A kind of chain preformed pile diaphragm wall
Technical field
The present invention relates to a kind of industry and civilian construction prefabricated component, particularly a kind of underground space ground support system.
Background technology
Along with the development of China's construction, the underground space utilization that is used for underground traffic, commerce and garage more and more obtains the attention of governments at all levels.In recent years, underground space excavation supporting skill wood is used in a large amount of engineerings.Traditional diaphragm wall supporting and protection structure form reasonable stress, but exist construction technology complicated, mud contamination is serious, and is long in time limit, defectives such as cost height, thereby it is alternative progressively to be poured a supporting and protection structure form in recent years.Relative diaphragm wall, castinplace pile supporting and protection structure has littler pollution, more casual labourer's phase and more advantage such as low cost.But for level was stressed, circular filling pile structure reasonable stress property can not show a candle to the rectangle continuous underground wall structure.
Summary of the invention
The object of the invention is intended to overcome present underground space excavation supporting and protection structure The Application of Technology defective commonly used; A kind of more low-carbon environment-friendly is provided; Casual labourer's phase more, low cost more, the chain preformed pile diaphragm wall of stay-in-grade underground space excavation supporting form of structure.
Chain according to the invention precast diaphragm walls, pile body by a chain, connecting plate and sealing material for the sink and cementitious composition, the pile is made of concrete, prestressed steel bars or steel strand, hoop Zhu, reinforced , the connecting plate, the main Zhu rivet holes, a hollow tank for precast concrete rectangular body, the two end faces of the pile of plates is connected, any two of the pile on the side wall corresponding to the stop concave tank , only the length of the water tank is smaller than four-fifths of the length of the pile body, two side walls corresponding to the shape of the tank for the same size, a single instance of two adjacent bodies coincide with each other to form a tank for sealing holes in the stop water hole is filled with cementitious sealing materials, reinforcement rivet holes on the plate, reinforcement plate rivet holes through the body of the pile reinforcement connections.
The described cavity that the chain stake of single individuality forms through the water stopping trough on the pile body more than at least two is filled the whole diaphragm wall of the chain formation of gelling sealing material in the cavity.
Water stopping trough on the described chain stake pile body is shaped as a kind of of shape after zhou duicheng tuxing is cut apart along axis of symmetry in the regular polygon.
Water stopping trough on the described chain stake pile body is shaped as semicircle, triangle, a kind of in square, trapezoidal.
Described water stopping trough is to be arranged parallel to each other more than two and with the vertical knuckle line of pile body, and its length is the 2/5-4/5 of pile body length.
Described reinforcing bar is a nonprestressed reinforcement.
The prestressed steel bars or strands alone as the pile reinforcement; or prestressed steel bars or non-prestressed steel strand with a pile main Zhu, mix with each other.
The prestressed steel bars or strands with non-prestressed reinforcement as the primary Zhu pile mixed with each other, the non-prestressed reinforcement is not greater than the length of the pile length.
The prestressed steel bars or strands with non-prestressed reinforcement as the primary Zhu pile mixed with each other, the non-prestressed reinforcement directly fixed to the plate, or fixed on the prestressed steel bars or strand, or on Shiguzhushang.
After the prefabricated pile body of chain preformed pile diaphragm wall of the present invention passes through the centrifugation moulding by materials such as concrete, main muscle, junction plates; The cuboid of the hollow that forms through high pressure or atmospheric steam curing again; Two ends at pile body are provided with junction plate, and junction plate is connected with main muscle through main muscle rivet hole, and water stopping trough is positioned on two lateral walls of the correspondence outside the preformed pile pile body; Its shape is identical; Equal and opposite in direction is the shape after zhou duicheng tuxing is cut apart along axis of symmetry, and the water stopping trough of two side is indent.In work progress, adjacent two preformed piles are implanted projected depth with construction machinery by designing requirement under the effect of guiding device, the water stopping trough on the adjacent in twos preformed pile sidewall unites two into one and forms the sealing hole; In this hole, inject the gelling sealing material; In the injection hole also can be mortar, cement paste or other ends the gelling sealing material, after the sclerosis of gelling sealing material is solidified, its gelling property with preformed pile with the cementation method integral body of chain one-tenth that bonds; Form diaphragm wall; This not only can realize keeping off soil simultaneously and sealing is once accomplished, and the more important thing is that under the effect of gelling sealing material, adjacent in twos pile body is bonded in together; Make through the ground collar tie beam that the preformed pile of single individuality is chain to have formed complete diaphragm wall, reach the effect of water-stop curtain.The present invention uses the centrifugal molding process batch production to produce, and can use high-strength concrete and high tensile reinforcement, meets the industrial policy of China, and more common precast concrete has more high-bearing capacity, and effects of energy conservation and environmental protection is obvious.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 is an end face transversary sketch map of the present invention.
Among the figure, 1-preformed pile, 2-junction plate, 3-master's muscle rivet hole, 4-master's muscle, 5-gelling sealing material, 6-concrete, 7-water stopping trough.
The specific embodiment
Below in conjunction with accompanying drawing further explanation is newly done in this practicality, but be not limited to embodiment.
Embodiment 1
Chain preformed pile diaphragm wall of the present invention is made up of pile body 1, water stopping trough 7, gelling sealing material 5.Fluid concrete 6 is after centrifugal forming, vibration moulding or alternate manner moulding adopt stream curing or natural curing to prepare the preformed pile of single individuality.Pile body 1 is the concrete prefabricated cuboid of hollow; On two end faces of pile body 1, be connected with junction plate 2; On any two corresponding lateral walls of pile body, water stopping trough 7 is arranged; The length of water stopping trough 7 is the 2/5-4/5 of pile body 1 length, water stopping trough 7 shapes on the two corresponding sidewalls, big or small identical, and water stopping trough is an indent; Water stopping trough 7 be shaped as a kind of of shape after zhou duicheng tuxing is cut apart along axis of symmetry in semicircle, triangle, square, trapezoidal or other regular polygon, water stopping trough 7 is to be arranged parallel to each other more than two and with the vertical knuckle line of pile body.In water stopping trough 7, be marked with gelling sealing material 5.Main muscle rivet hole 3 is arranged on junction plate 2, and junction plate 2 is connected with main muscle 4 through main muscle rivet hole 3, and main muscle 4 also can be steel strand, or junction plate 2 directly is connected with nonprestressed reinforcement.In prestressed steel bars or strands with non-prestressed reinforcement at the same time as the main Zhu, non-prestressed reinforcement can also be fixed on the prestressed steel bars or strands, this will help improve the pile bending flexural capacity moments.
In work progress; Adjacent two preformed piles are implanted projected depth with construction machinery by designing requirement under the effect of guiding device; Water stopping trough on the adjacent in twos preformed pile sidewall unites two into one and forms the sealing hole; In this hole, inject the gelling sealing material, can be mortar, cement paste or other ends the gelling sealing material.Because the length of water stopping trough is the 2/5-4/5 of pile body length, in planting a process, can effectively stop the soil body to pour in water stopping trough,, also can sealing material be strapped in the ideal range, to improve its utilization rate when when in water stopping trough, injecting sealing material.After 5 sclerosis of gelling sealing material are solidified; Its gelling property with the cementation method integral body of chain one-tenth that bonds, forms diaphragm wall with preformed pile, and this can realize simultaneously that not only retaining soil and sealing once accomplish; The more important thing is under the effect of gelling sealing material; Adjacent in twos pile body is bonded in together, makes that the preformed pile of single individuality is chain to have formed complete diaphragm wall, reaches the effect of water-stop curtain.The present invention uses the centrifugal molding process batch production to produce, and can use high-strength concrete and high tensile reinforcement, meets the industrial policy of China, and more common precast concrete pile has more high-bearing capacity, and effects of energy conservation and environmental protection is obvious.