JPH11280060A - Work execution method for continuous underground wall - Google Patents

Work execution method for continuous underground wall

Info

Publication number
JPH11280060A
JPH11280060A JP10368098A JP10368098A JPH11280060A JP H11280060 A JPH11280060 A JP H11280060A JP 10368098 A JP10368098 A JP 10368098A JP 10368098 A JP10368098 A JP 10368098A JP H11280060 A JPH11280060 A JP H11280060A
Authority
JP
Japan
Prior art keywords
underground wall
column
rows
constructed
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10368098A
Other languages
Japanese (ja)
Inventor
Keisuke Yoshida
圭佑 吉田
Naota Itoyama
直太 糸山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TONE GEO TECH CO Ltd
Original Assignee
TONE GEO TECH CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TONE GEO TECH CO Ltd filed Critical TONE GEO TECH CO Ltd
Priority to JP10368098A priority Critical patent/JPH11280060A/en
Publication of JPH11280060A publication Critical patent/JPH11280060A/en
Pending legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce the number of processes for constructing an underground wall by using column rows for reinforcing the ground placed at first as a guide for work execution of the underground wall without using a concrete foundation guide when performing work execution of the underground wall. SOLUTION: Two rows of column rows 10, 11 are placed at an interval smaller than a thickness of an underground wall for the ground 1 in which the underground wall is constructed, cut lines 12, 13 are formed using a cutter for the column rows, and a groove for the underground wall 15 is digged using the cut lines as ruler after crushing and removing the inner part. After the groove for the underground wall is digged, reinforcing bars are inserted therein and concrete is placed to construct the underground wall 15.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、地中壁の施工法に
関し、特に、地盤改良に用いるソイルセメントコラム等
を基準にして、地中壁を施工する工法に関する。
The present invention relates to a method for constructing an underground wall, and more particularly to a method for constructing an underground wall based on a soil cement column or the like used for ground improvement.

【0002】[0002]

【従来の技術】建築物等の構築に際しては、建物を直接
支持させるための地盤強化用の杭を施工することが行わ
れており、その他に、構築物の周囲の地盤を区画するた
めの止水作用を発揮させる地中壁を施工している。ま
た、構築物の施工する場所が軟弱地盤の場合には、地中
壁の両側に柱状の地盤改良体を列状に施工して、地盤の
支持強度をさらに向上させるような手段を用いることも
多く行われている。前記地中壁を施工するに際しては、
所定の厚さで長さが数mの深い溝を連接させるように施
工するか、あるいは多数本の孔を連続させて掘削し、所
定の巾の深い溝を作成してから、その溝の中に鉄筋を組
み合わせた籠状等の補強部材を挿入し、コンクリートを
注入して鉄筋コンクリート製の地中壁として構成してい
る。
2. Description of the Related Art When constructing a building or the like, a pile for reinforcing the ground for directly supporting the building is constructed, and in addition, a water stop for partitioning the ground around the structure. An underground wall that exerts its function is being constructed. In addition, when the construction site is constructed on soft ground, it is often the case that a columnar ground improvement body is constructed in rows on both sides of the underground wall to further improve the support strength of the ground. Is being done. When constructing the underground wall,
Construct a deep groove with a predetermined thickness and a length of several meters, or excavate a large number of holes continuously to create a deep groove with a predetermined width. A cage-like reinforcing member combined with a reinforcing bar is inserted into the slab, and concrete is injected into the reinforced concrete underground wall.

【0003】従来より、前記地中壁を構築するに際して
は、図5、6に示すような方法を用いているもので、最
初に、地中壁5の巾Wに対応させて、その両側に基礎ガ
イド2、3を構築している。そして、前記基礎ガイド
2、3の上に大型の掘削装置を乗せるようにして案内
し、その2つの基礎ガイドの対向する面を定規として用
い、オーガーやその他の掘削装置を用いて、地中壁のた
めの孔を掘削している。したがって、前記基礎ガイドを
用いて地中壁用のガイドとすることにより、地中壁の掘
削に際しては、施工装置の案内を容易に行うことができ
るために、精度の良い地中壁の施工が可能となる。
Conventionally, when constructing the underground wall, a method as shown in FIGS. 5 and 6 is used. First, the underground wall is made to correspond to the width W of the underground wall 5 on both sides thereof. Basic guides 2 and 3 are being constructed. Then, a large excavator is guided on the foundation guides 2 and 3, and the opposing surfaces of the two foundation guides are used as a ruler. Drilling holes for. Therefore, by using the foundation guide as a guide for the underground wall, when excavating the underground wall, it is possible to easily perform the guidance of the construction apparatus, so that the construction of the underground wall with high accuracy can be performed. It becomes possible.

