CN205776157U - Assembled underground continuous wall - Google Patents

Assembled underground continuous wall Download PDF

Info

Publication number
CN205776157U
CN205776157U CN201620566775.XU CN201620566775U CN205776157U CN 205776157 U CN205776157 U CN 205776157U CN 201620566775 U CN201620566775 U CN 201620566775U CN 205776157 U CN205776157 U CN 205776157U
Authority
CN
China
Prior art keywords
joint
wall
component
prefabricated components
underground continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620566775.XU
Other languages
Chinese (zh)
Inventor
刘全林
丁勇春
宋伟民
刘忠池
刘斐然
张衡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd
Shanghai Qiangjin Foundation Engineering Co Ltd
Original Assignee
SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd
Shanghai Qiangjin Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd, Shanghai Qiangjin Foundation Engineering Co Ltd filed Critical SHANGHAI YUANFANG GROUNDWORK ENGINEERING Co Ltd
Priority to CN201620566775.XU priority Critical patent/CN205776157U/en
Application granted granted Critical
Publication of CN205776157U publication Critical patent/CN205776157U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a kind of assembled underground continuous wall, diaphragm wall component is cavity structure, prefabricated in factory or job site, and component is the most assembled in the groove section excavated in advance to be connected;Joint includes transverse joint and vertical joint, and vertical joint uses dovetail manner, and transverse joint uses misconnection or joggle joint bolt connected mode, component side arranges built-in connection, the vertical joint of component arranges compaction grouting pipe, sets Grouting Pipe in component, and component bottom sets blotter and reinforces.This utility model, by assembling coercion underground continuous wall component in groove section at the construction field (site), is reinforced in conjunction with compaction grouting at the bottom of vertical abutment joint slip casting, wall and rubble, it is possible to form the continuous underground wall structure of overall structure rigidity and anti-permeability performance of simultaneously having.Controllability is strong, quality good, efficiency is high, the cycle is short in this utility model construction, saves material, and construction costs is low, and engineering construction is respond well.

Description

Assembled underground continuous wall
Technical field
This utility model relates to technical field of civil engineering, relates in particular to a kind of foundation pit enclosure assembled underground continuous Wall construction.
Background technology
Diaphram wall is the first-selected version of Construction of Deep Foundation and Extra-Deep Foundation Pit, extensive in all parts of the world Application, current diaphram wall is replacing many traditional deep foundations and deep footing groove enclosing structure and construction method.Underground is even Vibrate during continuous wall construction little, noise is low, it is adaptable to construction in urban architecture close quarters;Wall stiffness is big, and barrier performance is good;Can It is applicable to multiple geological conditions;It can be the permanent basis of superstructure;Can make full use of limited ground in property line and Space, gives full play to returns of investment;Work efficiency is high, the duration is short, reliable in quality.Cast-in-place diaphram wall be currently used most widely Version, but diaphram wall of constructing in complex geological condition such as sandy soil stratum at present, be the most relatively difficult to resolve certainly underground and connect The concrete pouring quality problem that slurry trench stability problem during continuous wall trenching construction and landslip of the sides of the trench cause, thus produce table Show muscle and the wall body mass defect such as hole, body of wall and joint localized seepage, wall steel bar basket structure damage, affect underground continuous The safety of wall construction and waterproof effect.
Continuous wall trench underground process and cell wall supporting all use mud, need to discharge mud, produce after casting concrete Substantial amounts of waste mud needs to process, and causes the increase of serious environmental pollution and cost.
The construction property of diaphram wall underwater casting determines job site and is difficult to the construction matter of 100% guarantee body of wall Amount, this is also the mass defect that cast-in-place continuous underground wall structure cannot improve or make up.Therefore, engineering circles needs a kind of energy of searching badly Enough substitute the Novel underground diaphragm wall structure of cast-in-place diaphram wall, but this industry predicament is solved the most well at present Certainly.
Utility model content
Technical problem to be solved in the utility model is, overcomes the knot of cast-in-place concrete under water present in prior art Structure wall body difficult quality control problem, it is provided that a kind of can the assembled underground continuous wall of overall assembling at the construction field (site).
For reaching above-mentioned purpose, the technical solution adopted in the utility model is:
A kind of assembled underground continuous wall, diaphram wall is assembled by some prefabricated components, and described prefabricated components set There is vertical joint;Described prefabricated components are provided with transverse joint;Described prefabricated components are cavity structure;Described prefabricated components are by standard Part and non-standard component composition, the physical dimension of standard component is modularization, and non-standard component physical dimension customizes as requested;Prefabricated pre- Having multiple vertical cavity in the middle of component processed, vertical cavity is in connecting up and down;Described prefabricated components side arranges some pre-buried companies Fitting combines with main body underground structure and forms two wall unifications.
Described vertical joint, joint form is joggle, and joggle section is concavo-convex rectangle, concavo-convex inverted trapezoidal trapezoidal, concavo-convex, recessed One or more be mutually combined of convex.
Described transverse joint, joint form is misconnection or joggle, and joint section is vertical misconnection, oblique misconnection, rectangle tenon Connect, one or more be mutually combined of trapezoidal joggle;Joint area is provided with bolt anchoring and connects.
The thickness of described prefabricated components is not less than 500mm, and single weight is not more than 500kN.
Further, described prefabricated components are cavity structure, carry out prefabricated in factory or job site framing segmentation, cross-section Face includes straightway and round corner section.
Further, described assembled underground continuous wall is provided with vertical joint, and connected mode is to be hung down by tongue-and-groove after centering Straight cutting enters.
Further, in top weak soil bottom pan soil or rock stratum, use and grab milling combination and mud off construction method, on Portion uses grab chute forming, and bottom uses slotter grooving;After grooving, assembled underground continuous wall segmentation is implanted.
Further, the described vertical joint of assembled underground continuous wall prefabricated components is provided with compaction grouting pipe, assembling Afterwards gap, vertical joint is carried out compaction grouting.
Further, described assembled underground continuous wall is provided with transverse joint, and joint form includes misconnection or joggle and ties Conjunction bolt connects, and joint section includes vertical misconnection, oblique misconnection, rectangle joggle, trapezoidal joggle etc., during assembling between vertical joint Uniform application marine glue, vertical connection equal joint bolt anchoring.
Further, described assembled underground continuous wall prefabricated components side arranges built-in connection and main body underground structure In conjunction with, make diaphram wall double as main body outer wall of underground structure, i.e. two wall unifications.
Further, described assembled underground continuous wall component bottom sets blotter.
Further, set Grouting Pipe in described assembled underground continuous wall prefabricated components, at the bottom of Grouting Pipe pipe, set one-way non-return Sealing ring, during assembling, Grouting Pipe pipe end stretch enters in blotter.
Further, described assembled underground continuous wall carries out blotter slip casting at the bottom of wall by Grouting Pipe after installing.
Owing to being prefabricated cavity structure, in its groove changed out, mud amount also greatly reduces.
Further, the grooving of assembled underground continuous wall, in Soft Soil Layer, uses multi-shaft stirring or two-wheel milling stirring Method forms the soil-cement body of superfluidity in underground continuous wall groove segment;
Further, when the diaphram wall that soil-cement body is implanted into, eliminate process and the seam note of discharge mud Slurry, has more the feature of environmental protection.
Beneficial effect: this utility model site operation operability is good, component quality of connection is reliable, assembling work efficiency Height, the Cavity structural member effectively save engineering material of energy, compare tradition underwater casting continuous underground wall structure and be more easy to ensure the whole of structure Body and construction quality, reduce construction costs, and engineering construction is respond well.
Accompanying drawing explanation
The utility model is described in further detail with detailed description of the invention below in conjunction with the accompanying drawings.
