CN105926589B - It is adapted to the steel-pipe pile and its grouting method of coral reef geology - Google Patents

It is adapted to the steel-pipe pile and its grouting method of coral reef geology Download PDF

Info

Publication number
CN105926589B
CN105926589B CN201610403979.6A CN201610403979A CN105926589B CN 105926589 B CN105926589 B CN 105926589B CN 201610403979 A CN201610403979 A CN 201610403979A CN 105926589 B CN105926589 B CN 105926589B
Authority
CN
China
Prior art keywords
steel
pipe pile
mud jacking
pressure hose
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610403979.6A
Other languages
Chinese (zh)
Other versions
CN105926589A (en
Inventor
张鸿
游新鹏
林树奎
程多云
郗永磊
刘广涛
汪磊
曹志
李文
夏元宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201610403979.6A priority Critical patent/CN105926589B/en
Publication of CN105926589A publication Critical patent/CN105926589A/en
Application granted granted Critical
Publication of CN105926589B publication Critical patent/CN105926589B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of steel-pipe pile and its grouting method suitable for coral reef geology, steel-pipe pile includes:Steel pipe pile body;And multiple mud jacking pipelines, its ring are located at steel-pipe pile inner body wall, mud jacking pipeline includes filling the high-pressure hose being axially disposed within steel-pipe pile inner body wall of body along steel pipe and is covered in the angle steel that outside high-pressure hose and both ends are fixed in steel-pipe pile inner body wall;Wherein, also there is multiple grout outlets for being oppositely arranged and connecting with high-pressure hose and multiple outer casings being arranged on lateral wall in steel pipe pile body, multiple through holes with grout outlet insertion are offered on the outer casing, it is provided with magnetic at the grout outlet to seal so that the grout outlet is in sealing state in not slip casting, grouting method includes drilling, arranges mud jacking pipeline, decentralization steel-pipe pile, slip casting in steel pipe pile body.The steel-pipe pile and slip casting method method of the present invention, which is applied to pile foundation construction, can significantly improve bearing capacity and stability of the bridge pile foundation in coral reef geological environment.

Description

It is adapted to the steel-pipe pile and its grouting method of coral reef geology
Technical field
The present invention relates to bridge pile foundation field.It is more particularly related to a kind of steel suitable for coral reef geology Pile tube and its grouting method.
Background technology
Coral reef is to develop the geologic body being collectively forming in tropical ocean environment by biological agent and geologic process, is one The special rock soil medium type of kind, there are the engineering-environment characteristic and engineering geological property of uniqueness.With field of civil engineering Continue to develop, the engineering structure on coral reef geological environment is more and more.Coral reef geology shows quasi- coral rock, coral rock Be respectively provided with density is low, hole is big, it is structural it is strong, fragility is big, intensity anisotropy outstanding feature, show extremely complex rock Native engineering characteristic, it is mainly reflected in following aspect:Spatially, the extremely complex property and inhomogeneities of material grainses group structure;Each group The inhomogeneities of structure hole, hole;The inhomogeneities of each group structure degree of consolidation;Particle fragility, particle also has broken under low confined pressure It is broken;Skeleton structure, there is very strong structural strength.In a word, loose gritty dust stratum, interbedding of soft and hard rocks, hole development, grading Uneven, Particle Breakage;The quasi- coral rock and coral rock of half diagenesis have typical hard fragility, its ground performance indications, such as saturation Uniaxial compressive strength, the basic permissible value of foundation bearing capacity, bored piles side friction standard value etc. all refer to compared to performances of rock Mark it is relatively low, hence in so that bridge pile foundation seems particularly severe in the construction of coral reef geological environment.The pile foundation of bridge is bridge simultaneously The critically important part of beam, the safety of bridge superstructure can propose higher requirement to the pile foundation of bridge.Slurry injection technique It is a kind of critically important means for improving pile foundation bearing capacity.Slurry injection technique is exactly the slurries for pressing equipment will to solidify using sending Material is injected in the gap of particle in stratum, the interface of soil layer or rock crack by certain means, makes its expansion, glue Knot, solidification, to reduce the permeability on stratum, strengthen formation strength, prevent settlement of foundation, the treatment technology of deformation.Exactly because Coral reef characteristic, it is therefore desirable to search out and be adapted to use in coral reef geological environment, and pile foundation can be significantly improved in coral The bearing capacity grouting steel-pipe pile and its grouting method of coral reef geological environment.
The content of the invention
It is an object of the invention to the abominable constructed for bridge pile foundation in coral reef geological environment, there is provided Yi Zhongneng Significantly improve grouting steel-pipe pile of the pile foundation in the bearing capacity of coral reef geological environment.
A kind of steel-pipe pile suitable for coral reef geology, including:
Steel pipe pile body;And
Multiple mud jacking pipelines, its ring are located at the steel-pipe pile inner body wall, and the mud jacking pipeline includes filling along the steel pipe The high-pressure hose being axially disposed within steel-pipe pile inner body wall of body and it is covered in that the high-pressure hose is outer and both ends are fixed Angle steel in the steel-pipe pile inner body wall;
Wherein, in the steel pipe pile body also have multiple grout outlets for being oppositely arranged and connecting with the high-pressure hose, And multiple outer casings being arranged on lateral wall, the through hole of multiple grout outlets insertions is offered on the outer casing, is gone out Magnetic envelope is provided with slurry mouth so that the grout outlet is in sealing state in not slip casting.
Preferably, wherein, the high-pressure hose is connected by elbow with the grout outlet, along during slip casting on the elbow The flow direction of slurries is provided with a non-return valve.
Preferably, wherein, multiple mud jacking pipeline groups are arranged at intervals with along its length in the steel-pipe pile inner body wall, The upper end of multiple mud jacking pipeline groups flushes, lower end not on sustained height, and two-by-two the difference in height of mud jacking pipeline group lower end be 10 ~20m.
Preferably, wherein, the multiple mud jacking pipeline group includes a first mud jacking pipeline group and multiple second mud jacking Pipeline group, the first mud jacking pipeline group include three the first mud jacking pipelines of equidistantly distributed, three the first mud jacking pipelines Lower end flushes and close to the lower end of the steel pipe pile body, and the second mud jacking pipeline group includes two second symmetrical pressures Pipeline is starched, the lower end of two the second mud jacking pipelines flushes.
Preferably, wherein, the high-pressure hose is welded in the steel-pipe pile inner body wall.
Preferably, wherein, at least one through hole is coaxially disposed with the grout outlet on the outer casing.
Preferably, wherein, the angle steel both ends be additionally provided with the steel plate end socket that is connected with the steel pipe pile body and Stiffener.
It is a still further object of the present invention to provide a kind of grouting method of the steel-pipe pile suitable for coral reef geology, including such as Lower step:
1) arrangement stake position is required according to Pile Foundations Design, drills through stake holes with drilling tool, whether detection stake holes, which is in, can normally construct State;
2) the steel pipe pile body of length and stake holes deep equality and the high-pressure hose that multiple watertightnesses are good are chosen, in steel pipe Along its axial arranged a plurality of mud jacking pipeline on pile body inwall, three mud jacking pipelines are first set at equal intervals, and lower end is close to steel pipe The lower end of pile body, then two mud jacking pipelines are symmetrically arranged every 10-20m successively upwards, hold level with both hands on a plurality of mud jacking pipeline Together, the high-pressure hose lower end in every mud jacking pipeline connects with a grout outlet, the steel-pipe pile body outer wall at grout outlet place On fix an outer casing;
3) the interior above-mentioned steel pipe pile body for arranging mud jacking pipeline of insertion into the stake holes constructed;
4) cement and water are stirred into slurries, grouting equipment is opened after filtering and injects slurries into high-pressure hose, during slip casting The order of the height from top to bottom slip casting into the high-pressure hose of mud jacking pipeline successively according to high-pressure hose lower end;
5) grouting pressure and grouting amount are observed, when grouting pressure reaches design load, after voltage stabilizing 5min, completes stake holes note Slurry;
6) next stake holes slip casting is transferred to, is finished until terminating all pile hole constructions.
Preferably, wherein, the water-cement ratio of the slurries is 0.26-0.28, and during slip casting, three close to steel pipe pile body Slurries glue in the mud jacking pipeline of lower end is more than the water-cement ratio of other each mud jacking pipelines.
Preferably, wherein, it is 15-17s that slurries, which go out machine fluidity, and the fluidity of 60min rear slurries is less than 25s.
The present invention comprises at least following beneficial effect:
(1) set on the inwall of steel pipe pile body multiple mud jacking pipelines can from all directions to steel tube pile grouting, and High-pressure hose connects with grout outlet, and by high-pressure hose slip casting into steel pipe pile body so in slip casting, slurries are from grout outlet Outflow, flow in the coral reef geology of matrix type structure by the through hole on outer casing, the hole filled up in coral reef geology, adds Gu coral reef geologic structure so that pile foundation forms integral rock-steady structure with coral reef geology, has greatly reinforced the stabilization of pile foundation Property and bearing capacity;
(2) magnetic envelope is shelved at the grout outlet in steel pipe pile body, and the purpose is to temporary protection grout outlet, prevents from transferring Grout outlet is blocked by soil on stake holes wall etc. when steel pipe pile body is into stake holes, and in slip casting, the slurries in high-pressure hose lead to The pressure of itself is crossed to wash magnetic envelope to rock stratum slip casting open, the effect on outer casing be protected when transfer steel-pipe pile steel-pipe pile outside Wall;
(3) in slip casting, the first slip casting since the higher stake side of the height of high-pressure hose lower end, slurries are from high-pressure hose stream Go out and entered by grout outlet in the coral reef rock stratum on upper strata, steel pipe pile body finally is filled to pile grouting again, i.e., first from upper To lower filling coral reef rock stratum, then steel-pipe pile is filled to pile grouting, such grouting method causes the hole of each layer of rock stratum Can be filled by slurries, and the section of pile foundation in itself is also all distributed by injecting paste material, greatly improve pile foundation stability and Bearing capacity;
(4) during slip casting, three slurries glues in the mud jacking pipeline of steel pipe pile body lower end are more than other each mud jacking The water-cement ratio of pipeline, the glue for increasing pile grouting are to strengthen the bearing capacity of pile body.
Further advantage, target and the feature of the present invention embodies part by following explanation, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the cross-sectional configuration schematic diagram of the present invention;
Fig. 3 is A full-page proof detail views in Fig. 2;
Fig. 4 is the partial structural diagram of the vertical section of the present invention;
Fig. 5 is the grouting method flow chart of the present invention.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to specification text Word can be implemented according to this.
It should be noted that experimental method described in following embodiments, is conventional method unless otherwise specified, institute Reagent and material are stated, unless otherwise specified, is commercially obtained;In the description of the invention, term " transverse direction ", " vertical To ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", the instruction such as " outer " side Position or position relationship are based on orientation shown in the drawings or position relationship, are for only for ease of the description present invention and simplify description, It is not instruction or implies signified device or element there must be specific orientation, with specific azimuth configuration and operation, because This is not considered as limiting the invention.
Shown such as Fig. 1, Fig. 2, Fig. 3, the present invention provides a kind of steel-pipe pile suitable for coral reef geology, including:
Steel pipe pile body 1;And
Multiple mud jacking pipelines 2, its ring are located at the inwall of steel pipe pile body 1, and mud jacking pipeline 2 includes the axle that body 1 is filled along steel pipe To the high-pressure hose 20 being arranged on the inwall of steel pipe pile body 1 and it is covered in outside high-pressure hose 20 and both ends are fixed on steel-pipe pile Angle steel 21 on the inwall of body 1;
Wherein, in steel pipe pile body 1 also have multiple grout outlets 10 for being oppositely arranged and connecting with high-pressure hose 20 and Multiple outer casings 11 being arranged on lateral wall, multiple through holes 110 with grout outlet insertion, grout outlet are offered on outer casing 11 Magnetic envelope 12 is provided with 10, magnetic envelope 12 is by magnetic absorption to make grout outlet 10 not at the grout outlet 10 of steel pipe pile body 1 Sealing state is in during slip casting.
In the above-mentioned technical solutions, the diameter of grout outlet 10 be typically worth control on 1cm or so, outer casing 11 with grout outlet The 10 diameter general controls of through hole 110 being connected are in 6mm.Set multiple mud jacking pipelines 2 can be with the inwall of steel pipe pile body 1 Slip casting is carried out to steel-pipe pile from all directions, and high-pressure hose 20 connects with grout outlet 10, it is soft by high pressure so in slip casting The slip casting into steel pipe pile body 1 of pipe 20, slurries are injected near 10 sides of grout outlet of steel pipe pile body 1, increase steel-pipe pile Bearing capacity in coral reef geology.Magnetic envelope 12 is shelved at the grout outlet 10 in steel pipe pile body 1, and the purpose is to temporarily protect Grout outlet 10 is protected, prevents that grout outlet 10 is blocked by soil on stake holes wall etc. when transferring steel pipe pile body 1 into stake holes, and is being noted During slurry, the slurries in high-pressure hose 20 are washed open magnetic envelope by the pressure of itself, and slurries flow out from grout outlet 10, by outer casing Through hole 110 on 11 is flow in the coral reef geology of matrix type structure, the hole filled up in coral reef geology so that pile foundation and coral Coral reef geology forms integrative-structure, has greatly reinforced the stability and bearing capacity of pile foundation.The effect of outer casing 11 is in decentralization steel The outer wall of steel-pipe pile is protected during pile tube.
In another technical solution, as shown in figure 4, high-pressure hose 20 is connected by elbow 22 with grout outlet 10, elbow A non-return valve 23 is provided with along the flow direction of slurries during slip casting on 22, due to horizontal where the bottom of high-pressure hose 20 and grout outlet 10 Line is in 90 °, it is therefore desirable to which it is in order that must note to connect high-pressure hose 20 and grout outlet 10, the setting of non-return valve 23 by elbow 22 Slurries can only flow in one direction during slurry, prevent adverse current from causing slip casting to fail.
In another technical solution, multiple mud jacking pipelines are arranged at intervals with along its length in the inwall of steel pipe pile body 1 Group (does not mark) in figure, the upper ends of multiple mud jacking pipeline groups flushes, lower end not on sustained height, and two-by-two under mud jacking pipeline group The difference in height at end is 10~20m, multiple mud jacking pipeline groups is set on steel-pipe pile, and the lower end of every group of mud jacking pipeline group is not same One height, so can cause each rock stratum to be filled by slurries, improve the stability and bearing capacity of pile foundation.
Further, multiple mud jacking pipeline groups include a first mud jacking pipeline group and multiple second mud jacking pipeline groups (figure In do not mark), the first mud jacking pipeline group includes three the first mud jacking pipelines of equidistantly distributed, under three the first mud jacking pipelines End flushes and includes two symmetrical the second madjack pipes close to the lower end of the steel pipe pile body, the second mud jacking pipeline group Road, the lower end of two the second mud jacking pipelines flush.In the above-mentioned technical solutions, i.e., 3 mud jacking pipelines are equally spaced at stake bottom Slip casting is carried out, and 2 mud jacking pipelines are arranged symmetrically each layer of stake side, this is due to that the grouting amount at a bottom is larger, this Arrangement can ensure all to be distributed by injecting paste material in the range of the section at a bottom as much as possible, ensure that the carrying energy of pile foundation Power.
In another technical solution, high-pressure hose 20 is welded on the inwall of steel pipe pile body 1, and high-pressure hose 20 is fixed On steel-pipe pile inwall, prevent that, in slip casting, high-pressure hose shakes or shifted, and influences slip casting effect.
In another technical solution, at least one through hole 110 is coaxially disposed with grout outlet 10 on outer casing 11, so Structure facilitate slurries to flow out from grout outlet to enter directly into coral reef geology by the through hole.
In another technical solution, the both ends of angle steel 21 are additionally provided with the steel plate end socket 210 being connected with steel pipe pile body With stiffener 211, the stability of angle steel 21 can be so improved.
The present invention also provides a kind of grouting method of the steel-pipe pile suitable for coral reef geology, sees Fig. 5, including following step Suddenly:
(1) arrangement stake position is required according to Pile Foundations Design, drills through stake holes with drilling tool, whether detection stake holes, which is in, can normally construct State;
(2) the steel pipe pile body 1 of length and stake holes deep equality and the high-pressure hose 20 that multiple watertightnesses are good are chosen, Along its axial arranged a plurality of mud jacking pipeline 2 on the inwall of steel pipe pile body 1, three mud jacking pipelines 2, and three pressures are first set at equal intervals The slurry lower end of pipeline 2 is symmetrically arranged two mud jacking pipelines 2 every 10-20m successively close to the lower end of steel pipe pile body 1, then upwards, The upper end of a plurality of mud jacking pipeline 2 is concordant, and the lower end of high-pressure hose 20 in every mud jacking pipeline 2 connects with a grout outlet 10;
(3) the interior above-mentioned steel pipe pile body 1 for arranging mud jacking pipeline of insertion into the stake holes constructed;
(4) cement and water are stirred into slurries, grouting equipment is opened after filtering and injects slurries into high-pressure hose, during slip casting The order of the height from top to bottom slip casting into the high-pressure hose of mud jacking pipeline successively according to high-pressure hose lower end;
(5) required to determine the grouting amount for not having root high-pressure hose according to Pile Foundations Design, observe grouting pressure and grouting amount, work as note When slurry pressure reaches design load, after voltage stabilizing 5min, the stake holes slip casting is completed;
(6) next stake holes slip casting is transferred to, is finished until terminating all pile hole constructions.
In the above-mentioned technical solutions, according to the special geology of coral reef, arrangement stake holes and the stake holes for drilling through respective depth, and Steel-pipe pile needed for prefabricated slip casting, grout outlet is chosen on the relatively low rock stratum of core-taking rate in steel pipe pile body, so in slip casting, Slurries can fill reinforces underground foundation into loose gritty dust stratum, and slip casting effect is preferable, and pile foundation stability is high.Basis simultaneously Design requirement determines the slip casting position of a bottom and every layer of stake side, because pile grouting amount is larger, therefore at steel-pipe pile stake bottom etc. Spacing arranges three mud jacking pipelines, can so ensure all to be distributed by injecting paste material as far as possible in the range of the section at a bottom, carry The high bearing capacity of pile foundation, then one layer of stake side pressure grouting pipeline is arranged every 10-20m, every layer of stake side pressure grouting pipeline includes two Symmetrically arranged mud jacking pipeline so that each rock stratum is distributed by injecting paste material, and piling strtucture is stable.In slip casting, first from high pressure The stake side that the height of flexible pipe lower end is higher starts slip casting, and slurries enter the coral on upper strata from high-pressure hose outflow by grout outlet In hermatolith layer, steel pipe pile body finally is filled to pile grouting again, i.e., first fills coral reef rock stratum from top to bottom, then to stake bottom Steel-pipe pile is filled in slip casting.Such grouting method causes the hole of each layer of rock stratum to be filled by slurries, and pile foundation is in itself Section is also all distributed by injecting paste material, greatly improves the stability and bearing capacity of pile foundation.
In another technical solution, the water-cement ratio of slurries is 0.26-0.28, because coral reef shows coral rock geology Character, therefore water-cement ratio when design coral reef slip casting is required with the slip casting of coral rock, and during slip casting, three close to steel-pipe pile sheets Concrete slurry glue in the mud jacking pipeline of body lower end is more than the water-cement ratio of other each mud jacking pipelines, increases the water of pile grouting Glue is that the slip casting of stake side is then to fill the hole of coral reef rock stratum, therefore each stake side in order to strengthen the bearing capacity of pile body The water-cement ratio of grouting serous fluid is consistent, during pile grouting, need to increase water-cement ratio.
In another technical solution, it is 15-17s that slurries, which go out machine fluidity, and the fluidity of 60min rear slurries is less than 25s.
Although embodiment of the present invention is disclosed as above, it is not restricted in specification and embodiment listed With it can be applied to various suitable the field of the invention completely, can be easily for those skilled in the art Other modification is realized, therefore under the universal limited without departing substantially from claim and equivalency range, it is of the invention and unlimited In specific details and shown here as the legend with description.

Claims (9)

  1. A kind of 1. grouting method of steel-pipe pile suitable for coral reef geology, it is characterised in that a kind of steel-pipe pile is provided, including:
    Steel pipe pile body;And
    Multiple mud jacking pipelines, its ring are located at the steel-pipe pile inner body wall, and the mud jacking pipeline is included along the steel pipe pile body The high-pressure hose being axially disposed within steel-pipe pile inner body wall and be covered in that the high-pressure hose is outer and both ends are fixed on institute State the angle steel in steel-pipe pile inner body wall;
    Wherein, in the steel pipe pile body also have multiple grout outlets for being oppositely arranged and connecting with the high-pressure hose and Multiple outer casings being arranged on lateral wall, multiple through holes with grout outlet insertion are offered on the outer casing, it is described Magnetic envelope is provided with grout outlet so that the grout outlet is in sealing state in not slip casting;
    The grouting method comprises the following steps:
    1) arrangement stake position is required according to Pile Foundations Design, drills through stake holes with drilling tool, whether detection stake holes is in normally can Construction State;
    2) the steel pipe pile body of length and stake holes deep equality and the high-pressure hose that multiple watertightnesses are good are chosen, in steel-pipe pile sheet Along its axial arranged a plurality of mud jacking pipeline on internal wall, three mud jacking pipelines are first set at equal intervals, and lower end is close to steel-pipe pile sheet The lower end of body, then two mud jacking pipelines are symmetrically arranged every 10-20m successively upwards, the upper end of a plurality of mud jacking pipeline is concordant, often High-pressure hose lower end in bar mud jacking pipeline connects with a grout outlet;
    3) the above-mentioned steel pipe pile body for arranging mud jacking pipeline is inserted into the stake holes constructed;
    4) cement and water are stirred into slurries, grouting equipment are opened after filtering and injects slurries into high-pressure hose, during slip casting according to The slip casting into the high-pressure hose of mud jacking pipeline successively of the order of the height of high-pressure hose lower end from top to bottom;
    5) grouting pressure and grouting amount are observed, when grouting pressure reaches design load, after voltage stabilizing 5min, completes the stake holes slip casting;
    6) next stake holes slip casting is transferred to, is finished until terminating all pile hole constructions.
  2. 2. being applied to the grouting method of the steel-pipe pile of coral reef geology as claimed in claim 1, the high-pressure hose passes through curved Head is connected with the grout outlet, and a non-return valve is provided with along the flow direction of slurries during slip casting on the elbow.
  3. 3. it is applied to the grouting method of the steel-pipe pile of coral reef geology as claimed in claim 1, it is characterised in that in the steel Pile tube inner body wall is arranged at intervals with multiple mud jacking pipeline groups along its length, and the upper ends of multiple mud jacking pipeline groups flushes, lower end Not on sustained height, and the difference in height of mud jacking pipeline group lower end is 10~20m two-by-two.
  4. 4. it is applied to the grouting method of the steel-pipe pile of coral reef geology as claimed in claim 3, it is characterised in that the multiple Mud jacking pipeline group includes a first mud jacking pipeline group and multiple second mud jacking pipeline groups, and the first mud jacking pipeline group includes etc. Three the first mud jacking pipelines of spacing distribution, the lower end of three the first mud jacking pipelines flush and under the steel pipe pile bodies End, the second mud jacking pipeline group include two symmetrical the second mud jacking pipelines, and the lower end of two the second mud jacking pipelines is neat It is flat.
  5. 5. it is applied to the grouting method of the steel-pipe pile of coral reef geology as claimed in claim 1, it is characterised in that the high pressure Flexible pipe is welded in the steel-pipe pile inner body wall.
  6. 6. it is applied to the grouting method of the steel-pipe pile of coral reef geology as claimed in claim 1, it is characterised in that the outer shield At least one through hole is coaxially disposed with the grout outlet on plate.
  7. 7. it is applied to the grouting method of the steel-pipe pile of coral reef geology as claimed in claim 1, it is characterised in that the angle steel Both ends are additionally provided with the steel plate end socket and stiffener being connected with the steel pipe pile body.
  8. 8. it is applied to the grouting method of the steel-pipe pile of coral reef geology as claimed in claim 1, it is characterised in that the slurries Water-cement ratio be 0.26-0.28, and during slip casting, three slurries water-cement ratios in the mud jacking pipeline of steel pipe pile body lower end are big In the water-cement ratio of other each mud jacking pipelines.
  9. 9. it is applied to the grouting method of the steel-pipe pile of coral reef geology as claimed in claim 1, it is characterised in that slurries go out machine Fluidity is 15-17s, and the fluidity of 60min rear slurries is less than 25s.
CN201610403979.6A 2016-06-07 2016-06-07 It is adapted to the steel-pipe pile and its grouting method of coral reef geology Active CN105926589B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610403979.6A CN105926589B (en) 2016-06-07 2016-06-07 It is adapted to the steel-pipe pile and its grouting method of coral reef geology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610403979.6A CN105926589B (en) 2016-06-07 2016-06-07 It is adapted to the steel-pipe pile and its grouting method of coral reef geology

Publications (2)

Publication Number Publication Date
CN105926589A CN105926589A (en) 2016-09-07
CN105926589B true CN105926589B (en) 2017-12-05

Family

ID=56832696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610403979.6A Active CN105926589B (en) 2016-06-07 2016-06-07 It is adapted to the steel-pipe pile and its grouting method of coral reef geology

Country Status (1)

Country Link
CN (1) CN105926589B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501761A (en) * 2020-05-08 2020-08-07 都城伟业集团有限公司 Offshore steel pipe pile distributed post-grouting device, pneumatic grouting assembly and construction method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975375B (en) * 2017-10-24 2019-01-11 济南城建集团有限公司 A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel
CN113373912A (en) * 2021-06-22 2021-09-10 上海市机械施工集团有限公司 Construction method for grouting pile bottom of steel pipe pile
CN114755154B (en) * 2022-03-10 2024-06-04 武汉理工大学 Grouting test device and test method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334429A (en) * 2013-07-16 2013-10-02 舟山市定海区巨洋技术开发有限公司 Shallow sea wind electricity facility force absorption pile
CN203594023U (en) * 2013-10-22 2014-05-14 山东鸿顺集团有限公司 Enhanced type long auger drilling pressure-grouting concrete pile
CN103866762A (en) * 2014-04-01 2014-06-18 华东建筑设计研究院有限公司 Pile body longitudinal multipoint grouting device
CN203668938U (en) * 2013-12-30 2014-06-25 天津市勘察院 Post grouting side wall grouting and guniting annular valve structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06136745A (en) * 1992-04-28 1994-05-17 J D F:Kk Construction method for hollow widened bottom cast-in-place concrete pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334429A (en) * 2013-07-16 2013-10-02 舟山市定海区巨洋技术开发有限公司 Shallow sea wind electricity facility force absorption pile
CN203594023U (en) * 2013-10-22 2014-05-14 山东鸿顺集团有限公司 Enhanced type long auger drilling pressure-grouting concrete pile
CN203668938U (en) * 2013-12-30 2014-06-25 天津市勘察院 Post grouting side wall grouting and guniting annular valve structure
CN103866762A (en) * 2014-04-01 2014-06-18 华东建筑设计研究院有限公司 Pile body longitudinal multipoint grouting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501761A (en) * 2020-05-08 2020-08-07 都城伟业集团有限公司 Offshore steel pipe pile distributed post-grouting device, pneumatic grouting assembly and construction method

Also Published As

Publication number Publication date
CN105926589A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN102691296B (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN105926589B (en) It is adapted to the steel-pipe pile and its grouting method of coral reef geology
CN103882881B (en) Go deep into rock construction method under water
CN105040775B (en) Deep layer pressure-bearing artesian well plugging system and method
CN107288657A (en) The weak cementing rock mass seepage failure area slip casting integrated control method of top of underground
CN108678772A (en) A kind of multilevel hierarchy suspension device and its construction method for rich water sandy gravel stratum tunnel
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
CN101205721A (en) Method for surrounding water by combination of steel cofferdam and heavy-pressure rotary-spraying pile in deep-water low-pile cap construction
CN109139052A (en) A kind of slip casting aperture apparatus and construction method based on high pressure deep hole grouting
CN108532586A (en) A kind of construction method of garage parking diaphram wall
CN101560764A (en) Method for calking exploratory hole by intermittent high-pressure rotary jet grouting
CN109577989B (en) Novel deep mine shaft wall structure and construction method
CN106087994A (en) A kind of high pressure jet grouting pore-forming dado structure and construction method thereof
CN108756893B (en) A kind of city shallow tunnel vault soil stabilization method
WO2024007591A1 (en) Rock-socketed monopile construction method based on double-casing pile stabilizing platform
CN211500658U (en) Shallow tunnel supporting construction that nearly connects that buries suitable for sand ground
CN103485347A (en) Batter pile used for building foundation pit support and construction method thereof
CN109487777A (en) A method of a reinforcing deep soft soil foundation of filling the span of a man's arms is formed using slip casing by pressure
KR101746654B1 (en) Method for constructing pile for reinforce of mine hole
CN205776157U (en) Assembled underground continuous wall
CN104074184B (en) Pile base post-grouted expanded-base bored pile
CN102979087B (en) Construction method for rotary excavation pile
CN208502786U (en) Multilevel hierarchy suspension device for rich water sandy gravel stratum tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant