Construction method of underground structureInfo
- Publication number
- JPH0726877A JPH0726877A JP5192905A JP19290593A JPH0726877A JP H0726877 A JPH0726877 A JP H0726877A JP 5192905 A JP5192905 A JP 5192905A JP 19290593 A JP19290593 A JP 19290593A JP H0726877 A JPH0726877 A JP H0726877A
- Authority
- JP
- Japan
- Prior art keywords
- constructing
- underground
- constructed
- underground structure
- continuous
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、地下構造物の構築方法
に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing an underground structure.
【0002】[0002]
【従来の技術】従来、地下に大規模な構造物を構築する
場合、地上部から開削して地下構造物を構築することが
多かった。2. Description of the Related Art Conventionally, when constructing a large-scale structure underground, it is often the case that an underground structure is constructed by excavating from the above-ground portion.
【0003】[0003]
【発明が解決しようとする課題】この場合、地上の構造
物を撤去する等の作業が必要であり、作業に困難を極め
ることが多かった。In this case, it is necessary to remove the structures on the ground, which is often difficult.
【0004】本発明は、このような問題に鑑みてなされ
たもので、その目的とするところは、地上部からの開削
を行わず、地下構造物を構築できる地下構造物の構築方
法を提供することにある。The present invention has been made in view of the above problems, and an object thereof is to provide a method for constructing an underground structure without constructing an excavation from the above-ground portion. Especially.
【0005】[0005]
【課題を解決するための手段】前述した目的を達成する
ために本発明は、複数のシールドトンネルを構築する工
程と、前記シールドトンネルから鉛直下方に向けて連続
地中壁を構築する工程と、前記複数のシールドトンネル
間に天井桁を構築する工程と、前記連続地中壁と前記天
井桁で囲まれた空間を掘削する工程と、を具備する地下
構造物の構築方法である。In order to achieve the above-mentioned object, the present invention comprises a step of constructing a plurality of shield tunnels, and a step of constructing a continuous underground wall from the shield tunnels vertically downward. A method of constructing an underground structure, comprising: a step of constructing a ceiling girder between the plurality of shield tunnels; and a step of excavating a space surrounded by the continuous underground wall and the ceiling girder.
【0006】[0006]
【作用】本発明では、複数のシールドトンネルを構築
し、シールドトンネルから鉛直下方に向けて連続地中壁
を構築し、複数のシールドトンネル間に天井桁を構築
し、連続地中壁と天井桁で囲まれた空間を掘削して地下
構造物を構築する。In the present invention, a plurality of shield tunnels are constructed, a continuous underground wall is constructed vertically downward from the shield tunnel, and a ceiling girder is constructed between the plurality of shield tunnels. An underground structure is constructed by excavating the space surrounded by.
【0007】[0007]
【実施例】以下、図面に基づいて本発明の実施例を詳細
に説明する。図1は、第1の実施例に係る地下構造物の
構築方法の説明図である。図1において1は地表、3
a、3bはシールドトンネル、5a、5bは連続地中
壁、7は天井桁、9は支柱、11a、11bはフロアを
示す。Embodiments of the present invention will now be described in detail with reference to the drawings. FIG. 1 is an explanatory diagram of a method of constructing an underground structure according to the first embodiment. In FIG. 1, 1 is the ground surface and 3
a, 3b are shield tunnels, 5a, 5b are continuous underground walls, 7 is a ceiling girder, 9 is a pillar, and 11a, 11b are floors.
【0008】図2は、この地下構造物の斜視図である。FIG. 2 is a perspective view of this underground structure.
【0009】次に、このような地下構造物の構築方法を
説明する。まずシールド機を用いてシールドトンネル3
a、3bを構築する。次に、このシールドトンネル3
a、3bの底部を掘削して連続地中壁5a、5bを構築
する。Next, a method of constructing such an underground structure will be described. First, using a shield machine, shield tunnel 3
Build a, 3b. Next, this shield tunnel 3
The bottoms of a and 3b are excavated to construct continuous underground walls 5a and 5b.
