JPH1196210A5 - - Google Patents
Info
- Publication number
- JPH1196210A5 JPH1196210A5 JP9-250674A JP25067497A JPH1196210A5 JP H1196210 A5 JPH1196210 A5 JP H1196210A5 JP 25067497 A JP25067497 A JP 25067497A JP H1196210 A5 JPH1196210 A5 JP H1196210A5
- Authority
- JP
- Japan
- Prior art keywords
- target
- tasks
- equipment
- processed
- aforementioned
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25067497A JPH1196210A (ja) | 1997-09-16 | 1997-09-16 | 生産計画立案方法および生産計画立案装置および記録媒体 |
| US09/139,269 US6311094B1 (en) | 1997-09-16 | 1998-08-25 | Production planning method, a storage medium and a production planning apparatus |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP25067497A JPH1196210A (ja) | 1997-09-16 | 1997-09-16 | 生産計画立案方法および生産計画立案装置および記録媒体 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH1196210A JPH1196210A (ja) | 1999-04-09 |
| JPH1196210A5 true JPH1196210A5 (enExample) | 2001-11-09 |
Family
ID=17211368
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP25067497A Pending JPH1196210A (ja) | 1997-09-16 | 1997-09-16 | 生産計画立案方法および生産計画立案装置および記録媒体 |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US6311094B1 (enExample) |
| JP (1) | JPH1196210A (enExample) |
Families Citing this family (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE10112681B4 (de) | 2000-03-31 | 2004-02-12 | International Business Machines Corp. | Computersystem mit Verfahren zum Planen von Vorgängen in einem Stahlwerk und Programmspeichereinrichtung zum Durchführen des Verfahrens |
| US7539630B2 (en) * | 2001-12-27 | 2009-05-26 | Jda Software Group | System, method, and computer program for replenishment by manufacture with attribute based planning |
| WO2003094410A2 (en) * | 2002-05-03 | 2003-11-13 | Manugistics, Inc. | Scheduling and sequencing supply chain resources |
| US7127314B2 (en) * | 2004-03-25 | 2006-10-24 | Taiwan Semiconductor Manufacturing Company, Ltd. | Fabrication monitoring system |
| JP2005316934A (ja) * | 2004-03-30 | 2005-11-10 | Sharp Corp | 生産管理方法及び工業製品の製造方法 |
| US7660730B2 (en) | 2004-03-31 | 2010-02-09 | Hitachi, Ltd. | Method of creating production plan of demand variation input type and method of creating production plan minimizing risk of demand variations |
| US7685075B2 (en) * | 2005-01-10 | 2010-03-23 | Taiwan Semiconductor Manufacturing Co., Ltd. | Costing system and method |
| US7039479B1 (en) * | 2005-01-12 | 2006-05-02 | Li-Chih Lu | Production planning system |
| JP2006215768A (ja) * | 2005-02-03 | 2006-08-17 | Hitachi Global Storage Technologies Netherlands Bv | 製造支援装置及び製造支援方法 |
| US20070239300A1 (en) | 2006-03-30 | 2007-10-11 | Burda Richard G | Method and system for setting rates and targets in a range management system |
| DE102007019636A1 (de) * | 2006-08-30 | 2008-03-13 | Bayer Technology Services Gmbh | Vorrichtung zum Auswählen eines auszuführenden Prozesses |
| DE102007035835A1 (de) * | 2007-07-31 | 2009-02-05 | Advanced Micro Devices, Inc., Sunnyvale | Verfahren und System zum Koordinieren eines Produktstroms in einer Fertigungsumgebung durch Verwendung prozessspezifischer WIP-Grenzen |
| JP6446308B2 (ja) * | 2015-03-26 | 2018-12-26 | 株式会社日立製作所 | 生産計画装置および生産計画方法 |
| CN107527115A (zh) * | 2017-08-14 | 2017-12-29 | 震坤行工业超市(上海)有限公司 | 智能仓储管理方法、装置、系统、及无人智能仓储设备 |
| JP7261639B2 (ja) * | 2019-03-29 | 2023-04-20 | 川崎重工業株式会社 | 生産管理システム及び生産管理方法 |
