JP6446308B2 - 生産計画装置および生産計画方法 - Google Patents
生産計画装置および生産計画方法 Download PDFInfo
- Publication number
- JP6446308B2 JP6446308B2 JP2015064475A JP2015064475A JP6446308B2 JP 6446308 B2 JP6446308 B2 JP 6446308B2 JP 2015064475 A JP2015064475 A JP 2015064475A JP 2015064475 A JP2015064475 A JP 2015064475A JP 6446308 B2 JP6446308 B2 JP 6446308B2
- Authority
- JP
- Japan
- Prior art keywords
- production
- planning
- master
- plan
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/18—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
- G05B19/406—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by monitoring or safety
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/067—Enterprise or organisation modelling
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/33—Director till display
- G05B2219/33064—Manufacturing planning and control agent and domain blackboards
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06395—Quality analysis or management
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Human Computer Interaction (AREA)
- Manufacturing & Machinery (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Description
Claims (8)
- 生産に要する資源に関する実績情報と、
前記生産の作業に必要な資源の計画を含む計画用マスタと、
生産計画に要する変数を含む計画パラメータと、を記憶する記憶部と、
前記計画用マスタの資源の計画と、前記実績情報の前記生産に要する資源の実績と、の差に応じて前記計画用マスタの作業に必要な資源の計画を変更し、前記計画用マスタの変更度合いに応じて前記計画パラメータを変更するパラメータ生成処理部と、
前記計画用マスタと、前記計画パラメータと、を用いた生産計画を算出する生産計画処理部と、
を備え、
前記計画用マスタおよび生産計画には、少なくとも製品ごとに、前記生産の作業に必要な資源として、生産に用いる設備が含まれ、
前記計画パラメータには、少なくとも前記製品ごとに、安全在庫の量を特定する情報と、前倒し生産を許容する日数を特定する情報と、が含まれ、
前記記憶部には、前記計画用マスタに含まれる情報の増減に応じて前記計画パラメータに含まれる情報を、納期を守り生産性を高める値に変更する所定の規則が含まれるマスタ変更影響情報が含まれ、
前記パラメータ生成処理部は、前記マスタ変更影響情報に従って前記計画パラメータを変更する、
ことを特徴とする生産計画装置。 - 請求項1に記載の生産計画装置であって、
前記実績情報には、生産投入量および完成量を特定する情報が含まれ、
前記計画用マスタには、計画不良率が含まれ、
前記計画パラメータには、安全在庫を特定する情報が含まれ、
前記パラメータ生成処理部は、前記実績情報の前記生産投入量および前記完成量を用いて不良率の実績値を算出し、前記計画用マスタの計画不良率との差に応じて前記計画用マスタの計画不良率を変更し、前記計画用マスタの計画不良率の変更度合いに応じて前記安全在庫を特定する情報を変更する、
ことを特徴とする生産計画装置。 - 請求項1に記載の生産計画装置であって、
前記実績情報には、生産量および生産に要する時間を特定する情報が含まれ、
前記計画用マスタには、作業時間が含まれ、
前記パラメータ生成処理部は、前記実績情報の前記生産量および前記生産に要する時間の実績と、前記計画用マスタの作業時間と、の差に応じて前記計画用マスタの作業時間を変更し、前記計画用マスタの作業時間の変更度合いに応じて前記計画パラメータを変更する、
ことを特徴とする生産計画装置。 - 請求項1に記載の生産計画装置であって、
前記計画用マスタには少なくとも不良率が含まれ、
前記パラメータ生成処理部は、前記計画用マスタと変更後の前記計画用マスタとの間で前記不良率が下がった量に応じて、前記安全在庫量を増やす、
ことを特徴とする生産計画装置。 - 請求項1に記載の生産計画装置であって、
前記生産計画処理部は、納期遵守率および生産性の積が最大となる前記計画用マスタと前記計画パラメータとの組み合わせを、組み合わせ最適化手順により特定する、
ことを特徴とする生産計画装置。 - 請求項1に記載の生産計画装置であって、
前記生産計画処理部は、前記生産計画の算出処理において、納期遵守率の閾値を受け付けて、当該閾値を超える前記計画用マスタと前記計画パラメータとの組み合わせを特定する、
ことを特徴とする生産計画装置。 - 記憶部と、
外部の装置から、生産に要する資源に関する実績情報と、作業に必要な資源の計画を含む計画用マスタと、を受け付け、
前記計画用マスタの資源の計画と、前記実績情報の前記生産に要する資源の実績と、の差に応じて前記計画用マスタの作業に必要な資源の計画を変更し、
前記計画用マスタの変更度合いに応じて生産計画に要する変数を含む計画パラメータを算出するパラメータ生成処理部と、
前記計画用マスタと、前記計画パラメータと、を前記外部の装置へ送信する出力部、
を備え、
前記計画用マスタおよび生産計画には、少なくとも製品ごとに、前記生産の作業に必要な資源として、生産に用いる設備が含まれ、
前記計画パラメータには、少なくとも前記製品ごとに、安全在庫の量を特定する情報と、前倒し生産を許容する日数を特定する情報と、が含まれ、
前記記憶部には、前記計画用マスタに含まれる情報の増減に応じて前記計画パラメータに含まれる情報を、納期を守り生産性を高める値に変更する所定の規則が含まれるマスタ変更影響情報が含まれ、
前記パラメータ生成処理部は、前記マスタ変更影響情報に従って前記計画パラメータを変更する、
ことを特徴とする生産計画装置。 - コンピュータに、生産を計画させる手順を実行させる生産計画方法であって、
前記コンピュータは、
生産に要する資源に関する実績情報と、
前記生産の作業に必要な資源の計画を含む計画用マスタと、
生産計画に要する変数を含む計画パラメータと、を記憶する記憶部と、制御部と、を備え、
前記制御部は、
前記計画用マスタの資源の計画と、前記実績情報の前記生産に要する資源の実績と、の差に応じて前記計画用マスタの作業に必要な資源の計画を変更し、前記計画用マスタの変更度合いに応じて前記計画パラメータを変更するパラメータ生成処理ステップと、
前記計画用マスタと、前記計画パラメータと、を用いた生産計画を算出する生産計画処理ステップと、
を実施し、
前記計画用マスタおよび生産計画には、少なくとも製品ごとに、前記生産の作業に必要な資源として、生産に用いる設備が含まれ、
前記計画パラメータには、少なくとも前記製品ごとに、安全在庫の量を特定する情報と、前倒し生産を許容する日数を特定する情報と、が含まれ、
前記記憶部には、前記計画用マスタに含まれる情報の増減に応じて前記計画パラメータに含まれる情報を、納期を守り生産性を高める値に変更する所定の規則が含まれるマスタ変更影響情報が含まれ、
前記パラメータ生成処理ステップでは、前記制御部は、前記マスタ変更影響情報に従って前記計画パラメータを変更する、
ことを特徴とする生産計画方法。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015064475A JP6446308B2 (ja) | 2015-03-26 | 2015-03-26 | 生産計画装置および生産計画方法 |
CN201510956286.5A CN106022552A (zh) | 2015-03-26 | 2015-12-18 | 生产计划装置以及生产计划方法 |
US15/007,449 US10037018B2 (en) | 2015-03-26 | 2016-01-27 | Production planning apparatus and production planning method |
EP16153308.8A EP3073424A1 (en) | 2015-03-26 | 2016-01-29 | Production planning apparatus and production planning method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015064475A JP6446308B2 (ja) | 2015-03-26 | 2015-03-26 | 生産計画装置および生産計画方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2016184309A JP2016184309A (ja) | 2016-10-20 |
JP6446308B2 true JP6446308B2 (ja) | 2018-12-26 |
Family
ID=55315310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2015064475A Active JP6446308B2 (ja) | 2015-03-26 | 2015-03-26 | 生産計画装置および生産計画方法 |
Country Status (4)
Country | Link |
---|---|
US (1) | US10037018B2 (ja) |
EP (1) | EP3073424A1 (ja) |
JP (1) | JP6446308B2 (ja) |
CN (1) | CN106022552A (ja) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6342064B2 (ja) * | 2015-12-22 | 2018-06-13 | 株式会社日立製作所 | リソース融通装置、スケジュール管理装置およびリソース融通システム |
US10606254B2 (en) * | 2016-09-14 | 2020-03-31 | Emerson Process Management Power & Water Solutions, Inc. | Method for improving process/equipment fault diagnosis |
CN110612489B (zh) * | 2017-05-18 | 2022-05-10 | 三菱电机株式会社 | 教育计划制定装置和计算机能读取的存储介质 |
EP3410363A1 (de) * | 2017-05-31 | 2018-12-05 | Siemens Aktiengesellschaft | Bestimmen eines produktionsplans |
US20190034944A1 (en) * | 2017-07-26 | 2019-01-31 | Walmart Apollo, Llc | Systems and methods for predicting buffer value |
CN107544444A (zh) * | 2017-08-16 | 2018-01-05 | 浙江力太科技有限公司 | 一种用于多设备间的同步生产管理方法 |
US20210073719A1 (en) * | 2018-02-26 | 2021-03-11 | Becton, Dickinson And Company | Visual interactive application for safety stock modeling |
JP6903239B2 (ja) * | 2018-08-06 | 2021-07-14 | 三菱電機株式会社 | 生産スケジューリング装置、および生産スケジューリング方法 |
JP7054668B2 (ja) * | 2018-11-08 | 2022-04-14 | 株式会社日立製作所 | 動的生産計画システムおよび動的生産計画装置 |
JP7022085B2 (ja) * | 2019-01-29 | 2022-02-17 | 株式会社日立製作所 | 計画支援装置、計画支援方法、および、計画支援システム |
CN110874705A (zh) * | 2019-09-30 | 2020-03-10 | 北京辰森世纪科技股份有限公司 | 生产出成率的分析方法、装置及设备 |
JP7001657B2 (ja) * | 2019-11-25 | 2022-01-19 | 株式会社日立製作所 | 配送計画作成装置及び配送計画作成方法 |
CN111126877B (zh) * | 2019-12-31 | 2024-02-23 | 青岛奥利普奇智智能工业技术有限公司 | 一种化纤行业计划排产方法和系统 |
Family Cites Families (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5280425A (en) * | 1990-07-26 | 1994-01-18 | Texas Instruments Incorporated | Apparatus and method for production planning |
US5586021A (en) * | 1992-03-24 | 1996-12-17 | Texas Instruments Incorporated | Method and system for production planning |
JP3334970B2 (ja) * | 1993-10-29 | 2002-10-15 | 松下電器産業株式会社 | 生産進捗管理支援方法及び装置 |
US5841659A (en) * | 1994-05-26 | 1998-11-24 | Matsushita Electric Industrial Co., Ltd. | Production plan generating method and apparatus |
JPH1196210A (ja) * | 1997-09-16 | 1999-04-09 | Toshiba Corp | 生産計画立案方法および生産計画立案装置および記録媒体 |
JP3741562B2 (ja) * | 1999-03-29 | 2006-02-01 | 松下電器産業株式会社 | 生産計画の作成方法及びその作成装置 |
JP2001265419A (ja) * | 2000-03-21 | 2001-09-28 | Toto Ltd | 基準情報を学習する生産管理システム |
JP2004021364A (ja) * | 2002-06-13 | 2004-01-22 | Hitachi Ltd | 経営意思決定支援システム |
JP2004094900A (ja) * | 2002-07-09 | 2004-03-25 | National Institute Of Advanced Industrial & Technology | 生産計画作成システム及び方法、並びにプログラム |
WO2004015599A1 (de) * | 2002-07-26 | 2004-02-19 | Joachim Niemann | Verfahren zur rechnergestützten steuerung von fertigungsprozessen |
US7441244B2 (en) * | 2003-12-10 | 2008-10-21 | International Business Machines Corporation | Workload scheduler with cumulative weighting indexes |
US7130707B2 (en) * | 2003-12-18 | 2006-10-31 | Taiwan Semiconductor Manufacturing Co., Ltd. | System and method for manufacturing planning and control |
JP4479316B2 (ja) * | 2004-04-08 | 2010-06-09 | 株式会社日立製作所 | 生産計画立案装置および方法 |
JP4533711B2 (ja) | 2004-09-28 | 2010-09-01 | 富士通株式会社 | リードタイム・歩留り管理プログラム |
JP4652042B2 (ja) * | 2004-12-24 | 2011-03-16 | ヒタチグローバルストレージテクノロジーズネザーランドビーブイ | 再作業工程を有する生産ラインにおける生産計画方法およびその生産計画システム |
JP4629728B2 (ja) * | 2005-04-12 | 2011-02-09 | 富士通株式会社 | 生産管理プログラム、生産管理方法、生産管理システム |
JP2007133612A (ja) * | 2005-11-09 | 2007-05-31 | Toshiba Corp | 生産計画装置及びその方法並びに生産計画処理プログラム |
JP2007201309A (ja) * | 2006-01-30 | 2007-08-09 | Seiko Epson Corp | シミュレーションのパラメータ更新システム |
JP2007279876A (ja) * | 2006-04-04 | 2007-10-25 | Hitachi Global Storage Technologies Netherlands Bv | 生産計画方法及び生産計画システム |
JP2008140015A (ja) * | 2006-11-30 | 2008-06-19 | Sharp Corp | 部品納入指示システム、部品納入指示方法、及び部品納入指示プログラム |
JP4951470B2 (ja) * | 2007-11-06 | 2012-06-13 | 株式会社日立製作所 | 生産計画立案支援システム |
JP2011100318A (ja) * | 2009-11-06 | 2011-05-19 | Elpida Memory Inc | 作業工程制御装置、作業工程制御方法およびプログラム |
-
2015
- 2015-03-26 JP JP2015064475A patent/JP6446308B2/ja active Active
- 2015-12-18 CN CN201510956286.5A patent/CN106022552A/zh active Pending
-
2016
- 2016-01-27 US US15/007,449 patent/US10037018B2/en active Active
- 2016-01-29 EP EP16153308.8A patent/EP3073424A1/en not_active Ceased
Also Published As
Publication number | Publication date |
---|---|
CN106022552A (zh) | 2016-10-12 |
US10037018B2 (en) | 2018-07-31 |
EP3073424A1 (en) | 2016-09-28 |
US20160282844A1 (en) | 2016-09-29 |
JP2016184309A (ja) | 2016-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6446308B2 (ja) | 生産計画装置および生産計画方法 | |
US11354121B2 (en) | Software portfolio management system and method | |
EP3772687B1 (en) | System and methods for optimal allocation of multi-tenant platform infrastructure resources | |
US20040153187A1 (en) | Systems and methods for improving planning, scheduling, and supply chain management | |
US8099336B2 (en) | Component inventory management | |
US20070219929A1 (en) | Planning granularity in manufacturing computing systems | |
US20170011466A1 (en) | Systems and methods for modular data processing | |
US20220026874A1 (en) | System and method for high-mix wheels for capacity planning resource planning and material resource planning | |
US8027857B2 (en) | Rough-cut manufacturing operations for use in planning | |
JP5196991B2 (ja) | 製造工程管理装置、製造工程管理方法、及びコンピュータプログラム | |
US20240135290A1 (en) | Computer System and Method for Coordinating Process of Creating and Managing a Punch Item | |
JPH08212261A (ja) | 仕掛計画立案装置 | |
US20220164745A1 (en) | Computer-based platform for customer-integrated supply chain management | |
US20160048794A1 (en) | Project and task status indicator generator using baseline metrics | |
US20230394605A1 (en) | Construction Project Risk Assessment and Mitigation | |
JP5499113B2 (ja) | 生産計画調整支援装置、生産計画調整支援方法、および生産計画調整支援プログラム | |
JP2006350883A (ja) | 知識データベースを利用した需要予測値自動判定システムおよびそれに用いられる需要予測値自動判定プログラム並びにそのプログラムが記録された記録媒体 | |
JP2010086048A (ja) | ロスコスト最適化システム、ロスコスト最適化方法、およびロスコスト最適化プログラム | |
JP3923509B2 (ja) | 生産管理装置、生産管理用プログラム及び生産管理方法 | |
US20220004993A1 (en) | System and Method for Updating Real-Time Project Status Based on Deliverable Status | |
JP4308554B2 (ja) | 生産管理支援装置、生産管理支援用のコンピュータプログラム、およびそのコンピュータプログラムを記録した記録媒体 | |
JP2022034474A (ja) | 情報処理装置、情報処理システム、及び情報処理プログラム | |
CN116308475A (zh) | 产成品成本结构确定方法及装置、介质、设备 | |
KR20130127788A (ko) | 설계변경 자동통지기능이 구비된 설계정보관리시스템 및 그 제어방법 | |
JP2011203817A (ja) | 生産計画システム、生産計画立案方法及び生産計画立案プログラム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170307 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20171113 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20171205 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180116 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20180605 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180702 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20181120 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20181203 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 6446308 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |