JPH0440317A - Method for constructing point mark device for ground boundary or the like - Google Patents

Method for constructing point mark device for ground boundary or the like

Info

Publication number
JPH0440317A
JPH0440317A JP14811090A JP14811090A JPH0440317A JP H0440317 A JPH0440317 A JP H0440317A JP 14811090 A JP14811090 A JP 14811090A JP 14811090 A JP14811090 A JP 14811090A JP H0440317 A JPH0440317 A JP H0440317A
Authority
JP
Japan
Prior art keywords
hole
concrete
buried
boundary
range
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP14811090A
Other languages
Japanese (ja)
Inventor
Mitsuhiro Fujiwara
充弘 藤原
Takayuki Fujiwara
隆行 藤原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP14811090A priority Critical patent/JPH0440317A/en
Publication of JPH0440317A publication Critical patent/JPH0440317A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

PURPOSE:To fullfill a mark function forever by putting a buried body such as sand and lime in the lower part of a hole space, pouring concrete into an upper part, and burying a boundary indication body in the top surface part of the concrete in an exposed state. CONSTITUTION:A thin and long batter pile is driven in to bore a hole 1 and a recessed part 5 is formed at the periphery of the hole 1 with a rotary forming shaft 4. The 1st buried body 6 of one of sand, charcoal, lime, a magnet, and an earthenware piece or their mixture is put in the hole 1 within a range A. Then a capsule 7 containing material relating to ground partition in a sealed state is thrown in. A 2nd buried body 8 is thrown in within a range B similarly to the buried body 6. Then the concrete 10 is poured into a range C including the recessed part 5 and the boundary indication body 11 is fixed before the concrete 10 is solidified. Consequently, even when the indication body 11 is extracted, the buried bodies 6 and 8 and capsule 7 are still buried, so trouble is prevented from occurring afterward.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、土地境界等のポイント標示装置の施工方法
に関する。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a method of constructing a point marking device for land boundaries, etc.

〔従来の技術〕[Conventional technology]

土地の境界区分問題については争いが多いが、コンクリ
ート社製で上面に標示が刻まれた標示装置を用いること
により、出来るだけ無用な争いが起きないようにしてい
る。
There are many disputes over land boundary division issues, but by using a marking device made by Concrete, with a sign engraved on the top, unnecessary disputes are avoided as much as possible.

〔発明が解決しようとする課題〕[Problem to be solved by the invention]

しかし、このような標示装置は、人手やパワーショヘル
などによって比較的簡単に抜かれるおそれがあり、また
、天変地異で表層部分がずれたりすることもある。この
場合、標示機能を全く果たさなくなることがよくあった
However, such a marking device may be relatively easily removed by hand or a power shovel, and the surface layer may be displaced due to natural disasters. In this case, it often ceased to perform any marking function.

前記事情に鑑みて、この発明の課題とするところは、掘
削されたり天変地異があったりしても何時までも標示機
能を発揮できるようにすることにある。
In view of the above circumstances, it is an object of the present invention to provide a device that can continue to function as a marker even if excavated or other natural disasters occur.

〔課題を解決するための手段〕[Means to solve the problem]

前記課題を解決するため、請求項1記載の発明は、孔明
は手段により地表から深さ方向に向けて土地に孔を明け
て孔明は手段を開孔から抜き出したのち、明けられた孔
−空間の下側部分に、砂、炭、石灰、マグネット等の別
埋設物を入れておき、そののち、孔空間の上側部分にコ
ンクリートを流し込んで、同コンクリートが固結しない
うちに、コンクリートの表層部分に境界明示体を露出状
に埋め込んでおくようにする。
In order to solve the above problem, the invention according to claim 1 provides that Komei makes a hole in the land from the ground surface in the direction of depth using a means, and after Komei pulls out the means from the hole, the made hole-space. Separate materials such as sand, charcoal, lime, and magnets are placed in the lower part of the hole, and then concrete is poured into the upper part of the hole space. Before the concrete hardens, the surface layer of the concrete is poured. Embed the boundary explicit body in an exposed manner.

請求項2記載の発明は、明けられた孔を追加により周部
に凹^のある孔にしておき、明けられた孔に流され固結
するコンクリートが前記凹みに引っ掛り得るようにする
In the invention as set forth in claim 2, the drilled hole is additionally made into a hole with a recess around the circumference, so that the concrete poured into the drilled hole and solidified can be caught in the recess.

〔実施例〕〔Example〕

以下、図示した実施例を参照しつつ詳しく説明する。 A detailed description will be given below with reference to the illustrated embodiments.

