JPS6250517A - Method and apparatus for construction of ready-made hollow pile - Google Patents

Method and apparatus for construction of ready-made hollow pile

Info

Publication number
JPS6250517A
JPS6250517A JP19048885A JP19048885A JPS6250517A JP S6250517 A JPS6250517 A JP S6250517A JP 19048885 A JP19048885 A JP 19048885A JP 19048885 A JP19048885 A JP 19048885A JP S6250517 A JPS6250517 A JP S6250517A
Authority
JP
Japan
Prior art keywords
pile
ready
head
made hollow
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP19048885A
Other languages
Japanese (ja)
Inventor
Tatsuo Yamamoto
山本 達雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Chemical Industry Co Ltd
Original Assignee
Asahi Chemical Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Chemical Industry Co Ltd filed Critical Asahi Chemical Industry Co Ltd
Priority to JP19048885A priority Critical patent/JPS6250517A/en
Publication of JPS6250517A publication Critical patent/JPS6250517A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To raise the efficiency of operations by a method in which a hollow pile having upper and lower openings is inserted into a prebored pit filled with a hardening liquid, the liquid in the pile head is removed out by jet water, and anchoring reinforcing bars are inserted into and fixed to the pile head. CONSTITUTION:A prebored hole A is excavated in the ground, and a hardening liquid is packed into the hole A. A ready-made hollow pile B whose upper and lower ends are opened is tipped with a cap 1 and inserted into the hole A. A kelly bar 2 is turned to rotate the pile B, thus penetrating to a level of 1m from the bottom the hole A. While the liquid is unhardened, the liquid in the hollow pile head is removed out to a given depth by jet water. Anchoring reinforcing bars 3 are inserted into the pile head, and concrete, etc., is filled into the pile head to fix the lower parts of the bars 3 to the pile B.

Description

【発明の詳細な説明】 産業上の利用分野 この発明は既製中空杭の施工方法とその施工に際して使
用する装置に係如、特にプレボーリング孔への挿入と、
アンカー鉄筋の配筋を容易ならしめるべくした方法と装
置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION Field of Industrial Application The present invention relates to a method for constructing ready-made hollow piles and an apparatus used for the construction, and in particular to insertion into a pre-bored hole;
The present invention relates to a method and device for facilitating the arrangement of anchor reinforcing bars.

従来技術 既製杭の埋込み工法において硬化性注入液を充填したプ
レボーリング孔内に開端既製杭を挿入し上端の開口部に
アンカー用鉄筋まだは鉄筋篭を挿入して取付け、アンカ
ー用鉄筋をフーチングコンクリート内に定着する方法が
実施されてきた。
Conventional technology In the ready-made pile embedding method, an open-ended ready-made pile is inserted into a pre-bored hole filled with a hardening injection liquid, and an anchor reinforcing bar or reinforcing bar cage is inserted into the opening at the upper end to install it, and the anchor reinforcing bar is attached to the footing concrete. Methods have been implemented to establish this within the country.

発明の解決しようとする問題点 以上の方法の場合既製杭の中空部に硬化性注入液が充満
して硬化する。したがってアンカー用鉄筋を杭頭部に挿
入するために硬化した注入液を研って除去する必要があ
り、大変な労力を要している。
Problems to be Solved by the Invention In the method described above, the hollow part of the ready-made pile is filled with the hardening injection liquid and hardened. Therefore, in order to insert the anchor reinforcing bars into the pile head, it is necessary to remove the hardened injection fluid by grinding, which requires a great deal of labor.

問題点を解決するだめの手段 この発明の要旨とする構成は、セメントミルク“ のよ
うな硬化性注入液を充填したプレボーリング孔内に開端
杭を挿入し、硬化性注入液が未硬化の間に、既製中空杭
頭部内の硬化性注入液を所要深さまで噴射水によって除
去し、次いで頭部内にアンカー鉄筋を挿入し、コンクリ
ート等を使用して定着する方法であり、またその方法を
実施するため、通常杭吊込み、回転キャップと云われる
杭頭部に嵌合する筒体部分と筒体部分の上方に突設され
た軸からなる金具に軸下端から筒体部分内に突設した噴
射ノズルを設けた装置を使用し、噴射ノズルから圧力水
を噴射して杭頭部内の未硬化の硬化性注入液を所要深さ
まで洗い流して除去するようにしたものである。
Means for Solving the Problems The configuration of the present invention is to insert an open-end pile into a pre-bored hole filled with a hardening injection liquid such as cement milk, and to insert the open end pile into a pre-bored hole filled with a hardening injection liquid such as cement milk. In this method, the hardening liquid in the head of the ready-made hollow pile is removed to the required depth by jetting water, and then anchor reinforcing bars are inserted into the head and fixed using concrete, etc. In order to carry out pile suspension, a metal fitting called a rotary cap consisting of a cylindrical part that fits into the pile head and a shaft protruding above the cylindrical part is installed from the lower end of the shaft into the cylindrical part. A device equipped with a spray nozzle is used to spray pressurized water from the spray nozzle to wash away the uncured hardening liquid in the pile head to the required depth and remove it.

実施例 先ず地盤中に拡大ピットを有する掘削機を使用してプレ
ボーリング孔Aを掘削する。その際掘削機の軸を通じて
プレボーリング孔A内にセメントミルクを注入し、ある
いはセメントミルクを注入しながら掘削機を上下回転し
て土砂と混合攪拌してフィルセメントとする等してプレ
ボーリング孔Aに硬化性注入液を充填しておく。
EXAMPLE First, a pre-boring hole A is excavated using an excavator having an enlarged pit in the ground. At this time, cement milk is injected into the pre-boring hole A through the shaft of the excavator, or the excavator is rotated up and down while injecting cement milk to mix and stir the earth and sand to form fill cement. is filled with curable injection liquid.

次いでそのプレボーリング孔A内にその孔径より僅か小
径で、上下端の開口した既製中空杭Bを挿入する。その
際杭頭には杭Bに対して着脱自在のキャップ1を取付け
、このキャップ1を吊下げることにより杭Bを建込むと
ともに当初自重で沈下するが、比重の大きい硬化性注入
液では孔A内に沈下しないのでキャップ1に連結しであ
るケリーバ−2を回転することにより杭Bを回転し、硬
化性注入液とのフリクションを切ることによシ孔Aの底
より1mの高さまで杭Bを挿入する。その結果孔Aと杭
Bとの間隙および杭Bの中空孔内には頭部まで硬化性注
入液が充満する。次いで前記硬化性注入液が未硬化の間
に杭頭部内の硬化性注入液を所要深さまで噴射水によっ
て洗い流すことにより除去し、次いで前記頭部内に筆状
等所要の形状とされたアンカー鉄筋3を挿入し、コンク
リート等を頭部内に充填し、アンカー鉄筋3の下部を杭
Bに定着する。なおアンカー鉄筋3の上部は基礎のフー
チングC等に埋設される。
Next, a ready-made hollow pile B with a diameter slightly smaller than that of the pre-bored hole A and open at the upper and lower ends is inserted into the pre-bored hole A. At this time, a removable cap 1 is attached to the pile cap, and by suspending this cap 1, the pile B is erected and initially sinks due to its own weight, but with a hardening injection liquid having a large specific gravity, the hole A Pile B is rotated by rotating Kelly bar 2, which is connected to cap 1, and the pile B is raised to a height of 1 m from the bottom of hole A by cutting the friction with the hardening injection liquid. Insert. As a result, the gap between the hole A and the pile B and the hollow hole of the pile B are filled up to the head with the curable injection liquid. Next, while the curable injection liquid is still uncured, the curable injection liquid inside the pile head is removed by washing it away with jet water to a required depth, and then an anchor is formed into a desired shape such as a brush shape within the pile head. Insert the reinforcing bar 3, fill the head with concrete, etc., and fix the lower part of the anchor reinforcing bar 3 to the pile B. Note that the upper part of the anchor reinforcing bar 3 is buried in the footing C of the foundation.

以上の方法を実施する装置として使用されるキャップ1
は杭Bの頭部に嵌合する筒状部分4と筒状部分4の上方
に突設されたケリーバ−2に連続する軸5と筒状部分4
と軸5を連結する方射状に配置された腕杆6および軸5
に対して着脱自在とし、筒状部分4内に突設した所要数
の噴射孔を有する噴射ノズル7からなる。
Cap 1 used as a device for carrying out the above method
The shaft 5 and the cylindrical portion 4 are connected to a cylindrical portion 4 that fits into the head of the pile B, and a kelly bar 2 that protrudes above the cylindrical portion 4.
and the shaft 5 and the arm rod 6 arranged in a radial manner to connect the shaft 5 with the shaft 5.
It consists of an injection nozzle 7 which is detachable from the cylindrical part 4 and has a required number of injection holes protruding into the cylindrical part 4.

