CN202482889U - Underground diaphragm wall of interlocked prefabricated pile - Google Patents

Underground diaphragm wall of interlocked prefabricated pile Download PDF

Info

Publication number
CN202482889U
CN202482889U CN2012200470484U CN201220047048U CN202482889U CN 202482889 U CN202482889 U CN 202482889U CN 2012200470484 U CN2012200470484 U CN 2012200470484U CN 201220047048 U CN201220047048 U CN 201220047048U CN 202482889 U CN202482889 U CN 202482889U
Authority
CN
China
Prior art keywords
pile
waterstop
chain
tanks
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2012200470484U
Other languages
Chinese (zh)
Inventor
黄强
颜小荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN ZHONGJI PIPE CO Ltd
China Academy of Building Research CABR
Original Assignee
YUNNAN ZHONGJI PIPE CO Ltd
China Academy of Building Research CABR
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN ZHONGJI PIPE CO Ltd, China Academy of Building Research CABR filed Critical YUNNAN ZHONGJI PIPE CO Ltd
Priority to CN2012200470484U priority Critical patent/CN202482889U/en
Application granted granted Critical
Publication of CN202482889U publication Critical patent/CN202482889U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Abstract

The utility model discloses an underground diaphragm wall of an interlocked prefabricated pile, which relates to an industrial and civil building prefabricated member, and in particular relates to an underground space rock-soil supporting system. The underground diaphragm wall is composed of more than two pile bodies, connecting plates, waterstop tanks and waterstop cementing materials, wherein the pile bodies are hollow concrete prefabricated rectangles composed of concrete, prestressed steel bars or steel strands, tie bars, steel bars, the connecting plates, main bar riveting holes and the waterstop tanks; the connecting plates are connected on two end surfaces of the pile bodies; any two opposite side walls of the pile bodies are provided with the concave waterstop tanks; every two adjacent waterstop tanks are opposite in positions; the length of each waterstop tank is 2/5-4/5 of that of each pile body; and the waterstop tanks in the two opposite side walls have same shapes and same sizes; the waterstop tanks in every two adjacent pile bodies are opposite in position; the opposite waterstop tanks are filled with the waterstop cementing materials; and the connecting plate is provided with the main bar riveting holes and connected with main bars in the pile bodies through the main bar riveting holes. Compared with the common prefabricated concrete, the underground diaphragm wall is relatively high in bearing capacity and relatively remarkable in energy-conversation and environment-friendly effects.

Description

A kind of chain preformed pile diaphragm wall
Technical field
The utility model relates to a kind of industry and civilian construction prefabricated component, particularly a kind of underground space ground support system.
Background technology
Along with the development of China's construction, the underground space utilization that is used for underground traffic, commerce and garage more and more obtains the attention of governments at all levels.In recent years, underground space excavation supporting skill wood is used in a large amount of engineerings.Traditional diaphragm wall supporting and protection structure form reasonable stress, but exist construction technology complicated, mud contamination is serious, and is long in time limit, defectives such as cost height, thereby it is alternative progressively to be poured a supporting and protection structure form in recent years.Relative diaphragm wall, castinplace pile supporting and protection structure has littler pollution, more casual labourer's phase and more advantage such as low cost.But for level was stressed, circular filling pile structure reasonable stress property can not show a candle to the rectangle continuous underground wall structure.
Summary of the invention
The purpose of the utility model is intended to overcome present underground space excavation supporting and protection structure The Application of Technology defective commonly used; A kind of more low-carbon environment-friendly is provided; Casual labourer's phase more, low cost more, the chain preformed pile diaphragm wall of stay-in-grade underground space excavation supporting form of structure.
The chain of the utility model precast diaphragm walls, pile body by a chain, connecting plate and sealing material for the sink and cementitious composition, the pile is made of concrete, prestressed steel bars or steel strand, hoop Zhu, steel, plate, main Zhu rivet holes, a hollow tank for precast concrete rectangular body, the two end faces of the pile of plates is connected, any two of the pile on the side wall corresponding to the stop concave sink, only the length of the tank is less than four-fifths of the length of the pile body, two side walls corresponding to the shape of the tank for the same size, a single instance of two adjacent bodies coincide with each other to form a tank for sealing holes in the sealing holes filled with cementitious sealing materials, reinforcement rivet holes on the plate, reinforcement plate rivet holes through the body of the pile reinforcement connections.
The described cavity that the chain stake of single individuality forms through the water stopping trough on the pile body more than at least two is filled the whole diaphragm wall of the chain formation of gelling sealing material in the cavity.
Water stopping trough on the described chain stake pile body is shaped as a kind of of shape after zhou duicheng tuxing is cut apart along axis of symmetry in the regular polygon.
Water stopping trough on the described chain stake pile body is shaped as semicircle, triangle, a kind of in square, trapezoidal.
Described water stopping trough is to be arranged parallel to each other more than two and with the vertical knuckle line of pile body, and its length is the 2/5-4/5 of pile body length.
Described reinforcing bar is a nonprestressed reinforcement.
The prestressed steel bars or strands alone as the pile reinforcement; or prestressed steel bars or non-prestressed steel strand with a pile main Zhu, mix with each other.
The prestressed steel bars or strands with non-prestressed reinforcement as the primary Zhu pile mixed with each other, the non-prestressed reinforcement is not greater than the length of the pile length.
The prestressed steel bars or strands with non-prestressed reinforcement as the primary Zhu pile mixed with each other, the non-prestressed reinforcement directly fixed to the plate, or fixed on the prestressed steel bars or strand, or on Shiguzhushang.
After the prefabricated pile body of the described chain preformed pile diaphragm wall of the utility model passes through the centrifugation moulding by materials such as concrete, main muscle, junction plates; The cuboid of the hollow that forms through high pressure or atmospheric steam curing again; Two ends at pile body are provided with junction plate, and junction plate is connected with main muscle through main muscle rivet hole, and water stopping trough is positioned on two lateral walls of the correspondence outside the preformed pile pile body; Its shape is identical; Equal and opposite in direction is the shape after zhou duicheng tuxing is cut apart along axis of symmetry, and the water stopping trough of two side is indent.In work progress, adjacent two preformed piles are implanted projected depth with construction machinery by designing requirement under the effect of guiding device, the water stopping trough on the adjacent in twos preformed pile sidewall unites two into one and forms the sealing hole; In this hole, inject the gelling sealing material; In the injection hole also can be mortar, cement paste or other ends the gelling sealing material, after the sclerosis of gelling sealing material is solidified, its gelling property with preformed pile with the cementation method integral body of chain one-tenth that bonds; Form diaphragm wall; This not only can realize keeping off soil simultaneously and sealing is once accomplished, and the more important thing is that under the effect of gelling sealing material, adjacent in twos pile body is bonded in together; Make through the ground collar tie beam that the preformed pile of single individuality is chain to have formed complete diaphragm wall, reach the effect of water-stop curtain.The utility model is to use the centrifugal molding process batch production to produce, and can use high-strength concrete and high tensile reinforcement, meets the industrial policy of China, and more common precast concrete has more high-bearing capacity, and effects of energy conservation and environmental protection is obvious.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the utility model end face transversary sketch map.
Among the figure, 1-preformed pile, 2-junction plate, 3-master's muscle rivet hole, 4-master's muscle, 5-gelling sealing material, 6-concrete, 7-water stopping trough.
The specific embodiment
Below in conjunction with accompanying drawing further explanation is newly done in this practicality, but be not limited to embodiment.
Embodiment 1
The described chain preformed pile diaphragm wall of the utility model is made up of pile body 1, water stopping trough 7, gelling sealing material 5.Fluid concrete 6 is after centrifugal forming, vibration moulding or alternate manner moulding adopt stream curing or natural curing to prepare the preformed pile of single individuality.Pile body 1 is the concrete prefabricated cuboid of hollow; On two end faces of pile body 1, be connected with junction plate 2; On any two corresponding lateral walls of pile body, water stopping trough 7 is arranged; The length of water stopping trough 7 is the 2/5-4/5 of pile body 1 length, water stopping trough 7 shapes on the two corresponding sidewalls, big or small identical, and water stopping trough is an indent; Water stopping trough 7 be shaped as a kind of of shape after zhou duicheng tuxing is cut apart along axis of symmetry in semicircle, triangle, square, trapezoidal or other regular polygon, water stopping trough 7 is to be arranged parallel to each other more than two and with the vertical knuckle line of pile body.In water stopping trough 7, be marked with gelling sealing material 5.Main muscle rivet hole 3 is arranged on junction plate 2, and junction plate 2 is connected with main muscle 4 through main muscle rivet hole 3, and main muscle 4 also can be steel strand, or junction plate 2 directly is connected with nonprestressed reinforcement.In prestressed steel bars or strands with non-prestressed reinforcement at the same time as the main Zhu, non-prestressed reinforcement can also be fixed on the prestressed steel bars or strands, this will help improve the pile bending flexural capacity moments.
In work progress; Adjacent two preformed piles are implanted projected depth with construction machinery by designing requirement under the effect of guiding device; Water stopping trough on the adjacent in twos preformed pile sidewall unites two into one and forms the sealing hole; In this hole, inject the gelling sealing material, can be mortar, cement paste or other ends the gelling sealing material.Because the length of water stopping trough is the 2/5-4/5 of pile body length, in planting a process, can effectively stop the soil body to pour in water stopping trough,, also can sealing material be strapped in the ideal range, to improve its utilization rate when when in water stopping trough, injecting sealing material.After 5 sclerosis of gelling sealing material are solidified; Its gelling property with the cementation method integral body of chain one-tenth that bonds, forms diaphragm wall with preformed pile, and this can realize simultaneously that not only retaining soil and sealing once accomplish; The more important thing is under the effect of gelling sealing material; Adjacent in twos pile body is bonded in together, makes that the preformed pile of single individuality is chain to have formed complete diaphragm wall, reaches the effect of water-stop curtain.The utility model is to use the centrifugal molding process batch production to produce, and can use high-strength concrete and high tensile reinforcement, meets the industrial policy of China, and more common precast concrete pile has more high-bearing capacity, and effects of energy conservation and environmental protection is obvious.

Claims (7)

1 A chain of underground continuous wall precast pile by pile, plate and sealing material for the sink and cementitious composition, the pile is made of concrete, prestressed steel bars or steel strand, hoop Zhu, rebar, plate main Zhu rivet holes, a hollow tank for precast concrete rectangular body, the body of the pile are connected to both end faces of plate, characterized in that two or more of the pile, the pile body corresponding to any two only on the concave side tank, the water tank for the length of the pile length 2/5-4/5, two side walls corresponding to the shape of the tank for the same size, the two adjacent sink for the pile position Correspondingly, the corresponding sealing sealing groove filled with cementitious material, the reinforcement plate on the rivet holes through the reinforcement plate body of the rivet hole and the pile reinforcement connection.
2. chain preformed pile diaphragm wall according to claim 1 is characterized in that, the cavity that plural at least pile body forms through the water stopping trough on the pile body is filled the whole diaphragm wall of the chain formation of gelling sealing material in the cavity.
3. chain preformed pile diaphragm wall according to claim 1 is characterized in that, described water stopping trough is to be arranged parallel to each other more than one and with the vertical knuckle line of pile body, and its length is less than 4/5ths of pile body length.
4. chain preformed pile diaphragm wall according to claim 1 is characterized in that, the water stopping trough on the described pile body is shaped as a kind of of shape after zhou duicheng tuxing is cut apart along axis of symmetry in the regular polygon.
5 according to claim 1, wherein the chain precast underground continuous wall, wherein the prestressing steel bars or strands alone as the pile reinforcement; or prestressed steel bars or strands with non-prestressed reinforcement as the pile Dominant Zhu, mixed with each other.
6 according to claim 5, wherein the chain precast underground continuous wall, wherein the prestressing steel bars or strands with non-prestressed reinforcement as the primary Zhu pile mixed with each other when used in non-prestressed reinforcement length greater than the length of the pile.
7 according to claim 5, wherein the chain precast underground continuous wall, wherein the prestressing steel bars or strands with non-prestressed reinforcement as the primary Zhu pile mixed with each other, the non-prestressed reinforcement fixed directly plate, or fixed on the prestressed steel bars or strands, or on the hoop Zhu.
CN2012200470484U 2012-02-14 2012-02-14 Underground diaphragm wall of interlocked prefabricated pile Withdrawn - After Issue CN202482889U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200470484U CN202482889U (en) 2012-02-14 2012-02-14 Underground diaphragm wall of interlocked prefabricated pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200470484U CN202482889U (en) 2012-02-14 2012-02-14 Underground diaphragm wall of interlocked prefabricated pile

Publications (1)

Publication Number Publication Date
CN202482889U true CN202482889U (en) 2012-10-10

Family

ID=46957319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200470484U Withdrawn - After Issue CN202482889U (en) 2012-02-14 2012-02-14 Underground diaphragm wall of interlocked prefabricated pile

Country Status (1)

Country Link
CN (1) CN202482889U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561315A (en) * 2012-02-14 2012-07-11 云南中技管桩有限公司 Linkage precast pile type underground diaphragm wall
CN103835283A (en) * 2014-03-25 2014-06-04 东南大学 All-wet-joint precast prestressed underground continuous wall and construction method thereof
CN105369799A (en) * 2015-11-12 2016-03-02 天津建城基业集团有限公司 Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall
CN106088081A (en) * 2016-07-25 2016-11-09 天津建城基业集团有限公司 A kind of pretensioned prestressing centrifugal forming high-strength concrete prefabricated hollow I shape support pile
CN107938653A (en) * 2017-12-23 2018-04-20 天津建城基业集团有限公司 A kind of chain piling wall slip casting brush wall device of chain concrete

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561315A (en) * 2012-02-14 2012-07-11 云南中技管桩有限公司 Linkage precast pile type underground diaphragm wall
CN102561315B (en) * 2012-02-14 2014-12-24 云南中技管桩有限公司 Linkage precast pile type underground diaphragm wall
CN103835283A (en) * 2014-03-25 2014-06-04 东南大学 All-wet-joint precast prestressed underground continuous wall and construction method thereof
CN103835283B (en) * 2014-03-25 2015-11-11 东南大学 Full wet joint prefabricated prestressed underground continuous wall and construction method thereof
CN105369799A (en) * 2015-11-12 2016-03-02 天津建城基业集团有限公司 Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall
CN106088081A (en) * 2016-07-25 2016-11-09 天津建城基业集团有限公司 A kind of pretensioned prestressing centrifugal forming high-strength concrete prefabricated hollow I shape support pile
CN107938653A (en) * 2017-12-23 2018-04-20 天津建城基业集团有限公司 A kind of chain piling wall slip casting brush wall device of chain concrete

Similar Documents

Publication Publication Date Title
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN101787710B (en) Integrally-assembled buttressed retaining wall and construction method thereof
CN107100290A (en) A kind of prefabricated shear wall and overlapping plate node
CN105926803B (en) A kind of 3D printing reinforced masonry shear wall structure with concave convex texture
CN202482889U (en) Underground diaphragm wall of interlocked prefabricated pile
CN107338801B (en) Prestressing force assembled Complex retaining wall structure and construction method
CN206737118U (en) A kind of prefabricated regeneration concrete bean column node of reinforcement
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN105369799A (en) Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall
CN104328790B (en) Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed
CN102561315B (en) Linkage precast pile type underground diaphragm wall
CN207419509U (en) Prestressing force assembled Complex retaining wall structure
CN204174614U (en) Flap shape pretensioning prestressed concrete pile
CN107178081A (en) A kind of prestressing force post jacking variable cross-section hollow shell pill and its construction method
CN206873665U (en) A kind of prefabricated shear wall and overlapping plate node
CN202416897U (en) Shock-proof reinforcing steel ring beam for masonry house
CN102561360B (en) Deep foundation pit supporting method
CN203668926U (en) Foundation for tapered concrete piles
CN209429115U (en) A kind of CFG pile composite foundation structure
CN112211184A (en) Building tubular pile with built-in reinforcing ribs
CN208328970U (en) A kind of environmentally friendly connection structure of precast concrete foundation and steel-pipe pile
CN202925541U (en) Concrete wall body pile and protection wall
CN207193953U (en) A kind of reinforced concrete tubular pile of outer rim
CN204571090U (en) The one formula of building by laying bricks or stones is exempted to tear type concrete collar tie beam template open
CN109235444A (en) A kind of prismatic prestressing force support pile, piling wall and its construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20121010

Effective date of abandoning: 20141224

RGAV Abandon patent right to avoid regrant