CN106400820A CN201610882542.5A CN201610882542A CN106400820A CN 106400820 A CN106400820 A CN 106400820A CN 201610882542 A CN201610882542 A CN 201610882542A CN 106400820 A CN106400820 A CN 106400820A
Authority
CN
China
Prior art keywords
pile
concrete
inner support
steel pipe
purlin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610882542.5A
Other languages
Chinese (zh)
Inventor
朱卫东
耿永旺
彭仑
王庆超
靳海彦
李富东
陈建辉
吴星志
李春潮
张海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201610882542.5A priority Critical patent/CN106400820A/en
Publication of CN106400820A publication Critical patent/CN106400820A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • E02D5/08Locking forms; Edge joints; Pile crossings; Branch pieces
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a cofferdam formed by latched steel tube and concrete combined piles and a construction method. The cofferdam comprises base sealing concrete, a plurality of latched steel tube piles, anchoring piles and an inner support, wherein the lower parts of the latched steel tube piles are sleeved with the anchoring piles; the base sealing concrete is arranged at the top of bed rock; the latched steel tube piles are inserted into the edge of the base sealing concrete and are sequentially connected end to end; each anchoring pile is prepared from reinforced concrete and deeply extends into the bed rock; each latched steel tube pile comprises a steel tube main body, a connecting pipe and a T-shaped connecting part; the inner support comprises a first inner support waist beam and a plurality of second inner support waist beams, wherein the first inner support waist beam and the second inner support waist beams are arranged in sequence from top to bottom. The cofferdam disclosed by the invention has the advantages of realizing dry excavation, solving the problems of difficult underwater blasting excavation and uncontrollable blasting excavation work amount, also solving the problem of relatively large difficulty in quality and safety control, also reducing the use amount of steel and reducing the underwater blasting volume; meanwhile, cofferdam construction and pile foundation construction can be synchronously performed, so the construction cost is lowered, and the construction period is shortened.

