JPS5628930A JP10261879A JP10261879A JPS5628930A JP S5628930 A JPS5628930 A JP S5628930A JP 10261879 A JP10261879 A JP 10261879A JP 10261879 A JP10261879 A JP 10261879A JP S5628930 A JPS5628930 A JP S5628930A
Authority
JP
Japan
Prior art keywords
sheet
wall
excavated
holes
driving groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10261879A
Other languages
Japanese (ja)
Inventor
Mitsuhiro Kunito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seiko Kogyo Co Ltd
Original Assignee
Seiko Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seiko Kogyo Co Ltd filed Critical Seiko Kogyo Co Ltd
Priority to JP10261879A priority Critical patent/JPS5628930A/en
Publication of JPS5628930A publication Critical patent/JPS5628930A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE: To attain the method whereby the sheet pile can be driven easily even into a hard ground, such as the ground containing gravel, connection of sheet piles can be performed smoothly because of a continuous building-in method applied and no aperture is made between the sheet piles, thereby water tight being assured.
CONSTITUTION: The ground 1 being excavated by a multiaxial excavator 2, an almost rectangular excavated wall holes B are formed of excavated holes A linked together on a straight line, while a continuous sheet-pile driving groove wall C is formed by the holes B. At the time when the sheet-pile driving groove wall C is formed, a setting-agent solution for water tight is injected into the wall C and stirred, thus the earth and sand in the wall C being made muddy. Next, before the mixture thus made being solidified, a plural number of the sheet piles 5 provided with connecting edge 6 on one side edge and connected edge 7 on the other are driven along the sheet-pile driving groove wall C and facing edges 6 and 7 of adjacent sheet piles 5 are engaged with each other.
COPYRIGHT: (C)1981,JPO&Japio
JP10261879A 1979-08-11 1979-08-11 Driving method for sheet pile Pending JPS5628930A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10261879A JPS5628930A (en) 1979-08-11 1979-08-11 Driving method for sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10261879A JPS5628930A (en) 1979-08-11 1979-08-11 Driving method for sheet pile

Publications (1)

Publication Number Publication Date
JPS5628930A true JPS5628930A (en) 1981-03-23

Family

ID=14332227

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10261879A Pending JPS5628930A (en) 1979-08-11 1979-08-11 Driving method for sheet pile

Country Status (1)

Country Link
JP (1) JPS5628930A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6187016A (en) * 1984-10-03 1986-05-02 Masahide Nagahara Sheathing work by steel sheet pile
JPS6363820A (en) * 1986-09-05 1988-03-22 Nakamura Kogyo Kk Penetrator for shape steel by biaxial auger
JPS6363819A (en) * 1986-09-05 1988-03-22 Nakamura Kogyo Kk Penetrator for shape steel by biaxial auger

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6187016A (en) * 1984-10-03 1986-05-02 Masahide Nagahara Sheathing work by steel sheet pile
JPS6363820A (en) * 1986-09-05 1988-03-22 Nakamura Kogyo Kk Penetrator for shape steel by biaxial auger
JPS6363819A (en) * 1986-09-05 1988-03-22 Nakamura Kogyo Kk Penetrator for shape steel by biaxial auger

Similar Documents

Publication Publication Date Title
JPS5628930A (en) Driving method for sheet pile
JPS57180714A (en) Method of executing water stop work for sheet pile wall
JPS5513338A (en) Caison sinking method
JPS55142835A (en) Earth retaining method
JPS55155832A (en) Floatage-preventing method for light-weight pipe
JPS5724728A (en) Sheathing method and waling structure for use in said method
JPS57155432A (en) Method of erecting construction of existing pile
JPS57226A (en) Construction and structure of net pile
JPS55165317A (en) Burying method for steel-pipe sheet pile
JPS5781525A (en) Construction of underground continuous wall
JPS554410A (en) Earth retaining method
JPS5655612A (en) Breakwater
JPS55119824A (en) Consecutive laying method and device for underground steel
JPS55136337A (en) Reinforcing method for existing structure, footing, ground and the like
JPS5612423A (en) Construction of underground continuous wall
GB1407799A (en) Shoring apparatus and a method of shoring an excavation
JPS5545910A (en) Pile pulling method
SU1057629A1 (en) Manifold
JPS56139311A (en) Construction of retaining wall
JPS5628937A (en) Multishaft excavator
JPS5542949A (en) Construction process for underground column row wall
JPS5748017A (en) Method and device for constructing continuous underground wall
JPS641820A (en) Cut-off wall constituted of a series of piles
JPS55155807A (en) Pile for constructing wave dissipation structure
JPS5685021A (en) Driving method of pile