Fig. 1 is this utility model assembled underground continuous wall straightway prefabricated components and vertical joint schematic cross-sectional view;
Fig. 2 is this utility model assembled underground continuous wall straightway prefabricated components and vertical joint elevational schematic view;
Fig. 3 is this utility model assembled underground continuous wall round corner section prefabricated components and vertical joint schematic cross-sectional view;
Fig. 4 is this utility model assembled underground continuous wall transverse joint generalized section;
Fig. 5 is that this utility model assembled underground continuous wall is grabbed milling combined process and entered generalized section after groove assembly;
Fig. 6 is that this utility model assembled underground continuous wall stirring technique enters generalized section after groove assembly.
In figure: 1-prefabricated components, 2 standard components, 3 non-standard components, 4-vertical joint, 5 transverse joints, 6 cavitys, 7 concavo-convex rectangles, 8 concavo-convex trapezoidal, 9 concavo-convex inverted trapezoidals, 10 concavo-convex arcs, 11 compaction grouting pipes, 12 faultings Connect, 13 oblique misconnection, 14 rectangle joggles, 15 trapezoidal joggles, 16 bolts, 17 marine glues, 18 blotters, 19 Grouting Pipe, 20 one-way non-return sealing rings, 21 built-in connections.
Detailed description of the invention
For the technological means making this utility model realize, creation characteristic, reach purpose and be easy to understand with effect, under Face combines and is specifically illustrating, and this utility model is expanded on further.
See Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5 and Fig. 6.
Assembled underground continuous wall structure is passed through transverse joint and vertical joint in advance by cavity diaphragm wall prefabricated components In the groove section of excavation, scene is spliced, including: diaphragm wall prefabricated components 1 are made up of standard component 2 and standard component 3, and component 1 sets It is equipped with in the middle of vertical joint 4 and transverse joint 5, diaphragm wall prefabricated components 1 and cavity 6 is set;Vertical joint 4 form includes concavo-convex square Shape 7, concavo-convex trapezoidal 7, concavo-convex inverted trapezoidal 9, concavo-convex arc 10 etc.;It is provided with compaction grouting pipe 11 at vertical joint 4;Transverse joint 5 forms include vertical misconnection 12, oblique misconnection 13, rectangle joggle 14, trapezoidal joggle 15, every kind of misconnection or joggle all with bolt 16 Anchoring combines;Uniform application marine glue 17 at transverse joint 5 during assembling;Diaphragm wall prefabricated components 1 bottom sets blotter 18; Set Grouting Pipe 19 in diaphragm wall prefabricated components 1, at the bottom of Grouting Pipe 19 pipe, set one-way non-return sealing ring 20;Diaphragm wall prefabricated components 1 side Face arranges built-in connection 21 and is connected with main body underground structure.
Assembled underground continuous wall construction procedure is as follows:
(1) grab milling combining construction method excavation underground continuous wall groove segment for using, be excavated to after designed elevation in groove section Interior backfill blotter 18.
(2) hanging and vertically assembling of diaphragm wall prefabricated components 1 standard component 2 or non-standard component 3 is carried out after groove section excavation, even Continuous wall prefabricated components 1 are hung and are fixed by buckle to groove section, then carry out the splicing of transverse joint 5, continue to hang after splicing Put prefabricated components 1, repeat vertically to splice until groove section bottom design absolute altitude, complete the assembling of a vertical wall section.
(3) mode being inserted perpendicularly into after using vertically joint 4 centering, repetition above (1), (2) step: grooving the most continuously Excavation, after carry out groove section in prefabricated components 1 vertically splice, then it is horizontally-spliced to carry out prefabricated components 1, thus formed had overall just The diaphram wall of degree.
(4) in the body of wall spliced, vertical abutment joint compaction grouting is carried out by compaction grouting pipe 11.
(5) in the body of wall spliced, Grouting Pipe 19 and one-way non-return sealing ring 20 are passed through to blotter at the bottom of wall 18 carry out compaction grouting at the bottom of wall.
The groove section thickness that described step (1) is excavated is 820mm, and grooving excavation uses bentonite slurry retaining wall.
In described step (1) groove section, backfill blotter 18 thickness is that compaction grouting gluing at the bottom of 50cm, with wall is formed at the bottom of wall Reinforcing body.
Described step (2) diaphragm wall prefabricated components 1 standard element 2 thickness is 780mm, and single-unit height is 8m, and width is 3m, Weight 320kN.
Described step (2) diaphragm wall prefabricated components 1 non-standard structural element 3 thickness is 780mm, and single-unit height is 5m, and width is 1.5m, weight 102kN.
The vertical joint 4 of described step (3) prefabricated components 1 uses concavo-convex rectangle 7, it is ensured that the occlusion of prefabricated components.
During described step (3) vertically splicing, transverse joint 5 uses trapezoidal joggle 15, first uniform application marine glue before docking 17, use bolt 16 to carry out anchor connection after docking, bolt 16 quantity and intensity are computed determining, it is ensured that vertical joint stiffness is not Less than component.
The vertical joint 4 of described step (4) carries out slip casting by compaction grouting pipe 11, it is ensured that the stagnant water effect of seam.
Blotter 18 compaction grouting amount at the bottom of described step (5) wall is not less than blotter volume 1.2 times.
It is pre-factory or job site that certain above-mentioned diaphragm wall grabs milling associated methods grooving and mud off, Cavity structural member System, stacking, handling, buckle when entering groove fixes and the marine glue of joint is smeared, and these are all the general knowledge in this area, This seldom describes.
(6) for using multi-shaft stirring or two-wheel milling stirring means to form the cement of fluidised form in underground continuous wall groove segment During the soil body, implanting prefabricated diaphram wall body by above-mentioned (2), the assembling of (3) step, soil-cement body has water stopping function, It is not required to carry out consolidation grouting process at seam crossing.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have more than been shown and described.One's own profession Skilled person will appreciate that of industry, this utility model is not restricted to the described embodiments, described in above-described embodiment and description Principle of the present utility model is simply described, on the premise of without departing from this utility model spirit and scope, this utility model also can There are various changes and modifications, in the range of these changes and improvements both fall within claimed this utility model.This utility model is wanted Protection domain is asked to be defined by appending claims and equivalent thereof.