Description

A kind of lock steel pipe and Combined concrete pile cofferdam and construction method
Technical field
The present invention relates to cofferdam technical field, it particularly relates to a kind of lock steel pipe and Combined concrete pile cofferdam and Construction method.
Background technology
In water traditional at present, Support of Foundation Pit Excavation has steel jacket box, steel lifted trunk, steel sheet-pile cofferdam and steel pipe pile cofferdam, in depth The engineering project of the embedding rock of water, typically adopts double-wall steel cofferdam, but its shortcoming:1st, underwater demolition must be first taken to excavate, then Sink, so increase the quantities of excavation of foundation pit, the duration is uncontrollable simultaneously;2nd, cofferdam is after excavation of foundation pit is complete, then merogenesis system Make, time-consuming for sinking, long in time limit;3rd, the steel material using is big.
Therefore, develop one kind and can solve that underwater demolition is difficult and a uncontrollable difficult problem, save the duration simultaneously again, reduce into This cofferdam, becomes the problem for insider's urgent need to resolve.
Content of the invention
The present invention proposes a kind of lock steel pipe and Combined concrete pile cofferdam, overcomes above-mentioned aspect in existing product Not enough.
The purpose of the present invention is to be achieved through the following technical solutions:
A kind of lock steel pipe and Combined concrete pile cofferdam, including bottom concrete, some lock steel-pipe piles, are socketed in lock steel The anchor pile of pile tube bottom and inner support, described bottom concrete is arranged on the top of basement rock, described lock steel-pipe pile grafting At the edge of bottom concrete and end to end successively, the bottom of described lock steel-pipe pile is concordant with the top of basement rock, described anchor Gu stake is made up of armored concrete, and this anchor pile gos deep into the inside of this basement rock;Described lock steel-pipe pile includes steel pipe main body, connects Adapter and the connector of T-shaped, this connecting tube is welded in described steel pipe main body side in the radial direction, and described steel pipe main body is radially Opposite side on direction welds this connector, and the tube wall of described connecting tube in axial direction offers can be with this connector phase clamping Gap;Described inner support be welded on lock steel-pipe pile area defined inwall on, described inner support include from top to bottom according to First inner support waist rail of secondary setting and some second inner support waist rails, described first inner support waist rail includes two be arrangeding in parallel Root first encloses purlin and uniform welding and encloses some first struts between purlin two first, and described second inner support waist rail includes two Root second encloses purlin, some second struts, some 3rd struts, two measurements of the chest, waist and hips purlins and some bearing diagonals, described second strut Be welded on two be arranged in parallel second enclose between purlin, described 3rd strut is vertically arranged with the second strut, and the weldering of the 3rd strut It is connected between the two measurements of the chest, waist and hips purlins be arrangeding in parallel, described bearing diagonal is near this second intersection position enclosing purlin and measurements of the chest, waist and hips purlin, institute The one end stating bearing diagonal is welded on second and encloses on purlin, and the other end of this bearing diagonal is welded on measurements of the chest, waist and hips purlin.
Further, described connector is I-steel.
Further, described anchor pile is socketed in steel pipe lower body part.
Further, every first is enclosed purlin, second encloses purlin and measurements of the chest, waist and hips purlin and be welded by two H profile steel.
Further, the top of described bottom concrete is provided with construction bearing platform, and described construction bearing platform bottom is provided with stake Base, described pile foundation gos deep into the inside of basement rock.
The invention also discloses a kind of lock steel pipe and concrete combined pile cofferdam construction method, comprise the following steps:
The welding of steel pipe main body, connecting tube and connector is completed lock steel-pipe pile to be obtained and checks by S1;
S2 surveying setting-out positioning after, by passed examination lock steel-pipe pile in the way of end to end successively inserting piling on basement rock top Portion, and anchored using anchor pile;
S3 fills out sand in the tube chamber of connecting tube, and is compacted;
S4 extracts out latching steel pipe and installs inner support with the water within Combined concrete pile cofferdam;
S5 bottom concrete back cover and construction construction bearing platform;
S6 constructs:
S7 construction removes this lock steel pipe and Combined concrete pile cofferdam after finishing.
Further, in S2, after surveying setting-out positioning, pile foundation punching and lock steel-pipe pile inserting piling are carried out, and by rotation Dig rig to carry out drawing hole in the good steel pipe main body of inserting piling, drawing hole depth is 3.0m under the absolute altitude of steel pipe main body bottom, has drawn one Pouring reinforcement concrete immediately behind individual hole.
Beneficial effects of the present invention are:Using lock steel pipe and Combined concrete pile cofferdam, can achieve dry dig operation, solve It is difficult that underwater demolition is excavated, a Blasting Excavation quantities uncontrollable difficult problem;Solve Double-Wall Steel Boxed Cofferdam need to point more piece making point again The section sinking problem larger to quality and security control difficulty.And latch steel pipe and Combined concrete pile cofferdam opposing double walls steel Cofferdam decreases steel using amount, decreases underwater demolition amount, can decrease construction cost with pile foundation construction synchronous expansion simultaneously, Save the construction period.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to institute in embodiment Need use accompanying drawing be briefly described it should be apparent that, drawings in the following description be only the present invention some enforcement Example, for those of ordinary skill in the art, on the premise of not paying creative work, can also obtain according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is the front view of the lock steel pipe described in the embodiment of the present invention and Combined concrete pile cofferdam;