【0004】[0004]

【発明が解決しようとする課題】前記基礎ガイド2、3
において、大型の掘削装置を支持するためには、鉄筋を
多く用いたコンクリートで構築する必要がある。例え
ば、重量が50トン程度の掘削装置を軟弱地盤上で支持
するためには、前記基礎ガイドの巾W2を2m、高さh
2も2m程度のものとして構成しているが、前記基礎ガ
イド2、3は、地中壁5を施工した後で除去するもので
ある。そして、前記基礎ガイドを除去してから、地中壁
の両側に所定の深さで地盤改良を行い、構築物の支持地
盤をより強固なものとする手段を用いている。
The above-mentioned basic guides 2, 3
In order to support a large excavator, it is necessary to construct it with concrete using a large amount of reinforcing steel. For example, in order to support an excavator weighing about 50 tons on soft ground, the width W2 of the foundation guide is set to 2 m and the height h
2 is also configured to be about 2 m, but the foundation guides 2 and 3 are removed after the underground wall 5 is constructed. Then, after the foundation guide is removed, the ground is improved at a predetermined depth on both sides of the underground wall to use a means for strengthening the support ground of the building.

【0005】ところが、前記基礎ガイドは大きなコンク
リート製の構築物であり、コンクリートの中に鉄筋が大
量に組み込まれているために、その構築のコストが高い
ものであるとともに、それを破砕するためには、多くの
労働力と機械を使用することが必要となる。また、大量
のコンクリートの廃棄物を処分することは、建築廃棄物
の量を増大させる原因ともなるために、その捨て場所に
も問題が多くある。さらに、前記を施工する際にも大量
の土を除去し、基礎ガイドを破砕して取り去った後で
も、その跡地に土を埋める等の作業を行うために、現場
で大量の土を移動させる必要がある等の問題もある。前
記問題に加えて、地中壁を直角または任意の角度で折れ
曲げた形状に構築する場合、または曲線状に構築する場
合等には、基礎ガイドを鉄筋コンクリートで構築する際
の型枠の組み立てにも、多くの手間を必要とする。
[0005] However, the foundation guide is a large concrete structure, and since a large amount of reinforcing steel is incorporated in the concrete, the construction cost is high. Need to use a lot of labor and machinery. In addition, disposal of a large amount of concrete waste causes an increase in the amount of construction waste, and therefore, there are many problems in disposal sites. Furthermore, when performing the above, it is necessary to remove a large amount of soil, even after crushing and removing the foundation guide, to move the large amount of soil at the site in order to perform work such as burying the soil on the former site There is also a problem such as there is. In addition to the above problems, when building the underground wall in a shape bent at a right angle or at an arbitrary angle, or when building a curved shape, etc., when assembling the formwork when building the foundation guide with reinforced concrete Also requires a lot of effort.

【0006】本発明は、前述したような従来の地中壁の
施工の問題を解消するもので、地盤改良のために施工し
たコラム列を、地中壁の施工のための定規として使用
し、地中壁の施工の工程を少なくするとともに、施工コ
ストを低下させ得る連続地中壁の施工法を提供すること
を目的としている。
The present invention solves the above-described problem of the construction of the underground wall as described above, and uses a column row constructed for ground improvement as a ruler for the construction of the underground wall. It is an object of the present invention to provide a method of constructing a continuous underground wall that can reduce the number of steps for constructing the underground wall and reduce the construction cost.

【0007】[0007]

【課題を解決するための手段】本発明は、地盤強化用の
コラム列を連続地中壁に沿わせて構築する工法に関す
る。本発明の請求項1の発明は、地中壁を構築する地盤
に対してコラム列を構築する工程と、前記コラム列に地
中壁の巾に対応するカット線を切削して形成する工程
と、前記コラム列のカット線の地中壁側に対応する部分
を除去する工程と、前記カット線を定規として用い、地
中壁用の溝を掘削する工程と、前記掘削した溝に鉄筋と
コンクリートとを打設する工程を経て、地中壁を構築す
ることを特徴とする。請求項2の発明は、前記コラム列
を2列に構築し、前記2列のコラム列に対して地中壁の
巾に対応させたカット線を切削して形成し、前記2つの
カット線を定規として地中壁用の溝を掘削することを特
徴とする。請求項3の発明は、前記2列に構築したコラ
ム列の上に、地中壁構築用の作業機を支持させて、地中
壁用の溝の掘削を行うことを特徴とする。
SUMMARY OF THE INVENTION The present invention relates to a method for constructing a column row for reinforcing the ground along a continuous underground wall. The invention according to claim 1 of the present invention includes a step of constructing a column row on the ground on which the underground wall is constructed, and a step of cutting and forming a cut line corresponding to the width of the underground wall in the column row. Removing the portion corresponding to the underground wall side of the cut line of the column row, excavating a groove for the underground wall using the cut line as a ruler, reinforcing steel and concrete in the excavated groove Then, the underground wall is constructed through the step of casting. The invention according to claim 2 is that the column rows are constructed in two rows, and a cut line corresponding to the width of the underground wall is formed by cutting the two column rows, and the two cut lines are formed. It is characterized by excavating a groove for underground wall as a ruler. The invention of claim 3 is characterized in that a work machine for constructing an underground wall is supported on the column row constructed in two rows, and a trench for the underground wall is excavated.

【0008】前述したようにして、地中壁を構築する工
法を用いることにより、従来の工法のように、地中壁の
掘削のための定規部材として鉄筋コンクリート製の基礎
ガイドを打設する必要がなく、地中壁の構築作業の工程
を簡素化することができる。また、最初に打設したコラ
ム列を、地中壁のガイドとして利用することにより、地
中壁構築後にコラム列を構築する必要がなく、重量の大
きな作業機を地中壁施工現場で安定した状態で支持する
ことが可能になる。そして、コラム列を2列に平行に構
築した後で、コラム列を介して作業機の支持を行わせる
ことにより、地盤が軟弱な場所での地中壁の構築作業を
も容易に行うことができる。
As described above, by using the method of constructing the underground wall, it is necessary to cast a reinforced concrete foundation guide as a ruler member for excavating the underground wall as in the conventional method. Therefore, the steps of the construction work of the underground wall can be simplified. In addition, by using the initially installed column row as a guide for the underground wall, there is no need to build a column row after the underground wall construction, and a heavy work machine can be stabilized at the underground wall construction site. It becomes possible to support in a state. Then, by constructing the column row in parallel with the two rows, by supporting the working machine via the column row, the construction work of the underground wall in a place where the ground is soft can be easily performed. it can.

【0009】[0009]

【発明の実施の形態】図示される例にしたがって、本発
明の連続地中壁の施工法を説明する。本発明において
は、図1、2に示すように、地中壁を施工する地盤1に
対して、最初に地盤改良のためのコラム列10、11を
施工する。前記コラム列の施工に際しては、従来公知の
工法を用いて、深さhが5〜7mで直径Dのコラムを隣
接させて列状に構築するもので、一般的なソイルセメン
トコラムとして構築すること、または、鉄筋等の補強部
材を埋設したコンクリートのコラムにより構成が可能で
ある。前記コラム列は、図2に示すように、地中壁の巾
Wに対して、内側に入り込むような間隔で2列に構築す
るもので、地中壁を構築する際には、前記コラム列1
0、11の対向する内面側を削るようにして構築する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A method of constructing a continuous underground wall according to the present invention will be described with reference to the illustrated example. In the present invention, as shown in FIGS. 1 and 2, first, column rows 10 and 11 for soil improvement are installed on the ground 1 on which an underground wall is to be installed. At the time of construction of the column row, a column having a depth h of 5 to 7 m and a diameter D is constructed adjacent to each other using a conventionally known construction method, and is constructed as a general soil cement column. Alternatively, it can be constituted by a concrete column in which a reinforcing member such as a reinforcing bar is embedded. As shown in FIG. 2, the column rows are constructed in two rows at intervals so as to enter inside the width W of the underground wall. 1
It is constructed such that opposing inner surfaces of 0 and 11 are cut.

