検出する際、前記ロールの1回転毎に基準位置の補正をすることを特徴とする板厚制御装置。 - 請求項1記載の板厚制御装置において、
前記圧延荷重変動算出手段は、前記ロールの1回転当りの荷重を回転位置ごとに記録し、1回転完了後に1回転の開始時点及び終了時点の各圧延荷重を直線補間し、その直線補間された圧延荷重値と回転位置毎の圧延荷重とを比較して、回転位置に関連して発生する圧延荷重の変動成分を算出することを特徴とする板厚制御装置。 - 請求項1記載の板圧制御装置において、
前記圧延荷重変動算出手段は、前記ロールの1回転あたりの荷重を回転位置ごとに記録し、1回転完了後に、1回転の間の圧延荷重の平均値と回転位置毎の圧延荷重を比較して、回転位置に関連して発生する圧延荷重の変動成分を算出することを特徴とする板厚制御装置。 - 請求項1記載の板厚制御装置において、
前記圧延荷重変動算出手段は、前記ロールの回転位置毎に、算出した圧延荷重の変動成分を積算し、現在の制御時刻における前記ロールの回転位置に一致する圧延荷重の積算値を求め、
前記操作量演算手段は、この圧延荷重の積算値によって発生する板厚変動を抑制するように前記圧延ロールのギャップ指令値を計算する
ことを特徴とする板厚制御装置。 - 請求項5記載の板厚制御装置において、
前記圧延荷重変動算出手段は、前記ロールギャップ操作量に時間遅れがある場合、現在の制御時刻におけるロールの回転位置に一致する圧延荷重積算値から、前記遅れ時間に相当するロールの回転位置分を遡って圧延荷重の積算値を求めることを特徴とする板厚制御装置。 - 請求項5記載の板厚制御装置において、
前記圧延荷重変動算出手段は、前記圧延荷重の変動成分を積算する場合、最初に積算した値の影響を小さくするように積算していくことを特徴とする板厚制御装置。 - 請求項1ないし7の何れかに記載の板厚制御装置において、
前記操作量演算手段は、板厚変動を低減する比率と、圧延ロールギャップ指令値又はその指令値に基づいたロールギャップとを用いて、ゲージメータ板厚を補正することを特徴とする板厚制御装置。
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2005/008898 WO2006123394A1 (ja) | 2005-05-16 | 2005-05-16 | 板厚制御装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JPWO2006123394A1 true JPWO2006123394A1 (ja) | 2008-12-25 |
JP4673848B2 JP4673848B2 (ja) | 2011-04-20 |
Family
ID=37430978
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2006520613A Active JP4673848B2 (ja) | 2005-05-16 | 2005-05-16 | 板厚制御装置 |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP4673848B2 (ja) |
CN (1) | CN1933926B (ja) |
WO (1) | WO2006123394A1 (ja) |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8302440B2 (en) * | 2007-04-12 | 2012-11-06 | Toshiba Mitsubishi-Electric Industrial Systems Corporation | Thickness control apparatus of reversing rolling mill |
JP4991576B2 (ja) * | 2008-01-08 | 2012-08-01 | 株式会社日立製作所 | 板厚制御システム |
JP5170240B2 (ja) * | 2008-05-07 | 2013-03-27 | 東芝三菱電機産業システム株式会社 | 圧延機の板厚制御装置 |
CN101939118B (zh) * | 2008-12-22 | 2013-06-05 | 新日铁住金株式会社 | 钢板带轧制方法及钢板制造方法 |
CN101648217B (zh) * | 2009-06-09 | 2011-07-20 | 中冶赛迪工程技术股份有限公司 | 一种基于轧辊旋转角度的偏心补偿方法及其设备 |
CN102096393B (zh) * | 2009-12-14 | 2012-10-10 | 宝山钢铁股份有限公司 | 一种矫直机非自动控制时的动态限幅方法及其系统 |
CN102858475B (zh) * | 2010-04-21 | 2015-11-25 | 东芝三菱电机产业系统株式会社 | 板厚控制装置、板厚控制方法、板厚控制程序 |
CN102380513B (zh) * | 2010-08-25 | 2014-11-05 | 株式会社日立制作所 | 轧制控制装置及轧制控制方法 |
US9242283B2 (en) | 2010-11-22 | 2016-01-26 | Toshiba Mitsubishi-Electric Industrial Systems Corporation | Control apparatus of rolling mill |
JP5817130B2 (ja) * | 2011-01-27 | 2015-11-18 | Jfeスチール株式会社 | 熱間圧延ラインにおけるロール制御方法 |
JP5818511B2 (ja) * | 2011-05-25 | 2015-11-18 | 株式会社神戸製鋼所 | 自動板厚制御方法 |
JP5949658B2 (ja) * | 2013-05-20 | 2016-07-13 | 東芝三菱電機産業システム株式会社 | 通板設備の制御システム |
CN103706644B (zh) * | 2013-12-20 | 2016-04-27 | 秦皇岛首秦金属材料有限公司 | 基于测厚仪测量厚度的辊缝设定值自适应控制方法 |
CN103817154A (zh) * | 2014-01-24 | 2014-05-28 | 宁波钢铁有限公司 | 一种提高花纹板基板厚度控制精度的方法 |
CN104923572B (zh) * | 2015-06-25 | 2017-01-11 | 中色科技股份有限公司 | 一种冷轧机上游轧机轧辊偏心补偿的方法 |
JP6670261B2 (ja) * | 2017-02-23 | 2020-03-18 | 株式会社日立製作所 | タンデム圧延ミル制御装置およびタンデム圧延ミル制御方法 |
JP7103896B2 (ja) * | 2018-09-05 | 2022-07-20 | 株式会社Uacj | 制御装置及び制御方法 |
WO2021038760A1 (ja) * | 2019-08-28 | 2021-03-04 | 東芝三菱電機産業システム株式会社 | ロール状態モニタ装置 |
CN112139252A (zh) * | 2020-09-01 | 2020-12-29 | 南京钢铁股份有限公司 | 一种针对加热后水梁印的轧件厚度优化控制方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002282917A (ja) * | 2001-03-28 | 2002-10-02 | Toshiba Corp | 圧延機の板厚制御装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4521859A (en) * | 1982-10-27 | 1985-06-04 | General Electric Company | Method of improved gage control in metal rolling mills |
-
2005
- 2005-05-16 CN CN2005800078081A patent/CN1933926B/zh active Active
- 2005-05-16 WO PCT/JP2005/008898 patent/WO2006123394A1/ja active Application Filing
- 2005-05-16 JP JP2006520613A patent/JP4673848B2/ja active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002282917A (ja) * | 2001-03-28 | 2002-10-02 | Toshiba Corp | 圧延機の板厚制御装置 |
Also Published As
Publication number | Publication date |
---|---|
CN1933926B (zh) | 2011-08-17 |
WO2006123394A1 (ja) | 2006-11-23 |
JP4673848B2 (ja) | 2011-04-20 |
CN1933926A (zh) | 2007-03-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4673848B2 (ja) | 板厚制御装置 | |
AU2010351732B2 (en) | Gage controller, gage control method, and gage control program | |
KR900000780B1 (ko) | 압연제품두께 제어방법 및 그 장치 | |
JP5071376B2 (ja) | 板厚制御装置 | |
KR101435760B1 (ko) | 압연기의 제어 장치 | |
WO2009136435A1 (ja) | 圧延機の板厚制御装置 | |
JPS6227884B2 (ja) | ||
KR20160003863A (ko) | 압연기의 판 두께 제어 장치 | |
WO2007108356A1 (ja) | 冷間連続圧延設備 | |
JP6766970B1 (ja) | 板厚制御装置および板厚制御方法 | |
KR100828015B1 (ko) | 판 두께 제어 장치 | |
CN111036686B (zh) | 一种冷轧机支撑辊偏心的预估补偿方法 | |
CN102513376A (zh) | 四、六辊板带轧机辊系偏心相位辨识检测方法 | |
JP2000140919A (ja) | 板厚変動解析装置、および板厚制御装置とその制御方法、並びに板厚制御装置を備えた圧延機 | |
JP4397796B2 (ja) | 圧延機のロール偏心制御装置 | |
AU2007249130B2 (en) | Gauge control system | |
JP3171212B2 (ja) | タンデム圧延機及びタンデム圧延機の板厚異常原因推定方法 | |
JP7411518B2 (ja) | プラント制御装置、圧延制御装置、プラント制御方法およびプラント制御プログラム | |
JPS6366606B2 (ja) | ||
JPH08141616A (ja) | 圧延機の自動板厚制御装置 | |
KR20040056094A (ko) | 쌍롤형 박판 주조장치에서 엑스레이 게이지를 이용한 박판두께 제어장치 및 방법 | |
JPH07185626A (ja) | 圧延機のロール偏芯除去装置およびロール偏芯除去方法 | |
JP2001205319A (ja) | 多段圧延機のクラウン制御方法及びクラウン制御装置 | |
JPS59166314A (ja) | タンデム圧延機の異常検出装置 | |
JPS63115608A (ja) | 冷間圧延機のロ−ル偏心除去機能付自動板厚制御装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20091208 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20100122 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110118 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110121 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4673848 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140128 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |