CN203129163U - Reinforcing framework structure for dam foundation - Google Patents

Reinforcing framework structure for dam foundation Download PDF

Info

Publication number
CN203129163U
CN203129163U CN 201320159986 CN201320159986U CN203129163U CN 203129163 U CN203129163 U CN 203129163U CN 201320159986 CN201320159986 CN 201320159986 CN 201320159986 U CN201320159986 U CN 201320159986U CN 203129163 U CN203129163 U CN 203129163U
Authority
CN
China
Prior art keywords
dam foundation
pile body
girth member
dam
stabilization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320159986
Other languages
Chinese (zh)
Inventor
宁永升
刘昊
冯树荣
李国权
陈洪来
常姗姗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Zhongnan Engineering Corp Ltd
Hydrochina Zhongnan Engineering Corp
Original Assignee
Hydrochina Zhongnan Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Zhongnan Engineering Corp filed Critical Hydrochina Zhongnan Engineering Corp
Priority to CN 201320159986 priority Critical patent/CN203129163U/en
Application granted granted Critical
Publication of CN203129163U publication Critical patent/CN203129163U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the field of dam foundation reinforcing and particularly relates to a reinforcing framework structure for a dam foundation. The reinforcing framework structure for the dam foundation comprises a plurality of pile bodies of which the main bodies are arranged in a soft foundation of the dam foundation. The bottom ends of the pile bodies reach a batholith boundary; the top ends of the pile bodies exceed a ground line; parts of the pile bodies, which exceed the ground line, are laitance sections which can be chiseled away; at least one reinforcing member is arranged in each pile body; the bottom ends of the reinforcing members exceed the batholith boundary; the top ends of the reinforcing members exceed the ground line; and concrete grid beams are fixedly connected by the laitance sections which can be chiseled away and the reinforcing members. The dam foundation reinforcing framework structure is suitable for weak dam foundations, and moreover, the integral strength and the skid resistance of the dam foundation can be remarkably improved.

Description

A kind of stabilization of dam foundation frame construction
Technical field
The utility model belongs to the stabilization of dam foundation field, is specifically related to a kind of stabilization of dam foundation frame construction.
Background technology
Engineering circle stabilization of dam foundation method commonly used has: the real sand pile of bath impact extrusion, cement-soil paddling process, dynamic compaction, high-pressure rotary spraying method etc. change and fill out the bed course method, shake.
Change and fill out the bed course method and be applicable to the shallow-layer soft foundation, for the soft stratum dark, that scope is wide that distributes, often because excavation and backfill amount are too big, do not possess economy.
The bath impact extrusion reality of shaking sand pile, cement-soil paddling process are possessing certain advantage aspect raising dam foundation bulk strength and the dam foundation settlement Control, but the antiskid effect is not remarkable.
Dynamic compaction is applicable to gravelly soil, sand, low saturation silt and cohesive soil, collapsible loess, and is not too suitable for mud and mucky soil ground, and when construction vibration is too big, easily disturbs residents.
High-pressure rotary spraying method is a kind of new method that is full of vitality during reinforcing soft foundation is handled, mainly be to utilize the high pressure jet grouting machine that the high pressure jet grouting pipe is sunk to underground desired depth, then the cement paste high pressure rotary is sprayed into soil layer and mix with the soil body, form the cement stabilization body of overlap joint continuously.This method efficiency of construction is high.It is applicable to the reinforcing of soft layers such as quarternary alluvium, diluvial formation, eluvium and artificial earth fill, more and more is extensive use of by people.But high-pressure rotary jet grouting pile is many and close humus soil, silt soil for cellulosic, and often the stake footpath is less behind the pile, intensity is lower, exists not enough at aspects such as dam foundation settlement Control and dam slope antiskid are stable.
The utility model content
For addressing the above problem, the utility model provides a kind of suitable weak dam foundation and can significantly improve the stabilization of dam foundation framework knot of dam foundation bulk strength and anti-slide performance.The employing pressure rotary-spraying steel pipe pile+grid beams reinforcing method of leaping high that shakes inserts steel pipe in the high-pressure rotary-spray pile body with vibroflotation method, and steel pipe is stretched into basement rock, forms frame construction with dam slope grid beams combination overlap joint then.
The technical solution of the utility model is:
A kind of stabilization of dam foundation frame construction comprises that main body is arranged on a plurality of pile bodies in the soft base of the dam foundation, and described pile body bottom is to the batholith line of demarcation, and the pile body top exceeds above-ground route, and described pile body exceeds above-ground route in addition partly for can cut the laitance section; Be provided with at least one girth member in described pile body, and section exceeds the batholith line of demarcation at the bottom of the girth member, the girth member top exceeds above-ground route; The concrete grid beams is fixedlyed connected with girth member by cutting the laitance section.
Described pile body and girth member top all preferably exceed more than the above-ground route 0.3m; Described girth member bottom exceeds the marginal length of batholith and is preferably greater than 0.2m.
Described pile body is preferably the high-pressure rotary-spray pile body.
Described girth member is preferably steel pipe or reinforcing bar.
Described concrete grid beams is preferably dimensioned to be: 350mm ~ 600mm is wide * and 400mm ~ 1000mm height, parallelogram is arranged or rhombus arranges that spacing is 1m ~ 4m, array pitch is 1m ~ 4m.
Compared with prior art, advantage of the present utility model is:
Stabilization of dam foundation frame construction of the present utility model adds girth member in the high-pressure rotary-spray pile body, the girth member bottom is squeezed into below the basement rock 0.2m, utilizes the fixed end effect of basement rock, improves the stability of pile body; The steel pipe that the elevates above the soil concrete grid beams with dam slope is cast in, the two ends up and down of high-pressure rotary-spray steel pipe pile can be pinned, form the integral reinforcing frame construction.This stiffening frame structure improves dam foundation settlement Control and dam slope stability against sliding energy.
Description of drawings
Fig. 1 is girth member mounting structure schematic diagram;
Fig. 2 is stabilization of dam foundation frame construction plane structure schematic diagram;
Fig. 3 is stabilization of dam foundation frame construction inner side structural representation;
Wherein, the 1st, concrete grid beams array pitch, the 2nd, above-ground route, the 3rd, can cut the laitance section, the 4th, pile body, the 5th, soft base, the 6th, basement rock line of demarcation, the 7th, girth member, the 8th, concrete grid beams, the 9th, concrete grid beams spacing.
The specific embodiment
Be described further below in conjunction with the utility model of embodiment.
Embodiment 1:
A kind of stabilization of dam foundation frame construction comprises that main body is arranged on a plurality of pile bodies 4 in the dam foundation soft basic 5, and described pile body 4 bottoms are to batholith line of demarcation 6, and the top exceeds above-ground route 2, and described pile body exceeds above-ground route in addition partly for can cut laitance section 3; Be provided with at least one girth member 7 in described pile body, and section exceeds batholith line of demarcation 6 at the bottom of the girth member, the top exceeds above-ground route 2; Concrete grid beams 8 is fixedlyed connected with girth member 7 by cutting laitance section 3.
Described pile body 4 and girth member 7 tops all exceed more than the above-ground route 0.3m; Described girth member 7 bottoms exceed the marginal length of batholith greater than 0.2m.Described pile body 4 is the high-pressure rotary-spray pile body.Described girth member 7 is steel pipe or reinforcing bar.Described concrete grid beams 8 is of a size of: 350mm ~ 600mm is wide * and 400mm ~ 1000mm height, parallelogram is arranged or rhombus arranges that spacing is 1m ~ 4m, array pitch is 1m ~ 4m.
Concrete job practices is as follows:
(1) utilizes high pressure jet grouting machine gunite pile.The high-pressure rotary-spray grouting crest level 0.3m that should be above the ground level so that the later stage is cut down the laitance of pile crown, removes the pile body weak part.High-pressure rotary-spray grouting end elevation is to the basement rock line of demarcation.
(2) before the cement slurry initial set, start shaking towards mode of high pressure jet grouting machine, rapidly steel pipe is lowered in the high-pressure rotary-spray pile body.
(3) when the basement rock line of demarcation, because the resistance of basement rock is bigger, at this moment can add goodly towards frequency according to actual conditions, will shake towards FREQUENCY CONTROL at 20HZ ~ 40HZ generally speaking.
(4) steel pipe is squeezed into basement rock 0.2m, to utilize the fixed end effect of basement rock, improved the stability of pile body.
(5) cut pile crown laitance section, the steel pipe that the elevates above the soil concrete grid beams with dam slope is cast in.So just, the two ends up and down of high-pressure rotary-spray steel pipe pile can be pinned, form the general frame structure.
(6) cast-in-situ concrete grid beams is of a size of 350mm ~ 600mm wide * 400mm ~ 1000mm height, parallelogram are arranged or rhombus arranges that spacing is 1m ~ 4m, and array pitch is 1m ~ 4m.
Use:
Stabilization of dam foundation frame construction of the present utility model has been used for certain pumped storage power plant, this power station lower storage reservoir homogeneous earth dam crest elevation 24.4m, bottom of the reservior elevation-2.0m, normal pool level elevation 19.0m, level of dead water elevation 0m.
This lower storage reservoir geological conditions is extremely complicated, the thick 2.0~5.0m of top silty clay, and the thick 0~8.0m of silt clay does not wait, the thick 2.20~5.50m of sand gravel stratum.Mucky soil distribution elevation 7.0~15.0m is positioned at below the reservoir level, and a band silt clay was thicker about homogeneous earth dam was long by the about 350m in north side, was 3~8m.Silt clay is the soft shape of moulding, and is a small amount of even be stream and mould shape, contains a small amount of rubble or gravel, stable extreme difference.
According to the operation characteristic of pumped storage, the frequent luffing of the water level of lower storage reservoir rises to fall suddenly suddenly, and the existence of dam foundation soft layer has brought adverse influence for the stable and foundation settlement of dam upstream dam slope.
After using the stabilization of dam foundation scheme of the utility model enforcement, significantly increase shear resistance and the bulk strength of structure, solved the stable problem that reaches sedimentation and deformation of dam foundation soft layer effectively.According to earth dam monitoring achievement, the requirement that can satisfy safe operation after the retaining is assert by the each side that takes part in building.

Claims (5)

1. a stabilization of dam foundation frame construction comprises that main body is arranged on a plurality of pile bodies in the soft base of the dam foundation, it is characterized in that described pile body bottom is to the batholith line of demarcation, and the pile body top exceeds above-ground route, and described pile body exceeds above-ground route in addition partly for can cut the laitance section; Be provided with at least one girth member in described pile body, and section exceeds the batholith line of demarcation at the bottom of the girth member, the girth member top exceeds above-ground route; The concrete grid beams is fixedlyed connected with girth member by cutting the laitance section.
2. according to the described stabilization of dam foundation frame construction of claim 1, it is characterized in that described pile body and girth member top all exceed more than the above-ground route 0.3m; Described girth member bottom exceeds the marginal length of batholith greater than 0.2m.
3. according to claim 1 or 2 described stabilization of dam foundation frame constructions, it is characterized in that described pile body is the high-pressure rotary-spray pile body.
4. according to claim 1 or 2 described stabilization of dam foundation frame constructions, it is characterized in that described girth member is steel pipe or reinforcing bar.
5. according to claim 1 or 2 described stabilization of dam foundation frame constructions, it is characterized in that described concrete grid beams is of a size of: 350mm ~ 600mm is wide * 400mm ~ 1000mm height, parallelogram is arranged or rhombus arranges that spacing is 1m ~ 4m, array pitch is 1m ~ 4m.
CN 201320159986 2013-04-02 2013-04-02 Reinforcing framework structure for dam foundation Expired - Lifetime CN203129163U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320159986 CN203129163U (en) 2013-04-02 2013-04-02 Reinforcing framework structure for dam foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320159986 CN203129163U (en) 2013-04-02 2013-04-02 Reinforcing framework structure for dam foundation

Publications (1)

Publication Number Publication Date
CN203129163U true CN203129163U (en) 2013-08-14

Family

ID=48937158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320159986 Expired - Lifetime CN203129163U (en) 2013-04-02 2013-04-02 Reinforcing framework structure for dam foundation

Country Status (1)

Country Link
CN (1) CN203129163U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195077A (en) * 2013-04-02 2013-07-10 中国水电顾问集团中南勘测设计研究院 Dam foundation reinforcement frame structure and dam foundation reinforcement method
CN108952674A (en) * 2018-06-25 2018-12-07 长江地球物理探测(武汉)有限公司 A kind of assay method and system of the engaging portion Tu Yan unfavorable geologic body detection

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195077A (en) * 2013-04-02 2013-07-10 中国水电顾问集团中南勘测设计研究院 Dam foundation reinforcement frame structure and dam foundation reinforcement method
CN103195077B (en) * 2013-04-02 2015-09-09 中国电建集团中南勘测设计研究院有限公司 A kind of dam foundation reinforcement frame structure and stabilization of dam foundation method
CN108952674A (en) * 2018-06-25 2018-12-07 长江地球物理探测(武汉)有限公司 A kind of assay method and system of the engaging portion Tu Yan unfavorable geologic body detection
CN108952674B (en) * 2018-06-25 2022-06-07 长江地球物理探测(武汉)有限公司 Analysis and evaluation method and system for poor geologic body detection of soil-rock junction

Similar Documents

Publication Publication Date Title
CN203741868U (en) Reinforced concrete retaining wall structure with combined anchor wire
CN204059332U (en) A kind of concrete precast pipe pile and piling prepressing Soft Ground device
CN1837511A (en) Double-rowed cofferdam and method for manufacturing the same
CN203924036U (en) A kind of pile for prestressed pipe of outsourcing active material pile body
CN203200746U (en) High-pressure jet grouting hollow reinforced tubular pile
CN104005404A (en) Prestressed pipe pile coated with active material pile body and construction method
CN103835292B (en) High frequency vibrating rushes the construction method of base-extending deposited pile tube
CN103741670A (en) Negative skin friction (NSF) removing foundation treatment method
CN103161151B (en) A kind of high-pressure rotary-spray hollow reinforces construction method and the high-pressure rotary-spray hollow reinforcing pile tube of pile tube
CN207469269U (en) A kind of hydraulic engineering High strength geogrid structure class ecological revetment
CN110965416A (en) Bamboo reinforcement system for reinforcing high-fill roadbed in mountainous area and construction method
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN205134303U (en) Compound reinforced structure of soft base of ecological bamboo raft among road engineering of field
CN103195077B (en) A kind of dam foundation reinforcement frame structure and stabilization of dam foundation method
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN204456058U (en) A kind of constructing structure reducing building base subsidence speed
CN204000848U (en) A kind of socketed pile for subaqueous construction
CN203129163U (en) Reinforcing framework structure for dam foundation
CN203729309U (en) Support system with combined double-row piles combined with vertical prestressed anchor bolts
CN106869153A (en) A kind of method of the quick soft soil foundation treatment of well-points dewatering
CN204645058U (en) A kind ofly be provided with the H type Double-row-piles Structure adding core rotary churning pile
CN202787275U (en) Tubular soil nailing wall of novel pneumatic impact anchor
CN212656252U (en) Novel transmission line tower foundation
CN202099795U (en) Crushed stone pile for reinforcing extremely soft soil foundation
RU121274U1 (en) ARTIFICIAL REINFORCED BASIS FOR ESTABLISHED OR RECONSTRUCTED BUILDING

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION

Free format text: FORMER NAME: ZHONGNAN PROSPECTING DESIGN INST. CHINA HYDRAUELECTRIC CONSULTANT GROUP

Owner name: CHINA POWER GROUP ZHONGNAN INVESTIGATION DESIGN +

Free format text: FORMER NAME: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee after: POWERCHINA ZHONGNAN ENGINEERING Corp.,Ltd.

Address before: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee before: HYDROCHINA ZHONGNAN ENGINEERING Corp.

CP03 Change of name, title or address

Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee after: HYDROCHINA ZHONGNAN ENGINEERING Corp.

Address before: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha

Patentee before: Mid-South Hydroelectric Investigation & Design Institute of China Hydropower Engineering Consulting Group

AV01 Patent right actively abandoned

Granted publication date: 20130814

Effective date of abandoning: 20150909

AV01 Patent right actively abandoned

Granted publication date: 20130814

Effective date of abandoning: 20150909

RGAV Abandon patent right to avoid regrant