【0010】図3に示す例は、ソイルセメントコラム1
0、11の列を巾方向に重なるように形成するか、ある
いは非常に接近させて形成し、厚さがWaの地中壁に対
応させる。前記図3のようにコラム列を非常に接近させ
るか、一部が重なるように施工する場合は、地中壁の厚
さが大きい値でない場合の他に、地中壁施工地盤の荷重
支持条件が良い場合に適用される。
FIG. 3 shows an example of a soil cement column 1.
The rows 0 and 11 are formed so as to be overlapped in the width direction or very close to each other, and correspond to the underground wall having a thickness of Wa. As shown in FIG. 3, when the column rows are very close to each other or when the columns are partially overlapped with each other, in addition to the case where the thickness of the underground wall is not a large value, the load supporting condition of the underground wall construction ground Is applied when good.

【0011】なお、前記コラム列の太さDは、構築物の
支持地盤の強度に応じて設定されるもので、地盤の支持
強度が比較的小さい値の場合には、径が大きい(太い)
ものを深い位置まで達するように施工するが、地盤の支
持強度が大きい場合には、細くて短いコラムを構築する
ことにより、容易に対処させることができる。また、施
工する地中壁が直線状の場合はもちろんのこと、地中壁
を曲面状に構築する場合や、直角に折れる状態に構築す
る場合にも、前記2列に形成するコラム列を、地中壁の
厚さWに対応させて構築することができるものであり、
前記コラム列を用いて地中壁用の溝の掘削作業を行うこ
とが可能になる。
The thickness D of the column row is set according to the strength of the ground supporting the structure. When the strength of the ground support is relatively small, the diameter D is large (thick).
The work is carried out so as to reach a deep position, but when the ground support strength is large, it can be easily dealt with by constructing a thin and short column. In addition, not only when the underground wall to be constructed is straight, but also when the underground wall is constructed in a curved shape, or when the underground wall is constructed to be bent at a right angle, the column row formed in the two rows is It can be constructed corresponding to the thickness W of the underground wall,
The excavation work of the trench for the underground wall can be performed using the column row.

【0012】前記図2、3に示すように、2列のコラム
列10、11を施工した後で、前記コラム列を用いて地
中壁を構築するに際しては、まず、最初にコラム列に対
して上から所定の深さで、カッター装置を用いてカット
線12、13を形成する。前記2つのカット線の間隔
は、地中壁の厚さWに対応する巾に形成する。前記カッ
ト線12、13によりカットされたコラムの内側の部分
は、図4に示すように、破砕機を用いて砕いて切取り部
14とすることにより、地中壁を構築する際の定規とし
てのカット線を形成する。そして、前記コラム列の間の
土をロックブレーカ等のような掘削装置を用いて除去
し、カット線の下部のコラム部分を破砕機を用いて取り
去り、地中壁の巾Wに対応する溝を形成する。また、前
記地中壁用の溝を掘削する際に、コラムの内側を溝掘削
用のオーガーを用いて切削することも可能である。前述
したようにして、地中壁15に対応する巾で強化した地
盤の下部に所定の深さHの溝を掘削し、鉄筋を挿入して
からコンクリートを流し込み、地中壁として構築する。
As shown in FIGS. 2 and 3, after constructing two column rows 10 and 11 and then constructing an underground wall using the column rows, first, Cut lines 12 and 13 are formed at a predetermined depth from above using a cutter device. The interval between the two cut lines is formed to have a width corresponding to the thickness W of the underground wall. As shown in FIG. 4, the inside portion of the column cut by the cut lines 12 and 13 is crushed using a crusher to form a cutout portion 14, which serves as a ruler when constructing an underground wall. Form a cut line. Then, the soil between the column rows is removed using a drilling device such as a rock breaker or the like, and the column portion below the cut line is removed using a crusher to form a groove corresponding to the width W of the underground wall. Form. When excavating the trench for the underground wall, the inside of the column can be cut using an auger for excavating the trench. As described above, a groove having a predetermined depth H is excavated in the lower part of the ground reinforced with a width corresponding to the underground wall 15, concrete is poured after inserting a reinforcing bar, and the underground wall is constructed.

【0013】なお、前記ソイルセメントコラムは、例え
ば、アースオーガー等を用いて土を掘削しながら、セメ
ントまたはセメントミルクを土に混合して作成するもの
であり、そのコラムが固化した後での耐圧強度は、1平
方cmあたり10〜30Kgf程度の値のものが使用され
る。したがって、前記コラムに対して、上面から丸鋸状
のダイヤモンドカッターやその他の切断装置を用いて、
カット線を切り込む作業を容易に行うことができる。ま
た、手持ちのロックドリルのような工具を用いて、カッ
ト線により規定された内部のコラム部分を破砕して、切
取り部を形成する作業を容易にできるものである。さら
に、図4に示すように、切取り部の下部を巾Wで切り欠
きして溝を形成する作業も、前記ロックドリルやその他
の任意の作業装置を用いて容易に行うことができる。
The soil cement column is made by mixing cement or cement milk into soil while excavating the soil using, for example, an earth auger, and has a pressure resistance after the column is solidified. The strength has a value of about 10 to 30 Kgf per square cm. Therefore, for the column, using a circular saw diamond cutter or other cutting device from the top,
The work of cutting the cut line can be easily performed. In addition, using a tool such as a hand-held rock drill, the inside column portion defined by the cut line can be crushed to easily form a cutout portion. Further, as shown in FIG. 4, the operation of forming a groove by cutting out the lower part of the cutout portion with the width W can be easily performed by using the rock drill or any other working device.

【0014】前述したようにして、コラム列10、11
の間を巾Wの溝を作成してから、その下部の土を掘削し
ながら地中壁用の溝を巾Wで施工し、硬い支持基盤にま
で達する溝を構築する。前記地中壁用の深い溝を施工す
る際には、泥水を注入して側壁の崩壊を防止しながら工
事を行うものであり、掘削作業には、アースドリル装置
や、クラムシェル、バケット装置等の任意の装置を用い
ることができる。そして、前記地中壁用の溝を掘削した
後で、溝の中に鉄筋の組み立て体を挿入し、溝の底まで
下ろしたパイプを用いて、溝の底からコンクリートを打
設して、泥水を上から排除しながら地中壁15を構築す
る。
As described above, the column rows 10, 11
Then, a groove having a width W is created, and a trench for the underground wall is constructed with the width W while excavating the soil under the groove, thereby constructing a groove reaching the hard support base. When the deep trench for the underground wall is constructed, the construction is performed while injecting muddy water to prevent collapse of the side wall, and the excavation work includes an earth drill device, a clamshell, a bucket device, and the like. Can be used. Then, after excavating the trench for the underground wall, an assembly of reinforcing bars is inserted into the trench, concrete is poured from the bottom of the trench using a pipe lowered to the bottom of the trench, and muddy water is poured. Is constructed from above, and the underground wall 15 is constructed.

【0015】前記示されるように、2列に構築されるコ
ラム列10、11は、構築物の建造場所の地盤の強度に
対応させて、そのコラムを施工する径Dにより設定され
るコラム列の厚さが選択される。例えば、支持強度の弱
い地盤に対しては、前記径Dを大きい値とするか、また
は固化材の使用量を多くして施工し、地盤強度が比較的
大きい場所では径Dの小さいものが選択される。また、
前記コラム列を打設する深さhは、前記コラムの径を決
定する場合と同様に、地盤の支持強度に対応させて任意
の深さまで構築するものである。したがって、前記コラ
ム列の上に大重量の作業機が乗った場合にも、2列のコ
ラム列により十分に安定して支持できるものとなり、コ
ラム列が沈下したり変形したりすることを防止できる。
As shown above, the column rows 10 and 11 constructed in two rows correspond to the strength of the ground at the construction site of the building, and the thickness of the column row set by the diameter D at which the column is constructed. Is selected. For example, for a ground having a low supporting strength, the diameter D is set to a large value or the amount of the solidifying material is increased, and a small diameter D is selected in a place where the ground strength is relatively large. Is done. Also,
The depth h at which the column rows are cast is, as in the case of determining the diameter of the columns, constructed to an arbitrary depth corresponding to the ground support strength. Therefore, even when a heavy working machine is mounted on the column rows, the two column rows can be sufficiently stably supported, and it is possible to prevent the column rows from sinking or deforming. .

【0016】もちろん、前記コラム列の上に大重量の作
業機を乗せて掘削作業を行う場合には、コラム列の上面
に厚い鉄板を敷いて、コラム列に対してクローラから局
部的な大きな荷重が付与されることがないようにして行
うものである。つまり、作業機の重量をコラム列に対し
て鉄板を介して分散させ、特定のコラム列に対して局部
的に大きな荷重が集中されないようにすることは、従来
の掘削作業機を用いて、地中壁を施工する工事の場合と
同様にして行われる。また、地中壁を施工する場所が、
比較的軟質の地盤である場合には、地中壁の構築前に打
設しているコラム列を用いて作業機を支持できることか
ら、作業機の支持のために厚い鉄板を大量に敷き込むこ
とにより、そのための資材を無駄に使用することがなく
なる。
Of course, when excavation work is carried out by placing a heavy working machine on the column row, a thick iron plate is laid on the top of the column row, and the crawler places a large load locally on the column row. Is performed so as not to be given. In other words, distributing the weight of the work equipment to the column rows via the iron plate so that a large load is not locally concentrated on a specific column row can be achieved by using a conventional excavator. It is carried out in the same way as the construction work for the inner wall. In addition, the place where the underground wall is constructed,
If the ground is relatively soft, the work equipment can be supported using the column rows cast before the construction of the underground wall, so a large number of thick iron plates must be laid to support the work equipment. Therefore, the material for that purpose is not wasted.

【0017】[0017]

【発明の効果】本発明の地中壁は、前述したようにして
構築するものであるから、従来の工法を用いる場合のよ
うに、地中壁の掘削のための定規部材として鉄筋コンク
リート製の基礎ガイドを打設する必要がなく、地中壁の
構築作業の工程を簡素化することができる。また、最初
に打設したコラム列を、地中壁のガイドとして利用する
ことにより、地中壁構築後にコラム列を構築する必要が
なく、重量の大きな作業機を地中壁施工現場で安定した
状態で支持することが可能になる。そして、コラム列を
2列に平行に構築した後で、コラム列を介して作業機の
支持を行わせることによって、地盤が軟弱な場所での地
中壁の構築作業をも容易に行うことができるとともに、
正確に位置決めした地中壁を構築できる。
Since the underground wall of the present invention is constructed as described above, as in the case of using the conventional method, a reinforced concrete foundation is used as a ruler member for excavating the underground wall. There is no need to cast a guide, and the construction process of the underground wall can be simplified. In addition, by using the initially installed column row as a guide for the underground wall, there is no need to build a column row after the underground wall construction, and a heavy work machine can be stabilized at the underground wall construction site. It becomes possible to support in a state. Then, by constructing the column rows in parallel with the two rows, by supporting the working machine via the column rows, the construction work of the underground wall in a place where the ground is soft can be easily performed. As well as
Underground walls that are accurately positioned can be constructed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 地盤にコラム列を構築する工程の説明図であ
る。
FIG. 1 is an explanatory diagram of a process of constructing a column row on the ground.

【図2】 図1の平面図である。FIG. 2 is a plan view of FIG.

【図3】 コラム列を接近させて施工する例の説明図で
ある。
FIG. 3 is an explanatory view of an example in which the work is carried out by approaching column columns.

【図4】 コラム列を用いて地中壁を構築する工程の説
明図である。
FIG. 4 is an explanatory diagram of a process of constructing an underground wall using column rows.

【図5】 従来の地中壁構築工法の説明図である。FIG. 5 is an explanatory view of a conventional underground wall construction method.

【図6】 図5の工法に用いる基礎ガイドの説明図であ
る。
FIG. 6 is an explanatory diagram of a basic guide used in the method of FIG. 5;

【符号の説明】[Explanation of symbols]

1 地盤、 2・3 基礎ガイド、 5・15
地中壁、10・11 コラム列、 12・13 カ
ット線、 14 切取り部。
1 Ground, 2.3 Basic Guide, 5/15
Underground wall, 10.11 column row, 12.13 cut line, 14 cutout.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 地盤強化用のコラム列を連続地中壁に沿
わせて構築するに際して、 地中壁を構築する地盤に対してコラム列を構築する工程
と、 前記コラム列に地中壁の巾に対応するカット線を切削し
て形成する工程と、 前記コラム列のカット線の地中壁側に対応する部分を除
去する工程と、 前記カット線を定規として用い、地中壁用の溝を掘削す
る工程と、 前記掘削した溝に鉄筋とコンクリートとを打設する工程
を経て、地中壁を構築することを特徴とする連続地中壁
の施工法。
1. A step of constructing a column row for a ground on which an underground wall is constructed when constructing a column row for ground reinforcement along a continuous underground wall; A step of cutting and forming a cut line corresponding to the width; a step of removing a portion corresponding to the underground wall side of the cut line of the column row; a groove for the underground wall using the cut line as a ruler And constructing an underground wall through a step of excavating steel and placing a reinforcing bar and concrete in the excavated trench.
【請求項2】 前記コラム列を2列に構築し、前記2列
のコラム列に対して地中壁の巾に対応させたカット線を
切削して形成し、前記2つのカット線を定規として地中
壁用の溝を掘削することを特徴とする請求項1に記載の
連続地中壁の施工法。
2. The method according to claim 1, wherein the column rows are constructed in two rows, and cut lines corresponding to the width of the underground wall are formed by cutting the two column rows, and the two cut lines are used as a ruler. The method for constructing a continuous underground wall according to claim 1, wherein a trench for an underground wall is excavated.
【請求項3】 前記2列に構築したコラム列の上に、地
中壁構築用の作業機を支持させて、地中壁用の溝の掘削
を行うことを特徴とする請求項1または2に記載の連続
地中壁の施工法。
3. An excavation of a trench for an underground wall by supporting a working machine for underground wall construction on the column row constructed in two rows. Construction method of continuous underground wall described in.
JP10368098A 1998-03-31 1998-03-31 Work execution method for continuous underground wall Pending JPH11280060A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10368098A JPH11280060A (en) 1998-03-31 1998-03-31 Work execution method for continuous underground wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10368098A JPH11280060A (en) 1998-03-31 1998-03-31 Work execution method for continuous underground wall

