CN104018518B - The method of prefabricated diaphragm wall and construction outer wall of basement and floor - Google Patents
The method of prefabricated diaphragm wall and construction outer wall of basement and floor Download PDFInfo
- Publication number
- CN104018518B CN104018518B CN201410238500.9A CN201410238500A CN104018518B CN 104018518 B CN104018518 B CN 104018518B CN 201410238500 A CN201410238500 A CN 201410238500A CN 104018518 B CN104018518 B CN 104018518B
- Authority
- CN
- China
- Prior art keywords
- wall
- prestressed
- floor
- holes
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明公开了一种预制式地下连续墙以及施工地下室外墙和楼板的方法,该连续墙包括墙单体(1)和桩基(2),多个墙单体(1)纵向叠加形成墙列,预应力钢筋(7)将该列墙列的全部墙单体(1)和桩基(2)张紧且预应力孔(3)内灌满水泥浆;每个墙单体(1)的内表面设有一排多个预留孔和预埋钢板,每个预留孔内设有连接钢筋;该方法的关键在于张紧预应力钢筋(7),使得墙列的全部墙单体(1)和桩基(2)张紧,且将楼板钢筋笼的水平向钢筋伸入预留孔与连接钢筋对接。该连续墙及施工方法能加快施工速度、缩短工期、横向抗剪和纵向抗压承载力好且施工楼板时无需敲掉地下连续墙混凝土。
The invention discloses a prefabricated underground continuous wall and a method for constructing basement exterior walls and floor slabs. The continuous wall comprises a wall unit (1) and a pile foundation (2), and a plurality of wall units (1) are stacked vertically to form a wall row, the prestressed steel bar (7) tensions all the wall monomers (1) and pile foundations (2) of the row of walls and fills the prestressed hole (3) with cement slurry; each wall monomer (1) A row of multiple reserved holes and pre-embedded steel plates are provided on the inner surface of the wall, and connecting steel bars are provided in each reserved hole; the key to this method is to tension the prestressed steel bars (7), so that all the wall monomers ( 1) and the pile foundation (2) are tensioned, and the horizontal steel bars of the floor reinforcement cage are extended into the reserved holes to connect with the connecting steel bars. The diaphragm wall and the construction method can speed up the construction speed, shorten the construction period, have good lateral shear resistance and longitudinal compression resistance, and the concrete of the diaphragm wall does not need to be knocked off when the floor is constructed.
Description
技术领域technical field
本发明涉及土木工程领域中的地下结构施工技术,具体讲是一种预制式地下连续墙以及利用该预制式地下连续墙施工地下室外墙和楼板的方法。The invention relates to underground structure construction technology in the field of civil engineering, in particular to a prefabricated underground diaphragm wall and a method for constructing basement exterior walls and floors by using the prefabricated underground diaphragm wall.
背景技术Background technique
随着基坑支护技术的进步及建筑物地下结构技术的发展,出现了一种集基坑围护桩墙和地下室外墙两种结构为一体的地下连续墙,该地下连续墙既具备基坑围护桩墙对基坑的支护和挡水功能又能直接作为地下室外墙以支承建筑物上部结构,施工该墙体后,无需再单独施工基坑围护桩墙和地下室外墙,故能够大幅度缩短工期,而且由于地下室外墙和基坑围护桩墙整合为一体,这就扩大了地下结构的使用面积且缩小了工地占用的面积,符合现在城市用地面积日益紧张的局面。With the advancement of foundation pit support technology and the development of building underground structure technology, a kind of underground diaphragm wall integrating foundation pit surrounding pile wall and basement exterior wall has emerged. The supporting and water retaining functions of the pit enclosure pile wall to the foundation pit can also be directly used as the basement exterior wall to support the upper structure of the building. After the wall is constructed, there is no need to separately construct the foundation pit enclosure protection pile wall and the basement exterior wall. Therefore, the construction period can be greatly shortened, and because the basement outdoor wall and the foundation pit surrounding pile wall are integrated, the usable area of the underground structure is expanded and the area occupied by the construction site is reduced, which is in line with the increasingly tense urban land area.
现有技术的地下连续墙的施工方法为:先钻桩孔,然后挖与墙体形状吻合的安装槽,再向桩孔内放入桩基钢筋笼并向安装槽内放入墙体钢筋笼,然后一体浇捣墙体及桩基混凝土。现有技术的施工方法存在一个弊端:由于整个墙体体积大,浇捣的混凝土的量多,混凝土硬化速度太慢,工期太长。The construction method of the underground diaphragm wall in the prior art is as follows: first drill the pile holes, then dig installation grooves matching the shape of the wall body, then put the pile foundation reinforcement cage into the pile holes and put the wall reinforcement cage into the installation grooves , and then pour and pound the wall and pile foundation concrete in one piece. There is a drawback in the construction method of the prior art: due to the large volume of the whole wall, the amount of poured concrete is large, the hardening speed of the concrete is too slow, and the construction period is too long.
为了加快施工速度、缩短工期,有人提出了一种将地下连续墙先预制的施工设想,即先预制好地下连续墙,然后直接将预制好已经硬化完全的外墙运输到施工现场,再将其直接吊运到安装槽内,这样就自然无需等待地下连续墙的混凝土硬化,大幅度缩短工期。但地下连续墙的体积巨大,自然不可能将完整的地下连续墙搬运和吊运,所以只能预制出墙单体,将墙单体吊运至安装槽内拼接成整体的地下连续墙。该设想由于存在一个难以克服的技术难题而无法实现:就是墙单体与墙单体之间的纵向即高度方向连接以及连续墙与桩基之间的纵向连接无法实现,这样,整个墙体的抗剪强度和纵向承载力不足,无法承担土体侧压力,也无法支承建筑物上部结构的纵向压力。而且,该设想还存在一个缺陷:由于地下连续墙是预制好的,这样,需要浇捣地下室楼板时,必须敲掉楼板同标高的地下连续墙混凝土,露出钢筋,再将楼板钢筋与地下连续墙钢筋对接,最后浇捣楼板混凝土,即施工楼板混凝土必须敲掉地下连续墙混凝土,过程繁琐,甚至容易对地下连续墙结构造成破坏。In order to speed up the construction speed and shorten the construction period, someone proposed a construction idea of prefabricating the underground diaphragm wall first, that is, prefabricating the underground diaphragm wall first, and then directly transporting the prefabricated and fully hardened outer wall to the construction site, and then transporting it to the construction site. It is directly hoisted into the installation tank, so naturally there is no need to wait for the concrete of the underground continuous wall to harden, which greatly shortens the construction period. However, the volume of the underground diaphragm wall is huge, and it is naturally impossible to carry and lift the complete underground diaphragm wall. Therefore, only the wall monomer can be prefabricated, and the wall monomer can be hoisted into the installation groove to form a whole underground diaphragm wall. This idea cannot be realized due to an insurmountable technical problem: that is, the longitudinal connection between the wall monomers, that is, the height direction, and the longitudinal connection between the continuous wall and the pile foundation cannot be realized. The shear strength and longitudinal bearing capacity are not enough to bear the lateral pressure of the soil, nor can it support the longitudinal pressure of the superstructure of the building. Moreover, there is also a defect in this idea: since the underground diaphragm wall is prefabricated, when the basement floor slab needs to be poured and rammed, the concrete of the underground diaphragm wall at the same level as the floor slab must be knocked out to expose the steel bars, and then the floor steel bars and the underground diaphragm wall The steel bars are butt-connected, and finally the concrete for the floor slab is poured, that is, the concrete for the underground diaphragm wall must be knocked out for the construction of the floor slab concrete. The process is cumbersome and may even easily cause damage to the structure of the underground diaphragm wall.
发明内容Contents of the invention
本发明要解决的一个技术问题是,提供一种能加快施工速度、缩短工期、横向抗剪和纵向抗压承载力好且施工楼板时无需敲掉地下连续墙混凝土的预制式地下连续墙。A technical problem to be solved by the present invention is to provide a prefabricated underground diaphragm wall that can speed up the construction speed, shorten the construction period, have good lateral shear and longitudinal compressive bearing capacity, and do not need to knock off the concrete of the diaphragm wall when constructing the floor slab.
本发明的一个技术解决方案是,提供一种预制式地下连续墙,它包括多个墙单体和多根桩基,每个墙单体沿纵向贯穿有多个预应力孔和多个非预应力孔,每个墙单体的横向钢筋外凸出墙单体的左右侧面,多个墙单体纵向叠加形成一列墙列,每列墙列的全部墙单体的预应力孔内贯穿有一根带套管的预应力钢筋,预应力钢筋的下端和套管的下端均锚固在桩基混凝土中,预应力钢筋将该列墙列的全部墙单体和桩基张紧且预应力孔内灌满水泥浆,每列墙列的全部墙单体的非预应力孔内贯穿有一根非预应力钢筋且非预应力孔内也灌满水泥浆;每两个相邻的墙列之间设有混凝土结合部,混凝土结合部内设有结合部钢筋笼,结合部钢筋笼与左右两侧的墙列的伸入混凝土结合部的横向钢筋对接固定;每个墙单体的内表面设有一个水平向凹槽,水平向凹槽槽底设有一排多个预留孔和一块预埋钢板,预埋钢板位于一排预留孔的下方,每个预留孔内设有与墙单体钢筋笼对接固定的连接钢筋,水平向凹槽内螺接一块用于遮挡预埋钢板和预留孔的封板。A technical solution of the present invention is to provide a prefabricated underground continuous wall, which includes a plurality of wall units and a plurality of pile foundations, and each wall unit has a plurality of prestressed holes and a plurality of non-prestressed holes in the longitudinal direction. Stress holes, the horizontal reinforcement of each wall monomer protrudes from the left and right sides of the wall monomer, and multiple wall monomers are stacked vertically to form a row of walls, and a prestressed hole runs through all the wall monomers of each row of walls. Prestressed steel bar with casing, the lower end of the prestressed steel bar and the lower end of the casing are anchored in the concrete of the pile foundation, the prestressed steel bar tensions all the wall monomers and pile foundations of the row of walls, and the prestressed holes are filled Full of cement slurry, a non-prestressed steel bar runs through the non-prestressed holes of all the wall monomers in each row of walls, and the non-prestressed holes are also filled with cement slurry; between every two adjacent wall rows Concrete junction, the concrete junction is equipped with a reinforcement cage for the junction, and the reinforcement cage of the junction is butt-fixed with the horizontal reinforcement extending into the concrete junction of the wall rows on the left and right sides; the inner surface of each wall monomer is provided with a horizontal There is a row of multiple reserved holes and a pre-embedded steel plate at the bottom of the horizontal groove. Butt fixed connecting steel bars, screw a sealing plate to cover the embedded steel plate and the reserved hole horizontally in the groove.
本发明要解决的另一个技术问题是,提供一种能加快施工速度、缩短工期、横向抗剪和纵向抗压承载力好且施工楼板时无需敲掉地下连续墙混凝土的施工地下室外墙和楼板的方法。Another technical problem to be solved by the present invention is to provide a construction basement exterior wall and floor slab that can speed up the construction speed, shorten the construction period, have good lateral shear resistance and longitudinal compressive bearing capacity, and do not need to knock off the concrete of the underground diaphragm wall when constructing the floor slab. Methods.
