JPH04108910A - Method for processing pile head of sunk concrete pile - Google Patents

Method for processing pile head of sunk concrete pile

Info

Publication number
JPH04108910A
JPH04108910A JP22628790A JP22628790A JPH04108910A JP H04108910 A JPH04108910 A JP H04108910A JP 22628790 A JP22628790 A JP 22628790A JP 22628790 A JP22628790 A JP 22628790A JP H04108910 A JPH04108910 A JP H04108910A
Authority
JP
Japan
Prior art keywords
pile
fixing liquid
concrete
head
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP22628790A
Other languages
Japanese (ja)
Inventor
Takashi Inoue
孝 井上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUMIYOSHI UNYU KK
Daido Concrete Kogyo KK
Daido Concrete Co Ltd
Original Assignee
SUMIYOSHI UNYU KK
Daido Concrete Kogyo KK
Daido Concrete Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUMIYOSHI UNYU KK, Daido Concrete Kogyo KK, Daido Concrete Co Ltd filed Critical SUMIYOSHI UNYU KK
Priority to JP22628790A priority Critical patent/JPH04108910A/en
Publication of JPH04108910A publication Critical patent/JPH04108910A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To shorten a work execution term and reduce the concerned cost by removing pile periphery fixing liquid filled in the hollow part of the head of a concrete pile by means of fluid spraying after the hollow ready-made concrete pile is inserted into a dug hole in which the pile periphery fixing liquid has been poured. CONSTITUTION:A fluid spray device 6 is placed on a pile 1. Then water is sprayed toward pile periphery fixing liquid 4 in a hollow part 1a to discharge the pile periphery fixing liquid 4 from the hollow part 1a. Further a reinforcing basket 8 is inserted into the space 7, thus obtained, of the head of the concrete pile 1, and concrete 9 is placed. Thus it is possible to remove the pile periphery fixing liquid 4 in the hollow part 1a extremely power-savingly and efficiently so that a work execution term can be shortened and the concerned cost can be reduced.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、ソイルセメント類を入れた掘削孔内に沈設し
たコンクリート杭の枕頭処理方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a method for treating the head of a concrete pile sunk in an excavated hole containing soil cement.

(従来の技術及び発明が解決しようとする課題)コンク
リート杭の建込みは、近年、騒音や振動による公害防止
の立場から、オーガーで掘削した孔の中にソイルセメン
ト類の杭周固定液を充填し、その中に既製の中空コンク
リート杭を自重あるいは回転により沈設することが行な
われている。
(Problems to be solved by conventional technology and the invention) In recent years, concrete piles have been erected by filling a pile circumferential fixing liquid such as soil cement into a hole drilled with an auger to prevent pollution caused by noise and vibration. However, ready-made hollow concrete piles are sunk into the piles using their own weight or rotation.

例えば、回転ミルク根固め工法(ケムンエ法)について
説明すると、第5図に示すように、まず、オーガー10
を用いて、ソイルセメント等の杭周固定液を注入しなが
ら地中の支持層に至るまでのコンクリート杭lより大径
とした掘削孔2を形成(第5図(イ))シ、オーガー1
0を引き上げながら下部に根固め液3を注入し、その上
部に杭周固定液4を注入(第5図(ロ))する。そして
、オーガー10を取り除き、第5図(ハ)のように、根
固め液3と杭周固定液4との注入された掘削孔2内に、
コンクリート杭1を挿入し、自重沈下あるいは回転を与
えながら沈下させて、第5図(ニ)のように沈設させる
ようにしている。
For example, to explain the rotary milk root hardening method (Kemun-ae method), first, as shown in Figure 5, the auger 10
Using the auger 1, an excavation hole 2 with a diameter larger than the concrete pile 1 is formed up to the underground support layer while injecting a pile circumferential fixing liquid such as soil cement (Fig. 5 (a)).
0, inject the root hardening liquid 3 into the lower part, and inject the pile circumference fixing liquid 4 into the upper part (Fig. 5 (b)). Then, the auger 10 is removed, and as shown in FIG.
The concrete pile 1 is inserted and allowed to sink under its own weight or while being rotated, as shown in Figure 5 (d).

とごろで、このように地中に沈設された杭は、建造物の
基礎と結合するため、沈設後にその枕頭処理を行なって
いる。この処理にはいくつかの方法が実施されているが
、−船釣には、コンクリート杭1の頭部中空部内に杭I
より上方に突出する鉄筋カゴの下部を挿入してコンクリ
−)・により杭Iにコンクリートで結合するようにして
おり、鉄筋カゴの上部を建造物の基礎コンクリート中に
埋設するようにしている。
In Togoro, the piles sunk in the ground in this way are connected to the foundations of buildings, so the head of the piles is treated after being sunk. Several methods have been implemented for this treatment. - For boat fishing, a pile I
The lower part of the reinforcing cage that protrudes further upward is inserted and connected to the pile I with concrete, and the upper part of the reinforcing cage is buried in the foundation concrete of the building.

しかし、上記した、杭周固定液4を注入した掘削孔2に
コンクリート杭1を沈設した場合、杭周固定液4は、コ
ンクリート杭】の中空部内にも充満し、固化することに
なる。そのため、従来は、枕頭の中空部内に充満した杭
周固定液の固化状の6のを手掘りあるいは電動ピックを
使用して所要の深さまで掘削して取り除いて鉄筋カゴの
挿入孔を形成するようにしている。ごの作業は、非常に
面倒で、多くの労力を要するとともに、時間的な制約を
受けるもので、杭沈設においての大きな問題となってい
た。
However, when the concrete pile 1 is sunk into the excavated hole 2 into which the pile circumferential fixing liquid 4 is injected, the pile circumferential fixing liquid 4 also fills the hollow part of the concrete pile and solidifies. Therefore, conventionally, the solidified pile circumferential fixing fluid that filled the hollow part of the pile head was excavated by hand or using an electric pick to the required depth and removed to form the insertion hole for the reinforcing bar cage. I have to. This work is extremely troublesome, requires a lot of labor, and is subject to time constraints, which has been a major problem in pile sinking.

本発明は、」二記の問題を解決するためになされたもの
で、杭周固定液を充填した掘削孔に中空コンクリート杭
を沈設した場合の枕頭処理を簡易に能率よく行なうこと
のできる方法を提供しようとするものである。
The present invention was made in order to solve the problems mentioned in "2", and provides a method for easily and efficiently treating the head of a hollow concrete pile when it is sunk into an excavated hole filled with a pile circumferential fixing fluid. This is what we are trying to provide.

(課題を解決するための手段) 」二記の目的を達成するための本発明の構成について、
実施態様を示した第1〜4図を参照して説明すると、本
発明は、ソイルセメント等の杭周固定液4を注入した掘
削孔2中に、中空のコンクリート既製杭lを挿入した後
、上記コンクリート杭1の頭部中空部Ia内に充満の杭
周固定液4を、流体の噴射により除去し、コンクリート
杭1の頭部中空部内に、鉄筋カゴ8挿入用の中腔7を形
成することを特徴とするものである。
(Means for Solving the Problems) Regarding the structure of the present invention to achieve the objects stated in 2.
The present invention will be described with reference to FIGS. 1 to 4 showing embodiments. After inserting a hollow concrete pile l into an excavation hole 2 into which a pile circumferential fixing liquid 4 such as soil cement is injected, The pile circumferential fixing liquid 4 filled in the hollow head part Ia of the concrete pile 1 is removed by jetting fluid, and a hollow cavity 7 for inserting the reinforcing bar cage 8 is formed in the hollow head part of the concrete pile 1. It is characterized by this.

(実施例) 以下、本発明方法の実施例について第1〜4図を参照し
て説明する。
(Example) Examples of the method of the present invention will be described below with reference to FIGS. 1 to 4.

第1図において、2はオーガーにより形成された掘削孔
で、その中に中空の既製コンクリート杭1が沈設され、
杭Iと孔壁との間及び杭Iの中空部Ia内には注入した
ソイルセメント等の杭周固定液4が充満している。コン
クリート杭Iの沈設終了時はこのような状態にある。
In Fig. 1, 2 is an excavation hole formed by an auger, into which a hollow ready-made concrete pile 1 is sunk,
The space between the pile I and the hole wall and the inside of the hollow part Ia of the pile I are filled with a pile circumferential fixing liquid 4 such as injected soil cement. This is the state at the end of concrete pile I sinking.

本発明は、この沈設されたコンクリート杭lの枕頭処理
を行なうものである。まず、第1図に示すように、杭1
」二に架台5を設置し、それに流体噴射装置6をそのノ
ズルをコンクリート杭Iの中空部1a内に向けて取付け
る。この場合、コンクリート杭Iの沈設に使用した回転
用キャップとロッドとを利用し、そのロッドの先に流体
噴射装置6を取付けるようにすることができる。そして
、第2図のように、中空部Ia内の杭周固定液(ノロ)
4に向けて水または空気を噴射する。その噴射流よって
杭周固定液4は中空f!1IIJIa内より矢印のよう
に掘削、飛散して排出されることになる。このようにし
て、第3図に示すように、コンクリート杭1の頭部に所
要深さの空腔7が形成されること?こなる。そして、ご
の空腔7には第4図に示すように鉄筋カゴ8を挿入し、
コンクリート9を打設してコンクリート杭Iと鉄筋カゴ
8とを結合するのである。
The present invention performs the head treatment of the concrete piles 1 that have been sunk. First, as shown in Figure 1, the pile 1
A pedestal 5 is installed on the second base, and a fluid injection device 6 is attached thereto with its nozzle directed into the hollow portion 1a of the concrete pile I. In this case, the rotary cap and rod used for sinking the concrete pile I can be used, and the fluid injection device 6 can be attached to the tip of the rod. Then, as shown in Figure 2, the pile circumference fixing liquid (slag) in the hollow part Ia
Spray water or air towards 4. Due to the jet flow, the pile circumference fixing fluid 4 is hollow f! It will be excavated, scattered and discharged from inside 1IIJIa as shown by the arrow. In this way, a cavity 7 of the required depth is formed in the head of the concrete pile 1, as shown in FIG. This will happen. Then, a reinforcing bar cage 8 is inserted into the empty space 7 as shown in FIG.
Concrete 9 is poured to connect concrete pile I and reinforcing bar cage 8.

コンクリート杭1より上方に突出した鉄筋カゴ8は建造
物の基礎コンクリート内に埋設され、コンクリート杭1
と建造物とは鉄筋カゴ8を介して強固に結合されること
になるのである。
A reinforcing bar cage 8 that protrudes above the concrete pile 1 is buried in the foundation concrete of the building, and is connected to the concrete pile 1.
and the building are firmly connected via the reinforcing steel cage 8.

」1記流体噴射による杭周固定液4の掘削は、固定液4
が硬化した後では、大きな噴射圧力を要することになる
ので、杭沈設直後の固定液がまだ液状をなしている時期
、あるいは半硬化、半流動状態にある時期に行なうよう
にするのが特筆である。
” 1. Excavation of the pile circumferential fixing liquid 4 by fluid injection is performed using the fixing liquid 4.
After the fixative has hardened, a large injection pressure is required, so it is important to carry out the process immediately after the pile is sunk, when the fixative is still in a liquid state, or when it is in a semi-hardened or semi-fluid state. be.

また、流体の噴射は、コンクリート杭1の沈設の際使用
した固定液注入用のホースの途中に切替弁を設けておき
、流体源に接続換えして行なうようにすれば好都合であ
る。
Further, it is convenient to inject the fluid by providing a switching valve in the middle of the hose for injecting the fixing fluid used when sinking the concrete pile 1 and changing the connection to the fluid source.

(発明の効果) 以上説明したように、本発明によれば、中空部内に杭周
固定液(ノロ)が充満している沈設杭の枕頭処理にあた
って、中空部内のノロを流体噴射により取除くよう?こ
したので、従来のように、手掘りや電動ピックを使用し
て作業することなく、極めて省力的で能率よく行なうこ
とかてき、それだけ施]−期間の短縮と経費の節減を図
ることができる等、優れた効果を奏するものである。
(Effects of the Invention) As explained above, according to the present invention, when treating the head of a submerged pile whose hollow part is filled with pile circumferential fixing liquid (slag), the slag in the hollow part can be removed by fluid injection. ? Therefore, it is possible to perform the work extremely labor-savingly and efficiently without having to dig by hand or use an electric pick as in the past, which can shorten the period and reduce costs. etc., it has excellent effects.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図乃至第4図は本発明方法の実施態様を例示したも
ので、第1図は沈設机上に流体噴射装置を設置したとこ
ろの断面図、第2図は流体噴射時の状態の断面図、第3
図は枕頭部内の杭周固定液を排除したところを示す断面
図、第4図は枕頭部内に鉄筋カゴを結合した状態の断面
図、第5図(イ)〜(ニ)は従来の杭沈設の工程を順次
示した断面図である。 ■・コンクリート杭   2 ・掘削孔4・杭周固定液
     6 流体噴射装置7・空腔        
8・・鉄筋カゴ(匂 図 (ロ) (ハ) (ニ)
Figures 1 to 4 illustrate embodiments of the method of the present invention, with Figure 1 being a cross-sectional view of the fluid ejecting device installed on a submerged desk, and Figure 2 being a cross-sectional view of the state during fluid jetting. , 3rd
The figure is a cross-sectional view showing the pile circumferential fixing liquid inside the pillow head removed, Figure 4 is a cross-sectional view of the state in which the reinforcing bar cage is connected inside the sleeper head, and Figures 5 (a) to (d) are conventional pile sinking methods. FIG. ■・Concrete pile 2 ・Drilled hole 4・Pile circumference fixing fluid 6 Fluid injection device 7・Vacancy
8.Reinforcement cage (inner diagram (b) (c) (d)

Claims (1)

