CN204000837U - A kind of prefabricated diaphragm wall - Google Patents
A kind of prefabricated diaphragm wall Download PDFInfo
- Publication number
- CN204000837U CN204000837U CN201420289660.1U CN201420289660U CN204000837U CN 204000837 U CN204000837 U CN 204000837U CN 201420289660 U CN201420289660 U CN 201420289660U CN 204000837 U CN204000837 U CN 204000837U
- Authority
- CN
- China
- Prior art keywords
- wall
- row
- hole
- prestressed
- monomers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The utility model discloses a kind of prefabricated diaphragm wall, it comprises wall monomer (1) and pile foundation (2), a plurality of wall monomers (1) longitudinally stack form wall row, and prestressed reinforcement (7) will be filled cement paste in whole wall monomers (1) of these row wall row and pile foundation (2) tensioning and prestress hole (3).This prefabricated diaphragm wall can accelerate speed of application, reduction of erection time, horizontal shearing resistance and longitudinally Compressive Bearing Capacity is good.
Description
Technical field
The utility model relates to the Underground Construction technology in field of civil engineering, is specifically a kind of prefabricated diaphragm wall.
Background technology
Along with the progress of Base hole supporting technology and the development of building underground structure technology, there is a kind of diaphragm wall that integrates foundation pit bracing piling wall and two kinds of structures of outer wall of basement, this diaphragm wall not only possessed foundation pit bracing piling wall to the supporting of foundation ditch and water retaining function but also can be directly as outer wall of basement with supporting building superstructure, construct after this body of wall, without more separately construction foundation pit go along with sb. to guard him piling wall and outer wall of basement, therefore reduction of erection time significantly, and because outer wall of basement and foundation pit bracing piling wall integrate, this has just expanded the usable floor area of underground structure and has dwindled the area that building site takies, the situation that meets present urban land area growing tension.
The construction method of the diaphragm wall of prior art is: subdrilling stake hole, and then dig the mounting groove identical with body of wall shape, then put into pile foundation steel bar cage and put into wall steel bar cage to mounting groove in stake hole, then one is watered and is smash body of wall and pile foundation concrete.There is a drawback in the construction method of prior art: because whole body of wall volume is large, water the concrete amount of smashing many, hardening of concrete speed is too slow, and the duration is oversize.
In order to accelerate speed of application, reduction of erection time, someone has proposed a kind of by the first prefabricated construction imagination of diaphragm wall, i.e. first prefabricated diaphragm wall, then directly the prefabricated exterior wall completely that hardened is transported to job site, again by its direct handling in mounting groove, so just nature is without the hardening of concrete of waiting for diaphragm wall, significantly reduction of erection time.But the bulky of diaphragm wall, nature can not, by complete diaphragm wall carrying and handling, so can only precast wall monomer, be spliced into whole diaphragm wall by the handling of wall monomer to mounting groove.This imagination cannot realize owing to there is a technical barrier that is difficult to overcome: be exactly wall monomer with wall monomer between be longitudinally that short transverse is connected and diaphragm wall cannot be realized with longitudinal connection the between pile foundation, like this, the shear strength of whole body of wall and longitudinal load-bearing power are not enough, cannot bear soil body lateral pressure, also cannot support the longitudinal pressure of building superstructure.
Utility model content
The technical problems to be solved in the utility model is to provide and can accelerate speed of application, reduction of erection time, horizontal shearing resistance and longitudinal good a kind of prefabricated diaphragm wall of Compressive Bearing Capacity.
Technical solution of the present utility model is, a kind of prefabricated diaphragm wall is provided, it comprises a plurality of wall monomers and many piles base, each wall monomer is longitudinally penetrated with a plurality of prestress holes and a plurality of non-prestressed hole, the left and right side of the outer protruding wall monomer of transverse reinforcement of each wall monomer, a plurality of wall monomers longitudinally superpose and form row wall row, in the prestress hole of whole wall monomers of every row wall row, be penetrated with a prestressed reinforcement with well, the lower end of prestressed reinforcement and the lower end of sleeve pipe are all anchored in pile foundation concrete, prestressed reinforcement will be filled cement paste in whole wall monomers of these row wall row and pile foundation tensioning and prestress hole, in the non-prestressed hole of whole wall monomers of every row wall row, be penetrated with in a nonprestressed reinforcement and non-prestressed hole and also fill cement paste, between every two adjacent wall row, be provided with concrete joint portion, be provided with joint portion reinforcing cage in concrete joint portion, joint portion reinforcing cage docks fixing with the transverse reinforcement that stretches into concrete joint portion of the wall row of the left and right sides.
Utilize the construct method of outer wall of basement and floor of prefabricated diaphragm wall of the present utility model, its step comprises:
A, dig mounting groove and bore a plurality of holes, stake hole is positioned at the bottom land of mounting groove;
B, in each hole, insert pile foundation steel bar cage and a prestressed reinforcement with well, and to the slip casting of stake hole;
C, a plurality of wall monomers are longitudinally superimposed as to a plurality of walls are listed as and put into mounting groove, each wall is listed as by a plurality of wall monomers and is formed by stacking from the bottom up, and the prestressed reinforcement of anchoring in the pile foundation of each wall row below and sleeve pipe are listed as to the prestress hole of whole wall monomers through this wall, in the non-prestressed hole of the whole wall monomers that are listed as to each wall again, insert nonprestressed reinforcement, then slip casting in the prestress hole being listed as to each wall and non-prestressed hole, after band concrete is stiff, tensioning prestressed reinforcement, like this, the wall monomer of a plurality of longitudinal stack has formed whole wall row;
D, in the gap between every two adjacent walls row, insert joint portion reinforcing cage, and the transverse reinforcement protruding on the side of each wall monomer of wall row docks fixing with joint portion reinforcing cage, then slip casting in gap, make it to form the concrete joint portion between wall row, like this, the whole diaphragm wall of a plurality of wall row formation.
A kind of prefabricated diaphragm wall of the utility model compared with prior art, has the following advantages and effect:
First, the agent structure of this diaphragm wall is that each wall monomer is prefabricated, only has the on-the-spot slip casting in coupling part, like this, has significantly reduced on-the-spot grouting amount, therefore the stiff speed of concrete is fast, significantly accelerates speed of application, shortens construction period, secondly, from longitudinal direction, prestressed reinforcement is by a plurality of wall monomers of same wall row and the longitudinally tensioning of concrete of pile foundation, horizontal shearing resistance and longitudinal Compressive Bearing Capacity of wall row have been improved, and the prestressed reinforcement in prestress hole and cement paste have formed longitudinal prestressing concrete joint pin, but not nonprestressed reinforcement and cement paste in prestress hole formed longitudinal non-prestressed concrete joint pin, prestressed concrete joint pin further becomes a plurality of wall monomers integral wall row with non-prestressed concrete joint pin with pile foundation reinforcement, further increase its horizontal shearing resistance and longitudinal Compressive Bearing Capacity, this just overcome that longitudinal between wall monomer and wall monomer is connected and diaphragm wall and pile foundation between the longitudinal technical barrier that cannot realize that is connected, again, by the joint portion reinforcing cage in concrete joint portion, the transverse reinforcement docking of the wall row of the left and right sides is fixing, make each wall row laterally connect into whole diaphragm wall.
Accompanying drawing explanation
Fig. 1 is the structural representation of facing of a kind of prefabricated diaphragm wall of the utility model and floor.
Fig. 2 be a kind of prefabricated diaphragm wall of the utility model wall monomer face structural representation.
Fig. 3 is the positive sectional structure schematic diagram of the wall row of a kind of prefabricated diaphragm wall of the utility model.
Fig. 4 is the positive sectional structure schematic diagram of amplification of a kind of prefabricated diaphragm wall of the utility model and floor junction.
Fig. 5 is the plan structure schematic diagram of a kind of prefabricated diaphragm wall of the utility model.
Shown in figure 1, wall monomer, 2, pile foundation, 3, prestress hole, 4, non-prestressed hole, 5, transverse reinforcement, 6, sleeve pipe, 7, prestressed reinforcement, 8, nonprestressed reinforcement, 9, concrete joint portion, 10, joint portion reinforcing cage, 11, level is to groove, 12, preformed hole, 13, pre-embedded steel slab, 14, connecting reinforcement, 15, shrouding, 16, stake hole, 17, mounting groove, 18, floor, 19, operation hole, 20, angle steel, 21, horizontal steel bar.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, a kind of prefabricated diaphragm wall of the utility model, it comprises a plurality of wall monomers 1 and many piles base 2.Each wall monomer 1 is longitudinally penetrated with a plurality of prestress holes 3 and a plurality of non-prestressed hole 4, the left and right side of the outer protruding wall monomer 1 of transverse reinforcement 5 of each wall monomer 1.A plurality of wall monomers 1 longitudinally stack form row wall row, in the prestress hole 3 of whole wall monomers 1 of every row wall row, be penetrated with one with the prestressed reinforcement 7 of sleeve pipe 6, the lower end of the lower end of prestressed reinforcement 7 and sleeve pipe 6 is all anchored in pile foundation 2 concrete, and prestressed reinforcement 7 will be filled cement paste in whole wall monomers 1 of these row wall row and pile foundation 2 tensionings and prestress hole 3.In the non-prestressed hole 4 of whole wall monomers 1 of every row wall row, be penetrated with in a nonprestressed reinforcement 8 and non-prestressed hole 4 and also fill cement paste.Between every two adjacent wall row, be provided with concrete joint portion 9, be provided with joint portion reinforcing cage 10 in concrete joint portion 9, joint portion reinforcing cage 10 docks fixing with the transverse reinforcement that stretches into concrete joint portion 95 of the wall row of the left and right sides.Specifically, the right flank of each wall monomer 1 that is positioned at the wall row in 9 left sides, concrete joint portion is protruding with transverse reinforcement 5, and this transverse reinforcement 5 docks with joint portion reinforcing cage 10 to be fixed; The left surface of each wall monomer 1 that is positioned at the wall row on 9 right sides, concrete joint portion is protruding with transverse reinforcement 5, and this transverse reinforcement 5 docks with joint portion reinforcing cage 10 to be fixed.The inner surface of each wall monomer 1 is provided with a level to groove 11, and level is provided with a plurality of preformed holes 12 of a row and a pre-embedded steel slab 13 to groove 11 bottom lands.A plurality of preformed holes 12 are horizontally in a row, and pre-embedded steel slab 13 is positioned at the below of row's preformed hole 12.In each preformed hole 12, be provided with wall monomer 1 reinforcing cage and dock fixing connecting reinforcement 14.Level is spirally connected one for blocking the shrouding 15 of pre-embedded steel slab 13 and preformed hole 12 in groove 11.Specifically, level is embedded with the built-in fitting with internal thread hole to the bottom land of groove 11, and screw screws in the internal thread hole of built-in fitting through the through hole of shrouding 15.
Utilize the construct method of outer wall of basement and floor of prefabricated diaphragm wall of the present utility model, it comprises the following steps.
A, dig mounting groove 17 and bore a plurality of holes 16, stake hole 16 is positioned at the bottom land of mounting groove 17.
B, in each hole 16 interior insertion pile foundation 2 reinforcing cages and a prestressed reinforcement 7 with sleeve pipe 6, and to 16 slip castings of stake hole, like this, prestressed reinforcement 7 and sleeve pipe 6 are all anchored in pile foundation 2, and prestressed reinforcement 7 lower ends form anchored end.
C, a plurality of wall monomers 1 are longitudinally superimposed as to a plurality of walls and are listed as and put into mounting groove 17, each wall is listed as by a plurality of wall monomers 1 and is formed by stacking from the bottom up, and the prestressed reinforcement 7 of anchoring in the pile foundation 2 of each wall row below and sleeve pipe 6 are listed as to the prestress hole 3 of whole wall monomers 1 through this wall, the interior insertion nonprestressed reinforcement 8 in non-prestressed hole 4 of the whole wall monomers 1 that are listed as to each wall again, then the interior slip casting of prestress hole 3 and non-prestressed hole 4 being listed as to each wall, after band concrete is stiff, tensioning prestressed reinforcement 7, like this, the wall monomer 1 of a plurality of longitudinal stacks has formed whole wall row.
D, in the gap between every two adjacent walls row, insert joint portion reinforcing cage 10, and the transverse reinforcement 5 protruding on the side of each wall monomer 1 of wall row docks fixing with joint portion reinforcing cage 10, then to slip casting in gap, make it to form the concrete joint portion 9 between wall row, like this, the whole diaphragm wall of a plurality of wall row formation.
E, at high floor 18 concrete of smashing basement top layer that water of diaphragm wall top mark, the vertical end face that protrudes this wall monomer 1 to reinforcing bar of the reinforcing cage of a wall monomer 1 of each wall row the top, while laying basement top floor 18 with the floor 18 of ground level, by the reinforcing cage of this floor plate 18 and being vertically connected to reinforcing bar of protruding on wall monomer 1 end face of wall row the top, and set up template, water floor 18 concrete of smashing top layer.On the floor 18 of basement top layer, stay in advance and dig and unearthed operation hole 19, this operation hole 19 polishing again after basement structure construction completes.
F, multiple tracks diaphragm wall form the edge of foundation ditch, under the soil body that digs in diaphragm wall form foundation ditch.Under dig the soil body in diaphragm wall until under dig the absolute altitude of lower one deck basement floor 18, lay down the shrouding 15 of the wall monomer 1 of this absolute altitude, preformed hole 12 and the pre-embedded steel slab 13 of wall monomer 1 inner surface are exposed, on pre-embedded steel slab 13, weld angle steel 20, re-lay the reinforcing cage of this floor plate 18 and the horizontal steel bar 21 of floor 18 reinforcing cages is stretched into preformed hole 12 and dock with the connecting reinforcement 14 in preformed hole 12, water again and smash floor 18 concrete and preformed hole 12 slip castings tamped and the horizontal steel plate of angle steel 20 is also anchored in concrete, water while smashing floor 18, same reserving on floor 18 under continuation dug and unearthed operation hole 19.
G, repeating step f, until the floor 18 of the bottom of basement has been constructed, water while smashing bottom floor 18, without giving over to industry hole 19.
Claims (1)
1. a prefabricated diaphragm wall, it is characterized in that: it comprises a plurality of wall monomers (1) and many piles base (2), each wall monomer (1) is longitudinally penetrated with a plurality of prestress holes (3) and a plurality of non-prestressed hole (4), the left and right side of the outer protruding wall monomer of transverse reinforcement (5) (1) of each wall monomer (1), a plurality of wall monomers (1) longitudinally stack form row wall row, in the prestress hole (3) of whole wall monomers (1) of every row wall row, be penetrated with the prestressed reinforcement (7) of a band sleeve pipe (6), the lower end of the lower end of prestressed reinforcement (7) and sleeve pipe (6) is all anchored in pile foundation (2) concrete, prestressed reinforcement (7) will be filled cement paste in whole wall monomers (1) of these row wall row and pile foundation (2) tensioning and prestress hole (3), in the non-prestressed hole (4) of whole wall monomers (1) of every row wall row, be penetrated with in a nonprestressed reinforcement (8) and non-prestressed hole (4) and also fill cement paste, between every two adjacent wall row, be provided with concrete joint portion (9), in concrete joint portion (9), be provided with joint portion reinforcing cage (10), joint portion reinforcing cage (10) docks fixing with the transverse reinforcement that stretches into concrete joint portion (9) (5) of the wall row of the left and right sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420289660.1U CN204000837U (en) | 2014-05-30 | 2014-05-30 | A kind of prefabricated diaphragm wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420289660.1U CN204000837U (en) | 2014-05-30 | 2014-05-30 | A kind of prefabricated diaphragm wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204000837U true CN204000837U (en) | 2014-12-10 |
Family
ID=52040863
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420289660.1U Expired - Fee Related CN204000837U (en) | 2014-05-30 | 2014-05-30 | A kind of prefabricated diaphragm wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204000837U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108265702A (en) * | 2018-01-26 | 2018-07-10 | 中铁上海工程局集团华海工程有限公司 | Diaphram wall cage top reinforcing bar protects structure and construction method |
-
2014
- 2014-05-30 CN CN201420289660.1U patent/CN204000837U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108265702A (en) * | 2018-01-26 | 2018-07-10 | 中铁上海工程局集团华海工程有限公司 | Diaphram wall cage top reinforcing bar protects structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018518B (en) | The method of prefabricated diaphragm wall and construction outer wall of basement and floor | |
US20140026518A1 (en) | Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts | |
CN109356173A (en) | A kind of pin-connected panel anchor bolt frame girder construction and its construction method | |
CN204000925U (en) | Prefabricated diaphragm wall | |
CN105525627A (en) | Two-way anchorage plate retaining wall and construction method thereof | |
CN111622251A (en) | Assembly type open caisson structure and construction method thereof | |
CN104631440B (en) | A kind of existing large-section in-situ concrete pile strength core increases foundation pit supporting construction and constructional method | |
CN109024721B (en) | Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation | |
CN110616740A (en) | Structure for expanding subway section in subway mine method construction interval and construction method thereof | |
CN101793027B (en) | Core-grouted static pressure anchor rod pile | |
CN104074197B (en) | The construction method of large diameter thin wall cylinder stake compound anchor rod-type foundation pit enclosure structure | |
CN113417300B (en) | Slope support system and construction method thereof | |
CN110593080A (en) | Inter-support trestle system combined with inner support system and construction method | |
CN202187340U (en) | Socketed pile with concrete-filled steel tube core column | |
CN201077988Y (en) | Hidden beam-column type prestressing force earth nail wall | |
KR20020060351A (en) | Pier revolution apparatus and T-type pier construction method using the same | |
CN204000837U (en) | A kind of prefabricated diaphragm wall | |
CN108643215B (en) | Construction method of anchor pier type foundation after rotary spraying and pressing into variable cross section | |
JPS58178706A (en) | Caisson and its setting | |
CN105484270A (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit | |
CN102286971A (en) | Concrete-filled steel tube core column socketed pile | |
CN213867907U (en) | Prefabricated expanded packing key type digging foundation for power transmission line | |
CN212388582U (en) | Assembled open caisson structure | |
CN109653193B (en) | Reverse construction method for underground continuous wall | |
Gispert | Prefabricated foundations for housing applied to room modules |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141210 Termination date: 20190530 |