CN106320322A - Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall - Google Patents

Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall Download PDF

Info

Publication number
CN106320322A
CN106320322A CN201610906110.3A CN201610906110A CN106320322A CN 106320322 A CN106320322 A CN 106320322A CN 201610906110 A CN201610906110 A CN 201610906110A CN 106320322 A CN106320322 A CN 106320322A
Authority
CN
China
Prior art keywords
standard component
side slope
assembled
wall
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610906110.3A
Other languages
Chinese (zh)
Inventor
刘全林
宋伟民
张扬
张衡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Qiangjin Foundation Engineering Co Ltd
Original Assignee
Shanghai Qiangjin Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Qiangjin Foundation Engineering Co Ltd filed Critical Shanghai Qiangjin Foundation Engineering Co Ltd
Priority to CN201610906110.3A priority Critical patent/CN106320322A/en
Publication of CN106320322A publication Critical patent/CN106320322A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • E02D5/105Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete of prestressed concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/10Prefabricated parts, e.g. composite sheet piles made of concrete or reinforced concrete
    • E02D5/12Locking forms; Edge joints; Pile crossings; Branch pieces

Abstract

The invention discloses a foundation pit and side slope envelope enclosure for a prestress fabricated special-shaped pile wall. The foundation pit and side slope envelope enclosure is formed by assembling standard components prefabricated through prestress high-strength reinforcing steel bars and high-strength concrete in a factorization manner on a construction site. The foundation pit and side slope envelope enclosure has reasonable stress performance, and meets requirements of soil blocking, water stopping and appearance decoration of a rock and soil foundation pit side slope and meets the requirement for using the foundation pit and side slope envelope enclosure as a permanent basement external wall structure. The appearance of the standard prefabricated components (called the standard components for short) is manufactured into T-shaped, rectangular and U-shaped sections according to stress and assembly requirements. Connectors between the standard components include the horizontal connectors and the vertical connectors. The foundation pit and side slope envelope enclosure is high in on-site assembly construction operability, high in component assembly degree, high in construction work efficiency, capable of saving engineering materials, low in project construction cost and good in project implementation effect.

