CN2557590Y - Prefabricated piling pile with bigger top for building foundation - Google Patents
Prefabricated piling pile with bigger top for building foundation Download PDFInfo
- Publication number
- CN2557590Y CN2557590Y CN 02217937 CN02217937U CN2557590Y CN 2557590 Y CN2557590 Y CN 2557590Y CN 02217937 CN02217937 CN 02217937 CN 02217937 U CN02217937 U CN 02217937U CN 2557590 Y CN2557590 Y CN 2557590Y
- Authority
- CN
- China
- Prior art keywords
- pile
- pile body
- utility
- building foundation
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model is a fat pile precast driven pile in the building foundation zone, which also comprises a pile body of the precast driven pile similar to the prior art, and is characterized in that the lower end of the pile body of the precast driven pile is the fat pile with the diameter larger than the diameter of the pile body by 5-50cm, and the outer side of the pile body has the thickness of 3-25cm and is filled with sands or pebbles. The utility model can greatly increase the bearing capacity of the pile end of the driven pile and reduce the fabrication cost of the pile foundation; and the outer side of the pile body is filled with sands or pebbles and has a certain thickness, which can facilitate water drainage, earth layer solidifying and foundation soil strengthening. The utility model is applied to the building foundation in earthy areas in the bearing stratum.
Description
The utility model relates to building field, relates in particular to the building foundation field.
At present, in the building foundation engineering, pre cast pile is widely used with its reliable in quality both at home and abroad, yet no matter stake of the existing pre cast pile side of being or pile tube are equal diameter from top to bottom, therefore, bearing capacity of pile tip is little.
The purpose of this utility model is to improve bearing capacity of pile tip greatly, reduces the pile foundation cost, and promotes the soil layer draining to solidify, and improves foundation soil strength.
The purpose of this utility model realizes by following technical measures, the utility model building foundation band stake major part pre cast pile is the same with prior art, all include the pre cast pile pile body, it is characterized in that in pre cast pile pile body lower end being the stake major part of diameter greater than pile body diameter 5-50cm, is back-up sand or the cobble of thickness 3-25cm in the pile body outside.Stake major part herein is plain concrete or steel bar concrete, and stake major part cross section is circular or square or polygon, and the stake major part is connected with insertion or electric welding with pile body.During pile sinking, because pile body diameter is less than the stake diameter at butt end, sand or cobble are just inserted along the stake and the gap of soil, until filling up.
The utility model compared with prior art has following advantage: can improve the bearing capacity of pile tip of driven pile greatly, reduce the pile foundation cost; The pile body outside is certain thickness back-up sand or cobble, is beneficial to draining, solidifies soil layer, improves foundation strength.The present invention is applicable to the bearing stratum building foundation of soft clay area preferably.
Description of drawings:
Fig. 1 is the generalized section of an embodiment of the present utility model.
An exemplary embodiments of the present utility model such as Fig. 1: on the place of forming by upper strata (1), (5), (6), stake major part (4) one ends are coated with in the tube chamber (7) of clay insertion tube stake pile body (2), at stake week heap sand, with pile driver it is squeezed in the soil layer (1), along with the sinking of pile body (2), sand (3) is just inserted the space between pile body (2) and the soil layer (1), when stake major part (4) enters bearing stratum (5) surface or certain depth, stop piling, and get final product after the space filled sand (3).
Claims (1)
1, utility model building foundation band stake major part pre cast pile is the same with prior art, all include the pre cast pile pile body, it is characterized in that in pre cast pile pile body lower end being the stake major part of diameter greater than pile body diameter 5-50cm, is back-up sand or the cobble of thickness 3-25cm in the pile body outside.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02217937 CN2557590Y (en) | 2002-06-05 | 2002-06-05 | Prefabricated piling pile with bigger top for building foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 02217937 CN2557590Y (en) | 2002-06-05 | 2002-06-05 | Prefabricated piling pile with bigger top for building foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2557590Y true CN2557590Y (en) | 2003-06-25 |
Family
ID=33696663
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 02217937 Expired - Fee Related CN2557590Y (en) | 2002-06-05 | 2002-06-05 | Prefabricated piling pile with bigger top for building foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2557590Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747724A (en) * | 2011-04-19 | 2012-10-24 | 陈东曙 | Sand-filled composite pile, pile forming device and pile forming method |
CN102900074A (en) * | 2012-10-25 | 2013-01-30 | 中国地质大学(武汉) | Prefabricated tubular pile with end screw thread with X-shaped variable section and construction method thereof |
-
2002
- 2002-06-05 CN CN 02217937 patent/CN2557590Y/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102747724A (en) * | 2011-04-19 | 2012-10-24 | 陈东曙 | Sand-filled composite pile, pile forming device and pile forming method |
CN102747724B (en) * | 2011-04-19 | 2015-12-02 | 陈东曙 | A kind of piling method of back-up sand composite pile |
CN102900074A (en) * | 2012-10-25 | 2013-01-30 | 中国地质大学(武汉) | Prefabricated tubular pile with end screw thread with X-shaped variable section and construction method thereof |
CN102900074B (en) * | 2012-10-25 | 2013-08-21 | 中国地质大学(武汉) | Prefabricated tubular pile with end screw thread with X-shaped variable section and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100476082C (en) | Post-grouting construction method for long helical bore grouting pile and grouting device thereof | |
CN111058443B (en) | Precast pile composite foundation construction method for eliminating loess collapsibility | |
CN103993598A (en) | Crashed stone grouting pile with lead holes implanted in cloth bag and construction method | |
CN202187340U (en) | Socketed pile with concrete-filled steel tube core column | |
CN2557590Y (en) | Prefabricated piling pile with bigger top for building foundation | |
CN2370066Y (en) | Channel slip casting steel bar concrete hollow prefabricated pile | |
CN208472713U (en) | A kind of composite structure mini pile for administering small-sized landslide | |
CN201605588U (en) | Structure for reinforcing and fixing slope surface of prestress anchoring frame beam | |
CN104196013A (en) | Composite Y-shaped pile and construction method of composite Y-shaped pile | |
CN207121896U (en) | Precast hollow uplift pile | |
CN201605587U (en) | Structure for reinforcing and fixing slope surface of prestress anchoring frame plate | |
CN1064100C (en) | Formation method for retaining wall | |
CN101024957A (en) | Process for composite processing prestressed concrete pipe pile | |
US4588327A (en) | Precast concrete pile and method of placing it in the ground | |
CN203866821U (en) | Lead hole implant cloth bag gravel grouting pile | |
CN201567574U (en) | Prestressed anchorage anchor pier slope reinforcing and fixing structure | |
CN102121248A (en) | Method for reinforcing and fixing sloping surface of prestressed anchorage element | |
CN200955146Y (en) | Multi-stage sink-pipe bored concrete pile | |
CN2567271Y (en) | Prestressed tubular pile with large-diameter pile end of building foundation engineering | |
CN202124857U (en) | Splitting pile | |
CN1042158C (en) | Injecting method for steel rod concrete prefabricated pile end | |
CN216130104U (en) | Large-scale stake of water conservancy picture peg | |
CN200955147Y (en) | High-rise building sink-pipe bored concrete pile | |
CN202090334U (en) | Capped two-way-perforated PTC tubular pile composite foundation | |
CN217267482U (en) | Simple and easy drilling bored concrete pile post-grouting device based on flexible slip casting pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |