CN102561315B - Linkage precast pile type underground diaphragm wall - Google Patents

Linkage precast pile type underground diaphragm wall Download PDF

Info

Publication number
CN102561315B
CN102561315B CN201210032567.8A CN201210032567A CN102561315B CN 102561315 B CN102561315 B CN 102561315B CN 201210032567 A CN201210032567 A CN 201210032567A CN 102561315 B CN102561315 B CN 102561315B
Authority
CN
China
Prior art keywords
pile body
pile
zhu
water stopping
diaphragm wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210032567.8A
Other languages
Chinese (zh)
Other versions
CN102561315A (en
Inventor
黄强
颜小荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy Of Building Sciences
Guangdong Sanhe Pile Co Ltd
Original Assignee
YUNNAN ZHONGJI PIPE CO Ltd
China Academy of Building Research CABR
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN ZHONGJI PIPE CO Ltd, China Academy of Building Research CABR filed Critical YUNNAN ZHONGJI PIPE CO Ltd
Priority to CN201210032567.8A priority Critical patent/CN102561315B/en
Publication of CN102561315A publication Critical patent/CN102561315A/en
Application granted granted Critical
Publication of CN102561315B publication Critical patent/CN102561315B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

A linkage precast pile type underground diaphragm wall relates to an industrial and civil building precast part, and particularly relates to an underground spatial geotechnical supporting system. The linkage precast pile type diaphragm wall comprises more than two piles, connecting plates, water retaining grooves and water retaining gel materials. Each pile is a hollow concrete precast rectangular pile formed by concrete, prestress steel bars or steel strands, hoop ribs, rebar, the connecting plates, main rib rivet holes and the water retaining grooves. The connecting plates are connected to two end faces of each pile, any two opposite lateral walls of each pile are provided with the inwardly-concave water retaining grooves, the length of each water retaining groove is 2/5-4/5 of that of each pile, the water retaining grooves on each two opposite lateral walls are identical in shape and size, the water retaining grooves of each two adjacent piles are opposite in position and filled with the water retaining gel materials. The connecting plates are provided with the main rib rivet holes and connected with main ribs in the piles through the main rib rivet holes. The linkage precast pile type underground diaphragm wall compared with normal precast concrete has higher bearing capacity and more evident energy saving and environment protection effects.

Description

A kind of linkage precast pile type underground diaphragm wall
Technical field
The present invention relates to a kind of industry and civilian construction prefabricated component, particularly a kind of underground space ground support system.
Background technology
Along with the development of China's construction, the underground space for underground traffic, business and garage utilizes the attention more and more obtaining governments at all levels.In recent years, Underground Space Excavation supporting skill wood is applied in a large amount of engineering.Traditional Diaphragm Wall Support Structure form reasonable stress, but there is complicated construction technique, mud contamination is serious, long in time limit, high cost defect, is thus in recent years progressively poured a supporting and protection structure form and substitutes.Relative diaphragm wall, castinplace pile supporting and protection structure has less pollution, more casual labourer's phase and the more advantage such as low cost.But for horizontal force, circular irrigation pilework receive strength rationality can not show a candle to rectangle continuous underground wall structure.
Summary of the invention
Object of the present invention is intended to the applied defect overcoming the supporting and protection structure technology that current Underground Space Excavation is commonly used, one more low-carbon environment-friendly is provided, more casual labourer's phase, more low cost, the linkage precast pile type underground diaphragm wall of stay-in-grade Underground Space Excavation supporting and protection structure form.
Linkage precast pile type underground diaphragm wall of the present invention, by chain stake pile body, junction plate and water stopping trough and gelling sealing material are formed, pile body is by concrete, prestressed steel bar or steel strand, Gu Zhu, reinforcing bar, junction plate, Zhu Zhu rivet hole, the hollow concrete prefabricated rectangle body that water stopping trough is formed, two end faces of pile body are connected with junction plate, any two corresponding sidewalls of pile body have the water stopping trough of indent, the length of water stopping trough is less than 4/5ths of pile body length, water stopping trough shape on two corresponding sidewalls, size is identical, the two pile body water stopping troughs identical rear formation sealing hole mutually of adjacent single individuality, gelling sealing material is filled with in sealing hole, junction plate has main muscle rivet hole, junction plate is connected with the main muscle in pile body by main muscle rivet hole.
The chain stake of the described single individuality of at least two or more, by the cavity of the water stopping trough formation on pile body, fills the overall diaphragm wall of the chain formation of gelling sealing material in cavity.
Water stopping trough shape on described chain stake pile body is the one of regular polygon formed symmetrical figure along the shape after axis of symmetry segmentation.
Water stopping trough shape on described chain stake pile body be semicircle, triangle, square, trapezoidal in one.
Described water stopping trough is more than two and is arranged parallel to each other with the longitudinal knuckle line of pile body, and its length is the 2/5-4/5 of pile body length.
Described reinforcing bar is nonprestressed reinforcement.
Described prestressed steel bar or steel strand are separately as the main muscle of pile body; Or prestressed steel bar or steel strand and nonprestressed reinforcement are as pile body Zhu Zhu, used in combination mutually.
Described prestressed steel bar or steel strand and nonprestressed reinforcement as pile body Zhu Zhu mutual used in combination time, the length of nonprestressed reinforcement is not more than pile body length.
Described prestressed steel bar or steel strand and nonprestressed reinforcement as pile body Zhu Zhu mutual used in combination time, nonprestressed reinforcement is directly fixed on junction plate, or is fixed on prestressed steel bar or steel strand, or on Gu Zhu.
After the prefabricated pile body of linkage precast pile type underground diaphragm wall of the present invention is shaping by centrifugation by materials such as concrete, main muscle, junction plates, again through the cuboid of the hollow of high pressure or atmospheric steam curing, junction plate is provided with at the two ends of pile body, junction plate is connected with main muscle by main muscle rivet hole, water stopping trough is positioned on two lateral walls of the correspondence outside preformed pile pile body, its shape is identical, equal and opposite in direction, be zhou duicheng tuxing along the shape after axis of symmetry segmentation, the water stopping trough of two side is indent.In work progress, adjacent two preformed piles are implanted projected depth with construction machinery by designing requirement under the effect of guiding device, water stopping trough on preformed pile sidewall adjacent between two unites two into one and forms sealing hole, gelling sealing material is injected in this hole, also mortar is can be in injection hole, cement paste or other only gelling sealing material, after the sclerosis of gelling sealing material is solidified, preformed pile to bond chain one-tenth entirety with cementation method by its gelling property, form diaphragm wall, this not only can realize gear soil simultaneously and sealing once completes, the more important thing is under the effect of gelling sealing material, pile body adjacent is between two bonded together, made by ground collar tie beam that the preformed pile of single individuality is chain defines complete diaphragm wall, reach effect of water-stop curtain.The present invention is application centrifugal molding process factorial praluction, and can apply high-strength concrete and high tensile reinforcement, meet the industrial policy of China, more common precast concrete has more high-bearing capacity, and effects of energy conservation and environmental protection is obvious.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is end face transversary schematic diagram of the present invention.
In figure, 1-preformed pile, 2-junction plate, the main muscle rivet hole of 3-, the main muscle of 4-, 5-gelling sealing material, 6-concrete, 7-water stopping trough.
Detailed description of the invention
Below in conjunction with accompanying drawing, this practicality is newly described further, but is not limited to embodiment.
Embodiment 1
Linkage precast pile type underground diaphragm wall of the present invention is made up of pile body 1, water stopping trough 7, gelling sealing material 5.Shaping through centrifugal forming, vibration moulding or alternate manner after fluid concrete 6, adopt stream curing or natural curing to prepare the preformed pile of single individuality.Pile body 1 is the concrete prefabricated cuboid of hollow, two end faces of pile body 1 are connected with junction plate 2, any two corresponding lateral walls of pile body there is water stopping trough 7, the length of water stopping trough 7 is the 2/5-4/5 of pile body 1 length, water stopping trough 7 shape on two corresponding sidewalls, size are identical, water stopping trough is indent, the shape of water stopping trough 7 be semicircle, triangle, square, trapezoidal or other regular polygon formed symmetrical figure along the one of the shape after axis of symmetry segmentation, water stopping trough 7 is more than two and is arranged parallel to each other with pile body longitudinal direction knuckle line.Gelling sealing material 5 is marked with in water stopping trough 7.Junction plate 2 has main muscle rivet hole 3, and junction plate 2 is connected with main muscle 4 by main muscle rivet hole 3, and main muscle 4 also can be steel strand, or junction plate 2 is directly connected with nonprestressed reinforcement.When prestressed steel bar or steel strand and nonprestressed reinforcement are simultaneously as Zhu Zhu, also nonprestressed reinforcement can be fixed on prestressed steel bar or steel strand, be conducive to improving pile body cross section anti-bending bearing capacity moment of flexure.
In work progress, adjacent two preformed piles are implanted projected depth with construction machinery by designing requirement under the effect of guiding device, water stopping trough on preformed pile sidewall adjacent between two unites two into one and forms sealing hole, in this hole, inject gelling sealing material, can be mortar, cement paste or other only gelling sealing material.Length due to water stopping trough is the 2/5-4/5 of pile body length, planting in a process and can effectively stoping the soil body to pour in water stopping trough, when when injecting sealing material in water stopping trough, also can be strapped in ideal range by sealing material, to improve its utilization rate.After gelling sealing material 5 sclerosis is solidified, preformed pile to bond chain one-tenth entirety with cementation method by its gelling property, form diaphragm wall, this not only can realize gear soil simultaneously and sealing once completes, the more important thing is under the effect of gelling sealing material, pile body adjacent is between two bonded together, and makes that the preformed pile of single individuality is chain defines complete diaphragm wall, reaches effect of water-stop curtain.The present invention is application centrifugal molding process factorial praluction, and can apply high-strength concrete and high tensile reinforcement, meet the industrial policy of China, more common precast concrete pile has more high-bearing capacity, and effects of energy conservation and environmental protection is obvious.

