SU1191520A1 - Method of constructing drainage - Google Patents
Method of constructing drainage Download PDFInfo
- Publication number
- SU1191520A1 SU1191520A1 SU843755883A SU3755883A SU1191520A1 SU 1191520 A1 SU1191520 A1 SU 1191520A1 SU 843755883 A SU843755883 A SU 843755883A SU 3755883 A SU3755883 A SU 3755883A SU 1191520 A1 SU1191520 A1 SU 1191520A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- trench
- soil
- filled
- cavity
- structuring
- Prior art date
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
СПОСОБ СТРОИТЕЛЬСТВА ДРЕНАЖА , включающий отрывку траншеи, укладку в нее труб, обратную засыпку грунта и его оструктуривание, отличающийс тем, что, с целью сокращени объемов работ, перед отрывкой траншеи вдоль ее оси выполн ют полость, которую заполн ют оструктуривающим веществом. CD рвЫ ел го о Й/г Л -J / IA DRAINAGE CONSTRUCTION METHOD comprising a trench section, pipe laying into it, backfilling of soil, and its structuring, characterized in that, in order to reduce the amount of work, before the fragment of the trench along its axis a cavity is filled, which is filled with an structuring substance. CD of ers about h / c / -L / I
Description
1; Изобретение относитс к мелиорати ному строительству, в частности к строительству дренажа на т жельпс рли ни-QTwx рруншах с применением структу рообразователей. Целью изобретени вл етс сокрагщение объемов работ. На фиг. 1 показана технологическа схема образовани полости вдоль оси дрены и заполнение ее оструктуривающим веществом; на фиг. 2 - сечение А-А на фиг.Г (полость, заполненна структурообразующим веществом ); на фиг. 3,отрывка траншеи многоковшовым экскаватором; на фиг. 4 - сечение Б-Б на фиг.3(открытой траншеи и кавальера, образованного из выработанного и оструктуренного грунта). . Способ осуществл ют следующим образом . По трассе предполагаемой траншеи движетс т гач 1 с ножом-уширителем 2, которьй образует полость 3. Одновременно полость 3 заполн етс струк турообразующим веществом 4, подаваемым из емкости 5. Затем по трассе траншеи вдоль полости , заполненной структурообразую- 202 щим веществом, проходит многоковшо- вьш экскаватор 6, образу траншею 7 заданной глубины с образованием кавальера 8 из оструктуренного грунта. При отрывке грунта из траншеи происходит многократное перемешивание отрытого грунта со структурообразователем , внесенным ранее в полость по трассе траншеи. Первичное перемешивание происходит при выемке грунта из траншеи и подаче его ковшами на транспортер экскаватора.Вторичное перемешивание грунта со структурообразовате- лем происходит при выбросе грунта со структурообразователем с транспортера экскаватора в кавальер. Затем по трассе траншеи после укладки труб 9 проходит траншее- засыпатель (например, шнековый J, пе ремеща грунт из кавальера 8 в траншею 7 и осуществл , таким образом , окончательное перемешивание грунта со структурообразователем при засыпке траншеи. В процессе работы дренажа вода в дрену поступает через водопроницаемую (оструктуренную )засыпку по всей длине дренажной трубы.one; The invention relates to land-improvement construction, in particular to the construction of drainage on t gelpsi or QTwx runes using a generator structure. The aim of the invention is to reduce the scope of work. FIG. Figure 1 shows the technological scheme for the formation of a cavity along the axis of the drain and its filling with an structuring substance; in fig. 2 - section A-A in FIG. G (cavity, filled with a structure-forming substance); in fig. 3, a trench fragment with a multi-bucket excavator; in fig. 4 - section BB in FIG. 3 (open trench and cavalier formed from worked-out and structured soil). . The method is carried out as follows. Along the route of the supposed trench, the treadmill 1 moves with the knife-expander 2, which forms the cavity 3. Simultaneously, the cavity 3 is filled with the structure-forming substance 4 supplied from the tank 5. Then along the route of the trench along the cavity filled with the structure-forming substance 202 - out excavator 6, forming a trench 7 of a predetermined depth with the formation of a cavalier 8 from structured soil. When extracting the soil from the trench, repeated mixing of the excavated soil with the amendment agent, previously introduced into the cavity along the route of the trench, occurs. Primary mixing takes place when excavating soil from a trench and feeding it with buckets to the excavator conveyor. Secondary mixing of soil with a structure-forming agent occurs when soil is thrown from the excavator conveyor to the cavalier. Then, after the pipe-laying of pipe 9, the trench-dumper passes through the trench (for example, auger J, moving the soil from the cavalier 8 to the trench 7 and, thus, final mixing of the soil with the structurant during backfilling of the trench. through permeable (structurally) backfill along the entire length of the drainage pipe.
