JPS57155432A - Method of erecting construction of existing pile - Google Patents
Method of erecting construction of existing pileInfo
- Publication number
- JPS57155432A JPS57155432A JP3779581A JP3779581A JPS57155432A JP S57155432 A JPS57155432 A JP S57155432A JP 3779581 A JP3779581 A JP 3779581A JP 3779581 A JP3779581 A JP 3779581A JP S57155432 A JPS57155432 A JP S57155432A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- ground
- caisson
- excavating
- buried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/24—Placing by using fluid jets
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
PURPOSE:To erect the caisson pile without noises and vibration by excavating the ground by injecting a water jet from the nose of the caisson pile while excavating the ground of the bottom in the pile by means of a reverse circulation cutter inserted into the pile. CONSTITUTION:A rotary table 11 is turned and driven, and the reverse circulation cutter 14 is rotated to excavate the ground. A pump 24 is driven, pressure water is injected from nozzles B and the ground is excavated. Water is returned to a sand washing tank 20 through a muddy water pipe 21. The pile A consisting of the caissons 1, 5 is buried into soil while excavating the ground. When the pile A is buried by a predetermined volume, a head member 8 is removed, another caisson 5 is added to the caisson 5 for connection, another shaft 16 for connection is added to a shaft 16 for connection, the ground is excavated through the reverse circulation cutter 14 and the water jet again, and the pile A is sunk by tare and buried.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3779581A JPS57155432A (en) | 1981-03-18 | 1981-03-18 | Method of erecting construction of existing pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3779581A JPS57155432A (en) | 1981-03-18 | 1981-03-18 | Method of erecting construction of existing pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS57155432A true JPS57155432A (en) | 1982-09-25 |
Family
ID=12507424
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3779581A Pending JPS57155432A (en) | 1981-03-18 | 1981-03-18 | Method of erecting construction of existing pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS57155432A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01151689A (en) * | 1987-12-08 | 1989-06-14 | Takechi Komusho Kk | Boring method |
JPH07197473A (en) * | 1993-12-29 | 1995-08-01 | Toda Constr Co Ltd | Structure of open caisson |
CN106193080A (en) * | 2016-08-09 | 2016-12-07 | 扬州工业职业技术学院 | A kind of well sinking device and construction method thereof |
JP2018178471A (en) * | 2017-04-10 | 2018-11-15 | 清水建設株式会社 | Caisson and method for settling caisson |
WO2019140883A1 (en) * | 2018-01-17 | 2019-07-25 | 中国电力科学研究院有限公司 | Bearing plate reinforcement device for squeeze and expansion cast-in-place pile |
-
1981
- 1981-03-18 JP JP3779581A patent/JPS57155432A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01151689A (en) * | 1987-12-08 | 1989-06-14 | Takechi Komusho Kk | Boring method |
JPH07197473A (en) * | 1993-12-29 | 1995-08-01 | Toda Constr Co Ltd | Structure of open caisson |
CN106193080A (en) * | 2016-08-09 | 2016-12-07 | 扬州工业职业技术学院 | A kind of well sinking device and construction method thereof |
JP2018178471A (en) * | 2017-04-10 | 2018-11-15 | 清水建設株式会社 | Caisson and method for settling caisson |
WO2019140883A1 (en) * | 2018-01-17 | 2019-07-25 | 中国电力科学研究院有限公司 | Bearing plate reinforcement device for squeeze and expansion cast-in-place pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS57155432A (en) | Method of erecting construction of existing pile | |
JPH09317373A (en) | Method of shaft construction | |
JPS56142923A (en) | Construction of foundation pile and case auger used therefor | |
JPH04108910A (en) | Method for processing pile head of sunk concrete pile | |
JP4633273B2 (en) | Earth retaining method and equipment | |
JPS57108313A (en) | Construction work and device for cut-off wall of in-site driven pile row and head of earth auger therefor | |
JPS6331633B2 (en) | ||
JPS5646031A (en) | Constructing method for pile foundation footing with erected trunk | |
JPS57140421A (en) | Construction of large-diameter in-situ cast pile | |
JPS5736216A (en) | Method and apparatus for driving pile | |
JP2001011849A (en) | Liquefaction prevention structure of ground, its construction method, and ground improving method | |
JPS5592425A (en) | Method and device for pile being driven into predigged hole | |
JPS6417920A (en) | Construction of precast pile with bag | |
JPS57151723A (en) | Concrete sheet pile and its driving | |
JP2791664B2 (en) | Simple underground continuous wall method | |
JPS5781525A (en) | Construction of underground continuous wall | |
JPH08151652A (en) | Pile foundation and its construction method | |
JPS57108329A (en) | Formation of basement | |
JPH1037202A (en) | Cutting excavation method and device removing underground spring water | |
JPS5659910A (en) | Depth continuous wall construction method using high-pressure injection of circulation muddy water | |
JPH1113070A (en) | Forming method for consolidation grouting hole | |
SU1028776A1 (en) | Apparatus for forming earth-concrete pile | |
JPS55111525A (en) | Method of construction of underground sheet pile wall | |
JPS60230430A (en) | Pile driving method | |
JPS594718A (en) | Jet injection device |