Fig. 2 is the top view of the lock steel pipe according to Fig. 1 and Combined concrete pile cofferdam;
Fig. 3 is the structural representation of the lock steel-pipe pile according to Fig. 1;
Fig. 4 is the structural representation of the anchor pile according to Fig. 1;
Fig. 5 is the flow chart of the lock steel pipe described in the embodiment of the present invention and concrete combined pile cofferdam construction method.
In figure:
1st, basement rock;2nd, latch steel-pipe pile;3rd, anchor pile;4th, connecting tube;5th, connector;6th, the first inner support waist rail;7th, in second Support wale;8th, first encloses purlin;9th, the first strut;10th, the 3rd strut;11st, measurements of the chest, waist and hips purlin;12nd, bearing diagonal;13rd, back cover coagulation Soil;14th, construction bearing platform;15th, pile foundation.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation description is it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, the every other embodiment that those of ordinary skill in the art are obtained, broadly fall into present invention protection Scope.
As Figure 1-4, a kind of lock steel pipe described according to embodiments of the present invention and Combined concrete pile cofferdam, including Bottom concrete 13, some lock steel-pipe piles 2, the anchor pile 3 being socketed in lock steel-pipe pile 2 bottom and inner support, described envelope Base concrete 13 is arranged on the top of basement rock 1, described lock steel-pipe pile 2 be plugged on bottom concrete 13 edge and successively head and the tail Connect, the bottom of described lock steel-pipe pile 2 is concordant with the top of basement rock 1, and described anchor pile 3 is made up of armored concrete, and should Anchor pile 3 gos deep into the inside of this basement rock 1;Described lock steel-pipe pile 2 includes the connector 5 of steel pipe main body, connecting tube 4 and T-shaped, institute State steel pipe main body side in the radial direction and weld this connecting tube 4, and the opposite side welding in the radial direction of described steel pipe main body This connector 5, the tube wall of described connecting tube 4 in axial direction offers can be with the gap of this connector 5 phase clamping;Described interior Support is welded on lock steel-pipe pile 2 area defined inwall, described inner support include setting gradually from top to bottom first in Support wale 6 and some second inner support waist rails 7, described first inner support waist rail 6 include be arrangeding in parallel two first enclose purlin 8 And uniform welding encloses some first struts 9 between purlin 8 two first, described second inner support waist rail 7 includes two second Enclose purlin, some second struts, some 3rd strut 10, two measurements of the chest, waist and hips purlins and some bearing diagonals 11, described second strut weldering Be connected on two be arranged in parallel second enclose between purlin, described 3rd strut 10 is vertically arranged with the second strut, and the 3rd strut 10 It is welded between the two measurements of the chest, waist and hips purlins 11 be arrangeding in parallel, described bearing diagonal 12 second encloses purlin and the intersection of measurements of the chest, waist and hips purlin 11 near this Position, one end of described bearing diagonal 12 is welded on second and encloses on purlin, and the other end of this bearing diagonal 12 is welded on measurements of the chest, waist and hips purlin 11 On.
In one particular embodiment of the present invention, described connector 5 is I-steel.
In one particular embodiment of the present invention, described anchor pile 3 is socketed in steel pipe lower body part.
In one particular embodiment of the present invention, every first is enclosed purlin 8, second encloses purlin and measurements of the chest, waist and hips purlin 11 by two H profile steel is welded.
In one particular embodiment of the present invention, the top of described bottom concrete 13 is provided with construction bearing platform 14, institute State construction bearing platform 14 bottom and be provided with pile foundation 15, described pile foundation 15 gos deep into the inside of basement rock 1.
As shown in figure 5, a kind of lock steel pipe described according to embodiments of the present invention and concrete combined pile cofferdam construction side Method, comprises the following steps:
The welding of steel pipe main body, connecting tube 4 and connector 5 is completed lock steel-pipe pile 2 to be obtained and checks by S1;
S2 surveying setting-out positioning after, by passed examination lock steel-pipe pile 2 in the way of end to end successively inserting piling push up in basement rock 1 Portion, and anchored using anchor pile 3;
S3 fills out sand in the tube chamber of connecting tube 4, and is compacted;
S4 extracts out latching steel pipe and installs inner support with the water within Combined concrete pile cofferdam;
S5 bottom concrete 13 back cover and construction construction bearing platform 14;
S6 constructs:
S7 construction removes this lock steel pipe and Combined concrete pile cofferdam after finishing.
In one particular embodiment of the present invention, in S2, after surveying setting-out positioning, pile foundation punching and lock steel are carried out Pile tube inserting piling, and carry out drawing hole in the good steel pipe main body of inserting piling by rotary drilling rig, drawing hole depth is steel pipe main body bottom 3.0m under absolute altitude, has drawn behind a hole pouring reinforcement concrete immediately.
Understand the technique scheme of the present invention for convenience, below by way of above-mentioned to the present invention in specifically used mode Technical scheme is described in detail.
The material of lock steel-pipe pile 2 is q235, and joint length is 16.6m, in processing, first, will on positioning clamping fixture φ 720 × 10mm steel pipe main body and φ 159 × 8mm connecting tube 4 and I 18 I-steel(Connector 5)Weld integral, steel pipe master Commissure between body and connecting tube 4 is welded φ 6mm wire rod in advance with profit welding.Then, the tube wall of connecting tube 4 is adopted vertically Carry out joint-cutting with automatic gas cutting machine, the wide 6 ± 1mm of open seam, construction requirement gap is uniformly straight, and polishes flat, connector 5 with Mode grafting from top to bottom enters in connecting tube 4, by the pipe in connecting tube 4 after multiple lock steel-pipe piles 2 link together Fill out sand in chamber to prevent leak.
Lock steel-pipe pile 2 lower end is placed in basal surfaces.For ensureing that cover layer is washed the monolithic stability in rear cofferdam, every steel Pile tube is respectively provided with armored concrete anchoring stake 3, anchor pile 3 diameter 0.6m, embedded basement rock 3m, and stretches into steel pipe 4.0m.Cofferdam is put down Face size 63.48 × 23.86m, arranges four layers of inner support altogether(One layer of first inner support waist rail 6 and 3 layer of second inner support waist rail 7).Cofferdam crest level is+102.074m, and cofferdam bottom elevation is+85.474m.In first inner support waist rail 6 first encloses purlin 8 and adopts It is welded with the H profile steel of 2 H500 × 200, the first strut 9 is all using φ 630 × 10mm steel pipe, the second inner support waist rail 7 In second enclose purlin and measurements of the chest, waist and hips purlin 11 is all welded using the H profile steel of 2 H800 × 300, bearing diagonal 12 and the second strut Using φ 720 × 10mm steel pipe, it is same that the 3rd strut 10 adopts φ 630 × 10mm steel pipe, the first strut 9 and the second strut to be respectively positioned on On one perpendicular, for ensureing lock steel-pipe pile 2 uniform force, need to be welded with the surrounding enclosing the lock steel-pipe pile 2 that purlin contacts Stiffener, enclose purlin and lock steel-pipe pile 2 between be connected by bracket form.
In construction:
Lock steel-pipe pile 2 inserting piling in S2 select from upstream cofferdam along bridge to from the beginning of center, then carry out to both sides successively, Closed up near the stake of downstream angle afterwards.Lock steel-pipe pile 2 is carried out pitching pile, is equipped with the vibration hammer of 120KW using 80t crawler crane.
In pile foundation punching in S2(For anchoring pile foundation 15)While, start to latch the inserting piling of steel-pipe pile 2, and pass through rotary digging Rig carries out drawing hole in the good steel pipe main body of inserting piling, and drawing bore dia is 0.6m, and drawing hole depth is steel pipe main body bottom absolute altitude Lower 3.0m, has drawn behind a hole pouring reinforcement concrete immediately(Anchor pile 3), filling concrete is using the construction of catheter perfusion under water.Steel Muscle concrete top surface exceeds lock steel-pipe pile 2 bottom surface 4 m, and steel pipe main body is in the concrete of the bottom surface of construction bearing platform 14 following placing intensity C30.
Fill out sand in S3 for ensureing overall seal, prevent river leakage to cofferdam.
In S4, inner support carries out prefabricated while latching the construction of steel-pipe pile 2 inserting piling in place, directly hangs when to be installed Put in place.Enclose purlin welding first below installation site before lifting and bear the interim short steel corbel enclosing purlin deadweight, then hang and enclose Purlin is in place.There is space between purlin because part latches inside steel-pipe pile 2 and encloses, the lock steel-pipe pile 2 having space is used short Bracing members and are welded and fixed on enclosing purlin, especially note cofferdam corner location and enclose the overall fixation of purlin.And will according to design Seek installation inner support, plate weld that the supported joint position triangle enclosing purlin and short steel is put more energy into, reinforcement of weld quality inspection simultaneously Look into, form stable inner supporting structure.
When removing inner support after the completion of construction in S8, fill up gravel between cofferdam and the thin seam of construction bearing platform 14, high Degree exceeds construction bearing platform 14 about 50cm, removes the second inner support waist rail 7 and the construction king-tower of bottom.When the works in cofferdam After the completion of all removing, then remove remaining inner support.After the completion for the treatment of cofferdam bracing demolition, remove lock steel-pipe pile 2 by root, Now need to send diver to pull the plug cutting, cut front upper end and must be hung with crane button and safe can carry out imderwater cutting operation. Must remove by root in work progress, it is to avoid come off and operating personnel is damaged.
In sum, by the technique scheme of the present invention, using lock steel pipe and Combined concrete pile cofferdam, can be real Now dry dig operation, solve underwater demolition and excavate difficult, the uncontrollable difficult problem of Blasting Excavation quantities;Solve Double-Wall Steel Boxed Cofferdam again More piece need to be divided to make the segmentation sinking problem larger to quality and security control difficulty.And latch steel pipe and concrete combined pile Cofferdam opposing double walls steel cofferdam decreases steel using amount, decreases underwater demolition amount, can subtract with pile foundation construction synchronous expansion simultaneously Lack construction cost, save the construction period.
The present invention is not limited to above-mentioned preferred forms, and anyone can show that under the enlightenment of the present invention other are various The product of form, however, making any change in its shape or structure, every have skill identical or similar to the present application Art scheme, is within the scope of the present invention.

Claims (7)

1. a kind of lock steel pipe with Combined concrete pile cofferdam it is characterised in that:Including bottom concrete(13), some lock steel Pile tube(2), be socketed in lock steel-pipe pile(2)The anchor pile of bottom(3)And inner support, described bottom concrete(13)It is arranged on Basement rock(1)Top, described lock steel-pipe pile(2)It is plugged on bottom concrete(13)Edge end to end successively, described Lock steel-pipe pile(2)Bottom and basement rock(1)Top concordant, described anchor pile(3)It is made up of armored concrete, and this anchoring Stake(3)Go deep into this basement rock(1)Inside;Described lock steel-pipe pile(2)Including steel pipe main body, connecting tube(4)Connector with T-shaped (5), this connecting tube is welded in described steel pipe main body side in the radial direction(4), and described steel pipe main body in the radial direction another This connector is welded in side(5), described connecting tube(4)Tube wall in axial direction offer can be with this connector(5)Phase clamping Gap;Described inner support is welded on lock steel-pipe pile(2)On area defined inwall, described inner support is included from top to bottom The the first inner support waist rail setting gradually(6)With some second inner support waist rails(7), described first inner support waist rail(6)Including Two first be arranged in parallel are enclosed purlin(8)And uniform welding encloses purlin two first(8)Between some first struts(9), institute State the second inner support waist rail(7)Enclose purlin, some second struts, some 3rd struts including two second(10), two pieces measurements of the chest, waist and hips Purlin and some bearing diagonals(11), described second strut be welded on two be arranged in parallel second enclose between purlin, described 3rd strut (10)It is vertically arranged with the second strut, and the 3rd strut(10)It is welded on the two measurements of the chest, waist and hips purlins be arrangeding in parallel(11)Between, institute State bearing diagonal(12)Second enclose purlin and measurements of the chest, waist and hips purlin near this(11)Intersection position, described bearing diagonal(12)One end be welded on Second encloses on purlin, and this bearing diagonal(12)The other end be welded on measurements of the chest, waist and hips purlin(11)On.
2. a kind of lock steel pipe according to claim 1 with Combined concrete pile cofferdam it is characterised in that described connector (5)For I-steel.
3. a kind of lock steel pipe according to claim 2 with Combined concrete pile cofferdam it is characterised in that described anchor pile (3)It is socketed in steel pipe lower body part.
4. one kind according to claim 3 latches steel pipe with Combined concrete pile cofferdam it is characterised in that every first is enclosed Purlin(8), second enclose purlin and measurements of the chest, waist and hips purlin(11)It is welded by two H profile steel.
5. a kind of lock steel pipe according to claim 4 and Combined concrete pile cofferdam are it is characterised in that described back cover mixes Solidifying soil(13)Top be provided with construction bearing platform(14), described construction bearing platform(14)Bottom is provided with pile foundation(15), described pile foundation (15)Go deep into basement rock(1)Inside.
6. a kind of lock steel pipe according to claim 5 and concrete combined pile cofferdam construction method are it is characterised in that wrap Include following steps:
S1 is by steel pipe main body, connecting tube(4)And connector(5)Welding completes lock steel-pipe pile is obtained(2)And check;
After S2 surveying setting-out positioning, by the lock steel-pipe pile of passed examination(2)In the way of end to end successively inserting piling in basement rock (1)Top, and use anchor pile(3)Anchored;
S3 is in connecting tube(4)Tube chamber in fill out sand, and be compacted;
S4 extracts out latching steel pipe and installs inner support with the water within Combined concrete pile cofferdam;
S5 bottom concrete(13)Back cover and construction construction bearing platform(14);
S6 constructs:
S7 construction removes this lock steel pipe and Combined concrete pile cofferdam after finishing.
7. a kind of lock steel pipe according to claim 6 with concrete combined pile cofferdam construction method it is characterised in that In S2, after surveying setting-out positioning, carry out pile foundation punching and lock steel-pipe pile inserting piling, and good in inserting piling by rotary drilling rig Carry out in steel pipe main body drawing hole, drawing hole depth is 3.0m under the absolute altitude of steel pipe main body bottom, drawn behind a hole pouring reinforcement concrete immediately.
CN201610882542.5A 2016-10-10 2016-10-10 Cofferdam formed by latched steel tube and concrete combined piles and construction method Pending CN106400820A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610882542.5A CN106400820A (en) 2016-10-10 2016-10-10 Cofferdam formed by latched steel tube and concrete combined piles and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610882542.5A CN106400820A (en) 2016-10-10 2016-10-10 Cofferdam formed by latched steel tube and concrete combined piles and construction method

Publications (1)

Publication Number Publication Date
CN106400820A true CN106400820A (en) 2017-02-15

Family

ID=59228924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610882542.5A Pending CN106400820A (en) 2016-10-10 2016-10-10 Cofferdam formed by latched steel tube and concrete combined piles and construction method

Country Status (1)

Country Link
CN (1) CN106400820A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958254A (en) * 2017-05-08 2017-07-18 中铁七局集团第四工程有限公司 Latch steel pipe and reinforced concrete combination pile cofferdam and its construction method
CN106988328A (en) * 2017-05-22 2017-07-28 中铁局集团有限公司 A kind of C c-types opening locked steel tube pilecofferdam and construction method
CN107034907A (en) * 2017-06-09 2017-08-11 中铁十七局集团第五工程有限公司 Deep water foundation shallow embedding covering soft rock geology lock steel pipe pile cofferdam construction method
CN108193698A (en) * 2017-12-11 2018-06-22 上海市基础工程集团有限公司 Shallow overburden deep water cushion cap sealing maintenance system
CN108660941A (en) * 2018-07-24 2018-10-16 东北大学 A kind of lock steel pipe splicing pile cofferdam and construction method
CN108729457A (en) * 2018-06-27 2018-11-02 中铁十六局集团第三工程有限公司 A kind of steel pipe pile cofferdam and its construction method for bridge deepwater foundation
CN109469080A (en) * 2018-12-11 2019-03-15 中铁五局集团贵州工程有限公司 A kind of embedding rock steel sheet pile cofferdam structure and its construction method under water
CN113653078A (en) * 2021-09-03 2021-11-16 中国水利水电第六工程局有限公司 Steel pipe pile cofferdam structure of reservoir area before dam and construction method thereof
CN113737780A (en) * 2021-09-01 2021-12-03 中国水利水电第六工程局有限公司 Underwater rock-socketed concrete pile and construction method thereof
CN117166462A (en) * 2023-09-08 2023-12-05 湖北省工业建筑集团有限公司 Rotary drilling pile foundation construction device and method for hard rock combined stratum

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958254A (en) * 2017-05-08 2017-07-18 中铁七局集团第四工程有限公司 Latch steel pipe and reinforced concrete combination pile cofferdam and its construction method
CN106988328A (en) * 2017-05-22 2017-07-28 中铁局集团有限公司 A kind of C c-types opening locked steel tube pilecofferdam and construction method
CN107034907A (en) * 2017-06-09 2017-08-11 中铁十七局集团第五工程有限公司 Deep water foundation shallow embedding covering soft rock geology lock steel pipe pile cofferdam construction method
CN108193698A (en) * 2017-12-11 2018-06-22 上海市基础工程集团有限公司 Shallow overburden deep water cushion cap sealing maintenance system
CN108729457A (en) * 2018-06-27 2018-11-02 中铁十六局集团第三工程有限公司 A kind of steel pipe pile cofferdam and its construction method for bridge deepwater foundation
CN108660941A (en) * 2018-07-24 2018-10-16 东北大学 A kind of lock steel pipe splicing pile cofferdam and construction method
CN109469080A (en) * 2018-12-11 2019-03-15 中铁五局集团贵州工程有限公司 A kind of embedding rock steel sheet pile cofferdam structure and its construction method under water
CN109469080B (en) * 2018-12-11 2023-12-19 中铁五局集团贵州工程有限公司 Underwater rock-socketed steel sheet pile cofferdam structure and construction method thereof
CN113737780A (en) * 2021-09-01 2021-12-03 中国水利水电第六工程局有限公司 Underwater rock-socketed concrete pile and construction method thereof
CN113653078A (en) * 2021-09-03 2021-11-16 中国水利水电第六工程局有限公司 Steel pipe pile cofferdam structure of reservoir area before dam and construction method thereof
CN117166462A (en) * 2023-09-08 2023-12-05 湖北省工业建筑集团有限公司 Rotary drilling pile foundation construction device and method for hard rock combined stratum
CN117166462B (en) * 2023-09-08 2024-05-07 湖北省工业建筑集团有限公司 Rotary drilling pile foundation construction device and method for hard rock combined stratum

