CN106320322A - Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall - Google Patents
Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall Download PDFInfo
- Publication number
- CN106320322A CN106320322A CN201610906110.3A CN201610906110A CN106320322A CN 106320322 A CN106320322 A CN 106320322A CN 201610906110 A CN201610906110 A CN 201610906110A CN 106320322 A CN106320322 A CN 106320322A
- Authority
- CN
- China
- Prior art keywords
- standard component
- side slope
- assembled
- wall
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/10—Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
- E02D5/105—Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete of prestressed concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/02—Sheet piles or sheet pile bulkheads
- E02D5/03—Prefabricated parts, e.g. composite sheet piles
- E02D5/10—Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
- E02D5/12—Locking forms; Edge joints; Pile crossings; Branch pieces
Abstract
The invention discloses a foundation pit and side slope envelope enclosure for a prestress fabricated special-shaped pile wall. The foundation pit and side slope envelope enclosure is formed by assembling standard components prefabricated through prestress high-strength reinforcing steel bars and high-strength concrete in a factorization manner on a construction site. The foundation pit and side slope envelope enclosure has reasonable stress performance, and meets requirements of soil blocking, water stopping and appearance decoration of a rock and soil foundation pit side slope and meets the requirement for using the foundation pit and side slope envelope enclosure as a permanent basement external wall structure. The appearance of the standard prefabricated components (called the standard components for short) is manufactured into T-shaped, rectangular and U-shaped sections according to stress and assembly requirements. Connectors between the standard components include the horizontal connectors and the vertical connectors. The foundation pit and side slope envelope enclosure is high in on-site assembly construction operability, high in component assembly degree, high in construction work efficiency, capable of saving engineering materials, low in project construction cost and good in project implementation effect.
Description
Technical field
The present invention relates to technical field of civil engineering, a kind of foundation ditch and the vertical building enclosure of side slope.
Background technology
The piling wall type building enclosure used in base pit engineering or slope project is a kind of important feature shape of foundation pit enclosure
Formula, extensively applies in all parts of the world, and current foundation ditch and side slope go along with sb. to guard him piling wall frequently with boring (rotation is dug) perfusion post, SMW
The shaped steel Soil-cement Wall of engineering method, prefabricated pile Soil-cement Wall and cast-in-place diaphram wall etc..
Bored concrete pile means at engineering site by mechanical hole building, mud off, formation stake holes in foundation soil, and within it
Placing steel reinforcement cage, in-site pouring concrete and the stake that formed, different according to forming hole method, bored concrete pile can be divided into again punching to irrigate
Several classes such as stake, cast-in-situ bored pile and digging hole filling pile.The construction of cast-in-situ bored pile, because of the difference of forms of protective wall selected by it, has mud
Slurry retaining wall mode and full-sleeve are constructed two kinds.Soft soil layer and unstable soil layer use mud off mode construct bored concrete pile pole
It is easily generated the common faults such as constriction, collapse hole, stake holes deflection, thus affects the quality of concrete placed under water, and generation circulates mud in a large number
Slurry, the discharge of mud and process will result in environmental pollution;Although full-sleeve construction technology can protect stablizing of hole wall, but still not
Can avoid completely using mud to carry out the Water And Earth Pressures at the bottom of balance pipe, owing to being affected by the solid element such as hole depth, casing length, difficulty of construction
Greatly, cost is high, and speed is slow.
The shaped steel Soil-cement Wall of SMW engineering method, H profile steel or steel pipe will be inserted in Soil-cement Wall, will bear
Load combines with antiseepage dash, makes the supporting construction simultaneously having carrying with two kinds of functions of sealing.For reducing
Construction costs, the H profile steel being commonly inserted at present or steel pipe are both needed to extract recovery, the most all at its external coating antifriction material, but
Antifriction material have impact on the bond strength of shaped steel and soil cement, can destroy soil cement water-stop curtain during shaped steel is inserted out simultaneously,
And produce the space of certain volume, cause deformation unfavorable to the environmental conservation closed on.