【0010】図3、図4は連続地中壁を構築するためシ
ールドトンネル3aの下方を掘削する場合において、シ
ールドトンネル3aを長さ方向から見た図、およびその
側面図である。図3、図4においてシールドトンネル3
a内にレール15a、15bが設けられる。連壁掘削機
13はレール15a、15b上を走行可能であり、カッ
タ17を有している。FIGS. 3 and 4 are a view of the shield tunnel 3a seen from the longitudinal direction and a side view thereof when excavating below the shield tunnel 3a for constructing a continuous underground wall. 3 and 4, the shield tunnel 3
Rails 15a and 15b are provided in a. The continuous wall excavator 13 can travel on rails 15a and 15b and has a cutter 17.
【0011】シールドトンネル3aの底部のセグメント
を取り外し、その位置に連壁掘削機13を停止させ、カ
ッタ17により掘削部19を掘削する。そしてこの掘削
部19に連続地中壁を構築する。すなわち掘削部19を
掘削しつつ、泥水を注入し、所定の深さまで掘削される
と、図5に示すように連壁掘削機13を移動させ、掘削
部19上に鉄筋建込車21を配置する。この鉄筋建込車
21は鉄筋25を掘削部19内に建て込む。図5におい
て23は鉄筋運搬車を示し、鉄筋運搬車23は鉄筋25
を運搬し、この鉄筋25が鉄筋建込車21に移されて掘
削部19中に継ぎ足されつつ建て込まれる。The segment at the bottom of the shield tunnel 3a is removed, the continuous wall excavator 13 is stopped at that position, and the excavator 19 is excavated by the cutter 17. Then, a continuous underground wall is constructed in the excavation section 19. That is, while excavating the excavation unit 19, when muddy water is injected and excavated to a predetermined depth, the continuous wall excavator 13 is moved as shown in FIG. To do. The reinforcing bar built-in vehicle 21 has a reinforcing bar 25 built in the excavation section 19. In FIG. 5, reference numeral 23 denotes a reinforcing bar carrier, and the reinforcing bar carrier 23 is a reinforcing bar 25.
The rebar 25 is transported to the rebar erection vehicle 21 and rebuilt in the excavation section 19 while being replenished.
【0012】鉄筋の建て込みが終了すると泥水を排出し
つつ、掘削部19にコンクリートを打設して連続地中壁
を構築する。なお連続地中壁5a、5bを構築する場
合、ウエルポイント等で地下水位を下げておく。When the building of the reinforcing bars is completed, concrete is placed in the excavated portion 19 to construct a continuous underground wall while discharging muddy water. When constructing the continuous underground walls 5a and 5b, the groundwater level is lowered at well points or the like.
【0013】このようにしてシールドトンネル3a、3
bの底部に連続地中壁5a、5bを構築した後、シール
ドトンネル3a、3b内から横穴を掘削し、天井桁7を
施工する。In this way, the shield tunnels 3a, 3
After constructing the continuous underground walls 5a and 5b at the bottom of b, the horizontal holes are excavated from inside the shield tunnels 3a and 3b, and the ceiling girder 7 is constructed.
【0014】図6は、天井桁7の施工の説明図である。
シールドトンネル3aの側部から水平ボーリングを行
い、鋼管パイプ27をジョイントしながら回転、圧入し
て天井桁7を構築する。FIG. 6 is an explanatory view of the construction of the ceiling girder 7.
Horizontal boring is performed from the side of the shield tunnel 3 a, and the ceiling girder 7 is constructed by rotating and press fitting while jointing the steel pipes 27.
【0015】このようにして連続地中壁5a、5b、天
井桁7が構築されると、これらによって囲まれた部分を
掘削し、支柱9、フロア11a、11bを逐次構築しつ
つ地下空間を構築していく(図1)。なおシールドトン
ネル3a、3は地下鉄等のアクセスに利用する。When the continuous underground walls 5a and 5b and the ceiling girder 7 are constructed in this manner, the portion surrounded by these is excavated, and the pillars 9 and the floors 11a and 11b are successively constructed to construct an underground space. (Fig. 1). The shield tunnels 3a and 3 are used for accessing subways.
【0016】このように本実施例ではシールドトンネル
3a、3bを構築した後、連続地中壁5a、5bおよび
天井桁7を構築して、それらで囲まれた空間を掘削し
て、地下構造物を構築することができる。したがって、
地上部から開削を行うことなく、大断面の地下道路等の
地下構造物を安全に構築できる。As described above, in this embodiment, after constructing the shield tunnels 3a and 3b, the continuous underground walls 5a and 5b and the ceiling girder 7 are constructed, and the space surrounded by them is excavated to construct an underground structure. Can be built. Therefore,
It is possible to safely construct underground structures such as large-scale underground roads without excavating from the ground.