【特許請求の範囲】[Claims] ソイルセメント等の杭周固定液を注入した掘削孔中に、
中空のコンクリート既製杭を挿入した後、上記コンクリ
ート杭の頭部中空部内に充満の杭周固定液を、流体の噴
射により除去し、コンクリート杭の頭部中空部内に、鉄
筋カゴ挿入用の空腔を形成することを特徴とする、沈設
コンクリート杭の枕頭処理方法。
In the excavation hole, a pile circumferential fixing liquid such as soil cement was injected.
After inserting a hollow pre-made concrete pile, the pile circumferential fixing liquid that is filled in the hollow head of the concrete pile is removed by fluid injection, and a cavity for inserting a reinforcing bar cage is created in the hollow head of the concrete pile. A method for treating the head of a sunken concrete pile, the method comprising: forming a bed head of a sunken concrete pile;
JP22628790A 1990-08-28 1990-08-28 Method for processing pile head of sunk concrete pile Pending JPH04108910A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22628790A JPH04108910A (en) 1990-08-28 1990-08-28 Method for processing pile head of sunk concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22628790A JPH04108910A (en) 1990-08-28 1990-08-28 Method for processing pile head of sunk concrete pile

Publications (1)

Publication Number Publication Date
JPH04108910A true JPH04108910A (en) 1992-04-09

Family

ID=16842853

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22628790A Pending JPH04108910A (en) 1990-08-28 1990-08-28 Method for processing pile head of sunk concrete pile

Country Status (1)

Country Link
JP (1) JPH04108910A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100350104C (en) * 2005-07-04 2007-11-21 雷玉华 Construction method of synchronous combined pile with high-pressure rotary-spraying pile tip
CN100366829C (en) * 2005-12-27 2008-02-06 雷玉华 Method for construction of large head expanding combined pile
CN100371537C (en) * 2006-01-05 2008-02-27 江苏南水土建工程公司 Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method
CN100427688C (en) * 2005-06-09 2008-10-22 清华大学 Side downhole soil-extruded foundation treating method and horizontal extruding-spreading device
CN102251781A (en) * 2011-04-27 2011-11-23 中铁二局股份有限公司 Guiding horizontal jet grouting pile pre-support construction method for scattered particle rock surrounding tunnel
JP2017172247A (en) * 2016-03-24 2017-09-28 株式会社熊谷組 Removal method of solidification object in pile head part of precast pile

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100427688C (en) * 2005-06-09 2008-10-22 清华大学 Side downhole soil-extruded foundation treating method and horizontal extruding-spreading device
CN100350104C (en) * 2005-07-04 2007-11-21 雷玉华 Construction method of synchronous combined pile with high-pressure rotary-spraying pile tip
CN100366829C (en) * 2005-12-27 2008-02-06 雷玉华 Method for construction of large head expanding combined pile
CN100371537C (en) * 2006-01-05 2008-02-27 江苏南水土建工程公司 Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method
CN102251781A (en) * 2011-04-27 2011-11-23 中铁二局股份有限公司 Guiding horizontal jet grouting pile pre-support construction method for scattered particle rock surrounding tunnel
JP2017172247A (en) * 2016-03-24 2017-09-28 株式会社熊谷組 Removal method of solidification object in pile head part of precast pile

Similar Documents

Publication Publication Date Title
US20210292987A1 (en) Construction method for pouring concrete in karst cave
JPH04108910A (en) Method for processing pile head of sunk concrete pile
CN212052717U (en) Structure for penetrating karst cave of precast tubular pile
JPS5985028A (en) Steel pipe pile and laying work thereof
JP2008031772A (en) Construction method of precast pile, and cover for use in the construction method
JPS59126821A (en) Erection work of foundation pile
JPS6250517A (en) Method and apparatus for construction of ready-made hollow pile
CN108316288A (en) Half casing guncreting pile construction equipment and construction method
CN111705814A (en) Inclined support pile structure and foundation pit enclosure method thereof
JPH1025734A (en) Bearing-pile reinforcing structure of existing structure and reinforcing method thereof
JPS61158517A (en) Method of processing extra-banking concrete for cast-in-place pile
JP6634251B2 (en) Pile foundation structure, ready-made pile burying device, method of constructing pile foundation structure using said ready-made pile burying device
KR19990048467A (en) Auger pile method using expandable mortar
JPS61216923A (en) Construction of in-situ concrete pile
JP2001336147A (en) Rotary cap with pile top treatment function, pile top treatment method, and embedding method of pile
JPS6331633B2 (en)
JPH05230831A (en) Pile diameter inside part cleaning method and cleaning device thereof in pile rotating/burying outer moat cement milk foundation consolidating engineering method
JPS5826115A (en) Expanded bottom pile work
JPH05321511A (en) Construction method for underground vessel in weak ground
JPH038922A (en) Executing method for hollow foundation pile and pile head filling-in stuff
JPS6112053B2 (en)
JPS6040683Y2 (en) Earth Auger
JPH05311645A (en) Construction method for cast-in-place concrete pile
JPH0114376B2 (en)
JPS6140817B2 (en)