Claims (3)

1. a linkage precast pile type underground diaphragm wall, by pile body, junction plate and water stopping trough and gelling sealing material are formed, pile body is by concrete, prestressed steel bar or steel strand, Gu Zhu, reinforcing bar, junction plate, Zhu Zhu rivet hole, the concrete prefabricated cuboid of the hollow that water stopping trough is formed, two end faces of pile body are connected with junction plate, it is characterized in that, pile body is more than two, any two corresponding sidewalls of pile body have the water stopping trough of indent, the length of water stopping trough is the 2/5-4/5 of pile body length, water stopping trough shape on two corresponding sidewalls, size is identical, two adjacent pile body water stopping trough positions are corresponding, gelling sealing material is filled with in corresponding water stopping trough, junction plate has main muscle rivet hole, junction plate is connected with the main muscle in pile body by main muscle rivet hole, described prestressed steel bar or steel strand are separately as the main muscle of pile body, or prestressed steel bar or steel strand and nonprestressed reinforcement are as pile body Zhu Zhu, used in combination mutually, prestressed steel bar or steel strand and nonprestressed reinforcement as pile body Zhu Zhu mutual used in combination time, the length of nonprestressed reinforcement is not more than pile body length.
2. linkage precast pile type underground diaphragm wall according to claim 1, is characterized in that, the cavity that at least plural pile body is formed by the water stopping trough on pile body, fills the overall diaphragm wall of the chain formation of gelling sealing material in cavity.
3. linkage precast pile type underground diaphragm wall according to claim 1, it is characterized in that, prestressed steel bar or steel strand and nonprestressed reinforcement as pile body Zhu Zhu mutual used in combination time, nonprestressed reinforcement is directly fixed on junction plate, or be fixed on prestressed steel bar or steel strand, or on Gu Zhu.
CN201210032567.8A 2012-02-14 2012-02-14 Linkage precast pile type underground diaphragm wall Active CN102561315B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210032567.8A CN102561315B (en) 2012-02-14 2012-02-14 Linkage precast pile type underground diaphragm wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210032567.8A CN102561315B (en) 2012-02-14 2012-02-14 Linkage precast pile type underground diaphragm wall

Publications (2)

Publication Number Publication Date
CN102561315A CN102561315A (en) 2012-07-11
CN102561315B true CN102561315B (en) 2014-12-24

Family

ID=46407796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210032567.8A Active CN102561315B (en) 2012-02-14 2012-02-14 Linkage precast pile type underground diaphragm wall

Country Status (1)

Country Link
CN (1) CN102561315B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088081A (en) * 2016-07-25 2016-11-09 天津建城基业集团有限公司 A kind of pretensioned prestressing centrifugal forming high-strength concrete prefabricated hollow I shape support pile
CN106320322A (en) * 2016-10-18 2017-01-11 上海强劲地基工程股份有限公司 Foundation pit and side slope envelope enclosure for prestress fabricated special-shaped pile wall
CN115387323A (en) * 2022-08-12 2022-11-25 上海建工二建集团有限公司 Assembled underground continuous wall connecting joint and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4304507A (en) * 1979-10-15 1981-12-08 Hiroichi Sato Method for producing a continuous wall
US4909674A (en) * 1987-05-28 1990-03-20 Kajima Corporation Underground continuous impervious wall and method for installing same
FR2816647B1 (en) * 2000-11-15 2003-01-17 Gtm Construction FACING FOR REINFORCED LAND WORK
CN2782762Y (en) * 2005-01-31 2006-05-24 黄强 Prestressed concrete hollow square section pile and tip of same
CN2876180Y (en) * 2005-12-05 2007-03-07 颜小荣 Normal polygon prestressed hollow pile end plate
CN101200900A (en) * 2007-12-17 2008-06-18 颜小荣 Construction method of water-stopping combined continuous wall prefabricated by centrifugal process
CN201155109Y (en) * 2007-12-07 2008-11-26 颜小荣 Precast water sealing continuous wall concrete component
CN102261065A (en) * 2010-05-25 2011-11-30 张继红 Opened high-strength concrete prefabricated pile, and pile mould and centrifugal manufacturing method thereof
CN202482889U (en) * 2012-02-14 2012-10-10 云南中技管桩有限公司 Underground diaphragm wall of interlocked prefabricated pile

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4304507A (en) * 1979-10-15 1981-12-08 Hiroichi Sato Method for producing a continuous wall
US4909674A (en) * 1987-05-28 1990-03-20 Kajima Corporation Underground continuous impervious wall and method for installing same
FR2816647B1 (en) * 2000-11-15 2003-01-17 Gtm Construction FACING FOR REINFORCED LAND WORK
CN2782762Y (en) * 2005-01-31 2006-05-24 黄强 Prestressed concrete hollow square section pile and tip of same
CN2876180Y (en) * 2005-12-05 2007-03-07 颜小荣 Normal polygon prestressed hollow pile end plate
CN201155109Y (en) * 2007-12-07 2008-11-26 颜小荣 Precast water sealing continuous wall concrete component
CN101200900A (en) * 2007-12-17 2008-06-18 颜小荣 Construction method of water-stopping combined continuous wall prefabricated by centrifugal process
CN102261065A (en) * 2010-05-25 2011-11-30 张继红 Opened high-strength concrete prefabricated pile, and pile mould and centrifugal manufacturing method thereof
CN202482889U (en) * 2012-02-14 2012-10-10 云南中技管桩有限公司 Underground diaphragm wall of interlocked prefabricated pile

Also Published As

Publication number Publication date
CN102561315A (en) 2012-07-11

Similar Documents

Publication Publication Date Title
CN101787710B (en) Integrally-assembled buttressed retaining wall and construction method thereof
CN203394170U (en) Prefabricated enclosing wall
CN105926803B (en) A kind of 3D printing reinforced masonry shear wall structure with concave convex texture
CN204849571U (en) Prefabricated assembly pier of posttension prestressing force tongue -and -groove plug -in type
CN202482889U (en) Underground diaphragm wall of interlocked prefabricated pile
CN203488189U (en) Tunnel structure for emptying renovation
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN203821625U (en) Fiber cloth-reinforced mortar-free reinforced masonry shear wall
CN105369799A (en) Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall
CN204645027U (en) Prose style free from parallelism grouting behind shaft or drift lining strength core composite pile
CN102561315B (en) Linkage precast pile type underground diaphragm wall
CN102493448A (en) Assembling anchor rod or anchor cable frame
CN110952524B (en) Waste tire thin-wall hollow pile for treating soft foundation and construction method thereof
CN105421446B (en) A kind of construction method of composite soil extruding solidification prefabricated pile for treatment of soft foundation
CN204825925U (en) Centrifugation side's stake envelope with chase mortise
CN107761759B (en) L-shaped concrete retaining wall
CN208136920U (en) A kind of triangle prestressing force foundation pit supporting pile and its connection structure
CN104805843A (en) Foundation pit supporting method
CN202337981U (en) Spliced anchor rod or anchor rope frame
CN102747724B (en) A kind of piling method of back-up sand composite pile
CN202039355U (en) Sand filling composite pile and pile forming device thereof
CN205475211U (en) A mix soil extrusion solidification precast pile for soft base is handled
CN201857608U (en) Synthetic pile
CN104480947A (en) Construction method of prestress cast-in-place pile and soil cement pile engagement support
CN103614989A (en) Prefabricated concrete ecological dike dam (slope) component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20180719

Granted publication date: 20141224

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20181226

Granted publication date: 20141224

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211122

Address after: No.30, Tongxing East Road, Dongsheng Town, Zhongshan City, Guangdong Province

Patentee after: GUANGDONG SANHE PILES Co.,Ltd.

Patentee after: China Academy of Building Sciences

Address before: 650000 Kunming majinpu South Zhongji pipe pile Co., Ltd

Patentee before: YUNNAN ZHONGZHI PIPE PILE CO.,LTD.

Patentee before: China Academy of Building Sciences