Description

The foundation ditch of a kind of prestressing force assembled abnormity piling wall and side slope building enclosure
Technical field
The present invention relates to technical field of civil engineering, a kind of foundation ditch and the vertical building enclosure of side slope.
Background technology
The piling wall type building enclosure used in base pit engineering or slope project is a kind of important feature shape of foundation pit enclosure Formula, extensively applies in all parts of the world, and current foundation ditch and side slope go along with sb. to guard him piling wall frequently with boring (rotation is dug) perfusion post, SMW The shaped steel Soil-cement Wall of engineering method, prefabricated pile Soil-cement Wall and cast-in-place diaphram wall etc..
Bored concrete pile means at engineering site by mechanical hole building, mud off, formation stake holes in foundation soil, and within it Placing steel reinforcement cage, in-site pouring concrete and the stake that formed, different according to forming hole method, bored concrete pile can be divided into again punching to irrigate Several classes such as stake, cast-in-situ bored pile and digging hole filling pile.The construction of cast-in-situ bored pile, because of the difference of forms of protective wall selected by it, has mud Slurry retaining wall mode and full-sleeve are constructed two kinds.Soft soil layer and unstable soil layer use mud off mode construct bored concrete pile pole It is easily generated the common faults such as constriction, collapse hole, stake holes deflection, thus affects the quality of concrete placed under water, and generation circulates mud in a large number Slurry, the discharge of mud and process will result in environmental pollution;Although full-sleeve construction technology can protect stablizing of hole wall, but still not Can avoid completely using mud to carry out the Water And Earth Pressures at the bottom of balance pipe, owing to being affected by the solid element such as hole depth, casing length, difficulty of construction Greatly, cost is high, and speed is slow.
The shaped steel Soil-cement Wall of SMW engineering method, H profile steel or steel pipe will be inserted in Soil-cement Wall, will bear Load combines with antiseepage dash, makes the supporting construction simultaneously having carrying with two kinds of functions of sealing.For reducing Construction costs, the H profile steel being commonly inserted at present or steel pipe are both needed to extract recovery, the most all at its external coating antifriction material, but Antifriction material have impact on the bond strength of shaped steel and soil cement, can destroy soil cement water-stop curtain during shaped steel is inserted out simultaneously, And produce the space of certain volume, cause deformation unfavorable to the environmental conservation closed on.
Steel sheet pile enclosure structure, employing is the Larsen steel sheet pile of band occlusion, is engaged by the fore shaft on stake limit and forms entirety, shape Become assembled building enclosure.But due to its length and the restriction of cross dimensions, it is only used for excavating shallower foundation ditch, as the degree of depth is little In the foundation pit enclosure of 6m.Owing to its bending rigidity is less, the deformation that stress produces is relatively big, in more important environmental conservation region Should not use.
Soil cement is inserted into the building enclosure of pile for prestressed pipe or square pile, has gear soil and the double effects of sealing.Due to The joint of its prefabricated pile connects strong ties such as being difficult to, or joint connection construction is the most complicated, up to the present, and can only be with single The prefabricated pile of joint is less than 15m as foundation pit enclosure structure, the long maximum of single-unit stake, uses the foundation ditch of this building enclosure or side slope deep Degree also only has 6~8m, it is clear that receiving by range of application of this building enclosure necessarily retrains.Even if the interconnection technique of joint is asked Topic solves, but to determine its bending resistance limited due to the cross section property of current pile tube or square pile, it is difficult to reach more rational Supporting benefit.
Diaphram wall is the primary structure form of Construction of Deep Foundation and Extra-Deep Foundation Pit, the most extensively should With.Diaphram wall is replacing many traditional deep foundations and deep footing groove enclosing structure at present, is applied to deep big foundation pit or city In city's municipal works and railway traffic engineering.Vibrate during construction of diaphragm wall little, noise is low, it is adaptable to urban architecture compact district Construct in territory;Wall stiffness is big, and barrier performance is good;It is applicable to multiple geological conditions;It can be the permanent basis of superstructure;Energy Enough make full use of the limited ground in property line and space, give full play to returns of investment;Work efficiency is high, the duration is short, reliable in quality. Cast-in-place diaphram wall is currently used widest version, but construction ground in complex geological condition such as sandy soil stratum Lower diaphragm wall, is the most relatively difficult to resolve the slurry trench stability problem in certainly continuous wall trench underground work progress, and landslip of the sides of the trench causes Concrete pouring quality problem, thus produce surface dew muscle and hole, body of wall and joint localized seepage, wall steel bar basket structure The wall body mass defects such as damage, affect safety and the waterproof effect of continuous underground wall structure.
Continuous wall trench underground process typically uses mud to carry out retaining wall, needs to discharge mud, produce after casting concrete Substantial amounts of waste mud needs to process, and causes the increase of serious environmental pollution and cost.
The construction property of diaphram wall underwater casting determines job site and is difficult to ensure that the construction quality of body of wall, and this is also It is the cast-in-place continuous underground wall structure mass defect that is difficult to improve or make up.Therefore, engineering circles need badly searching one can substitute The Novel underground diaphragm wall structure of cast-in-place diaphram wall, but this industry predicament is solved the most well at present.
Using precast reinforced concrete pile or wall, replacing the stake of cast-in-place reinforced concrete structure and wall will be underground engineering The direction in field.Currently for the precast concrete of superstructure, China Inst of Architectural Standard Design has worked out " assembling Formula concrete structure technique code " (JGJ1-2014), but this code is without reference to the technology in terms of underground exterior-protected structure and mark Standard, does not have directive function.Shanghai construction engineering group is attempted in prefabricated diaphram wall method, as new at Tung Wah hospital Build the empty stomach wallboard applying ground in the Foundation Pit Support Engineering of outpatient service prefabricated and be assembled into continuous underground wall structure.Due to single width wall Board size is relatively big (length reaches 20.5m), the most difficult in lifting and transport.
Owing to not accomplishing the assembled in situ of small members, limit this technology and do not obtain further popularization and application.
Use prefabricated tubular pile, as PHC pile tube, PRC pile tube, precast square pile and prefabricated I-shaped stake are tied as pattern foundation pit supporting structure Structure, the most existing many units are tested, but are all limited to the application of single-unit stake, this is because the type of attachment between stake does not has Efficiently solving, be embodied in assembled in situ connection construction difficulty, joint is unreliable, joint high in cost of production aspect, causes with using The application in foundation pit enclosure structure of the precast reinforced concrete piles wall fabricated construction is in experimental stage.
For stress characteristic and the feature of site operation of the vertical building enclosure of foundation ditch, it is little that employing is readily transported and lifts Size members the most quickly assembles, build a kind of not only kept off soil but also sealing go along with sb. to guard him piling wall, reduce foundation pit enclosure cost, be us The direction made great efforts.
Summary of the invention
The technical problem to be solved is, by optimizing cross sectional shape and the size of prefabricated piling wall, meets it Reasonably force request;Solving prefabricated standard component factorial construction difficulty big, single-piece transport difficult, piece weight is relatively big and hangs Dress inconvenience, the difficult problems such as assembled in situ construction period is longer, for different supporting requirements and force request, it is provided that a kind of prestressing force Assembled shaped pile wall base hole and side slope building enclosure.
For reaching above-mentioned purpose, the technical solution used in the present invention is:
A kind of prestressing force assembled shaped pile wall base hole and side slope building enclosure, assembled abnormity piling wall is to be filled by standard component Join and form;Standard component is to be formed by prestressed high-strength reinforced concrete and high-strength concrete prefabricated;Jointing between standard component Including horizontal joint and vertical joint;Being subject at horizontal joint advocates to use the mechanical adapter docked one by one, joint between muscle Concrete end face uses macromolecule resin glue bonding;Vertical joint is tongue and groove joggle or the high-pressure rotary-spray stirring of embedded sealing adhesive tape The embedded connection of stake.Its vertical abutment joint is made to occur without percolating water phenomenon.
The present invention utilizes prestressed high-strength reinforcing bar and high-strength concrete batch production to be prefabricated into standard component, assembles through job site Side slope building enclosure, there is preferably stress cross sectional shape, meet the gear soil of geotechnical slope, sealing, appearance decoration with And it is used as the requirement of for good and all lower outdoor wall construction.
The section of assembled abnormity piling wall is T-shaped, rectangle or U-shaped.
The T-shaped assembled abnormity piling wall of section is to be assembled by after real abdomen or standard component field combinations on an empty stomach, mark Quasi-part is T-shaped standard component or T-shaped standard component mixes composition with square type standard component.
The assembled abnormity piling wall that section takes the shape of the letter U is to be assembled by after real abdomen or standard component field combinations on an empty stomach, mark Quasi-part is that T-shaped standard component mixes composition with U-shaped standard component.
The rectangular assembled abnormity piling wall of section is to be assembled by after real abdomen or standard component field combinations on an empty stomach, mark Quasi-part is square type standard component.
The level connection joint of horizontal joint is sewn on vertical position in being dislocatedly distributed;The vertical connecting sewing of vertical joint is in up and down The straight joint distribution of alignment.
Being provided with some anchoring joints that strengthens at horizontal joint, enhancing anchoring joint is that screw lock formula is mechanically connected.
Being embedded with connecting screw hole on top that assembled abnormity piling wall exposes and side, connecting screw hole props up with Guan Liang, level Support beam or outer wall of basement connect.
The profile of standard component makes according to stress and matching requirements, all achieves and quick and precisely connects.
Assembly method is as follows:
(1) after T-shaped piling wall is by real abdomen or T-shaped standard component on an empty stomach or T-shaped standard component and square type standard component field combinations It is assembled;
(2) U-shaped piling wall is to be assembled after U-shaped standard component field combinations by real abdomen or T-shaped standard component on an empty stomach;
(3) square type piling wall is to be assembled by real abdomen or square type standard component on an empty stomach.
Horizontal joint in vertical position in being dislocatedly distributed;Vertical connecting sewing is the straight joint of consistency from top to bottom.
Being additionally arranged some at horizontal joint and strengthen anchoring joint, it connects and is connected by muscle of advocating is identical, is Screw lock formula is mechanically connected.
The exposed face of abnormity piling wall has end face and side, and it is embedded with connecting screw hole, it is simple to go along with sb. to guard him piling wall and Guan Liang, limit The horizontal support member on slope or the exterior wall of basement connect.
Beneficial effect: the present invention utilizes the various standard components prefabricated to batch production, combination at the construction field (site) and assembling, shape Becoming stress more rational shaped pile wall construction, have gear soil and water stopping function concurrently, alternative existing foundation ditch and side slope go along with sb. to guard him piling wall. Site operation of the present invention is workable, component assemblingization degree high, working performance is high, it is possible to ensures the globality of structure and executes Working medium amount, reduces construction costs, and engineering construction is respond well.
Accompanying drawing explanation
The invention will be further described with detailed description of the invention below in conjunction with the accompanying drawings.
Fig. 1 is the profile of T section stake diaphragm wall foundation pit enclosure structure of the present invention;
Fig. 2 is the expanded view of T section stake diaphragm wall foundation pit enclosure structure of the present invention;
Fig. 3 is the profile of U-shaped cross section of the present invention piling wall foundation pit enclosure structure;
Fig. 4 is the expanded view of U-shaped cross section of the present invention piling wall foundation pit enclosure structure;
Fig. 5 is the profile of T section stake separate type foundation pit enclosure structure of the present invention;
Fig. 6 is the expanded view of T section stake separate type foundation pit enclosure structure of the present invention;
Fig. 7 is Rectangular Section Pile separate type foundation pit enclosure structure profile of the present invention;
Fig. 8 is Rectangular Section Pile separate type foundation pit enclosure structure expanded view of the present invention;
Fig. 9 is the assembled T-shaped standard component of abnormity piling wall of the present invention assembling effect and tenon formula joint schematic diagram;
Figure 10 is the assembled T-shaped standard component of abnormity piling wall of the present invention assembling effect and rotating spraying mixture pile embedding joint signal Figure;
Figure 11 is that the assembled T-shaped standard component of abnormity piling wall of the present invention assembles schematic diagram with rectangle standard component;
Figure 12 is one T-shaped standard component of assembled abnormity piling wall of the present invention and a quasi-moments shape standard component assembling schematic diagram;
Figure 13 is assembled abnormity piling wall of the present invention T-shaped standard component assembling schematic diagram on an empty stomach;
Figure 14 is that the assembled T-shaped standard component of abnormity piling wall of the present invention assembles schematic diagram with U-shaped standard component;
Figure 15 is that assembled abnormity piling wall of the present invention T-shaped standard component on an empty stomach assembles schematic diagram with U-shaped standard component;
Figure 16 is the connection diagram docked one by one by muscle of advocating of the horizontal joint of assembled abnormity piling wall of the present invention;
Figure 17 is Rectangular Section Pile of the present invention and circular mixing pile Composite Foundation Pit building enclosure cross-sectional view;
Figure 18 is Rectangular Section Pile of the present invention and uniform thickness mixing pile Composite Foundation Pit building enclosure cross-sectional view;
Figure 19 is T section stake of the present invention and circular mixing pile Composite Foundation Pit building enclosure cross-sectional view;
Figure 20 is T section stake of the present invention and uniform thickness mixing pile Composite Foundation Pit building enclosure cross-sectional view;
Figure 21 is that circle mixing pile of the present invention is combined diaphragm wall foundation pit enclosure structure cross-sectional view with T section stake;
Figure 22 is that uniform thickness mixing pile of the present invention is combined diaphragm wall foundation pit enclosure structure cross-sectional view with T section stake;
In figure: the 1 prefabricated standard component of T-steel reinforced concrete, 2 horizontal joints, 21 by advocate muscle connecting screw hole, 3 vertical abutment joints, 31 vertical tenon formula joints, 32 vertical rotating spraying mixture piles embed joints, 33 vertical waterproof adhesive tapes, 4 Pre-buried screw that Guan Liang, 41 enclosure walls are connected with outer wall of basement, the 5 concrete prefabricated standard components of square steel bar, 6 levels The link position of joint, 7 screw lock formula machinery fittings, 8 high-strength steel bars, 9 screw lock steel bushings, 10 screw lock connecting rods, 11 High-strength resin glue, 12 connecting screw holes, the 13 prefabricated standard components of U-shaped armored concrete, 14 enhancing solidified earth, 15 enhancings are even Connect muscle.
Detailed description of the invention
For the technological means making the present invention realize, creation characteristic, reach purpose and be easy to understand with effect, below knot Conjunction is specifically illustrating, and the present invention is expanded on further.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall and side slope building enclosure, be for vertical side slope or vertical cut Wall of Deep Foundation Pit prop up dash soil pressure and protection stability of slope and control deformation building enclosure.Knot is gone along with sb. to guard him based on vertical side slope The stress characteristic of structure and sealing requirement, the assembled special-shaped wall that the present invention develops, give full play to T-shaped piling wall, rectangular pile and U-shaped The stress performance of plate.
See Fig. 1: by prefabricated for T-steel reinforced concrete standard component 1, splice length and longitudinal seam 3 splices width through horizontal joint 2 Degree, and it is combined together to form the piling wall structure of abnormity with hat beam 4, such as T-shaped piling wall, rectangle piling wall and U-shaped piling wall structure.
In this patent, the prefabricated standard component required for assembled abnormity piling wall is all prefabricated by modulated dimension standard , it is the novel prefabricated component of a kind of special exploitation.It is connected with modular connection between standard component, horizontal joint 6, use screw lock Formula mechanical fastener 7, fixes the bottom of high-strength steel bar 8 with screw lock steel bushing 9, and the other end fixes screw lock connecting rod 10, then with even Connect screw 12 to lock, i.e. achieve the docking one by one by muscle of advocating.Additionally, filling is high on the horizontal joint of two-stage nitration standard component Strong resin 11 bonds so that the horizontal joint between standard component realizes seamless binding, meets even rigidity of the nape degree and is more than this stiffness of the body of component The requirement of degree, sees Figure 16.
T-shaped standard component 1 uses that high-strength concrete is prefabricated with high-strength steel bar 8 to be formed.
Seeing Fig. 2, standard component all uses pre-tensioning system Shi Hanzhang.Its horizontal joint in the distribution of elevation location all by phase It is staggeredly arranged between adjacent every width wall, so can be effectively improved the degree of safety of assembled building enclosure.
See Fig. 2, the side panel of T-shaped standard component 1 is embedded with the screw 41 being connected with the basement wall, improves two The convenience of wall unification.
When the bottom soil layer preferably of foundation ditch, vertical building enclosure stress below the bottom surface, hole of foundation ditch and deformation will be by Gradually reducing, time below certain degree of depth, vertical building enclosure uses square type stake to replace the T-shaped piling wall on top, forms a kind of U-shaped Building enclosure, see Fig. 3, Fig. 4.
The joint having standard between square type stake and T-shaped piling wall realizes being docked by muscle of advocating;Its horizontal joint is in absolute altitude position The distribution put all is staggeredly arranged by between adjacent every width wall, sees Fig. 4.
See Fig. 4, the side panel of T-shaped standard component 1 is embedded with the screw 41 being connected with the basement wall, improves two The convenience of wall unification.
When foundation ditch barrier properties is less demanding, the T-shaped stake 1 that can use separate type is compound with cement mixing method as perpendicular To building enclosure, see Fig. 5 and Fig. 6
When the cutting depth of foundation ditch is shallower, or produce lateral Water And Earth Pressures less time, the rectangle of separate type can be used Stake 5, as vertical building enclosure, sees Fig. 7.Rectangular pile 5 is also the standard component of a kind of factorial praluction, for ease of transporting and hanging Dress, its length dimension all controls within the size allowing transport, and segmentation is inserted at the construction field (site), and horizontal joint is in ground-mounted After connection in insert into stratum, its horizontal joint is staggeredly arranged between the distribution of elevation location is all by adjacent every width wall, sees figure 8。
Strengthening solidified earth churned pile wall 14 is to use multi-shaft stirring stake diaphragm wall or equal thickness stirring wall to make, with rectangular pile Standard component 5 is composited, and the gap between rectangular pile standard component 5, by cement solidification soil filling, defines gear soil and sealing is gone along with sb. to guard him Structure, sees Fig. 7.
The vertical joint 3 of T-shaped stake 1 uses tongue and groove joggle 31, and seam is provided with sealing adhesive tape, sees Fig. 9.
The vertical joint 3 of T-shaped stake 1 uses high-pressure rotary-spray mixing pile 32 to embed connection sealing, sees Figure 10.
Seeing Figure 11, assembled abnormity piling wall is to be assembled by a square type standard component 5 and T-shaped standard component 1.
In order to improve the rigidity of enclosure wall, reduce body of wall deadweight, assembled abnormity piling wall is used T-shaped standard component 1 on an empty stomach Being assembled, vertical joint and on an empty stomach intracavity are filled into cement solidification soil, see Figure 12.
For reducing the weight of T-shaped standard component, reduce the length of its two wing, as backbar, the plan that supporting one is longer Rectangular slab 5 is assembled into the building enclosure of abnormity, sees Figure 13.
T-shaped standard component 1 and U-shaped standard component 13 are assembled into the building enclosure of abnormity, see Figure 14 and Figure 15, save work Journey material, reduces the cost of bracing engineering.
Rectangular Section Pile 5 is compounded to form foundation pit enclosure structure with circular mixing pile 14, there is the features such as construction is convenient, its Transverse section sees Figure 17;
Rectangular Section Pile 5 and uniform thickness mixing pile 14 are compounded to form foundation pit enclosure structure, its cross-sectional view, see Figure 18;
T section stake is compounded to form foundation pit enclosure structure with circular mixing pile 14, its cross-sectional view, see Figure 19;
T section stake and uniform thickness mixing pile 14 are compounded to form foundation pit enclosure structure, its cross-sectional view, see Figure 20;
Cylinder mixing pile 14 and T section stake 1 are compounded to form diaphragm wall foundation pit enclosure structure, its cross-sectional view, see Figure 21;
Uniform thickness mixing pile 14 and T section stake 1 are compounded to form diaphragm wall foundation pit enclosure structure, its transverse section, see figure 22。
The ultimate principle of the present invention, principal character and advantages of the present invention have more than been shown and described.The technology of the industry Personnel, it should be appreciated that the present invention is not restricted to the described embodiments, simply illustrating this described in above-described embodiment and description The principle of invention, the present invention also has various changes and modifications without departing from the spirit and scope of the present invention, and these become Change and improvement both falls within scope of the claimed invention.Claimed scope by appending claims and Equivalent defines.

Claims (8)

1. the foundation ditch of prestressing force assembled abnormity piling wall and a side slope building enclosure, is characterized in that, assembled abnormity piling wall is It is assembled by standard component;Standard component is to be formed by prestressed high-strength reinforced concrete and high-strength concrete prefabricated;Between standard component Jointing include horizontal joint and vertical joint;Being subject at horizontal joint advocates to use the mechanical type docked one by one between muscle Joint, joint concrete end face uses macromolecule resin glue bonding;Vertical joint is tongue and groove joggle or the height of embedded sealing adhesive tape The embedded connection of pressure rotary-spraying mixing pile.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 1 and side slope building enclosure, its feature It is that the section of assembled abnormity piling wall is T-shaped, rectangle or U-shaped.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 2 and side slope building enclosure, its feature It is that the T-shaped assembled abnormity piling wall of section is to be assembled by after real abdomen or standard component field combinations on an empty stomach, and standard component is T-shaped standard component or T-shaped standard component mix composition with square type standard component.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 2 and side slope building enclosure, its feature It is that the assembled abnormity piling wall that section takes the shape of the letter U is to be assembled by after real abdomen or standard component field combinations on an empty stomach, and standard component is T-shaped standard component mixes composition with U-shaped standard component.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 2 and side slope building enclosure, its feature It is that the rectangular assembled abnormity piling wall of section is to be assembled by after real abdomen or standard component field combinations on an empty stomach, standard component For square type standard component.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 2 and side slope building enclosure, its feature It is that the level connection joint of horizontal joint is sewn on vertical position in being dislocatedly distributed;The vertical connecting sewing of vertical joint is consistency from top to bottom Straight joint distribution.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 6 and side slope building enclosure, its feature Being to be provided with some anchoring joints that strengthens at horizontal joint, enhancing anchoring joint is that screw lock formula is mechanically connected.
The foundation ditch of a kind of prestressing force assembled abnormity piling wall the most according to claim 2 and side slope building enclosure, its feature On top that assembled abnormity piling wall exposes and side, to be embedded with connecting screw hole, connecting screw hole and Guan Liang, horizontal shore or Outer wall of basement connects.
CN201610906110.3A 2016-10-18 2016-10-18 Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall Pending CN106320322A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610906110.3A CN106320322A (en) 2016-10-18 2016-10-18 Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610906110.3A CN106320322A (en) 2016-10-18 2016-10-18 Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall

Publications (1)

Publication Number Publication Date
CN106320322A true CN106320322A (en) 2017-01-11

Family

ID=57817803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610906110.3A Pending CN106320322A (en) 2016-10-18 2016-10-18 Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall

Country Status (1)

Country Link
CN (1) CN106320322A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677162A (en) * 2017-02-13 2017-05-17 上海强劲地基工程股份有限公司 Stiff composite precast sheet pile envelope structure
CN109440782A (en) * 2018-12-17 2019-03-08 福州大学 The assembling concrete sheet pile foundation pit supporting construction and its construction method of included crown beam
WO2021109144A1 (en) * 2019-12-06 2021-06-10 邹胜斌 Modular intelligent dado cast-in-place pile and construction process therefor
CN114606930A (en) * 2022-03-29 2022-06-10 中天建设集团有限公司 Assembly type recyclable underground continuous wall and construction method thereof
CN114718051A (en) * 2022-05-06 2022-07-08 中冶集团武汉勘察研究院有限公司 Assembled pile-wall integrated structure and construction method thereof
CN114808696A (en) * 2022-05-07 2022-07-29 广西欣港交通投资有限公司 Prefabricated and cast-in-place combined anchorage foundation enclosure structure and construction method
CN114875930A (en) * 2022-05-10 2022-08-09 中铁大桥勘测设计院集团有限公司 Series arc diaphragm wall composite foundation suitable for weak stratum and construction method thereof
CN114606930B (en) * 2022-03-29 2024-04-26 中天建设集团有限公司 Assembled recyclable underground diaphragm wall and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55178040U (en) * 1979-06-05 1980-12-20
CN200946273Y (en) * 2005-09-21 2007-09-12 周兆弟 Plugging-in type pipe-connecting fastener
CN102561315A (en) * 2012-02-14 2012-07-11 云南中技管桩有限公司 Linkage precast pile type underground diaphragm wall
CN103334422A (en) * 2013-06-26 2013-10-02 中国建筑股份有限公司 Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof
CN105019472A (en) * 2015-07-14 2015-11-04 周兆弟 Composite fender pile for building basement
CN204825856U (en) * 2015-06-30 2015-12-02 国鼎(南通)管桩有限公司 Stake of prestressing force that excels in combination formula concrete wall
CN105887806A (en) * 2016-06-13 2016-08-24 上海强劲地基工程股份有限公司 Assembled type underground diaphragm wall and construction method thereof
CN206090534U (en) * 2016-10-18 2017-04-12 上海强劲地基工程股份有限公司 Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55178040U (en) * 1979-06-05 1980-12-20
CN200946273Y (en) * 2005-09-21 2007-09-12 周兆弟 Plugging-in type pipe-connecting fastener
CN102561315A (en) * 2012-02-14 2012-07-11 云南中技管桩有限公司 Linkage precast pile type underground diaphragm wall
CN103334422A (en) * 2013-06-26 2013-10-02 中国建筑股份有限公司 Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof
CN204825856U (en) * 2015-06-30 2015-12-02 国鼎(南通)管桩有限公司 Stake of prestressing force that excels in combination formula concrete wall
CN105019472A (en) * 2015-07-14 2015-11-04 周兆弟 Composite fender pile for building basement
CN105887806A (en) * 2016-06-13 2016-08-24 上海强劲地基工程股份有限公司 Assembled type underground diaphragm wall and construction method thereof
CN206090534U (en) * 2016-10-18 2017-04-12 上海强劲地基工程股份有限公司 Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曹净等: "《地下空间结构》", 28 February 2015, 中国水利水电出版社 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677162A (en) * 2017-02-13 2017-05-17 上海强劲地基工程股份有限公司 Stiff composite precast sheet pile envelope structure
CN106677162B (en) * 2017-02-13 2019-01-11 上海强劲地基工程股份有限公司 A kind of stiffness composite precast slab stake building enclosure
CN109440782A (en) * 2018-12-17 2019-03-08 福州大学 The assembling concrete sheet pile foundation pit supporting construction and its construction method of included crown beam
CN109440782B (en) * 2018-12-17 2023-12-15 福州大学 Assembled concrete slab pile foundation pit supporting structure with crown beam and construction method thereof
WO2021109144A1 (en) * 2019-12-06 2021-06-10 邹胜斌 Modular intelligent dado cast-in-place pile and construction process therefor
CN114606930A (en) * 2022-03-29 2022-06-10 中天建设集团有限公司 Assembly type recyclable underground continuous wall and construction method thereof
CN114606930B (en) * 2022-03-29 2024-04-26 中天建设集团有限公司 Assembled recyclable underground diaphragm wall and construction method thereof
CN114718051A (en) * 2022-05-06 2022-07-08 中冶集团武汉勘察研究院有限公司 Assembled pile-wall integrated structure and construction method thereof
CN114808696A (en) * 2022-05-07 2022-07-29 广西欣港交通投资有限公司 Prefabricated and cast-in-place combined anchorage foundation enclosure structure and construction method
CN114875930A (en) * 2022-05-10 2022-08-09 中铁大桥勘测设计院集团有限公司 Series arc diaphragm wall composite foundation suitable for weak stratum and construction method thereof

