CN106677205A - Fabricated special-shaped steel pipe pile combined retaining wall - Google Patents
Fabricated special-shaped steel pipe pile combined retaining wall Download PDFInfo
- Publication number
- CN106677205A CN106677205A CN201611042120.3A CN201611042120A CN106677205A CN 106677205 A CN106677205 A CN 106677205A CN 201611042120 A CN201611042120 A CN 201611042120A CN 106677205 A CN106677205 A CN 106677205A
- Authority
- CN
- China
- Prior art keywords
- retaining wall
- shaped steel
- special
- pipe
- chapped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0266—Retaining or protecting walls characterised by constructional features made up of preformed elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
- E02D5/06—Fitted piles or other elements specially adapted for closing gaps between two sheet piles or between two walls of sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/04—Prefabricated parts, e.g. composite sheet piles made of steel
- E02D5/08—Locking forms; Edge joints; Pile crossings; Branch pieces
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Composite Materials (AREA)
- Environmental & Geological Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Revetment (AREA)
Abstract
The invention relates to a fabricated special-shaped steel pipe pile combined retaining wall, and belongs to the technical field of ground and foundation engineering. The combined retaining wall comprises special-shaped steel pipes, connection end plates, high-strength bolts, filler inside the steel pipes, and high polymers. The special-shaped steel pipes are connected through tongue-and-groove structures to form the continuous steel pipe pile combined retaining wall; the special-shaped steel pipes are inserted in a foundation soil layer to bear the foundation pit side-direction soil pressure; the special-shaped steel pipes are installed segment by segment during construction and are connected with the end plates through the high-strength bolts; after the special-shaped steel pipes are struck in foundation preset positions, the filler is formed by mixing excavated debris with rubble, waste concrete blocks and the like, and the filler is backfilled; and gaps between steel pipe piles are filled with the high polymers through the grouting technology. The fabricated special-shaped steel pipe pile combined retaining wall can be used in building envelops of building foundation pit engineering, and is high in anti-bending bearing capacity, good in stability, convenient to construct, good in waterproofness, capable of being repeatedly used, capable of being freely spliced and combined and wide in engineering application prospect.
Description
Technical field
The present invention relates to ground and foundation engineering field.
Background technology
Profile iron pile tube combination retaining wall is on the basis of traditional steel sheet pile retaining wall and reinforced concrete sheet pile wall
A kind of novel fabricated retaining wall form that developed.Steel sheet pile has intensity higher, easily squeezes into hard soil layer, water proofing property
Can be good, the cofferdam of various profiles can be on demand constituted the characteristics of deep subaqueous work, and can repeatedly use, purposes is wide
It is general.Reinforced concrete sheet pile has the advantages that intensity is high, rigidity is big, draw materials conveniently, construct simple, its profile can be as needed
Design and produce, chase mortise structure can solve seam waterproof, pile pulling problem need not be considered compared with steel sheet pile, be commonly used in base pit engineering
In.In existing document, there is not yet profile iron pile tube combination retaining wall is applied in foundation pit enclosure structure, therefore, the present invention
The characteristics of combining steel sheet pile and Reinforced Concrete Slab Column, the profile iron pile tube combination retaining wall of proposition is a kind of new gear soil
Wall, high with intensity, rigidity is big, the features such as easy construction.
The profile iron pile tube of the novel compositions retaining wall is segmentation prefabricated components, can be prefabricated in the factory and in work progress
High-strength bolt pile extension is used as needed, and scene is without any welding job amount, and speed of application is fast.Using piling in work progress
Mode is pressed into steel-pipe pile in basic soil layer, and native stone mixing rubble, waste concrete block for excavating etc. are inserted in steel pipe,
To increase the weight of retaining wall itself, so as to improve stability.
In the form of profile iron pile tube combination retaining wall, the characteristics of steel strength is high, rigidity is big can be given full play to, with
Reinforced concrete sheet pile wall phase specific strength is higher, constructs convenient, reduces the loaded down with trivial details of the maintenance of formwork during prefabrication
Process.There is higher limit lateral capacity compared with steel sheet pile, processing and fabricating is convenient, and use range is more extensive.Work as wall
Can be near stake top or stake top plus one grappling pull bar when high larger, can be with the length squeezed in soil and section of steel-pipe pile
Greatly reduce.Horizontal support or skewed horizontal load structure can also be set, to ensure to combine the stability of retaining wall.In tenon groove structure
Seam crossing waterproof sealing is carried out using high polymer grouting technology, can greatly improve combination retaining wall waterproof ability.Construction
After the completion of by pile pulling operate, can to profile iron pile tube reclaim reuse.Can basis in actual Excavation Process
Foundation ditch flat shape carries out combination in any, and range of application is quite varied.Therefore, profile iron pile tube combination retaining wall has good
Stress performance and structural strength, convenient and quick construction, with good economic and social benefits.
The content of the invention
Building enclosure quick assembling, recoverable, factorial construction in order to solve the problems, such as base pit engineering, the present invention
There is provided a kind of assembled profile iron pile tube combination retaining wall, it is possible to achieve the prefabricated construction of retaining wall structure.The combination gear soil
Wall has good anti-native side bearing capacity and stiffness, and stability is strong, and water resistance is good, and scene does not have without any welding job amount yet
There are the masterplate workload and concrete wet trade in prefabrication process, convenient and quick construction, and reuse can be reclaimed, it is economical
Property is good.
Technical scheme is as follows:
. a kind of assembled profile iron pile tube combines retaining wall, it is characterised in that:Its retaining wall includes chapped pipe, connection
End plate, high-strength bolt, steel pipe inner stuffing, high polymer.Using the end for being welded to connect end plate and steel tubes;Using high-strength spiral shell
The end plate for connecting lower two chapped pipes is tethered, long steel-pipe pile is constituted;Linked together by tenon groove structure between steel tubes,
Form cantilevered combination retaining wall;Gap between tenon groove structure passes through high polymer;Slip casting is carried out in water-proof sealing chapped pipe
Portion's soil stone is removed by excavated by manual work, and mixes the formation implant backfill such as rubble, waste concrete block;Chapped pipe can be with split shape
Into the flat shape for needing, the requirement of actual place excavation of foundation pit is met.
The present invention has following effective effect:
1. determine base pit engineering in building enclosure quick assembling, recoverable, the problem of factorial construction;
2. the characteristics of steel strength is high, rigidity is big can be given full play to, it is higher with reinforced concrete sheet pile wall phase specific strength,
Construction is convenient, reduces the complicated processes of formwork maintenance during prefabrication.
3. operated by pile pulling after the completion of constructing, profile iron pile tube can be reclaimed and be reused, economy is good.
4. high polymer grouting technique is adopted, and water resistance is good.
4. combination in any can be carried out according to foundation ditch flat shape in actual Excavation Process, be had wide range of applications.
The new prefabricated profile iron pile tube combination retaining wall intensity is high, and good waterproof performance, easy construction can be applied in building
In the building enclosure of base pit engineering, with more wide future in engineering applications.
Description of the drawings
Fig. 1 is the retaining wall assembling schematic diagram of the present invention.
Fig. 2 is the profile iron pile tube schematic diagram of the present invention.
Fig. 3 is the plane corner profile iron pile tube schematic diagram of the present invention.
Fig. 4 is the retaining wall assembling view of the present invention.
In figure:Fill out in 1-chapped pipe, 2-connection end plate, 3-high-strength bolt, 4-steel pipe inner stuffing, 5-steel pipe
Fill thing.
Specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail.
As shown in drawings, the present invention is a kind of assembled profile iron pile tube retaining wall, by chapped pipe, connection end plate, height
Strength bolt, steel pipe inner stuffing, high polymer composition,.Its linkage editor is as follows:
Prefabrication:
A. each basic element of character of precast pier in the factory:Chapped pipe 1, connection end plate 2.
B. in the relevant position drilling of connection end plate 2.
C. connection end plate 2 is welded to into the end of chapped pipe 1, one end beveling of most bottom section steel pipe is simultaneously sealed with steel plate welding
Close.
Site operation:
D. most 1 lifting of bottom section chapped pipe is in place and fixed, is squeezed into piling machine.
E. connect chapped pipe 1 with high-strength bolt 3, continue to squeeze into ground.
F. chapped pipe 1 squeezes into excavation pit behind precalculated position, by native stone mixing rubble, the waste concrete block excavated
It is backfilling in chapped pipe 1 etc. implant 4 is formed.
G. high polymer 5 is formed into waterproof sealing using the gap between slurry injection technique filling tenon groove structure.
The present invention provides a kind of assembled profile iron pile tube and combines retaining wall, it is possible to achieve the assembling of retaining wall structure is applied
Work.The combination retaining wall has good anti-native side bearing capacity and stiffness, and stability is strong, good waterproof performance, and scene is without any welding
Workload, also without the masterplate workload and concrete wet trade in prefabrication process, convenient and quick construction, and can reclaim weight
Use again, economy is good, in can be applicable to building foundation engineering building enclosure.
Claims (6)
1. a kind of assembled profile iron pile tube combines retaining wall, it is characterised in that:Its retaining wall includes chapped pipe 1, connection end
Plate 2, high-strength bolt 3, steel pipe inner stuffing 4, high polymer 5.Using the end for being welded to connect end plate 2 and steel tubes 1;Using height
Strength bolt 3 connects the end plate 2 of upper and lower two chapped pipes 1, constitutes long steel-pipe pile;Connected by tenon groove structure between steel tubes 1
It is connected together, forms cantilevered combination retaining wall;Gap between tenon groove structure carries out water-proof sealing by the slip casting of high polymer 5;
Chapped pipe 1 squeezes into the formation such as ground precalculated position, spoil stone mixing rubble, waste concrete block implant 4 and inserts abnormity
In steel pipe 1;Chapped pipe 1 can form the flat shape for needing with split, meet the requirement of actual place excavation of foundation pit.
2. assembled profile iron pile tube according to claim 1 combines retaining wall, it is characterised in that:Using welded ends
The end of plate 2 and steel tubes 1, the length and width size of chapped pipe is 0.8 meter~1.0 meters, the length a width of 0.3 of wherein tenon groove structure
The thickness of rice, chapped pipe 1 and end plate 2 should meet the overall anti-bending bearing capacity requirement of combination retaining wall.
3. assembled profile iron pile tube according to claim 1 combines retaining wall, it is characterised in that:Using high-strength bolt 3
Connect the end plate 2 of upper and lower two chapped pipes 1, the quantity and intensity of high-strength bolt should meet the overall anti-bending bearing capacity of retaining wall
Require, the full-length of 5 meters of the employing of chapped pipe 1, can according to actual needs be attached, and can reclaim repetition makes
With.
4. assembled profile iron pile tube according to claim 1 combines retaining wall, it is characterised in that:Between steel tubes 1
Linked together by tenon groove structure, form cantilevered combination retaining wall, can as needed piece together required flat shape,
And the length of embedment of chapped pipe 1 should be calculated by cantilever design and anti-native side bearing capacity and deformation is checked, if can not meet will
Asking can internally apply to support or add one grappling pull bar in stake top.
5. assembled profile iron pile tube according to claim 1 combines retaining wall, it is characterised in that:In chapped pipe 1
Native stone can be excavated by artificial mode, and mix rubble, waste concrete block etc. formed implant 4 backfill, so as to
Make the combination retaining wall that there is the stress characteristic of gravity wall.
6. assembled profile iron pile tube according to claim 1 combines retaining wall, it is characterised in that:Between tenon groove structure
Gap carries out water-proof sealing by the slip casting of high polymer 5, so that the combination retaining wall has good water-blocking characteristic.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611042120.3A CN106677205A (en) | 2016-11-11 | 2016-11-11 | Fabricated special-shaped steel pipe pile combined retaining wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611042120.3A CN106677205A (en) | 2016-11-11 | 2016-11-11 | Fabricated special-shaped steel pipe pile combined retaining wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106677205A true CN106677205A (en) | 2017-05-17 |
Family
ID=58867274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611042120.3A Pending CN106677205A (en) | 2016-11-11 | 2016-11-11 | Fabricated special-shaped steel pipe pile combined retaining wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106677205A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107090825A (en) * | 2017-05-24 | 2017-08-25 | 汤始建华建材(苏州)有限公司 | A kind of dike fender pile |
CN107882211A (en) * | 2017-12-15 | 2018-04-06 | 赵建敏 | Constraint compound wall structure for building |
CN108118702A (en) * | 2018-01-31 | 2018-06-05 | 中交上海三航科学研究院有限公司 | For the recoverable flexible compound supporting construction and method of construction of coral reef foundation pit |
CN108661045A (en) * | 2018-07-20 | 2018-10-16 | 东北大学 | A kind of prefabricated GFRP pipe concretes spliced pile |
CN108867689A (en) * | 2018-08-21 | 2018-11-23 | 中铁二院工程集团有限责任公司 | Fully-prefabricated assembled green retaining wall and construction method |
CN109113047A (en) * | 2018-08-15 | 2019-01-01 | 绿山高科建设科技有限公司 | A kind of sheet pile wall building enclosure |
CN110468722A (en) * | 2019-08-29 | 2019-11-19 | 中天路桥有限公司 | A kind of more folding face abnormity clear-water concrete bridge abutment moulding plate construction methods |
CN110520574A (en) * | 2017-07-18 | 2019-11-29 | 四万十混凝土株式会社 | Retaining wall stacking building block |
CN113431032A (en) * | 2021-08-27 | 2021-09-24 | 启东霓辉新材料科技有限公司 | Reinforced prestressed concrete corrugated sheet pile and construction method thereof |
CN114718081A (en) * | 2022-03-29 | 2022-07-08 | 中天建设集团有限公司 | Prefabricated assembled recyclable foundation pit enclosure pile and construction method thereof |
CN115431398A (en) * | 2021-06-04 | 2022-12-06 | 周兆弟 | Prefabricated pile wall preparation process and prefabricated pile wall |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120177445A1 (en) * | 2011-01-11 | 2012-07-12 | Pilepro, Llc | Steel pipe piles and pipe pile structures |
CN102619215A (en) * | 2012-05-05 | 2012-08-01 | 中铁十六局集团第五工程有限公司 | Lock catch type steel pipe pile structure and construction method thereof |
CN103334422A (en) * | 2013-06-26 | 2013-10-02 | 中国建筑股份有限公司 | Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof |
CN204825925U (en) * | 2015-08-05 | 2015-12-02 | 上海金同济土木技术工程有限公司 | Centrifugation side's stake envelope with chase mortise |
CN105887806A (en) * | 2016-06-13 | 2016-08-24 | 上海强劲地基工程股份有限公司 | Assembled type underground diaphragm wall and construction method thereof |
CN105908756A (en) * | 2016-05-31 | 2016-08-31 | 浙江工业大学 | Variable-stiffness foundation pit supporting structure |
-
2016
- 2016-11-11 CN CN201611042120.3A patent/CN106677205A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120177445A1 (en) * | 2011-01-11 | 2012-07-12 | Pilepro, Llc | Steel pipe piles and pipe pile structures |
CN102619215A (en) * | 2012-05-05 | 2012-08-01 | 中铁十六局集团第五工程有限公司 | Lock catch type steel pipe pile structure and construction method thereof |
CN103334422A (en) * | 2013-06-26 | 2013-10-02 | 中国建筑股份有限公司 | Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof |
CN204825925U (en) * | 2015-08-05 | 2015-12-02 | 上海金同济土木技术工程有限公司 | Centrifugation side's stake envelope with chase mortise |
CN105908756A (en) * | 2016-05-31 | 2016-08-31 | 浙江工业大学 | Variable-stiffness foundation pit supporting structure |
CN105887806A (en) * | 2016-06-13 | 2016-08-24 | 上海强劲地基工程股份有限公司 | Assembled type underground diaphragm wall and construction method thereof |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107090825A (en) * | 2017-05-24 | 2017-08-25 | 汤始建华建材(苏州)有限公司 | A kind of dike fender pile |
CN110520574A (en) * | 2017-07-18 | 2019-11-29 | 四万十混凝土株式会社 | Retaining wall stacking building block |
