CN106400820A - Cofferdam formed by latched steel tube and concrete combined piles and construction method - Google Patents
Cofferdam formed by latched steel tube and concrete combined piles and construction method Download PDFInfo
- Publication number
- CN106400820A CN106400820A CN201610882542.5A CN201610882542A CN106400820A CN 106400820 A CN106400820 A CN 106400820A CN 201610882542 A CN201610882542 A CN 201610882542A CN 106400820 A CN106400820 A CN 106400820A
- Authority
- CN
- China
- Prior art keywords
- pile
- concrete
- inner support
- steel pipe
- purlin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
- E02D5/08—Locking forms; Edge joints; Pile crossings; Branch pieces
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610882542.5A CN106400820A (en) | 2016-10-10 | 2016-10-10 | Cofferdam formed by latched steel tube and concrete combined piles and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610882542.5A CN106400820A (en) | 2016-10-10 | 2016-10-10 | Cofferdam formed by latched steel tube and concrete combined piles and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106400820A true CN106400820A (en) | 2017-02-15 |
Family
ID=59228924
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610882542.5A Pending CN106400820A (en) | 2016-10-10 | 2016-10-10 | Cofferdam formed by latched steel tube and concrete combined piles and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106400820A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106958254A (en) * | 2017-05-08 | 2017-07-18 | 中铁七局集团第四工程有限公司 | Latch steel pipe and reinforced concrete combination pile cofferdam and its construction method |
CN106988328A (en) * | 2017-05-22 | 2017-07-28 | 中铁局集团有限公司 | A kind of C c-types opening locked steel tube pilecofferdam and construction method |
CN107034907A (en) * | 2017-06-09 | 2017-08-11 | 中铁十七局集团第五工程有限公司 | Deep water foundation shallow embedding covering soft rock geology lock steel pipe pile cofferdam construction method |
CN108193698A (en) * | 2017-12-11 | 2018-06-22 | 上海市基础工程集团有限公司 | Shallow overburden deep water cushion cap sealing maintenance system |
CN108660941A (en) * | 2018-07-24 | 2018-10-16 | 东北大学 | A kind of lock steel pipe splicing pile cofferdam and construction method |
CN108729457A (en) * | 2018-06-27 | 2018-11-02 | 中铁十六局集团第三工程有限公司 | A kind of steel pipe pile cofferdam and its construction method for bridge deepwater foundation |
CN109469080A (en) * | 2018-12-11 | 2019-03-15 | 中铁五局集团贵州工程有限公司 | A kind of embedding rock steel sheet pile cofferdam structure and its construction method under water |
CN113653078A (en) * | 2021-09-03 | 2021-11-16 | 中国水利水电第六工程局有限公司 | Steel pipe pile cofferdam structure of reservoir area before dam and construction method thereof |
CN113737780A (en) * | 2021-09-01 | 2021-12-03 | 中国水利水电第六工程局有限公司 | Underwater rock-socketed concrete pile and construction method thereof |
CN117166462A (en) * | 2023-09-08 | 2023-12-05 | 湖北省工业建筑集团有限公司 | Rotary drilling pile foundation construction device and method for hard rock combined stratum |
-
2016
- 2016-10-10 CN CN201610882542.5A patent/CN106400820A/en active Pending
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106958254A (en) * | 2017-05-08 | 2017-07-18 | 中铁七局集团第四工程有限公司 | Latch steel pipe and reinforced concrete combination pile cofferdam and its construction method |
CN106988328A (en) * | 2017-05-22 | 2017-07-28 | 中铁局集团有限公司 | A kind of C c-types opening locked steel tube pilecofferdam and construction method |
CN107034907A (en) * | 2017-06-09 | 2017-08-11 | 中铁十七局集团第五工程有限公司 | Deep water foundation shallow embedding covering soft rock geology lock steel pipe pile cofferdam construction method |
CN108193698A (en) * | 2017-12-11 | 2018-06-22 | 上海市基础工程集团有限公司 | Shallow overburden deep water cushion cap sealing maintenance system |
CN108729457A (en) * | 2018-06-27 | 2018-11-02 | 中铁十六局集团第三工程有限公司 | A kind of steel pipe pile cofferdam and its construction method for bridge deepwater foundation |
CN108660941A (en) * | 2018-07-24 | 2018-10-16 | 东北大学 | A kind of lock steel pipe splicing pile cofferdam and construction method |
CN109469080A (en) * | 2018-12-11 | 2019-03-15 | 中铁五局集团贵州工程有限公司 | A kind of embedding rock steel sheet pile cofferdam structure and its construction method under water |
CN109469080B (en) * | 2018-12-11 | 2023-12-19 | 中铁五局集团贵州工程有限公司 | Underwater rock-socketed steel sheet pile cofferdam structure and construction method thereof |
CN113737780A (en) * | 2021-09-01 | 2021-12-03 | 中国水利水电第六工程局有限公司 | Underwater rock-socketed concrete pile and construction method thereof |
CN113653078A (en) * | 2021-09-03 | 2021-11-16 | 中国水利水电第六工程局有限公司 | Steel pipe pile cofferdam structure of reservoir area before dam and construction method thereof |
