CN207392271U - A kind of waterproof construction of permanent collimation stake - Google Patents

A kind of waterproof construction of permanent collimation stake Download PDF

Info

Publication number
CN207392271U
CN207392271U CN201721259058.3U CN201721259058U CN207392271U CN 207392271 U CN207392271 U CN 207392271U CN 201721259058 U CN201721259058 U CN 201721259058U CN 207392271 U CN207392271 U CN 207392271U
Authority
CN
China
Prior art keywords
stake
collimation
steel cylinder
casing
permanent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721259058.3U
Other languages
Chinese (zh)
Inventor
袁斌
黄秋筠
李宏亮
傅韬
莫承礼
谢明鸣
黄天明
梁文雄
朱学文
林鑫良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Original Assignee
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd filed Critical Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority to CN201721259058.3U priority Critical patent/CN207392271U/en
Application granted granted Critical
Publication of CN207392271U publication Critical patent/CN207392271U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model is related to a kind of waterproof constructions of permanent collimation stake, including collimation stake and the interior casing being set in outside collimation stake, outer casing and limiting section, the interior casing is sheathed in outer casing, the limiting section includes upper steel cylinder and lower steel cylinder, the upper steel cylinder is located between collimation stake and interior casing, the lower steel cylinder is located between collimation stake and outer casing, the outside casing in lower end of the upper steel cylinder extends annular chuck, the upper surface of the lower steel cylinder is connected with the lower surface of annular chuck, the lower surface of the lower steel cylinder fits in the mortar upper surface between collimation stake and outer casing bottom.The utility model is by using new waterproof construction system, with the protection of a variety of waterproof material multilayers, preferably the Groundwater infiltration works that underground is enriched is protected, simultaneously, using the structure of inside and outside casing, the interference that completely isolated external force collimation stake generates, can more accurately observe the sedimentation and displacement of surrounding structure.

Description

A kind of waterproof construction of permanent collimation stake
Technical field
The utility model is related to building field, more particularly, to a kind of waterproof construction of permanent collimation stake.
Background technology
Permanent collimating point is set large aperture Percussion Piles, the welding of steel pile casting sinking, artificial rock drilling, cylindrical structure, a depth Bottom hole portion complexity waterproof construction, high-accuracy built-in fitting are pre-buried etc. to be integrated integrated biological pond system, first using Percussion Piles impact into Hole, then sinking steel pile casting do retaining wall, manually carry out the construction of a sequence after pumping light mud down toward bottom hole, in pile driving construction is collimated, Deep-well structurally waterproof, the anti-tampering isolation of collimation stake, collimating point built-in fitting are pre-buried etc. in high precision, are the key that work progress, especially It is the construction that these labyrinths are carried out under deep-well structure, how ensures that a year space either direction last year relative displacement is less than 0.3 millimeter, year differential settlement be less than 0.3 millimeter, it is necessary to which stake bottom will not after the completion of without sediment, how ensureing bottom water-proof system Infiltration is to collimate the main problem for needing to solve in pile driving construction.
The content of the invention
The utility model is the waterproof problem overcome described in the above-mentioned prior art, provides a kind of waterproof knot of permanent collimation stake Structure.
In order to solve the above technical problems, the technical solution of the utility model is as follows:
A kind of waterproof construction of permanent collimation stake, including collimation stake and the interior casing being set in outside collimation stake and outer shield Cylinder, the interior casing are sheathed in the outer casing, further include limiting section, and the limiting section includes upper steel cylinder and lower steel cylinder, institute Steel cylinder is stated to be located between the collimation stake and the interior casing, the lower steel cylinder be located at collimation stake and the outer casing it Between, the outside casing in lower end of the upper steel cylinder extends annular chuck, upper surface and the annular chuck of the lower steel cylinder Lower surface be connected, the lower surface of the lower steel cylinder is fitted on the mortar between the collimation stake and the outer casing bottom Surface;The structure design being combined using new limiting section and inside and outside casing, what completely isolated external force collimation stake generated Interference, it is completely isolated between pile body and outboard structure among collimation stake, can more accurately observe the sedimentation of surrounding structure with Displacement, meanwhile, new waterproof construction system with the protection of a variety of waterproof material multilayers, has preferably protected what underground was enriched Groundwater infiltration works.
Further, as optimal technical scheme, the upper end outer wall of the upper steel cylinder is provided with /V steel disc;Shield in ensureing Gap between cylinder and collimation stake.
Further, as optimal technical scheme, the interior casing be mounted on limiting section above the mortar with it is described On the first concrete poured between outer casing, the second concrete has been poured between the interior casing and the outer casing.
Further, as optimal technical scheme, set and have the gap between the upper steel cylinder and the collimation stake, it is described Gap jute packing, the upper end end set of the jute packing have the first adhesive tape;It is close after jute packing, then using adhesive tape Envelope, has preferably protected the infiltration of underground water.
Further, as optimal technical scheme, the mortar is provided with the second adhesive tape with the collimation stake junction.
Further, as optimal technical scheme, the 3rd adhesive tape is posted in annular chuck end lower surface, and the described 3rd Adhesive tape is connected with the lower steel cylinder outer wall upper end.
Further, as optimal technical scheme, bentonite is filled between the lower steel cylinder and the collimation stake.
Further, as optimal technical scheme, annular protrusion is extended in the bottom of the outer casing to mortar, described The lower surface of annular protrusion is provided with the 4th adhesive tape.
Compared with prior art, the advantageous effect of technical solutions of the utility model is:
The permanent collimation stake waterproof construction of the utility model, using collimation stake and the separation of surrounding structure and flexible water knot Structure system, can preferably eliminate the error brought due to sedimentation and generated in measurement, this structure can be applied long-term high-precision with needs Spend the measurement control of stable building or equipment;By using new waterproof construction system, with a variety of waterproof material multilayers Protection, the Groundwater infiltration works that underground has preferably been protected to enrich, meanwhile, it is completely isolated using the structure of inside and outside casing The interference that external force collimation stake generates, it is completely isolated between pile body and outboard structure among collimation stake, it can more accurately see Observe the sedimentation and displacement of surrounding structure.
Description of the drawings
Fig. 1 is the utility model structure chart.
Fig. 2 is the utility model partial enlargement structure chart.
Wherein, collimation stake be the 1, second adhesive tape be 11, interior casing is 2, outer casing is 3, annular protrusion 31, the 4th glue Article it is 32, limiting section 4, upper steel cylinder are 41, lower steel cylinder is 42, annular chuck 43, the 3rd adhesive tape are 44, /V steel disc is 45th, jute packing 46, the first adhesive tape are 47, bentonite 5, mortar 6, basement rock 7, the first concrete are the 8, second coagulation Soil is 9, clay 10.
Attached drawing is only for illustration, it is impossible to be interpreted as the limitation to this patent;It is attached in order to more preferably illustrate the present embodiment Scheme some components to have omission, zoom in or out, do not represent the size of actual product;To those skilled in the art, Some known features and its explanation may be omitted and will be understood by attached drawing;The same or similar label corresponds to same or similar Component;The terms describing the positional relationship in the drawings are only for illustration, it is impossible to be interpreted as the limitation to this patent.
Specific embodiment
The preferred embodiment of the utility model is described in detail below in conjunction with the accompanying drawings, so that the advantages of the utility model It is more easy to be readily appreciated by one skilled in the art with feature, so as to make the scope of protection of the utility model apparent define.
Embodiment 1
A kind of waterproof construction of the permanent collimation stake of the utility model, as depicted in figs. 1 and 2:Including collimation stake 1 and it is arranged Interior casing 2 and outer casing 3 and limiting section 4, interior casing 2 outside collimation stake 1 are sheathed in outer casing 3, and limiting section 4 includes Upper steel cylinder 41 and lower steel cylinder 42, upper steel cylinder 41 are located between collimation stake 1 and interior casing 2, and lower steel cylinder 42 is located at collimation stake 1 and outer shield Between cylinder 3, the outside casing 3 in lower end of upper steel cylinder 41 extends annular chuck 43, the upper surface of lower steel cylinder 42 and annular chuck 43 lower surface is connected, and the lower surface of lower steel cylinder 42 fits in 6 upper surface of mortar between 3 bottom of collimation stake 1 and outer casing; It is tamped in surrounding 10 back-filling in layers of clay of outer casing 3, it is ensured that mud 6 not overflow by around.
The upper end outer wall of upper steel cylinder 41 is provided with /V steel disc 45, and /V steel disc 45 and the inner wall of interior casing 2 abut against, and protects Gap in card between casing and collimation stake;Meanwhile set and have the gap between upper steel cylinder 41 and collimation stake 1, gap flax silk Filleting 46, the upper end end set of jute packing 46 have the first adhesive tape 47;It, can be with after jute packing, then using adhesive tape sealing The infiltration of underground water is preferably protected.
Interior casing 2 is mounted on the first concrete eight poured between the limiting section 4 of 6 top of mortar and outer casing 3, interior shield The second concrete 9 has been poured between cylinder 2 and outer casing 3;Mortar 6 is provided with the second adhesive tape 11 with 1 junction of collimation stake;Annular snap The 3rd adhesive tape 44 is posted in 43 end lower surface of platform, and the 3rd adhesive tape 44 is connected with lower 42 outer wall upper end of steel cylinder;Lower steel cylinder 42 and standard Bentonite 5 is filled between straight stake 1;Annular protrusion 31 is extended in the bottom of outer casing 3 to mortar 6, annular protrusion 31 Lower surface is provided with the 4th adhesive tape 32., it is necessary to first clean out 31 surface contaminants of annular protrusion, so before the 4th adhesive tape 32 is pasted Afterwards the second adhesive tape 11 is pasted in collimation 1 bottom outside of stake again.Wherein mortar 6 has preferable anti-permeability performance and bonding, anti crack performance, In conjunction with sealing joint strip, the infiltration of underground water has preferably been protected.
Bentonite 5 in the present embodiment is microdilatancy bentonite, the first adhesive tape 47, the second adhesive tape 11, the 3rd adhesive tape 44 with And the 4th adhesive tape 32 be that water-swellable article rubber water stop, mortar 6 are waterproof polymer mortars.
The utility model is by using microdilatancy bentonite, water-swellable article rubber water stop, waterproof polymer mortar and spy The multiple materials such as the steel cylinder and casing of system form flexible water structural system with collimation stake, preferably eliminate and brought due to sedimentation The error generated in measurement, this structure can be applied with the measurement of the building or equipment of long-term high-accuracy stable is needed to control;Pass through Using new waterproof construction system, with the protection of a variety of waterproof material multilayers, the underground water that underground has preferably been protected to enrich Works is penetrated into, meanwhile, using the structure of inside and outside casing, interference that completely isolated external force collimation stake generates is collimated in stake Between it is completely isolated between pile body and outboard structure, can more accurately observe the sedimentation and displacement of surrounding structure;Employ punching Hole stake combines the construction technology at manually clear bottom, and the sedimentation of pile body has been completely secured, preferably ensure that the precision of alignment measurement.
Obviously, above-described embodiment of the utility model is only intended to clearly illustrate the utility model example, and It is not the restriction to the embodiment of the utility model.For those of ordinary skill in the art, in above description On the basis of can also make other variations or changes in different ways.There is no need and unable to give all embodiments It is exhaustive.All any modification, equivalent and improvement made within the spirit and principle of the utility model etc., should be included in Within the protection domain of the utility model claims.

Claims (8)

1. a kind of waterproof construction of permanent collimation stake, including collimating stake(1)Be set in collimation stake(1)External interior casing(2) With outer casing(3), the interior casing(2)It is sheathed on the outer casing(3)It is interior, which is characterized in that further include limiting section(4), institute State limiting section(4)Including upper steel cylinder(41)With lower steel cylinder(42), the upper steel cylinder(41)Positioned at the collimation stake(1)With it is described interior Casing(2)Between, the lower steel cylinder(42)Positioned at the collimation stake(1)With the outer casing(3)Between, the upper steel cylinder(41) The outside casing in lower end(3)Extend annular chuck(43), the lower steel cylinder(42)Upper surface and the annular chuck (43)Lower surface be connected, the lower steel cylinder(42)Lower surface fit in the collimation stake(1)With the outer casing(3)Bottom Mortar between portion(6)Upper surface.
2. the waterproof construction of permanent collimation stake according to claim 1, which is characterized in that the upper steel cylinder(41)Upper end Outer wall is provided with /V steel disc(45).
3. the waterproof construction of permanent collimation stake according to claim 1, which is characterized in that the interior casing(2)It is mounted on The mortar(6)The limiting section of top(4)With the outer casing(3)Between the first concrete for pouring(8)On, the interior casing (2)With the outer casing(3)Between poured the second concrete(9).
4. the waterproof construction of permanent collimation stake according to claim 1, which is characterized in that the upper steel cylinder(41)With it is described Collimate stake(1)Between set and have the gap, the gap jute packing(46), the jute packing(46)Upper end end set It is equipped with the first adhesive tape(47).
5. the waterproof construction of permanent collimation stake according to claim 1, which is characterized in that the mortar(6)With the standard Straight stake(1)Junction is provided with the second adhesive tape(11).
6. the waterproof construction of permanent collimation stake according to claim 1, which is characterized in that the annular chuck(43)End Post the 3rd adhesive tape in lower surface(44), the 3rd adhesive tape(44)With the lower steel cylinder(42)Outer wall upper end is connected.
7. the waterproof construction of permanent collimation stake according to claim 1, which is characterized in that the lower steel cylinder(42)With it is described Collimate stake(1)Between be filled with bentonite(5).
8. the waterproof construction of permanent collimation stake according to claim 1, which is characterized in that the outer casing(3)Bottom To mortar(6)Extend annular protrusion(31), the annular protrusion(31)Lower surface be provided with the 4th adhesive tape(32).
CN201721259058.3U 2017-09-28 2017-09-28 A kind of waterproof construction of permanent collimation stake Active CN207392271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721259058.3U CN207392271U (en) 2017-09-28 2017-09-28 A kind of waterproof construction of permanent collimation stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721259058.3U CN207392271U (en) 2017-09-28 2017-09-28 A kind of waterproof construction of permanent collimation stake

Publications (1)

Publication Number Publication Date
CN207392271U true CN207392271U (en) 2018-05-22

Family

ID=62404265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721259058.3U Active CN207392271U (en) 2017-09-28 2017-09-28 A kind of waterproof construction of permanent collimation stake

Country Status (1)

Country Link
CN (1) CN207392271U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505313A (en) * 2018-12-14 2019-03-22 深圳市普赛特建筑工程技术有限公司 Water-tight device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505313A (en) * 2018-12-14 2019-03-22 深圳市普赛特建筑工程技术有限公司 Water-tight device
CN109505313B (en) * 2018-12-14 2023-10-27 深圳市普赛特建筑工程技术有限公司 waterproof device

Similar Documents

Publication Publication Date Title
CN101487249B (en) Embedding apparatus and method for earth pressure box
CN102943466B (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN107386274A (en) Wear the compound isolation pile and its reinforced construction method of bridge pier in tunnel side
CN101614020A (en) Flexible bladder type anti-corrosive apparatus and use the anticorrosion stake and the job practices of this device
CN105019485B (en) A kind of excavation of foundation pit dead load test on pile foundation detection method
CN101798820A (en) Cast-in-situ bored pile double sleeve for separating contact of piles and earth
CN110924403A (en) Method for judging support safety of miniature cast-in-place pile of artificial hole digging well
CN101974905A (en) Pile-embedding method for hollow pile and auger drill for implementing same
CN207392271U (en) A kind of waterproof construction of permanent collimation stake
ITTO20100618A1 (en) PERFORATION DEVICE FOR THE EXECUTION OF DIAPHRAGM AND ITS METHOD.
CN103556623A (en) Construction method for continuous wall of crossing deep-buried large-sized municipal pipeline
CN105926589B (en) It is adapted to the steel-pipe pile and its grouting method of coral reef geology
CN201334678Y (en) Soil pressure cell inbuilt device
JP2007078449A (en) Device for measuring settlement of underground pipe
CN207109805U (en) Wear the compound isolation pile of bridge pier in a kind of tunnel side
CN104213553A (en) Construction technology for seamless impervious wall in vibration blunt caissons
CN108625384A (en) A kind of construction method of deep strong permeable layer base pit dewatering structure
CN109944251A (en) The drawing hole construction method that soft rock stratum steel sheet pile is squeezed into
JP2005273376A (en) Working face stabilizing method applicable to underground structure construction method
CN108868583A (en) A kind of drilling mechanism and rotary drilling rig
KR101600477B1 (en) Top down construction method for developping stability through improved process of piller
CN103603356A (en) Annular post-grouting device for lower pile tips under sandstone geological conditions
JP2015148105A (en) Ground improving method and ground improving system
CN209483363U (en) Have both the combined type push-bench of earth pressure balance and mud and water balance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant