JPS641820A - Cut-off wall constituted of a series of piles - Google Patents

Cut-off wall constituted of a series of piles

Info

Publication number
JPS641820A
JPS641820A JP15475487A JP15475487A JPS641820A JP S641820 A JPS641820 A JP S641820A JP 15475487 A JP15475487 A JP 15475487A JP 15475487 A JP15475487 A JP 15475487A JP S641820 A JPS641820 A JP S641820A
Authority
JP
Japan
Prior art keywords
pile
ground
series
cut
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15475487A
Other languages
Japanese (ja)
Other versions
JPH011820A (en
Inventor
Yoshio One
Wataru Yugawa
Nobuyuki Yumii
Yasuhiro Yamamoto
Kosuke Morita
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON DORO KK
Shimizu Construction Co Ltd
Nippon Road Co Ltd
Shimizu Corp
Original Assignee
NIPPON DORO KK
Shimizu Construction Co Ltd
Nippon Road Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON DORO KK, Shimizu Construction Co Ltd, Nippon Road Co Ltd, Shimizu Corp filed Critical NIPPON DORO KK
Priority to JP62-154754A priority Critical patent/JPH011820A/en
Priority claimed from JP62-154754A external-priority patent/JPH011820A/en
Publication of JPS641820A publication Critical patent/JPS641820A/en
Publication of JPH011820A publication Critical patent/JPH011820A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE: To improve the follow-up ability against the ground rigidity and to secure long time cut-off efficiency by excavating a series of pile holes into the ground by means of an earth auger, filling the asphalt mastic and constructing a continuous wall.
CONSTITUTION: A pile hole 6 is excavated into the ground 5 by an earth auger 2. Then, the asphalt mastic 7a is pressed into the hole 6 from a mastic pump 4 through a metallic hose 3 for heat and pressure resistance fixed to the upper end of the auger 2. According to the constitution, after forming a preceding pile A in order, a succeeding pile B is also formed by the same working process to construct a continuous wall.
COPYRIGHT: (C)1989,JPO&Japio
JP62-154754A 1987-06-22 Waterproof pile row wall construction method Pending JPH011820A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62-154754A JPH011820A (en) 1987-06-22 Waterproof pile row wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62-154754A JPH011820A (en) 1987-06-22 Waterproof pile row wall construction method

Publications (2)

Publication Number Publication Date
JPS641820A true JPS641820A (en) 1989-01-06
JPH011820A JPH011820A (en) 1989-01-06

Family

ID=

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04155006A (en) * 1990-10-19 1992-05-28 Kubota Corp Laying method of conduit pipe for embankment
JPH0628346A (en) * 1992-11-04 1994-02-04 Casio Comput Co Ltd Ruled line processor

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51125912A (en) * 1975-04-17 1976-11-02 Seiko Kogyo Kk Sheathing wall construction method
JPS5482809A (en) * 1977-12-15 1979-07-02 Takashi Miyashita Method of building underground continuous waterrstop wall

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51125912A (en) * 1975-04-17 1976-11-02 Seiko Kogyo Kk Sheathing wall construction method
JPS5482809A (en) * 1977-12-15 1979-07-02 Takashi Miyashita Method of building underground continuous waterrstop wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04155006A (en) * 1990-10-19 1992-05-28 Kubota Corp Laying method of conduit pipe for embankment
JPH0628346A (en) * 1992-11-04 1994-02-04 Casio Comput Co Ltd Ruled line processor

Similar Documents

Publication Publication Date Title
JPS641820A (en) Cut-off wall constituted of a series of piles
US2952130A (en) Pile
JPS57108313A (en) Construction work and device for cut-off wall of in-site driven pile row and head of earth auger therefor
JPS5330143A (en) Construction method of underground tanks
JPS56131711A (en) Water shielding plate for constructing cut-off wall
JPS5664028A (en) Sheathing construction work by antecedent support framework
JPS57205615A (en) Construction of cut-off wall
JPS57140424A (en) Construction work of reinforced soil
JPS5659926A (en) Construction method for retaining wall and underground outer wall
JPS57161228A (en) Construction work of foundation
JPS57116835A (en) Construction of structure with basement
JPS5542949A (en) Construction process for underground column row wall
JPS5771925A (en) Construction of continuous underground wall and reference pile used therefor
JPS5670322A (en) Construction of underground wall by column strip
JPS5516172A (en) Excavation work method and apparatus for preventing landslide at ditch scooping
JPS5766222A (en) Construction of underground continuous wall
JPS5639239A (en) Hollow concrete block for afforestation
JPS56153016A (en) Application of reinforced foundation pile
JPS57197315A (en) Method and apparatus for sheathing wall work
JPS5724728A (en) Sheathing method and waling structure for use in said method
JPS5664030A (en) Placement of soil-sheathing fence
JPS57197316A (en) Construction of pillar-rowed underground wall
JPS55165337A (en) Compression forming machine for excavated soil
JPS55161113A (en) Constructing method for continuous underground wall
JPS554410A (en) Earth retaining method