CN117166462A (en) * | 2023-09-08 | 2023-12-05 | 湖北省工业建筑集团有限公司 | Rotary drilling pile foundation construction device and method for hard rock combined stratum |
CN117166462B (en) * | 2023-09-08 | 2024-05-07 | 湖北省工业建筑集团有限公司 | Rotary drilling pile foundation construction device and method for hard rock combined stratum |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106400820A (en) | Cofferdam formed by latched steel tube and concrete combined piles and construction method | |
CN109723065B (en) | Reinforcing device and deep foundation pit local freezing reinforcing construction method in water-rich gravel stratum | |
CN110821503B (en) | Construction method for main body of ultra-deep shield section air shaft after tunnel advance | |
CN104612162B (en) | A kind of Deep Foundation Pit of Metro Stations excavation construction method | |
CN102606162B (en) | Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel | |
CN102536273B (en) | One-step forming construction method for 26m large-span space | |
CN205742213U (en) | Foundation pit supporting construction | |
CN102134853A (en) | CT sealed steel pipe pile foundation pit water stop supporting device and construction method thereof | |
CN111560962A (en) | Backfill area foundation pit supporting structure and construction method thereof | |
CN110424460A (en) | A kind of tunnel open excavation construction technology | |
CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
CN103147444A (en) | Foundation pit enclosure structure capable of realizing supporting while excavating and foundation pit excavating method | |
CN201943077U (en) | Waterproof curtain of CT-type fore shaft steel pipe pile | |
CN107191206A (en) | A kind of step construction method of Shallow-buried Large-span Tunnel Unit two six | |
CN114352292A (en) | Shallow-buried bias-pressure multi-arch tunnel construction method for weathering phyllite stratum | |
CN106758759A (en) | A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed | |
CN214695636U (en) | Novel foundation pit inclined pile supporting structure | |
CN110080779A (en) | Tunnel tunnel bottom karst cave treatment construction method | |
CN213014295U (en) | A slip casting fills device for handling abandonment air-raid shelter | |
CN108729457A (en) | A kind of steel pipe pile cofferdam and its construction method for bridge deepwater foundation | |
CN112324458A (en) | Repair construction method for punctured duct pieces adjacent to shield tunnel of transmission tower | |
CN108035360A (en) | A kind of method for pattern foundation pit supporting structure | |
CN112483126A (en) | Construction method of underground excavation air duct of composite stratum with upper soft part and lower hard part | |
CN111549789A (en) | Reinforcing structure for foundation pit support and construction method thereof | |
CN206245325U (en) | One kind lock steel pipe and Combined concrete pile cofferdam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhu Weidong Inventor after: Li Fudong Inventor after: Chen Jianhui Inventor after: Wu Xingzhi Inventor after: Li Chunchao Inventor after: Zhang Hailong Inventor after: Yang Jinwen Inventor after: Geng Yongwang Inventor after: Ma Baoli Inventor after: Peng Lun Inventor after: Lv Zhijun Inventor after: Lv Xiuhua Inventor after: Wang Qingchao Inventor after: Jin Haiyan Inventor before: Zhu Weidong Inventor before: Zhang Hailong Inventor before: Geng Yongwang Inventor before: Peng Lun Inventor before: Wang Qingchao Inventor before: Jin Haiyan Inventor before: Li Fudong Inventor before: Chen Jianhui Inventor before: Wu Xingzhi Inventor before: Li Chunchao |
|
COR | Change of bibliographic data | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Ma Dong Inventor after: Jin Haiyan Inventor after: Li Fudong Inventor after: Chen Jianhui Inventor after: Wu Xingzhi Inventor after: Li Chunchao Inventor after: Zhang Hailong Inventor after: Zhu Weidong Inventor after: Yang Jinwen Inventor after: Geng Yongwang Inventor after: Ma Baoli Inventor after: Peng Lun Inventor after: Lv Zhijun Inventor after: Lv Xiuhua Inventor after: Wang Qingchao Inventor before: Zhu Weidong Inventor before: Li Fudong Inventor before: Chen Jianhui Inventor before: Wu Xingzhi Inventor before: Li Chunchao Inventor before: Zhang Hailong Inventor before: Yang Jinwen Inventor before: Geng Yongwang Inventor before: Ma Baoli Inventor before: Peng Lun Inventor before: Lv Zhijun Inventor before: Lv Xiuhua Inventor before: Wang Qingchao Inventor before: Jin Haiyan |
|
CB03 | Change of inventor or designer information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170215 |
|
RJ01 | Rejection of invention patent application after publication |