б-бbb
fpue. 4fpue. four
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843755883A SU1191520A1 (en) | 1984-04-04 | 1984-04-04 | Method of constructing drainage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843755883A SU1191520A1 (en) | 1984-04-04 | 1984-04-04 | Method of constructing drainage |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1191520A1 true SU1191520A1 (en) | 1985-11-15 |
Family
ID=21124858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU843755883A SU1191520A1 (en) | 1984-04-04 | 1984-04-04 | Method of constructing drainage |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1191520A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2782322C1 (en) * | 2022-04-14 | 2022-10-25 | Федеральное государственное бюджетное научное учреждение "Всероссийский научно-исследовательский институт гидротехники и мелиорации имени А.Н. Костякова" (ФГБНУ "ВНИИГиМ им. А.Н. Костякова") | Drainage construction method on bushy waterlogged lands |
-
1984
- 1984-04-04 SU SU843755883A patent/SU1191520A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 1002453, кл. Е 02 В 11/00, 1980. Авторское свидетельство СССР № 181005, кл. Е 02 В 11/00,4964. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2782322C1 (en) * | 2022-04-14 | 2022-10-25 | Федеральное государственное бюджетное научное учреждение "Всероссийский научно-исследовательский институт гидротехники и мелиорации имени А.Н. Костякова" (ФГБНУ "ВНИИГиМ им. А.Н. Костякова") | Drainage construction method on bushy waterlogged lands |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1191520A1 (en) | Method of constructing drainage | |
US3245222A (en) | Construction of underground dams | |
JPH0249896A (en) | Open shield method and machine thereof | |
JPS6117696A (en) | Construction of underground head | |
JPS5664028A (en) | Sheathing construction work by antecedent support framework | |
JPH04309692A (en) | Underground space construction method | |
JPH0823266B2 (en) | Construction method of underground space | |
RU2101502C1 (en) | Method of formation of haulage ramp | |
JPH06346699A (en) | Excavation method of underground space | |
SU1668548A1 (en) | Arena construction method | |
JPS601451B2 (en) | Water stop mountain stop wall construction method using Benoto pile excavator | |
RU1794130C (en) | Method of drainage construction in poorly draining soils | |
JPH04209207A (en) | Guide pipe for compaction pile | |
JPS5516172A (en) | Excavation work method and apparatus for preventing landslide at ditch scooping | |
SU1273436A1 (en) | Method of constructing dams on weak foundation | |
SU1057629A1 (en) | Manifold | |
SU1208148A1 (en) | Method of forming trench for pipeline with flaring pipes | |
SU1535924A1 (en) | Method of constructing antiseepage member of earth water-head structure | |
SU756045A1 (en) | Method of vertical mining in filling massif | |
JPS5542949A (en) | Construction process for underground column row wall | |
JP2002129588A (en) | Undersea tunnel connecting method | |
JP2001032269A (en) | Waste enclosing structure, and its execution method | |
SU1715936A1 (en) | Method of erecting deepened hydraulic structure and construction therefor | |
JP2004238981A (en) | Method for constructing tunnel | |
JPH0462299A (en) | Larger section tunnel and construction method thereof |