Construction process for underground column row wall

Info

Publication number
JPS5542949A
JPS5542949A JP11568078A JP11568078A JPS5542949A JP S5542949 A JPS5542949 A JP S5542949A JP 11568078 A JP11568078 A JP 11568078A JP 11568078 A JP11568078 A JP 11568078A JP S5542949 A JPS5542949 A JP S5542949A
Authority
JP
Japan
Prior art keywords
piles
bores
excavated
auger screw
construction process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11568078A
Other languages
Japanese (ja)
Inventor
Shinhachiro Ueda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nitto Kogyo Co Ltd
Original Assignee
Nitto Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nitto Kogyo Co Ltd filed Critical Nitto Kogyo Co Ltd
Priority to JP11568078A priority Critical patent/JPS5542949A/en
Publication of JPS5542949A publication Critical patent/JPS5542949A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE: In excavating a bore between a pair of piles by an auger screw, to prevent the auger screw from slanting by so excavating the bore that it intersects the piles.
CONSTITUTION: A self-hardening muddy fluid material 3 is filled in spaced excavated bores 2 and a reinforcing pile 5 is buried in each of the bores 2, to form piles 4. During when the piles 4 are machinable, excavated bores 6 are excavated between the piles 4. The bores 6 are so excavated by an auger screw that it intersects the piles 4 on its both sides, so that arch-shaped faces 4a are formed at the side faces of the piles 4. Because the auger screw is applied with the same excavation resistance from the piles 4 on its both sides during the excavation, it will not slant. A self-hardening muddy fluid material 7 is filled in the bores 6 and a steel pipe pile 8 is buried in each of the bores 6.
COPYRIGHT: (C)1980,JPO&Japio
JP11568078A 1978-09-19 1978-09-19 Construction process for underground column row wall Pending JPS5542949A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11568078A JPS5542949A (en) 1978-09-19 1978-09-19 Construction process for underground column row wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11568078A JPS5542949A (en) 1978-09-19 1978-09-19 Construction process for underground column row wall

Publications (1)

Publication Number Publication Date
JPS5542949A true JPS5542949A (en) 1980-03-26

Family

ID=14668609

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11568078A Pending JPS5542949A (en) 1978-09-19 1978-09-19 Construction process for underground column row wall

Country Status (1)

Country Link
JP (1) JPS5542949A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040023915A (en) * 2002-09-12 2004-03-20 (주)한빛하이테크엔지니어링 Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method and construction method thereof
JP2020183617A (en) * 2019-04-26 2020-11-12 株式会社アストリード Construction method of earth retaining concrete wall, earth retaining concrete wall, and shaft guide device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040023915A (en) * 2002-09-12 2004-03-20 (주)한빛하이테크엔지니어링 Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method and construction method thereof
JP2020183617A (en) * 2019-04-26 2020-11-12 株式会社アストリード Construction method of earth retaining concrete wall, earth retaining concrete wall, and shaft guide device

Similar Documents

Publication Publication Date Title
JPH11107686A (en) Long distance driving method in semishield method
JPS5542949A (en) Construction process for underground column row wall
US5868526A (en) Trench shield
JPS57127018A (en) Excavating method and device for continuous underground wall
JPS5670322A (en) Construction of underground wall by column strip
JPS5781523A (en) Construction work of horizontal water shield layer under ground
JPS57140421A (en) Construction of large-diameter in-situ cast pile
SU1788267A1 (en) Method for mining difficult-to-dredge placers
JPS5516172A (en) Excavation work method and apparatus for preventing landslide at ditch scooping
JPS57130622A (en) Construction of continuous underground wall
JPS56146515A (en) Method and apparatus for burying existing pile
JPS5724728A (en) Sheathing method and waling structure for use in said method
SU1191520A1 (en) Method of constructing drainage
JPS5685021A (en) Driving method of pile
JPS5545943A (en) Method of executing work for improving ground at bottom part of underground sewer
SU1055876A1 (en) Slope-working method
JPS5568936A (en) Trench digging device
DRUSHNAREV et al. New Continuous-flow Process for Blast-hole Drilling in Hydraulic-engineering, Reclamation, and Water-resources Construction
SU1051281A1 (en) Dump formation method
JPS573914A (en) Asphalt mastic continuous wall coupling structure and its construction
JPH056636B2 (en)
JPS55119827A (en) Method and device for digging conduit
JPS554410A (en) Earth retaining method
JPS56100919A (en) Preventing method for liquefaction of sandy ground