Similar Documents

Publication Publication Date Title
CN106320322A (en) Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall
CN105887806B (en) Assembled underground continuous wall and its construction method
CN106049506B (en) A kind of APS assembleds supporting pile structure and construction method
PH12014502301B1 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
CN106677205A (en) Fabricated special-shaped steel pipe pile combined retaining wall
KR20090094555A (en) Top-down underground construction method using prefabricated concrete column member as temporary bridge column
CN106120812A (en) A kind of assembled active well structure and construction method
EP3118374A1 (en) Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same
JP2018024982A (en) Reinforcement method and reinforcement structure of existing pile foundation
KR20140075767A (en) Retaining wall construction using site compaction and excavation
CN110130363A (en) Assembled is implanted into foundation pit enclosure stake and pile wall interaction structure and its construction method
CN109630127A (en) A kind of construction method of rich water soft stratum ultra-deep shield vertical shaft
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN107338804A (en) A kind of hollow independent composite pile foundation of super-large diameter and its method of construction
CN109972630A (en) A kind of foundation pit enclosure structure and its construction method of the assembly of PC component
CN107012871A (en) A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation ditch fabricated construction
US20020071725A1 (en) Earth support and permanent structural foundation wall
CN205776157U (en) Assembled underground continuous wall
CN107620316A (en) A kind of rocky bed large volume deepwater foundation construction method
CN206090534U (en) Foundation ditch and side slope envelope of prestressing force assembled dysmorphism stake wall
JP2007211408A (en) Seismic strengthening construction method for existing concrete bridge pier
CN106149745A (en) A kind of truss type steel tube grouting pile basis and construction method thereof
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN205917713U (en) Truss -like steel pipe slip casting pile foundation
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170111