【0017】図7は、本発明の第2の実施例の説明図で
ある。この第2の実施例では3個のシールドトンネル3
c、3d、3eを構築し、連続地中壁5c、5dを構築
し、天井桁7a、7bを斜めに構築し、地下構造物とし
たものである。このように天井桁7a、7bを斜めにす
ることによって土圧に対して強い構造となる。FIG. 7 is an explanatory diagram of the second embodiment of the present invention. In this second embodiment, three shield tunnels 3
c, 3d, 3e are constructed, continuous underground walls 5c, 5d are constructed, and ceiling girders 7a, 7b are constructed obliquely to form an underground structure. In this way, by making the ceiling girders 7a and 7b oblique, a structure that is strong against earth pressure is obtained.
【0018】[0018]
【発明の効果】以上、詳細に説明したように本発明によ
れば、地上部からの開削を行わず、地下構造物を構築で
きる。As described above in detail, according to the present invention, an underground structure can be constructed without excavation from the above-ground portion.
【図1】 本発明の第1の実施例に係る地下構造物の構
築方法の説明図FIG. 1 is an explanatory diagram of a method for constructing an underground structure according to a first embodiment of the present invention.
【図2】 地下構造物の斜視図[Fig. 2] Perspective view of underground structure
【図3】 連壁掘削機13による掘削の説明図FIG. 3 is an explanatory diagram of excavation by the continuous wall excavator 13.
【図4】 連壁掘削機13による掘削の説明図FIG. 4 is an explanatory diagram of excavation by the continuous wall excavator 13.
【図5】 鉄筋の挿入時の説明図FIG. 5 is an explanatory view of inserting a reinforcing bar.
【図6】 天井桁7の構築を示す図FIG. 6 is a diagram showing the construction of the ceiling girder 7.
【図7】 第2の実施例に係る地下構造物の説明図FIG. 7 is an explanatory view of an underground structure according to the second embodiment.
1………地表 3a、3b、3c、3d、3e………シールドトンネル 5a、5b、5c、5d………連続地中壁 7、7a、7b………天井桁 1 ... Ground surface 3a, 3b, 3c, 3d, 3e ... Shield tunnels 5a, 5b, 5c, 5d ......... Continuous underground wall 7, 7a, 7b ...
Claims (3)
と、 前記シールドトンネルから鉛直下方に向けて連続地中壁
を構築する工程と、 前記複数のシールドトンネル間に天井桁を構築する工程
と、 前記連続地中壁と前記天井桁で囲まれた空間を掘削する
工程と、 を具備する地下構造物の構築方法。1. A step of constructing a plurality of shield tunnels, a step of constructing a continuous underground wall from the shield tunnel in a vertically downward direction, a step of constructing a ceiling girder between the plurality of shield tunnels, A method of constructing an underground structure, comprising: excavating a space surrounded by a continuous underground wall and the ceiling girder.
徴とする請求項1記載の地下構造物の構築方法。2. The method for constructing an underground structure according to claim 1, wherein the ceiling girder is provided in a horizontal direction.
けることを特徴とする請求項1記載の地下構造物の構築
方法。3. The method for constructing an underground structure according to claim 1, wherein the ceiling girder is provided obliquely to the horizontal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5192905A JP2656892B2 (en) | 1993-07-07 | 1993-07-07 | Underground structure construction method and continuous underground wall construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5192905A JP2656892B2 (en) | 1993-07-07 | 1993-07-07 | Underground structure construction method and continuous underground wall construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0726877A true JPH0726877A (en) | 1995-01-27 |
JP2656892B2 JP2656892B2 (en) | 1997-09-24 |
Family
ID=16298935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5192905A Expired - Lifetime JP2656892B2 (en) | 1993-07-07 | 1993-07-07 | Underground structure construction method and continuous underground wall construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2656892B2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100439968B1 (en) * | 2002-02-02 | 2004-07-15 | 백상현 | A method of constrution method for tunnel of structure pipe |
JP2007170095A (en) * | 2005-12-26 | 2007-07-05 | Taisei Corp | Construction method of underground structure, and jacking machine |
KR100805189B1 (en) * | 2006-09-12 | 2008-02-21 | 신일씨엔아이(주) | Construction method of underground structure characterized by going side by side wall construction and excavation |
KR101407631B1 (en) * | 2012-07-25 | 2014-06-13 | 쌍용건설 주식회사 | Underground tunnel structure and construction method for underground tunnel structure using presssed pipe |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03103600A (en) * | 1989-09-14 | 1991-04-30 | Takenaka Komuten Co Ltd | Construction of large space of building in extremely deep underground |
JPH03122400A (en) * | 1989-10-04 | 1991-05-24 | Takenaka Komuten Co Ltd | Method for constructing architectural big space in great depth underground |
JPH03224999A (en) * | 1990-01-29 | 1991-10-03 | Shimizu Corp | Construction of underground cavity having large section and tunnel |
-
1993
- 1993-07-07 JP JP5192905A patent/JP2656892B2/en not_active Expired - Lifetime
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03103600A (en) * | 1989-09-14 | 1991-04-30 | Takenaka Komuten Co Ltd | Construction of large space of building in extremely deep underground |
JPH03122400A (en) * | 1989-10-04 | 1991-05-24 | Takenaka Komuten Co Ltd | Method for constructing architectural big space in great depth underground |
JPH03224999A (en) * | 1990-01-29 | 1991-10-03 | Shimizu Corp | Construction of underground cavity having large section and tunnel |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100439968B1 (en) * | 2002-02-02 | 2004-07-15 | 백상현 | A method of constrution method for tunnel of structure pipe |
JP2007170095A (en) * | 2005-12-26 | 2007-07-05 | Taisei Corp | Construction method of underground structure, and jacking machine |
JP4705467B2 (en) * | 2005-12-26 | 2011-06-22 | 大成建設株式会社 | Construction method of underground structure |
KR100805189B1 (en) * | 2006-09-12 | 2008-02-21 | 신일씨엔아이(주) | Construction method of underground structure characterized by going side by side wall construction and excavation |
KR101407631B1 (en) * | 2012-07-25 | 2014-06-13 | 쌍용건설 주식회사 | Underground tunnel structure and construction method for underground tunnel structure using presssed pipe |
Also Published As
Publication number | Publication date |
---|---|
JP2656892B2 (en) | 1997-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101205783B1 (en) | The complex execution method which dismantling work of existing underground structure and constructs of new building simultaneously | |
JP4295272B2 (en) | Friction cut plate used in open shield method and its fixing method | |
JP4022687B2 (en) | Construction method for underground structures | |
CN111042104A (en) | Method for constructing diaphragm wall at existing underground structure | |
JPH0726877A (en) | Construction method of underground structure | |
JP2009174185A (en) | Method of constructing wide section of tunnel | |
JP3135188B2 (en) | Construction method of underground cavity | |
JP2000291398A (en) | Underground structure and construction method therefor | |
JP3125171B2 (en) | How to build underground structures | |
JP2004060266A (en) | Non-open-cut construction method for underground structure | |
JP4243069B2 (en) | Construction method of earth retaining wall | |
JPH05256083A (en) | Method of widening underground tunnel and branch/ junction construction method | |
CN207062996U (en) | Cross the constructing structure of urban road underpass | |
JP2700694B2 (en) | How to build a large architectural space underground | |
JP2668648B2 (en) | Construction method of underground structure and starting pit used for it | |
JPS62220616A (en) | Construction work for underground space | |
JPH02300422A (en) | Construction of underground structure | |
JP2004316125A (en) | Work execution method for large sectional tunnel and deformed section shield machine | |
JP2977985B2 (en) | Underground space construction method | |
JP3646698B2 (en) | Construction method for underground structures | |
JP2878254B1 (en) | Open shield method | |
JP2005307688A (en) | Construction method for earth retaining wall for newly built underground skeleton and construction method for newly built skeleton by use of its method | |
JPS61186623A (en) | Method of building foundation of building | |
JPH0430026A (en) | Constructing method of underground structure | |
JPH07259108A (en) | Constructing method for underground structure |