この噴射ノズル7にはポンプ8からホース9を経て高圧
水を送るようにしておく。なお噴射ノズル7″またけキ
ャップ1を回転させる場合には軸5とホース9との連結
部分にスイーベル機構を設ける。また筒体部分4と杭B
との着脱機構としては従来公知の手段である筒体部分下
端に逆り形の切込みを形成し、この切込みに杭頭部に突
設した突起を係合する構造が採用できる。例えば特公昭
56−6451号公報に示される構造である。
High pressure water is sent to this injection nozzle 7 from a pump 8 via a hose 9. In addition, when rotating the injection nozzle 7'' straddle cap 1, a swivel mechanism is provided at the connecting part between the shaft 5 and the hose 9.
As the attaching/detaching mechanism, a conventionally known structure can be adopted in which an inverted cut is formed in the lower end of the cylindrical body part and a protrusion provided on the pile head is engaged with this cut. For example, there is a structure shown in Japanese Patent Publication No. 56-6451.

発明の効果 この発明は以上の構成からなり、杭中空部の杭頭部付近
に充満した硬化性注入液を噴射水で洗い流すことにより
、中空部内の折り作業が省略でき頭部内へのアンカー鉄
筋の挿入と良質なモルタルの充填が容易確実となる。
Effects of the Invention This invention has the above-mentioned configuration, and by washing away the hardening injection liquid that has filled the vicinity of the pile head in the hollow part of the pile with jet water, folding work inside the hollow part can be omitted, and anchor reinforcing bars can be inserted into the head of the pile. This makes it easy and reliable to insert and fill with high quality mortar.

また以上の作業の除水の噴射ノズルを杭の建込みと回転
挿入に使用するキャップに付設しておくことにより杭の
挿入後直ちに水の噴射作業が可能となり、作業能率が向
上し、かつ装置費用を安価て提供することができる。
In addition, by attaching the water removal spray nozzle for the above work to the cap used for pile erection and rotational insertion, water can be sprayed immediately after pile insertion, improving work efficiency and equipment. It can be provided at low cost.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図、第2図、第3図および第4図は施工過程を示し
た縦断面図、第5図、第6図は前記施工に際して使用す
る装置の縦断面図と底面図である。 A・・プレボーリング孔、B・・杭 C・・フーチング、1・・キャップ 2・・ケリーバ−13・・アンカー鉄筋4・・筒状部分
、5・・軸、6・・腕杆7・・噴射ノズル、8・・ポン
プ、9・・ホース第 3 里 第4図 第 5L!! ’J6  図
1, 2, 3 and 4 are longitudinal sectional views showing the construction process, and FIGS. 5 and 6 are longitudinal sectional views and bottom views of the equipment used in the construction. A... Pre-boring hole, B... Pile C... Footing, 1... Cap 2... Kelly bar 13... Anchor reinforcing bar 4... Cylindrical part, 5... Shaft, 6... Arm bar 7... Injection nozzle, 8...Pump, 9...Hose No. 3, No. 4, No. 5L! ! 'J6 figure

Claims (2)

【特許請求の範囲】[Claims] (1)硬化性注入液を充填したプレボーリング孔内に上
下端の開口した既製中空杭を挿入し、前記硬化性注入液
が未硬化の間に、既製中空杭頭部内の硬化性注入液を噴
射水によって除去し、次いで前記頭部内にアンカー鉄筋
を挿入定着することを特徴とする既製中空杭の施工方法
(1) Insert a ready-made hollow pile with open top and bottom ends into a pre-bored hole filled with a curable injection liquid, and while the curable injection liquid has not yet hardened, apply the curable injection liquid inside the head of the ready-made hollow pile. 1. A method for constructing a ready-made hollow pile, which comprises removing the head with water spray, and then inserting and fixing an anchor reinforcing bar into the head.
(2)既製中空杭の杭頭部に嵌合する筒体部分と筒体部
分の上方に突設された軸と筒体部分と軸を連結する腕杆
および軸下端から筒体部分内に突設した噴射ノズルから
なることを特徴とする既製中空杭の施工装置。
(2) A cylindrical part that fits into the pile head of a ready-made hollow pile, a shaft that projects above the cylindrical part, an arm rod that connects the cylindrical part and the shaft, and a shaft that protrudes into the cylindrical part from the lower end of the shaft. A construction device for ready-made hollow piles, characterized by comprising an injection nozzle.
JP19048885A 1985-08-29 1985-08-29 Method and apparatus for construction of ready-made hollow pile Pending JPS6250517A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19048885A JPS6250517A (en) 1985-08-29 1985-08-29 Method and apparatus for construction of ready-made hollow pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19048885A JPS6250517A (en) 1985-08-29 1985-08-29 Method and apparatus for construction of ready-made hollow pile

Publications (1)

Publication Number Publication Date
JPS6250517A true JPS6250517A (en) 1987-03-05

Family

ID=16258926

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19048885A Pending JPS6250517A (en) 1985-08-29 1985-08-29 Method and apparatus for construction of ready-made hollow pile

Country Status (1)

Country Link
JP (1) JPS6250517A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0718676A (en) * 1993-06-28 1995-01-20 Toshihiko Fujii Erecting method for foundation pile
KR100441627B1 (en) * 2000-10-09 2004-08-02 신성종합건축사사무소(주) Apparatus for Injecting Grouting Liquid Through Pile Hole
JP2012172937A (en) * 2011-02-23 2012-09-10 Chiyoda Kako Kensetsu Kk Construction method of pipe for heat extraction
JP2013019249A (en) * 2011-07-14 2013-01-31 Chiyoda Geotech Co Ltd Rotating buried pile, burying construction method thereof, and underground burial structure flotation suppression device
JP2017172247A (en) * 2016-03-24 2017-09-28 株式会社熊谷組 Removal method of solidification object in pile head part of precast pile

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0718676A (en) * 1993-06-28 1995-01-20 Toshihiko Fujii Erecting method for foundation pile
KR100441627B1 (en) * 2000-10-09 2004-08-02 신성종합건축사사무소(주) Apparatus for Injecting Grouting Liquid Through Pile Hole
JP2012172937A (en) * 2011-02-23 2012-09-10 Chiyoda Kako Kensetsu Kk Construction method of pipe for heat extraction
JP2013019249A (en) * 2011-07-14 2013-01-31 Chiyoda Geotech Co Ltd Rotating buried pile, burying construction method thereof, and underground burial structure flotation suppression device
JP2017172247A (en) * 2016-03-24 2017-09-28 株式会社熊谷組 Removal method of solidification object in pile head part of precast pile

Similar Documents

Publication Publication Date Title
CN105604001B (en) Drilling tool is stirred in the stake of stiff-core cement soil cylinder and the rotation of construction method and tubular
CN103233469A (en) Process and device for rotating and extending pile and slurry feed device
JP2009062711A (en) Bored precast pile method using earth drill
JPS5985028A (en) Steel pipe pile and laying work thereof
JPS6250517A (en) Method and apparatus for construction of ready-made hollow pile
CN110258600A (en) A kind of vertical cofferdam construction engineering method suitable for deep water waters
JPH04108910A (en) Method for processing pile head of sunk concrete pile
CN111705814A (en) Inclined support pile structure and foundation pit enclosure method thereof
JPS61158517A (en) Method of processing extra-banking concrete for cast-in-place pile
JP3673158B2 (en) Pile embedding method and jig
JP6634251B2 (en) Pile foundation structure, ready-made pile burying device, method of constructing pile foundation structure using said ready-made pile burying device
JP3752345B2 (en) Casing construction method
JP3676850B2 (en) Steel pile construction method
JP2001336147A (en) Rotary cap with pile top treatment function, pile top treatment method, and embedding method of pile
CN108193683A (en) The processing method and foundation structure of deep foundation base
KR900005913B1 (en) Base stake inflated in bump state at lower end there of and its construction
JPS5924028A (en) Setting of large-diameter casing and casing thereof
KR19990048467A (en) Auger pile method using expandable mortar
JP2007032101A (en) Steel pipe pile and foot protection method therefor
JPS62202118A (en) Burying work of pile
JPH07238543A (en) Execution method of wide flange beam pile
JPH0511166B2 (en)
JP2002194739A (en) Immersion method for concrete pile
KR950002733B1 (en) Boring machine for clay type ground
JPH04185814A (en) Construction of structural core column