Steel sheet pile enclosure structure, employing is the Larsen steel sheet pile of band occlusion, is engaged by the fore shaft on stake limit and forms entirety, shape
Become assembled building enclosure.But due to its length and the restriction of cross dimensions, it is only used for excavating shallower foundation ditch, as the degree of depth is little
In the foundation pit enclosure of 6m.Owing to its bending rigidity is less, the deformation that stress produces is relatively big, in more important environmental conservation region
Should not use.
Soil cement is inserted into the building enclosure of pile for prestressed pipe or square pile, has gear soil and the double effects of sealing.Due to
The joint of its prefabricated pile connects strong ties such as being difficult to, or joint connection construction is the most complicated, up to the present, and can only be with single
The prefabricated pile of joint is less than 15m as foundation pit enclosure structure, the long maximum of single-unit stake, uses the foundation ditch of this building enclosure or side slope deep
Degree also only has 6~8m, it is clear that receiving by range of application of this building enclosure necessarily retrains.Even if the interconnection technique of joint is asked
Topic solves, but to determine its bending resistance limited due to the cross section property of current pile tube or square pile, it is difficult to reach more rational
Supporting benefit.
Diaphram wall is the primary structure form of Construction of Deep Foundation and Extra-Deep Foundation Pit, the most extensively should
With.Diaphram wall is replacing many traditional deep foundations and deep footing groove enclosing structure at present, is applied to deep big foundation pit or city
In city's municipal works and railway traffic engineering.Vibrate during construction of diaphragm wall little, noise is low, it is adaptable to urban architecture compact district
Construct in territory;Wall stiffness is big, and barrier performance is good;It is applicable to multiple geological conditions;It can be the permanent basis of superstructure;Energy
Enough make full use of the limited ground in property line and space, give full play to returns of investment;Work efficiency is high, the duration is short, reliable in quality.
Cast-in-place diaphram wall is currently used widest version, but construction ground in complex geological condition such as sandy soil stratum
Lower diaphragm wall, is the most relatively difficult to resolve the slurry trench stability problem in certainly continuous wall trench underground work progress, and landslip of the sides of the trench causes
Concrete pouring quality problem, thus produce surface dew muscle and hole, body of wall and joint localized seepage, wall steel bar basket structure
The wall body mass defects such as damage, affect safety and the waterproof effect of continuous underground wall structure.
Continuous wall trench underground process typically uses mud to carry out retaining wall, needs to discharge mud, produce after casting concrete
Substantial amounts of waste mud needs to process, and causes the increase of serious environmental pollution and cost.
The construction property of diaphram wall underwater casting determines job site and is difficult to ensure that the construction quality of body of wall, and this is also
It is the cast-in-place continuous underground wall structure mass defect that is difficult to improve or make up.Therefore, engineering circles need badly searching one can substitute
The Novel underground diaphragm wall structure of cast-in-place diaphram wall, but this industry predicament is solved the most well at present.
Using precast reinforced concrete pile or wall, replacing the stake of cast-in-place reinforced concrete structure and wall will be underground engineering
The direction in field.Currently for the precast concrete of superstructure, China Inst of Architectural Standard Design has worked out " assembling
Formula concrete structure technique code " (JGJ1-2014), but this code is without reference to the technology in terms of underground exterior-protected structure and mark
Standard, does not have directive function.Shanghai construction engineering group is attempted in prefabricated diaphram wall method, as new at Tung Wah hospital
Build the empty stomach wallboard applying ground in the Foundation Pit Support Engineering of outpatient service prefabricated and be assembled into continuous underground wall structure.Due to single width wall
Board size is relatively big (length reaches 20.5m), the most difficult in lifting and transport.
Owing to not accomplishing the assembled in situ of small members, limit this technology and do not obtain further popularization and application.
Use prefabricated tubular pile, as PHC pile tube, PRC pile tube, precast square pile and prefabricated I-shaped stake are tied as pattern foundation pit supporting structure
Structure, the most existing many units are tested, but are all limited to the application of single-unit stake, this is because the type of attachment between stake does not has
Efficiently solving, be embodied in assembled in situ connection construction difficulty, joint is unreliable, joint high in cost of production aspect, causes with using
The application in foundation pit enclosure structure of the precast reinforced concrete piles wall fabricated construction is in experimental stage.