Publications (1)

Publication Number Publication Date
JPH11280060A true JPH11280060A (en) 1999-10-12

Family

ID=14360510

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10368098A Pending JPH11280060A (en) 1998-03-31 1998-03-31 Work execution method for continuous underground wall

Country Status (1)

Country Link
JP (1) JPH11280060A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017031562A (en) * 2015-07-29 2017-02-09 鹿島建設株式会社 Construction method of continuous underground wall
JP2019190029A (en) * 2018-04-19 2019-10-31 鹿島建設株式会社 Guide wall and construction method of guide wall
CN113931167A (en) * 2021-10-12 2022-01-14 上海城建市政工程(集团)有限公司 Method for reinforcing wall of underground continuous wall with inscribed wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017031562A (en) * 2015-07-29 2017-02-09 鹿島建設株式会社 Construction method of continuous underground wall
JP2019190029A (en) * 2018-04-19 2019-10-31 鹿島建設株式会社 Guide wall and construction method of guide wall
CN113931167A (en) * 2021-10-12 2022-01-14 上海城建市政工程(集团)有限公司 Method for reinforcing wall of underground continuous wall with inscribed wall

Similar Documents

Publication Publication Date Title
JP6661448B2 (en) Construction method of underground diaphragm wall
KR20020046904A (en) A method of construction for the breast wall
JP3893056B2 (en) Construction method of underground structure
CN109518681A (en) Precast concrete square pile connector processing method
JPH11280060A (en) Work execution method for continuous underground wall
JP4485006B2 (en) Construction method for underground structures
KR200362565Y1 (en) Earth Retaining Wall Structure Using Precast Concrete Pile and Construction Method Thereof
JP3948655B2 (en) Construction method of retaining wall and underground structure
JP2000291398A (en) Underground structure and construction method therefor
JP4020858B2 (en) Manufacturing method for underground structures
JP2021116619A (en) Steel guide wall
JPH06306853A (en) Construction of underground structure
JP2017206882A (en) Method of constructing underground structure
KR20110034831A (en) Method for non excavated excavating construction using steel pipe and steel pipe with hole
JP2004132124A (en) Pneumatic caisson and pneumatic caisson constructing method
JP2656892B2 (en) Underground structure construction method and continuous underground wall construction method
KR100654973B1 (en) Earth Retaining Wall Structure Using Precast Concrete Pile and Construction Method Thereof
JP7204228B2 (en) Underground beam construction method
JPS6018769B2 (en) Construction method of underground structure
KR102625776B1 (en) Construction method of CIP retaining wall with improved water protection and ground subsidence prevention function
KR102575701B1 (en) A method of open cut excavation tunnel using a messer plate
JP2004132125A (en) Caisson connecting method
JP3841679B2 (en) Ground improvement method
JP3684482B1 (en) Caisson connection method
JPH10121465A (en) Continuos underground wall engineering method

Legal Events

Date Code Title Description
A621 Written request for application examination

Effective date: 20050112

Free format text: JAPANESE INTERMEDIATE CODE: A621

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061120

A131 Notification of reasons for refusal

Effective date: 20061128

Free format text: JAPANESE INTERMEDIATE CODE: A131

A02 Decision of refusal

Effective date: 20070403

Free format text: JAPANESE INTERMEDIATE CODE: A02