第1図ないし第6図は、この発明の一実施例を示してい
る。同実施例において、■は孔で、土地2に明けられて
いる。この孔1は、第1図に示すように、細長い打ち込
み杭(孔明は手段)3の打ち込みによって明けられる。
1 to 6 show an embodiment of the present invention. In the same example, ■ is a hole, which is opened in land 2. As shown in FIG. 1, this hole 1 is opened by driving a slender driving stake 3 (Koumei is the means).

打ち込み抗3は、第2図に示すように、抜き出される。The driving resistance 3 is pulled out as shown in FIG.

必要に応じて、第3図に示すように、回転成形軸4を使
って孔1の周部に凹み5が明けられる0回転成形軸4は
、出没可能な掘削突起4aを備え、同突起4aの回転に
より凹み5が形成されるようになっているそのあと、第
4図に示すように、まず砂、炭、石灰、マグネット、陶
片のいずれか1種類あるいはこれらの混合によるところ
の第1別埋設物6をAの範囲に入れる。この第1別埋設
物6は、後で説明に出てくる境界明示体11およびコン
クリート10が引き抜かれても孔1内に残るようになり
、土地所有者にとっての安全確保を図るようにするもの
である。
If necessary, as shown in FIG. 3, the rotary molding shaft 4 is provided with a retractable excavation protrusion 4a, and a recess 5 is made in the circumference of the hole 1 using the rotary molding shaft 4. As shown in FIG. Place the separate buried object 6 in range A. This first separate buried object 6 remains in the hole 1 even if the boundary marking body 11 and concrete 10, which will be explained later, are pulled out, thereby ensuring safety for the landowner. It is.

次に、カブセルフを投入しておく。このカブセルフの中
には本土地区分に関する種々の資料を密封状態でできる
だけ多く入れておくようにする。
Next, add the turnip self. This Cub Self should contain as many various materials related to the land classification as possible in a sealed state.

そのあと、前記砂、炭、石灰、マグネット、陶片のいず
れかあるいはこれらの混合によるところの第2別埋設物
8を入れておく、この第2別埋設物8はB範囲に入れら
れる。第1および第2別埋設物6,8は同じ物であるこ
とが多いが、違うものであってもよい、このものは、前
記カブセルフの中に資料として記載しておくようにする
After that, a second buried object 8 made of any one of the sand, charcoal, lime, magnet, pottery shards, or a mixture thereof is put in. This second buried object 8 is placed in range B. The first and second buried objects 6 and 8 are often the same object, but they may be different objects, and these objects should be recorded in the Cub Self as a document.

孔1内には、凹み5を含むCの範囲にコンクリート10
を導入する。このコンクリート10が固結しないうちに
、第5図に示すように、境界明示体11を差し込み固定
する。
Inside hole 1, concrete 10 is placed in area C including recess 5.
will be introduced. Before the concrete 10 hardens, the boundary marking body 11 is inserted and fixed as shown in FIG.

この境界明示体11は、下端が開口したコンクリート製
の本体11aとこの本体11a内に一端が差し込まれ先
端が鋭利になった軸11bを備えている。軸11bを固
結しないコンクリートlOの中へ差し込み、本体11a
もこのコンクリートlOの上層部分の中へ差し込んで、
境界明示体11を露出状態で立設するようにする。この
境界明示体11の上面には境界標示が付されている。
This boundary clarifying body 11 includes a main body 11a made of concrete with an open lower end and a shaft 11b having one end inserted into the main body 11a and having a sharp tip. Insert the shaft 11b into unconsolidated concrete lO, and remove the main body 11a.
Insert it into the upper layer of this concrete lO,
The boundary clarifying body 11 is erected in an exposed state. A boundary mark is attached to the upper surface of this boundary marking body 11.

コンクリ−)10は、凹み5の中にも流れ込んで固結し
、そのため、容易に抜は出すようなことはない。しかも
、このコンクリートlOに固結した境界明示体11も容
易に抜は出すようなことがない。前記本体11aは金属
やプラスチック製であってもよい。
The concrete 10 also flows into the recess 5 and solidifies, so that it is not easily pulled out. Furthermore, the boundary marking body 11 solidified in the concrete 1O is not easily pulled out. The main body 11a may be made of metal or plastic.

したがって、仮に、境界明示体11が抜かれたとしても
、地中には別埋設物6.8およびカブセルフが秘密的に
埋まっているので、あとでトラブルが発生するようなこ
とがない。
Therefore, even if the boundary clarifying body 11 is removed, since the separate buried object 6.8 and the turnip self are secretly buried underground, no trouble will occur later.

第7図ないし第10図に示すものは別の実施例を示して
いる。
7 to 10 show other embodiments.

同実施例では、前記と同様に、第7図に示すように、土
地2に孔1が明けられ、この孔lの数箇所に、回転成形
軸4により追加的に凹み5−が明けられる。そのあと、
第8図に示すように、第1埋設物6、カブセルフ、第2
埋設物8が入れられ、上層としてコンクリート10が詰
め込まれる。
In this embodiment, similarly to the above, as shown in FIG. 7, a hole 1 is made in the land 2, and recesses 5- are additionally made in several places in the hole 1 by the rotary molding shaft 4. after that,
As shown in FIG.
A buried object 8 is placed, and concrete 10 is packed as an upper layer.

第9図に示すように、コンクリート10が固結しないう
ちに、境界明示体11が固定される。この実施例では、
他に、コンクリート10が入しラれる内周面に第10図
に示すように「境界杭」と明示したプレート12が張り
付けられる。このプレート12も別埋設物としてatす
る。
As shown in FIG. 9, the boundary marking body 11 is fixed before the concrete 10 hardens. In this example,
In addition, as shown in FIG. 10, a plate 12 clearly labeled as a "boundary pile" is attached to the inner peripheral surface into which the concrete 10 is inserted. This plate 12 is also buried separately.

第11図は、他の実施例を示している。FIG. 11 shows another embodiment.

二の実施例では、境界明示体11が高さHの高いもので
道路標識等の案内標示機能を備えたものになっている。
In the second embodiment, the boundary marking body 11 has a high height H and is equipped with a guide marking function such as a road sign.

案内標示はllcで示されているなお、第12図に示す
ものは、岩盤15の上に砂層16を備えたものを対象に
し、これに前記のような境界明示体17を立設するよう
にしたものを示している。すなわち、砂層16に上から
孔18を明け、この孔18内にコンクリート19を流し
込む前に、孔18の底に相当する岩盤15の表面に接着
剤20を付けておくようにする。
The guide sign is indicated by llc.The one shown in FIG. It shows what was done. That is, a hole 18 is made from above in the sand layer 16, and before concrete 19 is poured into the hole 18, an adhesive 20 is applied to the surface of the rock 15 corresponding to the bottom of the hole 18.

境界明示体17は、本体17aと長い軸17bとを備え
たものとされ、本体!?aのない状態の長い軸17bを
その先端が接着剤20により接着されるようにして孔1
8内に挿入する。そのあと、コンクリート19を流し込
み、同コンクリート19が流れ込まないうちに、本体1
7aをコンクリート19に差し込みながら固定する。こ
の固定は、本体17aに設けられたナツト17dを軸1
7bにねじ込むことで行なわれる。
The boundary clarifying body 17 includes a main body 17a and a long shaft 17b. ? The long shaft 17b without a is attached to the hole 1 so that its tip is glued with the adhesive 20.
Insert into 8. After that, concrete 19 is poured, and before the concrete 19 has poured in, the main body 1
7a is inserted into the concrete 19 and fixed. This fixing is done by attaching a nut 17d provided on the main body 17a to the shaft 1.
This is done by screwing into 7b.

第13図ないし第15図は、付加的な案例を示している
。この案例は、第13図のように、旧来からある境界明
示体(境界杭)25の固着力を高めるための方法で、境
界明示体25を、第14図に示すように、まず、抜き去
り、その孔26内に固着力を高めるための接着剤(糊等
)27を投入して、再び、境界明示体25を差し込むよ
うにするものである。
Figures 13 to 15 show additional examples. This example, as shown in Fig. 13, is a method for increasing the adhesion force of the conventional boundary marking body (boundary stake) 25. As shown in Fig. 14, the boundary marking body 25 is first removed. Then, an adhesive (glue, etc.) 27 is put into the hole 26 to increase the adhesion force, and the boundary marking body 25 is inserted again.

なお、前記実施例では、土地の境界を明示する方法を説
明したが、配管を明示する方法であってもよい。
In addition, although the method of clearly indicating the boundary of land was explained in the said Example, the method of clearly indicating piping may be sufficient.

〔発明の効果〕〔Effect of the invention〕

この発明は、以上のようであり、したがって、掘削され
たり天変地異があったりしても何時までも標示機能を発
揮できるようになる。
The present invention is as described above, and therefore, even if excavation occurs or natural disasters occur, the marking function can be maintained at any time.

【図面の簡単な説明】[Brief explanation of drawings]

第1図ないし第6図はこの発明の一実施例を工程順に示
す断面図、第7図ないし第9図は別の実施例を工程順に
示す断面図、第10図はその境界杭を示す斜視図、第1
I図は境界明示体の他の実施例を示す断面図、第12図
は岩盤のあるところに境界明示体を固着する方法を示す
断面図、第13図ないし第15図は付加的な実施例を示
す断面図である。 1−孔 2−土地 3−打ち込み抗(孔明は手段)4−
何転成形軸 5−凹み 6,7.8別埋設物 10− 
コンクリート 11−−−−〜境界明示第11図 4図 第5図
Figures 1 to 6 are sectional views showing one embodiment of the present invention in order of process, Figures 7 to 9 are sectional views showing another embodiment in order of process, and Figure 10 is a perspective view showing boundary piles thereof. Figure, 1st
Figure I is a sectional view showing another embodiment of the boundary marking body, Figure 12 is a sectional view showing a method of fixing the boundary marking body to a place where there is rock, and Figures 13 to 15 are additional embodiments. FIG. 1-hole 2-land 3-driving pit (Koumei is the means) 4-
What rotation molding shaft 5-dent 6, 7.8 separate buried object 10-
Concrete 11-----Boundary Clearance Figure 11 Figure 4 Figure 5

Claims (2)

【特許請求の範囲】[Claims] (1)孔明け手段により地表から深さ方向に向けて土地
に孔を明けて孔明け手段を同孔から抜き出したのち、明
けられた孔空間の下側部分に、砂、炭、石灰、マグネッ
ト等の別埋設物を入れておき、そののち、孔空間の上側
部分にコンクリートを流し込んで、同コンクリートが固
結しないうちに、コンクリートの表層部分に境界明示体
を露出状に埋め込んでおくようにする土地境界等のポイ
ント標示装置の施工方法。
(1) After drilling a hole in the land from the ground surface to the depth direction using a drilling means and pulling out the drilling means from the hole, sand, charcoal, lime, and magnets are placed in the lower part of the opened hole space. After that, pour concrete into the upper part of the hole space, and before the concrete hardens, bury the boundary marking body exposed in the surface layer of the concrete. Construction method of point marking device for land boundaries, etc.
(2)明けられた孔を追加により周部に凹みのある孔に
しておき、明けられた孔に流され固結するコンクリート
が前記凹みに引っ掛り得るようにした請求項1記載の土
地境界等のポイント標示装置の施工方法。
(2) The land boundary, etc. according to claim 1, wherein the drilled hole is additionally made into a hole with a recess around the periphery, so that concrete poured into the drilled hole and solidified can be caught in the recess. Construction method of point marking device.
JP14811090A 1990-06-05 1990-06-05 Method for constructing point mark device for ground boundary or the like Pending JPH0440317A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14811090A JPH0440317A (en) 1990-06-05 1990-06-05 Method for constructing point mark device for ground boundary or the like

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14811090A JPH0440317A (en) 1990-06-05 1990-06-05 Method for constructing point mark device for ground boundary or the like

Publications (1)

Publication Number Publication Date
JPH0440317A true JPH0440317A (en) 1992-02-10

Family

ID=15445475

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14811090A Pending JPH0440317A (en) 1990-06-05 1990-06-05 Method for constructing point mark device for ground boundary or the like

Country Status (1)

Country Link
JP (1) JPH0440317A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174144A (en) * 2013-03-21 2013-06-26 中冶集团武汉勘察研究院有限公司 On-site casting method for bottom peg burying in preformed grille under seaside levee
JP2018017954A (en) * 2016-07-29 2018-02-01 株式会社イージーサービス Townscape recovery plate and management device thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174144A (en) * 2013-03-21 2013-06-26 中冶集团武汉勘察研究院有限公司 On-site casting method for bottom peg burying in preformed grille under seaside levee
JP2018017954A (en) * 2016-07-29 2018-02-01 株式会社イージーサービス Townscape recovery plate and management device thereof

Similar Documents

Publication Publication Date Title
JP2992252B2 (en) Ground anchor head fixing device
JPH0440317A (en) Method for constructing point mark device for ground boundary or the like
CN203070720U (en) Construction site civilized construction cable warning pile
JP2004190241A (en) Foundation structure of main column erected on ground
JPS6146610B2 (en)
CN207392271U (en) A kind of waterproof construction of permanent collimation stake
CN205984135U (en) Pre -buried formula marker post
JP4002025B2 (en) Indicator
JP2001348886A (en) Building foundation construction method in weak ground
JPH0351373Y2 (en)
JPH10219683A (en) Underground pile molding method and device therefor
CN213329116U (en) Lower edge prefabricated part device of asphalt pavement inspection well cover
JPH09209377A (en) Constructing method for l-shaped retaining wall
JP3418789B2 (en) Caisson structure
JP3424110B2 (en) Boundary sign pile
JPH11140881A (en) Penetration method for caisson foundation
JPS609172B2 (en) How to build underground structures
JP2005156190A (en) Method for manufacturing marking pile
JPS5910619A (en) Vibrationless and noiseless driving work of steel pile
JPS6192235A (en) Fixing of embedded pipe
JPS6351501A (en) Temporary restoration of road under drilling construction
JPS5980894A (en) Shield construction method and drain apparatus
JPS61155512A (en) Removal of negative frictional force of in-site pile
JPS6122874Y2 (en)
JPS60144654U (en) Construction method of cast-in-place concrete shafts for wooden buildings