For stress characteristic and the feature of site operation of the vertical building enclosure of foundation ditch, it is little that employing is readily transported and lifts
Size members the most quickly assembles, build a kind of not only kept off soil but also sealing go along with sb. to guard him piling wall, reduce foundation pit enclosure cost, be us
The direction made great efforts.
Summary of the invention
The technical problem to be solved is, by optimizing cross sectional shape and the size of prefabricated piling wall, meets it
Reasonably force request;Solving prefabricated standard component factorial construction difficulty big, single-piece transport difficult, piece weight is relatively big and hangs
Dress inconvenience, the difficult problems such as assembled in situ construction period is longer, for different supporting requirements and force request, it is provided that a kind of prestressing force
Assembled shaped pile wall base hole and side slope building enclosure.
For reaching above-mentioned purpose, the technical solution used in the present invention is:
A kind of prestressing force assembled shaped pile wall base hole and side slope building enclosure, assembled abnormity piling wall is to be filled by standard component
Join and form;Standard component is to be formed by prestressed high-strength reinforced concrete and high-strength concrete prefabricated;Jointing between standard component
Including horizontal joint and vertical joint;Being subject at horizontal joint advocates to use the mechanical adapter docked one by one, joint between muscle
Concrete end face uses macromolecule resin glue bonding;Vertical joint is tongue and groove joggle or the high-pressure rotary-spray stirring of embedded sealing adhesive tape
The embedded connection of stake.Its vertical abutment joint is made to occur without percolating water phenomenon.
The present invention utilizes prestressed high-strength reinforcing bar and high-strength concrete batch production to be prefabricated into standard component, assembles through job site
Side slope building enclosure, there is preferably stress cross sectional shape, meet the gear soil of geotechnical slope, sealing, appearance decoration with
And it is used as the requirement of for good and all lower outdoor wall construction.
The section of assembled abnormity piling wall is T-shaped, rectangle or U-shaped.
The T-shaped assembled abnormity piling wall of section is to be assembled by after real abdomen or standard component field combinations on an empty stomach, mark
Quasi-part is T-shaped standard component or T-shaped standard component mixes composition with square type standard component.
The assembled abnormity piling wall that section takes the shape of the letter U is to be assembled by after real abdomen or standard component field combinations on an empty stomach, mark
Quasi-part is that T-shaped standard component mixes composition with U-shaped standard component.
The rectangular assembled abnormity piling wall of section is to be assembled by after real abdomen or standard component field combinations on an empty stomach, mark
Quasi-part is square type standard component.
The level connection joint of horizontal joint is sewn on vertical position in being dislocatedly distributed;The vertical connecting sewing of vertical joint is in up and down
The straight joint distribution of alignment.
Being provided with some anchoring joints that strengthens at horizontal joint, enhancing anchoring joint is that screw lock formula is mechanically connected.
Being embedded with connecting screw hole on top that assembled abnormity piling wall exposes and side, connecting screw hole props up with Guan Liang, level
Support beam or outer wall of basement connect.
The profile of standard component makes according to stress and matching requirements, all achieves and quick and precisely connects.
Assembly method is as follows:
(1) after T-shaped piling wall is by real abdomen or T-shaped standard component on an empty stomach or T-shaped standard component and square type standard component field combinations
It is assembled;
(2) U-shaped piling wall is to be assembled after U-shaped standard component field combinations by real abdomen or T-shaped standard component on an empty stomach;
(3) square type piling wall is to be assembled by real abdomen or square type standard component on an empty stomach.
Horizontal joint in vertical position in being dislocatedly distributed;Vertical connecting sewing is the straight joint of consistency from top to bottom.
Being additionally arranged some at horizontal joint and strengthen anchoring joint, it connects and is connected by muscle of advocating is identical, is
Screw lock formula is mechanically connected.
The exposed face of abnormity piling wall has end face and side, and it is embedded with connecting screw hole, it is simple to go along with sb. to guard him piling wall and Guan Liang, limit
The horizontal support member on slope or the exterior wall of basement connect.
Beneficial effect: the present invention utilizes the various standard components prefabricated to batch production, combination at the construction field (site) and assembling, shape
Becoming stress more rational shaped pile wall construction, have gear soil and water stopping function concurrently, alternative existing foundation ditch and side slope go along with sb. to guard him piling wall.
Site operation of the present invention is workable, component assemblingization degree high, working performance is high, it is possible to ensures the globality of structure and executes
Working medium amount, reduces construction costs, and engineering construction is respond well.
Accompanying drawing explanation
The invention will be further described with detailed description of the invention below in conjunction with the accompanying drawings.
Fig. 1 is the profile of T section stake diaphragm wall foundation pit enclosure structure of the present invention;
Fig. 2 is the expanded view of T section stake diaphragm wall foundation pit enclosure structure of the present invention;
Fig. 3 is the profile of U-shaped cross section of the present invention piling wall foundation pit enclosure structure;
Fig. 4 is the expanded view of U-shaped cross section of the present invention piling wall foundation pit enclosure structure;
Fig. 5 is the profile of T section stake separate type foundation pit enclosure structure of the present invention;
Fig. 6 is the expanded view of T section stake separate type foundation pit enclosure structure of the present invention;
Fig. 7 is Rectangular Section Pile separate type foundation pit enclosure structure profile of the present invention;
Fig. 8 is Rectangular Section Pile separate type foundation pit enclosure structure expanded view of the present invention;
Fig. 9 is the assembled T-shaped standard component of abnormity piling wall of the present invention assembling effect and tenon formula joint schematic diagram;
Figure 10 is the assembled T-shaped standard component of abnormity piling wall of the present invention assembling effect and rotating spraying mixture pile embedding joint signal
Figure;
Figure 11 is that the assembled T-shaped standard component of abnormity piling wall of the present invention assembles schematic diagram with rectangle standard component;
Figure 12 is one T-shaped standard component of assembled abnormity piling wall of the present invention and a quasi-moments shape standard component assembling schematic diagram;
Figure 13 is assembled abnormity piling wall of the present invention T-shaped standard component assembling schematic diagram on an empty stomach;
Figure 14 is that the assembled T-shaped standard component of abnormity piling wall of the present invention assembles schematic diagram with U-shaped standard component;
Figure 15 is that assembled abnormity piling wall of the present invention T-shaped standard component on an empty stomach assembles schematic diagram with U-shaped standard component;
Figure 16 is the connection diagram docked one by one by muscle of advocating of the horizontal joint of assembled abnormity piling wall of the present invention;
Figure 17 is Rectangular Section Pile of the present invention and circular mixing pile Composite Foundation Pit building enclosure cross-sectional view;
Figure 18 is Rectangular Section Pile of the present invention and uniform thickness mixing pile Composite Foundation Pit building enclosure cross-sectional view;
Figure 19 is T section stake of the present invention and circular mixing pile Composite Foundation Pit building enclosure cross-sectional view;
Figure 20 is T section stake of the present invention and uniform thickness mixing pile Composite Foundation Pit building enclosure cross-sectional view;
Figure 21 is that circle mixing pile of the present invention is combined diaphragm wall foundation pit enclosure structure cross-sectional view with T section stake;
Figure 22 is that uniform thickness mixing pile of the present invention is combined diaphragm wall foundation pit enclosure structure cross-sectional view with T section stake;
In figure: the 1 prefabricated standard component of T-steel reinforced concrete, 2 horizontal joints, 21 by advocate muscle connecting screw hole,
3 vertical abutment joints, 31 vertical tenon formula joints, 32 vertical rotating spraying mixture piles embed joints, 33 vertical waterproof adhesive tapes, 4
Pre-buried screw that Guan Liang, 41 enclosure walls are connected with outer wall of basement, the 5 concrete prefabricated standard components of square steel bar, 6 levels
The link position of joint, 7 screw lock formula machinery fittings, 8 high-strength steel bars, 9 screw lock steel bushings, 10 screw lock connecting rods, 11
High-strength resin glue, 12 connecting screw holes, the 13 prefabricated standard components of U-shaped armored concrete, 14 enhancing solidified earth, 15 enhancings are even
Connect muscle.
Detailed description of the invention
For the technological means making the present invention realize, creation characteristic, reach purpose and be easy to understand with effect, below knot
Conjunction is specifically illustrating, and the present invention is expanded on further.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall and side slope building enclosure, be for vertical side slope or vertical cut
Wall of Deep Foundation Pit prop up dash soil pressure and protection stability of slope and control deformation building enclosure.Knot is gone along with sb. to guard him based on vertical side slope
The stress characteristic of structure and sealing requirement, the assembled special-shaped wall that the present invention develops, give full play to T-shaped piling wall, rectangular pile and U-shaped
The stress performance of plate.
See Fig. 1: by prefabricated for T-steel reinforced concrete standard component 1, splice length and longitudinal seam 3 splices width through horizontal joint 2
Degree, and it is combined together to form the piling wall structure of abnormity with hat beam 4, such as T-shaped piling wall, rectangle piling wall and U-shaped piling wall structure.
In this patent, the prefabricated standard component required for assembled abnormity piling wall is all prefabricated by modulated dimension standard
, it is the novel prefabricated component of a kind of special exploitation.It is connected with modular connection between standard component, horizontal joint 6, use screw lock
Formula mechanical fastener 7, fixes the bottom of high-strength steel bar 8 with screw lock steel bushing 9, and the other end fixes screw lock connecting rod 10, then with even
Connect screw 12 to lock, i.e. achieve the docking one by one by muscle of advocating.Additionally, filling is high on the horizontal joint of two-stage nitration standard component
Strong resin 11 bonds so that the horizontal joint between standard component realizes seamless binding, meets even rigidity of the nape degree and is more than this stiffness of the body of component
The requirement of degree, sees Figure 16.
T-shaped standard component 1 uses that high-strength concrete is prefabricated with high-strength steel bar 8 to be formed.
Seeing Fig. 2, standard component all uses pre-tensioning system Shi Hanzhang.Its horizontal joint in the distribution of elevation location all by phase
It is staggeredly arranged between adjacent every width wall, so can be effectively improved the degree of safety of assembled building enclosure.
See Fig. 2, the side panel of T-shaped standard component 1 is embedded with the screw 41 being connected with the basement wall, improves two
The convenience of wall unification.
When the bottom soil layer preferably of foundation ditch, vertical building enclosure stress below the bottom surface, hole of foundation ditch and deformation will be by
Gradually reducing, time below certain degree of depth, vertical building enclosure uses square type stake to replace the T-shaped piling wall on top, forms a kind of U-shaped
Building enclosure, see Fig. 3, Fig. 4.
The joint having standard between square type stake and T-shaped piling wall realizes being docked by muscle of advocating;Its horizontal joint is in absolute altitude position
The distribution put all is staggeredly arranged by between adjacent every width wall, sees Fig. 4.
See Fig. 4, the side panel of T-shaped standard component 1 is embedded with the screw 41 being connected with the basement wall, improves two
The convenience of wall unification.
When foundation ditch barrier properties is less demanding, the T-shaped stake 1 that can use separate type is compound with cement mixing method as perpendicular
To building enclosure, see Fig. 5 and Fig. 6
When the cutting depth of foundation ditch is shallower, or produce lateral Water And Earth Pressures less time, the rectangle of separate type can be used
Stake 5, as vertical building enclosure, sees Fig. 7.Rectangular pile 5 is also the standard component of a kind of factorial praluction, for ease of transporting and hanging
Dress, its length dimension all controls within the size allowing transport, and segmentation is inserted at the construction field (site), and horizontal joint is in ground-mounted
After connection in insert into stratum, its horizontal joint is staggeredly arranged between the distribution of elevation location is all by adjacent every width wall, sees figure
8。
Strengthening solidified earth churned pile wall 14 is to use multi-shaft stirring stake diaphragm wall or equal thickness stirring wall to make, with rectangular pile
Standard component 5 is composited, and the gap between rectangular pile standard component 5, by cement solidification soil filling, defines gear soil and sealing is gone along with sb. to guard him
Structure, sees Fig. 7.
The vertical joint 3 of T-shaped stake 1 uses tongue and groove joggle 31, and seam is provided with sealing adhesive tape, sees Fig. 9.