Claims (4)

1. an assembled underground continuous wall, is characterized in that, diaphram wall is assembled by some prefabricated components, described prefabricated Component is provided with vertical joint;Described prefabricated components are provided with transverse joint;Described prefabricated components are cavity structure;Described prefabricated components Being made up of standard component and non-standard component, the physical dimension of standard component is modularization, and non-standard component physical dimension customizes as requested; Having multiple vertical cavity in the middle of prefabricated prefabricated components, vertical cavity is in connecting up and down;Described prefabricated components side arranges some Built-in connection combines with main body underground structure and forms two wall unifications.
A kind of assembled underground continuous wall the most according to claim 1, is characterized in that, described vertical joint, joint form For joggle, joggle section is one or more mutual of concavo-convex rectangle, concavo-convex inverted trapezoidal trapezoidal, concavo-convex, concavo-convex arc Combination.
A kind of assembled underground continuous wall the most according to claim 1, is characterized in that, described transverse joint, joint form For misconnection or joggle, joint section be vertical misconnection, oblique misconnection, rectangle joggle, trapezoidal joggle one or more It is mutually combined;Joint area is provided with bolt anchoring and connects.
A kind of assembled underground continuous wall the most according to claim 1, is characterized in that, the thickness of described prefabricated components is the least In 500mm, single weight is not more than 500kN.
CN201620566775.XU 2016-06-13 2016-06-13 Assembled underground continuous wall Active CN205776157U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620566775.XU CN205776157U (en) 2016-06-13 2016-06-13 Assembled underground continuous wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620566775.XU CN205776157U (en) 2016-06-13 2016-06-13 Assembled underground continuous wall

