CN102747724B - A kind of piling method of back-up sand composite pile - Google Patents

A kind of piling method of back-up sand composite pile Download PDF

Info

Publication number
CN102747724B
CN102747724B CN201110097619.5A CN201110097619A CN102747724B CN 102747724 B CN102747724 B CN 102747724B CN 201110097619 A CN201110097619 A CN 201110097619A CN 102747724 B CN102747724 B CN 102747724B
Authority
CN
China
Prior art keywords
pile
sand
making device
casting ring
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110097619.5A
Other languages
Chinese (zh)
Other versions
CN102747724A (en
Inventor
陈东曙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Wanatchee electromechanical equipment Engineering Co.
Original Assignee
陈东曙
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 陈东曙 filed Critical 陈东曙
Priority to CN201110097619.5A priority Critical patent/CN102747724B/en
Publication of CN102747724A publication Critical patent/CN102747724A/en
Application granted granted Critical
Publication of CN102747724B publication Critical patent/CN102747724B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of back-up sand composite pile, pile making device and piling method thereof, its object is to provide a kind of composite tube stake that back-up sand is solidified outside cylinder stake stake week, pile making device and piling method thereof.This back-up sand composite pile, comprises the pile body implanting soil layer, has back-up sand cured layer outside described pile body stake week.The invention has the beneficial effects as follows: in the ground having deep soft soil, back-up sand outside cylinder stake stake week, can improve soil around pile earth, quick release pore water pressure, promotes weak soil solidification, thus significantly improves bearing capacity of single pile, and save cost, the foundation engineering of deep soft soil can be widely used in.

Description

A kind of piling method of back-up sand composite pile
Technical field
The present invention relates to a kind of pile body and pile making device, piling method, particularly relate to a kind of in construction work based on back-up sand composite pile, pile making device and piling method thereof.
Background technology
Multilayer, small sized multiple story building in the soft foundation that China coast city blazons, its basic expense remains high always, and the effect that all kinds of foundation pattern uses is irregular very large again.Weak soil in these soft foundations is that stream is moulded, half-flow plastic shape or plastic shape, and high-compressibility, adds bad hydraulic permeability, and belong to hypersensitivity soil, once disturbance, mechanical property reduces sharply, and the restore cycle is very long.In the design of multilayer on this kind of ground, small sized multiple story building, using maximum is the stake of prestressed concrete cylinder, fast, pollution-free, the economic cost performance of this constant product quality, speed of application is good, but having in deep soft soil, because bearing capacity of single pile is on the low side, lay out pile overstocked, often cause pile shaft floating up, off normal and phenomenon of rupture.
Chinese patent notification number CN2673944Y, disclose a kind of major part back-up sand pile for prestressed pipe, it includes the tubulose pile body of prestressed reinforced concrete, at pipe pile end, have the stake major part of steel concrete prefabricated separately or concrete or steel, stake diameter at butt end is greater than tubular pile body diameter 8-40cm; At tubular pile body, every 1-7m, the wide 5-25cm having to protrude, the concrete of high 5-20cm or steel concrete rib, two intercostal back-up sand or grit, the cross section of rib is trapezoidal, isosceles trapezoid or right-angled trapezium.This major part back-up sand pile for prestressed pipe is prefabricated component, not only will increase manpower and materials and be transported to construction plant, and the construction cost of being driven underground is higher.
Chinese patent notification number CN2712587Y, disclose a kind of Bamboo-shaped pile for prestressed pipe punching block, it includes the main body punching block that two block length strip semicircle securing members are tightened, main body punching block is at interval of 1-4m, a sliver transvers section is had to be the annular recess of right-angled trapezium or nearly right-angled trapezium or isosceles trapezoid, the long 5-40cm of groove cross section four edges, part or all establish R angle in annular recess and main body punching block junction surface and annular recess two corner angle.This Bamboo-shaped pile for prestressed pipe punching block is the mould as prefabricated Bamboo-shaped pile for prestressed pipe, is only suitable for prefabricated component, can not as the purposes of poured in place concrete, and its cost of manufacture is higher.
Summary of the invention
The object of the present invention is to provide a kind of cast-in-situ concrete composite tube stake of back-up sand solidification outside cylinder stake stake week, to solve the problem that the bearing capacity of single stake in deep soft soil ground existed in background technology is on the low side and employing prefabricated component construction cost is higher.
To achieve these goals, technical scheme of the present invention is: a kind of back-up sand composite pile, comprise the pile body implanting soil layer, outside described pile body stake week, there is back-up sand cured layer, the cured layer be connected as a single entity with pile body that described back-up sand cured layer is formed for making weak soil solidify after back-up sand outside pile body stake week.In the ground having deep soft soil, back-up sand outside pile body stake week, can improve soil around pile earth, discharge pore water pressure fast, promotes weak soil solidification, thus significantly improves bearing capacity of single pile.
As preferably, described pile body is the stake of cast-in-situ concrete large-diameter thin-wall cylinder.Pile body adopts cylinder stake to save material, cost-saving.
The beneficial effect of back-up sand composite pile of the present invention is: in the ground having deep soft soil, and back-up sand outside cylinder stake stake week, can improve soil around pile earth, discharge pore water pressure fast, promotes weak soil solidification, thus significantly improves bearing capacity of single pile, and saved cost.
The present invention also aims to provide a kind of pile making device for the manufacture of above-mentioned back-up sand composite pile.
To achieve these goals, technical scheme of the present invention is: a kind of pile making device, comprises clad steel casing and pile top, and on the outer cylinder of the outer casing of described clad steel casing, cover has several for the casting ring of casting.When this pile making device is squeezed into soil layer, casting ring on outer casing can arrange the earth in stake week, form the cavity of certain distance, at this moment back-up sand in the cavities, can improve soil around pile earth, discharge pore water pressure fast, promote weak soil solidification, thus significantly improve the bearing capacity of the pile body of formation, owing to being poured in place concrete, reduce construction cost.
As preferably, described casting ring in the form of a ring, be placed on the outer cylinder of clad steel casing, the external diameter of the internal diameter of described casting ring and the outer casing of clad steel casing is adaptive, be connected with the silk rope that can need to regulate according to site operation length between adjacent described casting ring, between the casting ring that described pile top is adjacent, be also connected with silk rope.When pulling up pile making device, this casting ring comes off together with pile top, and form with the concrete poured into the pile body connected as one, casting ring also can in needing to be designed to other shapes being conducive to pile according to actual field construction, the rectangular triangle of section as casting ring or circle etc., and also can be made the bascule of similar turnover panel, when squeezing into pile making device, turnover panel is in open mode, facilitate casting, when pulling up pile making device, turnover panel is in closure state, fit in casing surface, can not earth be mentioned.
As preferably, described pile top is enlarged footing pile top.Pile top is enlarged footing pile top, and namely the outside diameter of pile top is greater than the external diameter of the outer casing of clad steel casing, and such pile top also can arrange earth, has the effect of casting ring.
As preferably, described pile top is profile of tooth pile top.Pile top is profile of tooth pile top, and such pile top also can arrange earth, has the effect of casting ring, and the teeth of this pile top can be designed to several, and its shape can be designed to triangle or the various shape such as square.
The beneficial effect of pile making device of the present invention is: when this pile making device is squeezed into soil layer, casting ring on outer casing can arrange the earth in stake week, form the cavity of certain distance, at this moment back-up sand in the cavities, soil around pile earth can be improved, discharge pore water pressure fast, promote weak soil solidification, thus significantly improve the bearing capacity of the pile body of formation, and its construction cost is lower.
The present invention also aims to provide a kind of piling method manufacturing above-mentioned back-up sand composite pile.
To achieve these goals, technical scheme of the present invention is: a kind of piling method, comprises the following steps:
1. mix pile top in the bottom of pile making device, by the casting ring set of serial connection on the outer casing of pile making device, and casting ring is lifted on the cylinder top of outer casing, then utilizes clamper to be fixedly connected with vibrating hammer at the top of pile making device;
2. pile making device is erect and is placed in construction location and exerts pressure on vibrating hammer, pile making device is sunk in soil, and back-up sand in the cavity that arranges of the pile making device stake whole body, the press-in pile making device limit back-up sand of vibration limit, back;
3. when cavity be contracted to gradually affect back-up sand time, the next one that then falls is lifted on the casting ring on outer casing cylinder top, then adjust the length of the silk rope between pile top and this casting ring, make pile top draw this casting ring, continue the press-in pile making device limit back-up sand of vibration limit, limit afterwards;
4. repeat the 3. to walk, until pile making device to be sunk to the soil layer of projected depth;
5. unclamp the clamper at clad steel casing top, remove vibrating hammer, in interlayer, put into reinforcing cage, fall vibrating hammer and again clamp clad steel casing; If form concrete back-up sand composite tube stake not with reinforcing cage, then skip the and 5. walk and directly carry out the and 6. walk;
6. to inoculated part concrete between double-layer pipe interlayer, the vibration of perfusion limit, back on pull out pile making device, pile top and casting ring come off and form with concrete the pile body connected as one.
If the soil property of job site is better moulding, the cavity of formation can't reduce gradually thus affect back-up sand, then do not need to fall casting ring.Can, in advance at the pre-buried one section of sleeve of construction location, after described pile making device is squeezed in sleeve, make back-up sand convenient in addition.
The beneficial effect of piling method of the present invention is: when this pile making device is squeezed into soil layer, casting ring on outer casing can arrange the earth in stake week, form the cavity of certain distance, at this moment back-up sand in the cavities, soil around pile earth can be improved, discharge pore water pressure fast, promote weak soil solidification, thus significantly improve the bearing capacity of the pile body of formation, and its construction cost is lower.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of back-up sand composite pile;
Fig. 2 is a kind of structural representation of pile making device in embodiment 1;
Fig. 3 is the elevation of Fig. 2;
Fig. 4 is a kind of structural representation of pile top;
Fig. 5 is the sectional view of pile top.
Number in the figure is respectively: 1. pile body 2. back-up sand cured layer 3. clad steel casing 4. pile top 5. casting ring 6. ropes.
Detailed description of the invention
Also by reference to the accompanying drawings technical scheme of the present invention is further described specifically below by embodiment.
Embodiment 1:
As shown in Figure 1, a kind of back-up sand composite pile, comprise the pile body 1 implanting soil layer, described pile body 1 is the stake of cast-in-situ concrete large-diameter thin-wall cylinder, has back-up sand cured layer 2 outside the stake week of pile body 1, so-called back-up sand cured layer 2 refers in the ground having deep soft soil, back-up sand outside the stake week of pile body 1, can improve soil around pile earth like this, discharge pore water pressure fast, promote the weak soil solidification of stake week, thus significantly improve bearing capacity of single pile.
As shown in Figures 2 and 3, a kind of pile making device for the manufacture of above-mentioned back-up sand composite pile, comprise the vertical clad steel casing 3 arranged with one heart, pile top 4 is provided with in the bottom of clad steel casing 3, as shown in Figure 4 and Figure 5, pile top 4 is for expanding hair style, namely the outside diameter of pile top 4 is greater than the diameter of the outer casing of clad steel casing 3, its for bottom be pointed ring bodies, its end face has the annular boss that can embed between two casing, on the outer cylinder of the outer casing of clad steel casing 3, cover has casting ring 5, this casting ring 5 in the form of a ring, the rectangular triangle of its section, and wedge angle upward, adaptive on the outer cylinder being enclosed within clad steel casing 3, this casting ring 5 has three, connect with silk rope 6 between adjacent casting ring 5, and also connect with silk rope 6 between the casting ring 5 that is adjacent of pile top 4, this rope 6 can need to regulate length according to site operation.
Adopt above-mentioned pile making device to manufacture a piling method for back-up sand composite pile, comprise the following steps:
1. mix pile top 4 in the bottom of pile making device, the casting ring 5 of serial connection is enclosed within the outer casing of pile making device, and casting ring 5 is lifted on the cylinder top of outer casing, then utilize clamper to be fixedly connected with vibrating hammer at the top of pile making device;
2. pile making device is erect and is placed in construction location and exerts pressure on vibrating hammer, pile making device is sunk in soil, and back-up sand in the cavity that arranges of the pile making device stake whole body, the press-in pile making device limit back-up sand of vibration limit, back;
3. when cavity be contracted to gradually affect back-up sand time, the next one that then falls is lifted on the casting ring 5 on outer casing cylinder top, then the length of the silk rope 6 between pile top 4 and this casting ring 5 is adjusted, make pile top 4 draw this casting ring 5 by silk rope 6 to sink, continue the press-in pile making device limit back-up sand of vibration limit, limit afterwards;
4. repeat the 3. to walk, until pile making device to be sunk to the soil layer of projected depth;
5. then unclamp the clamper at clad steel casing 3 top, remove vibrating hammer, in interlayer, put into reinforcing cage, fall vibrating hammer and again clamp clad steel casing 3; If form concrete back-up sand composite pile not with reinforcing cage, then skip the and 5. walk and directly carry out the and 6. walk;
6. to inoculated part concrete between clad steel casing 3 interlayer, the vibration of perfusion limit, back on pull out pile making device, pile top 4 and casting ring 5 come off and are formed with concrete and connect as one and have the pile body 1 of back-up sand cured layer 2 outside stake week.
Embodiment 2:
A kind of pile making device, the difference of the pile making device in itself and embodiment 1 is: pile top 4 is not enlarged footing pile top, but profile of tooth pile top, its structure extends several teeth in annular solid periphery, and this kind of pile top 4 is open in Chinese patent Authorization Notice No. CN201347550Y.
Above-mentioned described specific embodiment is only do preferable examples explanation to design of the present invention.All any amendments done within the spirit and principles in the present invention are supplementary or equivalent to be substituted, within the protection domain that all should be included in the claims in the present invention.

Claims (1)

1. a piling method for back-up sand composite pile, comprises back-up sand composite pile and the pile making device for the manufacture of back-up sand composite pile,
Described back-up sand composite pile comprises the pile body (1) implanting soil layer, there is outside described pile body stake week back-up sand cured layer (2), the cured layer be connected as a single entity with pile body (1) that described back-up sand cured layer (2) is formed for making weak soil solidify after back-up sand outside pile body (1) stake week, described pile body (1) is the stake of cast-in-situ concrete large-diameter thin-wall cylinder;
Described pile making device comprises clad steel casing (3) and pile top (4), it is characterized in that: on the outer cylinder of the outer casing of described clad steel casing (3), cover has several for the casting ring (5) of casting, described casting ring (5) in the form of a ring, be placed on the outer cylinder of clad steel casing (3), the external diameter of the internal diameter of described casting ring (5) and the outer casing of clad steel casing (3) is adaptive, the silk rope (6) that can need to regulate according to site operation length is connected with between described adjacent casting ring (5), also silk rope (6) is connected with between the casting ring (5) that described pile top (4) is adjacent, described pile top (4) is enlarged footing pile top,
It is characterized in that, comprise the following steps:
1. pile top (4) is mixed in the bottom of pile making device, the casting ring (5) of serial connection is enclosed within the outer casing of pile making device, and casting ring (5) is lifted on the cylinder top of outer casing, then utilize clamper to be fixedly connected with vibrating hammer at the top of pile making device;
2. pile making device is erect and is placed in construction location and exerts pressure on vibrating hammer, pile making device is sunk in soil, and back-up sand in the cavity that arranges of the pile making device stake whole body, the press-in pile making device limit back-up sand of vibration limit, back;
3. when cavity be contracted to gradually affect back-up sand time, the next one that then falls is lifted on the casting ring (5) on outer casing cylinder top, then the length of the silk rope (6) between pile top (4) and this casting ring (5) is adjusted, make pile top (4) draw this casting ring (5) by silk rope (6), continue the press-in pile making device limit back-up sand of vibration limit, limit afterwards;
4. repeat the 3. to walk, until pile making device to be sunk to the soil layer of projected depth;
5. then unclamp the clamper at clad steel casing (3) top, remove vibrating hammer, in interlayer, put into reinforcing cage, fall vibrating hammer and again clamp clad steel casing (3); If form concrete back-up sand composite pile not with reinforcing cage, then skip the and 5. walk and directly carry out the and 6. walk;
6. to inoculated part concrete between clad steel casing (3) interlayer, the vibration of perfusion limit, back on pull out pile making device, pile top (4) and casting ring (5) come off and are formed with concrete and connect as one and have the pile body (1) of back-up sand cured layer (2) outside stake week.
CN201110097619.5A 2011-04-19 2011-04-19 A kind of piling method of back-up sand composite pile Expired - Fee Related CN102747724B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110097619.5A CN102747724B (en) 2011-04-19 2011-04-19 A kind of piling method of back-up sand composite pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110097619.5A CN102747724B (en) 2011-04-19 2011-04-19 A kind of piling method of back-up sand composite pile

Publications (2)

Publication Number Publication Date
CN102747724A CN102747724A (en) 2012-10-24
CN102747724B true CN102747724B (en) 2015-12-02

Family

ID=47028189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110097619.5A Expired - Fee Related CN102747724B (en) 2011-04-19 2011-04-19 A kind of piling method of back-up sand composite pile

Country Status (1)

Country Link
CN (1) CN102747724B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061353B (en) * 2013-01-05 2015-01-07 台山市宁华电力设计有限公司 Windproof reinforced concrete rod sleeve base
CN106958242A (en) * 2017-04-01 2017-07-18 浙江龙翔建设有限公司 Steel pile casting is installed and method for dismounting
CN108277800B (en) * 2018-01-12 2023-10-24 潘海涛 Reinforced concrete pipe joint gravel pile with consolidated sand layer and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2557590Y (en) * 2002-06-05 2003-06-25 邹宗煊 Prefabricated piling pile with bigger top for building foundation
CN2673944Y (en) * 2003-08-19 2005-01-26 邹宗煊 Prestressed pipe pile with large end filled with sand
CN201347550Y (en) * 2008-10-31 2009-11-18 陈建雄 Tooth-shaped pile tip of large diameter cast-in-situ concrete thin wall tooth-shaped barrel pile
CN101684650A (en) * 2008-09-27 2010-03-31 陈东曙 Cast-in-place concrete thin-walled tooth-shaped tubular pile with large diameter, pile forming device and method for forming pile
CN201506969U (en) * 2009-08-26 2010-06-16 浙江海桐高新工程技术有限公司 Large-diameter dyke tubular pile and dyke or wharf structure thereof
CN101994303A (en) * 2009-08-26 2011-03-30 浙江海桐高新工程技术有限公司 Large diameter grain tubular pile embanking construction process and embanking or wharf structure thereof
CN202039355U (en) * 2011-04-19 2011-11-16 陈东曙 Sand filling composite pile and pile forming device thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2557590Y (en) * 2002-06-05 2003-06-25 邹宗煊 Prefabricated piling pile with bigger top for building foundation
CN2673944Y (en) * 2003-08-19 2005-01-26 邹宗煊 Prestressed pipe pile with large end filled with sand
CN101684650A (en) * 2008-09-27 2010-03-31 陈东曙 Cast-in-place concrete thin-walled tooth-shaped tubular pile with large diameter, pile forming device and method for forming pile
CN201347550Y (en) * 2008-10-31 2009-11-18 陈建雄 Tooth-shaped pile tip of large diameter cast-in-situ concrete thin wall tooth-shaped barrel pile
CN201506969U (en) * 2009-08-26 2010-06-16 浙江海桐高新工程技术有限公司 Large-diameter dyke tubular pile and dyke or wharf structure thereof
CN101994303A (en) * 2009-08-26 2011-03-30 浙江海桐高新工程技术有限公司 Large diameter grain tubular pile embanking construction process and embanking or wharf structure thereof
CN202039355U (en) * 2011-04-19 2011-11-16 陈东曙 Sand filling composite pile and pile forming device thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《扩大头带肋填砂预应力管桩的研究与应用》;金国平等;《建筑结构》;20060630;第36卷;第57-61页 *

Also Published As

Publication number Publication date
CN102747724A (en) 2012-10-24

Similar Documents

Publication Publication Date Title
US20160376762A1 (en) Construction method for planting hollow columns in a seabed of a marine environment for supporting waterborne structures thereon
CN202265822U (en) Pile forming device for cast-in-situ concrete thin-wall piles
CN103993598A (en) Crashed stone grouting pile with lead holes implanted in cloth bag and construction method
CN111236258A (en) Prefabricated pile wall supporting structure with stiffening rib wall and unloading platform and construction method thereof
CN102747724B (en) A kind of piling method of back-up sand composite pile
CN112922019A (en) Single-pile foundation for reinforcing soft soil foundation by offshore wind power vibroflotation cemented pile and construction method
CN202039355U (en) Sand filling composite pile and pile forming device thereof
CN204000925U (en) Prefabricated diaphragm wall
CN102493439A (en) Building fundamental pile constructional element
CN102561315B (en) Linkage precast pile type underground diaphragm wall
CN113789779B (en) Pile foundation structure applied to soft soil foundation and coral sand foundation and construction method
CN211368723U (en) Novel grouting pipe
CN203866821U (en) Lead hole implant cloth bag gravel grouting pile
CN209260899U (en) A kind of steel pipe connecting node of assembly concrete column
CN106592586A (en) Prefabricated pile with external hoops and filled with sand-gravel aggregates, and construction method thereof
CN105421446A (en) Mixed soil extruded and cured precast pile for soft foundation treatment as well as construction method
CN203129163U (en) Reinforcing framework structure for dam foundation
CN204000837U (en) A kind of prefabricated diaphragm wall
CN103835290A (en) Pile foundation structure suitable for marine soft soil and design method thereof
CN213926295U (en) Hole wall supporting device of pile foundation pit hole
CN218757447U (en) Multifunctional pile foundation structure
CN217500224U (en) Grouting device for improving bearing capacity of pile foundation
CN212582661U (en) Manual hole digging pile for overhead line
CN211899325U (en) Trench assembly type ladder step structure
CN201924342U (en) Cast-in-place concrete cylindrical sheet connecting pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Zhang Xinying

Inventor after: Jin Ling

Inventor before: Chen Dongshu

CB03 Change of inventor or designer information
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170927

Address after: 301800 Tianjin city Baodi District Huo Ge Zhuang Zhen jinshuiwan garden 30-1-1106

Co-patentee after: Jin Ling

Patentee after: Zhang Xinying

Address before: 315040 room 6, Lane 1805, Xingning alley, Jiangdong District, Zhejiang, Ningbo

Patentee before: Chen Dongshu

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180606

Address after: 221000 Room 202, A6 office building, Xuzhou Road North Pioneer Park, Xuzhou Industrial Park, Jiawang, Xuzhou, Jiangsu.

Patentee after: Jiangsu Wanatchee electromechanical equipment Engineering Co.

Address before: 301800 30-1-1106, Baodi, Tianjin

Co-patentee before: Jin Ling

Patentee before: Zhang Xinying

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20180419