CN107882211A (en) * | 2017-12-15 | 2018-04-06 | 赵建敏 | Constraint compound wall structure for building |
CN108118702A (en) * | 2018-01-31 | 2018-06-05 | 中交上海三航科学研究院有限公司 | For the recoverable flexible compound supporting construction and method of construction of coral reef foundation pit |
CN108661045A (en) * | 2018-07-20 | 2018-10-16 | 东北大学 | A kind of prefabricated GFRP pipe concretes spliced pile |
CN108661045B (en) * | 2018-07-20 | 2023-11-24 | 东北大学 | Precast GFRP pipe concrete spliced pile |
CN109113047B (en) * | 2018-08-15 | 2021-02-19 | 广东博智林机器人有限公司 | Sheet pile wall enclosure structure |
CN109113047A (en) * | 2018-08-15 | 2019-01-01 | 绿山高科建设科技有限公司 | A kind of sheet pile wall building enclosure |
CN108867689A (en) * | 2018-08-21 | 2018-11-23 | 中铁二院工程集团有限责任公司 | Fully-prefabricated assembled green retaining wall and construction method |
CN110468722A (en) * | 2019-08-29 | 2019-11-19 | 中天路桥有限公司 | A kind of more folding face abnormity clear-water concrete bridge abutment moulding plate construction methods |
CN115431398A (en) * | 2021-06-04 | 2022-12-06 | 周兆弟 | Prefabricated pile wall preparation process and prefabricated pile wall |
CN115431398B (en) * | 2021-06-04 | 2024-06-07 | 周兆弟 | Preparation process of prefabricated pile wall and prefabricated pile wall |
CN113431032A (en) * | 2021-08-27 | 2021-09-24 | 启东霓辉新材料科技有限公司 | Reinforced prestressed concrete corrugated sheet pile and construction method thereof |
CN113431032B (en) * | 2021-08-27 | 2021-11-02 | 启东霓辉新材料科技有限公司 | Reinforced prestressed concrete corrugated sheet pile and construction method thereof |
CN114718081A (en) * | 2022-03-29 | 2022-07-08 | 中天建设集团有限公司 | Prefabricated assembled recyclable foundation pit enclosure pile and construction method thereof |
CN114718081B (en) * | 2022-03-29 | 2024-05-03 | 中天建设集团有限公司 | Prefabricated pile capable of recycling foundation pit enclosure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106677205A (en) | Fabricated special-shaped steel pipe pile combined retaining wall | |
CN105887806B (en) | Assembled underground continuous wall and its construction method | |
CN102124163B (en) | Method for constructing a chair-type, self-supported earth retaining wall | |
CN103422510B (en) | Steel pipe frame type cofferdam structure and construction method | |
CN110004991B (en) | Underground structure anti-floating system based on convex wing foot plate and construction method | |
CN103321246B (en) | Underground diaphragm wall based foundation pit construction method | |
JP2018024982A (en) | Reinforcement method and reinforcement structure of existing pile foundation | |
CN107338804B (en) | A kind of hollow independent composite pile foundation of super-large diameter and its method of construction | |
CN110004919B (en) | Foundation pit enclosure construction method used in pipeline influence range | |
CN106320322A (en) | Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall | |
CN107012871A (en) | A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation ditch fabricated construction | |
CN106677162A (en) | Stiff composite precast sheet pile envelope structure | |
CN105887804A (en) | High-strength prestressed concrete channel plate pile | |
CN205776154U (en) | A kind of high-strength prestressed concrete flute profile sheet pile | |
CN104480945B (en) | A kind of foundation ditch reversed construction method | |
CN104499489B (en) | Foundation pit construction method | |
CN110359471B (en) | Anti-seepage damage structure of strong water-permeable sandy soil layer of underwater tunnel and construction method | |
CN112554206A (en) | PC plate beam shared by foundation pit support structure and basement outer wall and installation method thereof | |
CN204326119U (en) | A kind of pile-raft foundation float Structure | |
CN206928281U (en) | Pretensioning prestressed concrete porous hollow ecology stake | |
CN206090534U (en) | Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall | |
CN110258526A (en) | The method of prefabricated diaphram wall and construct outer wall of basement and floor | |
CN113585336B (en) | Quick construction method of sinking type concrete mixing station in soft foundation environment | |
CN115198806A (en) | Underground wall post-cast strip template reinforcing and installing construction method | |
CN210887256U (en) | Straight combined sheet pile-ground wall-connecting type frame of water retaining cofferdam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170517 |