Similar Documents

Publication Publication Date Title
CN106400820A (en) Cofferdam formed by latched steel tube and concrete combined piles and construction method
CN109723065B (en) Reinforcing device and deep foundation pit local freezing reinforcing construction method in water-rich gravel stratum
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN102606162B (en) Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN102536273B (en) One-step forming construction method for 26m large-span space
CN205742213U (en) Foundation pit supporting construction
CN102134853A (en) CT sealed steel pipe pile foundation pit water stop supporting device and construction method thereof
CN111560962A (en) Backfill area foundation pit supporting structure and construction method thereof
CN110424460A (en) A kind of tunnel open excavation construction technology
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN103147444A (en) Foundation pit enclosure structure capable of realizing supporting while excavating and foundation pit excavating method
CN201943077U (en) Waterproof curtain of CT-type fore shaft steel pipe pile
CN107191206A (en) A kind of step construction method of Shallow-buried Large-span Tunnel Unit two six
CN114352292A (en) Shallow-buried bias-pressure multi-arch tunnel construction method for weathering phyllite stratum
CN106758759A (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN214695636U (en) Novel foundation pit inclined pile supporting structure
CN110080779A (en) Tunnel tunnel bottom karst cave treatment construction method
CN213014295U (en) A slip casting fills device for handling abandonment air-raid shelter
CN108729457A (en) A kind of steel pipe pile cofferdam and its construction method for bridge deepwater foundation
CN112324458A (en) Repair construction method for punctured duct pieces adjacent to shield tunnel of transmission tower
CN108035360A (en) A kind of method for pattern foundation pit supporting structure
CN112483126A (en) Construction method of underground excavation air duct of composite stratum with upper soft part and lower hard part
CN111549789A (en) Reinforcing structure for foundation pit support and construction method thereof
CN206245325U (en) One kind lock steel pipe and Combined concrete pile cofferdam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Zhu Weidong

Inventor after: Li Fudong

Inventor after: Chen Jianhui

Inventor after: Wu Xingzhi

Inventor after: Li Chunchao

Inventor after: Zhang Hailong

Inventor after: Yang Jinwen

Inventor after: Geng Yongwang

Inventor after: Ma Baoli

Inventor after: Peng Lun

Inventor after: Lv Zhijun

Inventor after: Lv Xiuhua

Inventor after: Wang Qingchao

Inventor after: Jin Haiyan

Inventor before: Zhu Weidong

Inventor before: Zhang Hailong

Inventor before: Geng Yongwang

Inventor before: Peng Lun

Inventor before: Wang Qingchao

Inventor before: Jin Haiyan

Inventor before: Li Fudong

Inventor before: Chen Jianhui

Inventor before: Wu Xingzhi

Inventor before: Li Chunchao

COR Change of bibliographic data
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Ma Dong

Inventor after: Jin Haiyan

Inventor after: Li Fudong

Inventor after: Chen Jianhui

Inventor after: Wu Xingzhi

Inventor after: Li Chunchao

Inventor after: Zhang Hailong

Inventor after: Zhu Weidong

Inventor after: Yang Jinwen

Inventor after: Geng Yongwang

Inventor after: Ma Baoli

Inventor after: Peng Lun

Inventor after: Lv Zhijun

Inventor after: Lv Xiuhua

Inventor after: Wang Qingchao

Inventor before: Zhu Weidong

Inventor before: Li Fudong

Inventor before: Chen Jianhui

Inventor before: Wu Xingzhi

Inventor before: Li Chunchao

Inventor before: Zhang Hailong

Inventor before: Yang Jinwen

Inventor before: Geng Yongwang

Inventor before: Ma Baoli

Inventor before: Peng Lun

Inventor before: Lv Zhijun

Inventor before: Lv Xiuhua

Inventor before: Wang Qingchao

Inventor before: Jin Haiyan

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215

RJ01 Rejection of invention patent application after publication