Publications (1)

Publication Number Publication Date
CN205776157U true CN205776157U (en) 2016-12-07

Family

ID=58135037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620566775.XU Active CN205776157U (en) 2016-06-13 2016-06-13 Assembled underground continuous wall

Country Status (1)

Country Link
CN (1) CN205776157U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083128A (en) * 2018-09-10 2018-12-25 浙江吉通地空建筑科技有限公司 Fashioned iron column assembled underground continuous wall with high-bearing capacity
CN110258576A (en) * 2019-05-28 2019-09-20 安徽省公路桥梁工程有限公司 The construction method of foundation pit enclosure support system
CN110258524A (en) * 2019-05-28 2019-09-20 广州穗岩土木科技股份有限公司 A kind of assembled underground continuous wall unit and its construction method
CN111576661A (en) * 2020-05-28 2020-08-25 重庆天地人建设集团有限公司 Concrete prefabricated wall and construction process thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083128A (en) * 2018-09-10 2018-12-25 浙江吉通地空建筑科技有限公司 Fashioned iron column assembled underground continuous wall with high-bearing capacity
CN110258576A (en) * 2019-05-28 2019-09-20 安徽省公路桥梁工程有限公司 The construction method of foundation pit enclosure support system
CN110258524A (en) * 2019-05-28 2019-09-20 广州穗岩土木科技股份有限公司 A kind of assembled underground continuous wall unit and its construction method
CN110258576B (en) * 2019-05-28 2021-04-09 安徽省公路桥梁工程有限公司 Construction method of foundation pit enclosure support system
CN110258524B (en) * 2019-05-28 2021-06-18 广州穗岩土木科技股份有限公司 Assembled underground diaphragm wall unit and construction method thereof
CN111576661A (en) * 2020-05-28 2020-08-25 重庆天地人建设集团有限公司 Concrete prefabricated wall and construction process thereof

Similar Documents

Publication Publication Date Title
CN105887806B (en) Assembled underground continuous wall and its construction method
CN102900089B (en) With the combination piling bar cofferdam of hydro-expansive rubber waterproof fore shaft
CN203034467U (en) Combined steel pile cofferdam with water-proof fore shafts
CN205776157U (en) Assembled underground continuous wall
CN107268636A (en) The diaphragm wall foundation ditch that the steel cylinder or steel sheet pile of a kind of seal groove and occlusion structure are constituted is with going along with sb. to guard him and construction method
CN106677205A (en) Fabricated special-shaped steel pipe pile combined retaining wall
CN106400820A (en) Cofferdam formed by latched steel tube and concrete combined piles and construction method
CN101718099B (en) Automatic wall-forming device and method of static pressure continuous concrete wall
CN108035337B (en) The construction method of a kind of diaphram wall and applied to the connector in this method
CN107542115A (en) Underground project waterproof structure and its construction method
AU2015230478A1 (en) Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same
CN111206577B (en) Construction method of steel guide wall foundation of sea area deepwater anchorage foundation
CN107217676A (en) A kind of steel cylinder with seal groove and occlusion structure or steel sheet pile and steel construction diaphragm wall
CN107012871B (en) A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation pit fabricated construction
CN106320322A (en) Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall
CN104988915A (en) Prefabrication and installation method of detachable steel protection tube device and underwater connection beam
CN208545763U (en) A kind of steel pipe pile cofferdam for bridge deepwater foundation
CN102359112A (en) Method for bracing foundation pit by using steel box piles
CN111733853A (en) Tongue-and-groove type prefabricated underground continuous wall structure
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN107620316A (en) A kind of rocky bed large volume deepwater foundation construction method
CN111779022A (en) Novel structure of underground comprehensive pipe gallery in anti-settling and anti-inclining soft soil foundation and construction method thereof
CN107489106A (en) A kind of rocky bed subaqueous bearing platform construction method
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN105386444A (en) Foundation pile hole forming device and method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant