JPS5715720A - Curing method for support bulb for end of sunk pile - Google Patents

Curing method for support bulb for end of sunk pile

Info

Publication number
JPS5715720A
JPS5715720A JP8777380A JP8777380A JPS5715720A JP S5715720 A JPS5715720 A JP S5715720A JP 8777380 A JP8777380 A JP 8777380A JP 8777380 A JP8777380 A JP 8777380A JP S5715720 A JPS5715720 A JP S5715720A
Authority
JP
Japan
Prior art keywords
existing pile
hollow part
cement milk
support bulb
given
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8777380A
Other languages
Japanese (ja)
Inventor
Yaeji Suzawa
Masao Manabe
Tsutomu Igawa
Akira Oshima
Isamu Urushibata
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Concrete Industries Co Ltd
Original Assignee
Nippon Concrete Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Concrete Industries Co Ltd filed Critical Nippon Concrete Industries Co Ltd
Priority to JP8777380A priority Critical patent/JPS5715720A/en
Publication of JPS5715720A publication Critical patent/JPS5715720A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE: To improve a monolithical unity if a support bulb and its spherical ground, by a method wherein a high-pressure gaseous substance is fed to a hollow part of an existing pile before an initial curing of a cement milk mixture starts, andt the hollow part is kept in a high-pressure state for a given period of time.
CONSTITUTION: Cement milk is poured to form a support bulb 3 for sinking an existing pile 1 down to a given depth from a ground surface 2 by interior excavating process, and after the cement milk is agitated and mixed, a cleansing water 6 is filled up to a given water level. An auger screw is pulled out of the existing pile 1 as it is washed with the cleansing water 6. A lid 7 is firmly adhered to an upper end plate 1a of the existing pile 1, and a conduit 8, which is inserted through the lid 7, connects together the space in the hollow part of the existing pile 1 and a compressor 9 to keep the inside of the hollow part in a high-pressure state for a given period of time.
COPYRIGHT: (C)1982,JPO&Japio
JP8777380A 1980-06-30 1980-06-30 Curing method for support bulb for end of sunk pile Pending JPS5715720A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8777380A JPS5715720A (en) 1980-06-30 1980-06-30 Curing method for support bulb for end of sunk pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8777380A JPS5715720A (en) 1980-06-30 1980-06-30 Curing method for support bulb for end of sunk pile

Publications (1)

Publication Number Publication Date
JPS5715720A true JPS5715720A (en) 1982-01-27

Family

ID=13924290

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8777380A Pending JPS5715720A (en) 1980-06-30 1980-06-30 Curing method for support bulb for end of sunk pile

Country Status (1)

Country Link
JP (1) JPS5715720A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100441627B1 (en) * 2000-10-09 2004-08-02 신성종합건축사사무소(주) Apparatus for Injecting Grouting Liquid Through Pile Hole
JP2008031772A (en) * 2006-07-31 2008-02-14 Jfe Steel Kk Construction method of precast pile, and cover for use in the construction method
JP2014134008A (en) * 2013-01-09 2014-07-24 Ohbayashi Corp Creating method for solidified body and burying method for steel pipe pile using the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100441627B1 (en) * 2000-10-09 2004-08-02 신성종합건축사사무소(주) Apparatus for Injecting Grouting Liquid Through Pile Hole
JP2008031772A (en) * 2006-07-31 2008-02-14 Jfe Steel Kk Construction method of precast pile, and cover for use in the construction method
JP2014134008A (en) * 2013-01-09 2014-07-24 Ohbayashi Corp Creating method for solidified body and burying method for steel pipe pile using the same

Similar Documents

Publication Publication Date Title
JPS5715720A (en) Curing method for support bulb for end of sunk pile
FR2830269B1 (en) PROCESS FOR PREPARING A SELF-COMPACTING FILL, SELF-COMPACTING FILL AND THE USE THEREOF
JPS56142923A (en) Construction of foundation pile and case auger used therefor
JPS5736214A (en) Reinforcing construction work of lock bolt for soft ground
JPS5634823A (en) Concrete pile injection constructing method
IT1201049B (en) Hollow foundation element for waterlogged ground
JPS5536584A (en) Construction process for continuous underground wall
GB2010361A (en) Method and Apparatus for Producing Slit Walls in the Ground
JPS566822A (en) Base pile making method
JPS55161117A (en) Constructing method for underground continuous wall by precast concrete member
JPS56135625A (en) Construction of underwater structure
JPS5789018A (en) Construction work for cut-off wall
JPS56135621A (en) Sand pile construction work in underwater ground
JP2504682B2 (en) Underwater landfill method
JPS5724720A (en) Increasing method for pull resistance of structure material driven into ground
JPS5592420A (en) Soft ground improvement process
JPS57112513A (en) Construction of foundation pile for ground improvement
JPS5639235A (en) Construction method for underwater concrete structure
JPS5526356A (en) Soft ground improvement method and its device
JPS56159422A (en) Bury and fixing of concrete pile
JPS5719422A (en) Fixing method of net in process covering slope with net
JPS55142810A (en) Forming of cement mortar layer outside underwater structure
JPS55105021A (en) High pressure chemichal liquid grouting method utilizing high frequency vibration pressure
JPS5733614A (en) Method for sinking installed pile through internal excavation
JPS5561989A (en) Installation method for water treatment deep tank