The vertical joint 3 of T-shaped stake 1 uses high-pressure rotary-spray mixing pile 32 to embed connection sealing, sees Figure 10.
Seeing Figure 11, assembled abnormity piling wall is to be assembled by a square type standard component 5 and T-shaped standard component 1.
In order to improve the rigidity of enclosure wall, reduce body of wall deadweight, assembled abnormity piling wall is used T-shaped standard component 1 on an empty stomach
Being assembled, vertical joint and on an empty stomach intracavity are filled into cement solidification soil, see Figure 12.
For reducing the weight of T-shaped standard component, reduce the length of its two wing, as backbar, the plan that supporting one is longer
Rectangular slab 5 is assembled into the building enclosure of abnormity, sees Figure 13.
T-shaped standard component 1 and U-shaped standard component 13 are assembled into the building enclosure of abnormity, see Figure 14 and Figure 15, save work
Journey material, reduces the cost of bracing engineering.
Rectangular Section Pile 5 is compounded to form foundation pit enclosure structure with circular mixing pile 14, there is the features such as construction is convenient, its
Transverse section sees Figure 17;
Rectangular Section Pile 5 and uniform thickness mixing pile 14 are compounded to form foundation pit enclosure structure, its cross-sectional view, see Figure 18;
T section stake is compounded to form foundation pit enclosure structure with circular mixing pile 14, its cross-sectional view, see Figure 19;
T section stake and uniform thickness mixing pile 14 are compounded to form foundation pit enclosure structure, its cross-sectional view, see Figure 20;
Cylinder mixing pile 14 and T section stake 1 are compounded to form diaphragm wall foundation pit enclosure structure, its cross-sectional view, see
Figure 21;
Uniform thickness mixing pile 14 and T section stake 1 are compounded to form diaphragm wall foundation pit enclosure structure, its transverse section, see figure
22。
The ultimate principle of the present invention, principal character and advantages of the present invention have more than been shown and described.The technology of the industry
Personnel, it should be appreciated that the present invention is not restricted to the described embodiments, simply illustrating this described in above-described embodiment and description
The principle of invention, the present invention also has various changes and modifications without departing from the spirit and scope of the present invention, and these become
Change and improvement both falls within scope of the claimed invention.Claimed scope by appending claims and
Equivalent defines.
Claims (8)
1. the foundation ditch of prestressing force assembled abnormity piling wall and a side slope building enclosure, is characterized in that, assembled abnormity piling wall is
It is assembled by standard component;Standard component is to be formed by prestressed high-strength reinforced concrete and high-strength concrete prefabricated;Between standard component
Jointing include horizontal joint and vertical joint;Being subject at horizontal joint advocates to use the mechanical type docked one by one between muscle
Joint, joint concrete end face uses macromolecule resin glue bonding;Vertical joint is tongue and groove joggle or the height of embedded sealing adhesive tape
The embedded connection of pressure rotary-spraying mixing pile.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 1 and side slope building enclosure, its feature
It is that the section of assembled abnormity piling wall is T-shaped, rectangle or U-shaped.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 2 and side slope building enclosure, its feature
It is that the T-shaped assembled abnormity piling wall of section is to be assembled by after real abdomen or standard component field combinations on an empty stomach, and standard component is
T-shaped standard component or T-shaped standard component mix composition with square type standard component.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 2 and side slope building enclosure, its feature
It is that the assembled abnormity piling wall that section takes the shape of the letter U is to be assembled by after real abdomen or standard component field combinations on an empty stomach, and standard component is
T-shaped standard component mixes composition with U-shaped standard component.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 2 and side slope building enclosure, its feature
It is that the rectangular assembled abnormity piling wall of section is to be assembled by after real abdomen or standard component field combinations on an empty stomach, standard component
For square type standard component.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 2 and side slope building enclosure, its feature
It is that the level connection joint of horizontal joint is sewn on vertical position in being dislocatedly distributed;The vertical connecting sewing of vertical joint is consistency from top to bottom
Straight joint distribution.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 6 and side slope building enclosure, its feature
Being to be provided with some anchoring joints that strengthens at horizontal joint, enhancing anchoring joint is that screw lock formula is mechanically connected.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 2 and side slope building enclosure, its feature
On top that assembled abnormity piling wall exposes and side, to be embedded with connecting screw hole, connecting screw hole and Guan Liang, horizontal shore or
Outer wall of basement connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610906110.3A CN106320322A (en) | 2016-10-18 | 2016-10-18 | Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610906110.3A CN106320322A (en) | 2016-10-18 | 2016-10-18 | Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106320322A true CN106320322A (en) | 2017-01-11 |
Family
ID=57817803
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610906110.3A Pending CN106320322A (en) | 2016-10-18 | 2016-10-18 | Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106320322A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677162A (en) * | 2017-02-13 | 2017-05-17 | 上海强劲地基工程股份有限公司 | Stiff composite precast sheet pile envelope structure |
CN109440782A (en) * | 2018-12-17 | 2019-03-08 | 福州大学 | The assembling concrete sheet pile foundation pit supporting construction and its construction method of included crown beam |
WO2021109144A1 (en) * | 2019-12-06 | 2021-06-10 | 邹胜斌 | Modular intelligent dado cast-in-place pile and construction process therefor |
CN114606930A (en) * | 2022-03-29 | 2022-06-10 | 中天建设集团有限公司 | Assembly type recyclable underground continuous wall and construction method thereof |
CN114718051A (en) * | 2022-05-06 | 2022-07-08 | 中冶集团武汉勘察研究院有限公司 | Assembled pile-wall integrated structure and construction method thereof |
CN114808696A (en) * | 2022-05-07 | 2022-07-29 | 广西欣港交通投资有限公司 | Prefabricated and cast-in-place combined anchorage foundation enclosure structure and construction method |
CN114875930A (en) * | 2022-05-10 | 2022-08-09 | 中铁大桥勘测设计院集团有限公司 | Series arc diaphragm wall composite foundation suitable for weak stratum and construction method thereof |
CN114606930B (en) * | 2022-03-29 | 2024-04-26 | 中天建设集团有限公司 | Assembled recyclable underground diaphragm wall and construction method thereof |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55178040U (en) * | 1979-06-05 | 1980-12-20 | ||
CN200946273Y (en) * | 2005-09-21 | 2007-09-12 | 周兆弟 | Plugging-in type pipe-connecting fastener |
CN102561315A (en) * | 2012-02-14 | 2012-07-11 | 云南中技管桩有限公司 | Linkage precast pile type underground diaphragm wall |
CN103334422A (en) * | 2013-06-26 | 2013-10-02 | 中国建筑股份有限公司 | Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof |
CN105019472A (en) * | 2015-07-14 | 2015-11-04 | 周兆弟 | Composite fender pile for building basement |
CN204825856U (en) * | 2015-06-30 | 2015-12-02 | 国鼎(南通)管桩有限公司 | Stake of prestressing force that excels in combination formula concrete wall |
CN105887806A (en) * | 2016-06-13 | 2016-08-24 | 上海强劲地基工程股份有限公司 | Assembled type underground diaphragm wall and construction method thereof |
CN206090534U (en) * | 2016-10-18 | 2017-04-12 | 上海强劲地基工程股份有限公司 | Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall |
-
2016
- 2016-10-18 CN CN201610906110.3A patent/CN106320322A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55178040U (en) * | 1979-06-05 | 1980-12-20 | ||
CN200946273Y (en) * | 2005-09-21 | 2007-09-12 | 周兆弟 | Plugging-in type pipe-connecting fastener |
CN102561315A (en) * | 2012-02-14 | 2012-07-11 | 云南中技管桩有限公司 | Linkage precast pile type underground diaphragm wall |
CN103334422A (en) * | 2013-06-26 | 2013-10-02 | 中国建筑股份有限公司 | Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof |
CN204825856U (en) * | 2015-06-30 | 2015-12-02 | 国鼎(南通)管桩有限公司 | Stake of prestressing force that excels in combination formula concrete wall |
CN105019472A (en) * | 2015-07-14 | 2015-11-04 | 周兆弟 | Composite fender pile for building basement |
CN105887806A (en) * | 2016-06-13 | 2016-08-24 | 上海强劲地基工程股份有限公司 | Assembled type underground diaphragm wall and construction method thereof |
CN206090534U (en) * | 2016-10-18 | 2017-04-12 | 上海强劲地基工程股份有限公司 | Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall |
Non-Patent Citations (1)
Title |
---|
曹净等: "《地下空间结构》", 28 February 2015, 中国水利水电出版社 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677162A (en) * | 2017-02-13 | 2017-05-17 | 上海强劲地基工程股份有限公司 | Stiff composite precast sheet pile envelope structure |
CN106677162B (en) * | 2017-02-13 | 2019-01-11 | 上海强劲地基工程股份有限公司 | A kind of stiffness composite precast slab stake building enclosure |
CN109440782A (en) * | 2018-12-17 | 2019-03-08 | 福州大学 | The assembling concrete sheet pile foundation pit supporting construction and its construction method of included crown beam |
CN109440782B (en) * | 2018-12-17 | 2023-12-15 | 福州大学 | Assembled concrete slab pile foundation pit supporting structure with crown beam and construction method thereof |
WO2021109144A1 (en) * | 2019-12-06 | 2021-06-10 | 邹胜斌 | Modular intelligent dado cast-in-place pile and construction process therefor |
CN114606930A (en) * | 2022-03-29 | 2022-06-10 | 中天建设集团有限公司 | Assembly type recyclable underground continuous wall and construction method thereof |
CN114606930B (en) * | 2022-03-29 | 2024-04-26 | 中天建设集团有限公司 | Assembled recyclable underground diaphragm wall and construction method thereof |
CN114718051A (en) * | 2022-05-06 | 2022-07-08 | 中冶集团武汉勘察研究院有限公司 | Assembled pile-wall integrated structure and construction method thereof |
CN114808696A (en) * | 2022-05-07 | 2022-07-29 | 广西欣港交通投资有限公司 | Prefabricated and cast-in-place combined anchorage foundation enclosure structure and construction method |
CN114875930A (en) * | 2022-05-10 | 2022-08-09 | 中铁大桥勘测设计院集团有限公司 | Series arc diaphragm wall composite foundation suitable for weak stratum and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106320322A (en) | Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall | |
CN105887806B (en) | Assembled underground continuous wall and its construction method | |
CN106049506B (en) | A kind of APS assembleds supporting pile structure and construction method | |
PH12014502301B1 (en) | Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method | |
CN106677205A (en) | Fabricated special-shaped steel pipe pile combined retaining wall | |
KR20090094555A (en) | Top-down underground construction method using prefabricated concrete column member as temporary bridge column | |
CN106120812A (en) | A kind of assembled active well structure and construction method | |
EP3118374A1 (en) | Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same | |
JP2018024982A (en) | Reinforcement method and reinforcement structure of existing pile foundation | |
KR20140075767A (en) | Retaining wall construction using site compaction and excavation | |
CN110130363A (en) | Assembled is implanted into foundation pit enclosure stake and pile wall interaction structure and its construction method | |
CN109630127A (en) | A kind of construction method of rich water soft stratum ultra-deep shield vertical shaft | |
CN103321244A (en) | Construction method for additionally arranged basement in existing building on sand foundation | |
CN107338804A (en) | A kind of hollow independent composite pile foundation of super-large diameter and its method of construction | |
CN109972630A (en) | A kind of foundation pit enclosure structure and its construction method of the assembly of PC component | |
CN107012871A (en) | A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation ditch fabricated construction | |
US20020071725A1 (en) | Earth support and permanent structural foundation wall | |
CN205776157U (en) | Assembled underground continuous wall | |
CN107620316A (en) | A kind of rocky bed large volume deepwater foundation construction method | |
CN206090534U (en) | Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall | |
JP2007211408A (en) | Seismic strengthening construction method for existing concrete bridge pier | |
CN106149745A (en) | A kind of truss type steel tube grouting pile basis and construction method thereof | |
CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
CN205917713U (en) | Truss -like steel pipe slip casting pile foundation | |
CN105484270B (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170111 |