| JP7492871B2 (ja) * | 2020-07-03 | 2024-05-30 | 株式会社日立製作所 | 製販施策立案方法及びその装置 |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5402350A (en) * | 1991-06-28 | 1995-03-28 | Texas Instruments Incorporated | Scheduling for multi-task manufacturing equipment |
| JP3047675B2 (ja) | 1993-05-20 | 2000-05-29 | トヨタ自動車株式会社 | 生産比率制御方法および生産比率制御装置 |
| JP2738334B2 (ja) | 1995-03-17 | 1998-04-08 | 日本電気株式会社 | 生産計画平準調整システム |
| US5826238A (en) * | 1996-04-02 | 1998-10-20 | Taiwan Semiconductor Manufacturing | Daily target generation and machine allocation with priority |
| JPH1076446A (ja) * | 1996-08-30 | 1998-03-24 | Toshiba Corp | 生産工程管理装置および生産工程管理方法 |
| US5889673A (en) * | 1996-12-27 | 1999-03-30 | Vanguard International Semiconductor Corporation | Manufacturing method and system for dynamic dispatching of integrated circuit wafer lots |
| US5880960A (en) * | 1997-01-27 | 1999-03-09 | Taiwan Semiconductor Manufacturing Company, Ltd. | Method to improve WIP balance in a manufacturing line |
| US5825650A (en) * | 1997-03-11 | 1998-10-20 | Taiwan Semiconductor Manufacturing Co., Ltd. | Method for determining standard cycle time of a stage dynamically |
| US5748478A (en) * | 1997-03-17 | 1998-05-05 | Vanguard International Semiconductor Corporation | Output management of processing in a manufacturing plant |
| US5950170A (en) * | 1997-04-11 | 1999-09-07 | Vanguard International Semiconductor Corporation | Method to maximize capacity in IC fabrication |
-
1997
- 1997-09-16 JP JP25067497A patent/JPH1196210A/ja active Pending
-
1998
- 1998-08-25 US US09/139,269 patent/US6311094B1/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Carrie et al. | Work scheduling in FMS under tool availability constraints | |
| WO1995009401B1 (en) | System and method for integrating a business environment with a process control environment | |
| JPH1076446A5 (enExample) | ||
| Kireeva et al. | Graph-matrix modeling of production systems as a basis for managing the production capacity of metal working enterprises | |
| JP2021096563A (ja) | 生産計画立案支援システム及び生産計画立案支援方法 | |
| JP2000071119A (ja) | 形鋼の鋸断方法 | |
| JPWO2022024343A5 (ja) | 生産計画最適化装置、方法、プログラム、及び制御装置 | |
| Mütze et al. | Deriving of sequencing strategies for multi-stage productions supported by logistic models and software tools | |
| Craven | Some constraints, fallacies and solutions in GT applications | |
| Olaitan et al. | A nested configuration of POLCA and Generic Kanban in a high product mix manufacturing system | |
| JP2000112504A (ja) | 生産工場のパラメータの最適化システム及びその計算用媒体 | |
| Saeedi et al. | Modeling and optimization of batch production based on layout and cutting problems under uncertainty | |
| Ornek et al. | The Determination of In‐Process Inventory and Manufacturing Lead Time in Multi‐Stage Production Systems | |
| JP3400851B2 (ja) | 物流制御方法 | |
| JPH08112607A (ja) | シーケンススケジューリング装置 | |
| Sitepu et al. | Planning of warehouse area for vise manufacturing by considering raw material requirements | |
| CN118605429B (zh) | 基于启发式算法的生产线调度方法、装置、设备及介质 | |
| JP4119588B2 (ja) | ワークの生産比率制御装置 | |
| JPS60242942A (ja) | ワ−ク加工システムに於ける数値制御工作機械の稼動効率向上方法 | |
| JP3111821B2 (ja) | 生産計画装置 | |
| JP2017207977A (ja) | 生産スケジュール決定装置及び生産スケジュール決定方法 | |
| Van Goubergen et al. | Set-Up Reduction for Multi-Stage Manufacturing Lines-A Case study (Presentation Supporting Paper) | |
| JP2000107961A (ja) | 生産性評価シミュレーション装置および方法 | |
| Mahdavi et al. | A genetic approach for solving a hybrid flow shop scheduling problem | |
| JPS62216006A (ja) | 板金加工用の自動プログラミング装置 |