本发明的另一个技术解决方案是,提供一种施工地下室外墙和楼板的方法,其步骤包括:Another technical solution of the present invention is to provide a method for constructing basement exterior walls and floor slabs, the steps of which include:
a、挖安装槽并钻多个桩孔,桩孔位于安装槽的槽底;a. Dig the installation groove and drill multiple pile holes, the pile holes are located at the bottom of the installation groove;
b、在每个桩孔内插入桩基钢筋笼和一根带套管的预应力钢筋,并向桩孔注浆;b. Insert a pile foundation reinforcement cage and a prestressed steel bar with casing into each pile hole, and inject grout into the pile hole;
c、将多个墙单体纵向叠加成多个墙列并放入安装槽内,每个墙列由多个墙单体从下往上叠加而成,且将每个墙列下方的桩基中锚固的预应力钢筋及套管穿过该墙列全部墙单体的预应力孔,再向每个墙列的全部墙单体的非预应力孔内插入非预应力钢筋,然后向各个墙列的预应力孔和非预应力孔内注浆,带混凝土干硬后,张紧预应力钢筋,这样,多个纵向叠加的墙单体形成了整体的墙列;c. Stack multiple wall monomers vertically to form multiple wall columns and put them into the installation groove. Each wall column is formed by stacking multiple wall monomers from bottom to top, and the pile foundation under each wall column The prestressed steel bars and sleeves anchored in the middle pass through the prestressed holes of all the wall monomers of the wall column, and then insert the non-prestressed steel bars into the non-prestressed holes of all the wall monomers of each wall column, and then insert the non-prestressed steel bars into each wall Grouting in the prestressed holes and non-prestressed holes of the column, after the concrete is dry and hard, the prestressed steel bars are tensioned, so that multiple longitudinally superimposed wall monomers form an integral wall column;
d、向每两个相邻墙列之间的间隙内插入结合部钢筋笼,且墙列的各个墙单体的侧面上凸出的横向钢筋与结合部钢筋笼对接固定,然后间隙内注浆,使之形成墙列之间的混凝土结合部,这样,多个墙列形成整体的地下连续墙;d. Insert the reinforcement cage of the joint into the gap between every two adjacent wall columns, and the protruding transverse reinforcement on the side of each wall monomer of the wall column is docked and fixed with the reinforcement cage of the joint, and then grouting in the gap , so that it forms the concrete junction between the wall columns, so that multiple wall columns form an integral underground continuous wall;
e、在地下连续墙顶标高浇捣地下室顶层的楼板混凝土,且在地下室顶层的楼板上预留下挖和出土的作业孔;e. Pour and tamp the floor slab concrete on the top floor of the basement at the top level of the underground diaphragm wall, and reserve work holes for excavation and excavation on the floor slab of the top floor of the basement;
f、下挖地下连续墙内的土体直至下挖到下一层地下室楼板的标高,卸掉该标高的墙单体的封板,使得墙单体内表面的预留孔和预埋钢板露出,在预埋钢板上焊接角钢,再铺设该层楼板的钢筋笼且将楼板钢筋笼的水平向钢筋伸入预留孔与预留孔中的连接钢筋对接,再浇捣楼板混凝土且将预留孔注浆填实并将角钢的横钢板也锚固在混凝土中,浇捣楼板时,同样在楼板上预留出继续下挖和出土的作业孔;f. Excavate the soil in the underground diaphragm wall until it reaches the level of the next basement floor, and remove the sealing plate of the wall unit at this level, so that the reserved holes and pre-embedded steel plates on the inner surface of the wall unit are exposed. Weld the angle steel on the pre-embedded steel plate, then lay the reinforcement cage of the floor and extend the horizontal reinforcement of the reinforcement cage of the floor into the reserved hole to connect with the connection reinforcement in the reserved hole, then pour the floor concrete and place the reserved hole Fill it with grout and anchor the horizontal steel plate of the angle steel in the concrete. When pouring and tamping the floor slab, also reserve a working hole on the floor slab for continued digging and excavation;
g、重复步骤f,直至地下室的底层的楼板施工完成。g. Step f is repeated until the floor slab construction of the bottom floor of the basement is completed.
本发明预制式地下连续墙以及施工地下室外墙和楼板的方法与现有技术相比,具有以下优点和效果:Compared with the prior art, the prefabricated underground diaphragm wall and the method for constructing basement exterior wall and floor slab of the present invention have the following advantages and effects:
首先,该地下连续墙的主体结构即各个墙单体是预制好的,只有连接部分现场注浆,这样,大幅度减少了现场注浆量,故混凝土干硬速度快,大幅度加快施工速度,缩短施工周期;其次,从纵向方向看,预应力钢筋将同一墙列的多个墙单体和桩基的混凝土沿纵向张紧,提高了墙列的横向抗剪和纵向抗压承载力,且预应力孔内的预应力钢筋及水泥浆形成了纵向预应力混凝土连接柱,而非预应力孔内的非预应力钢筋和水泥浆形成了纵向非预应力混凝土连接柱,预应力混凝土连接柱和非预应力混凝土连接柱进一步将多个墙单体和桩基加固成整体墙列,进一步增大其横向抗剪和纵向抗压承载力,这就克服了墙单体与墙单体之间的纵向连接以及连续墙与桩基之间的纵向连接无法实现的技术难题;再次,通过混凝土结合部内的结合部钢筋笼,将左右两侧的墙列的横向钢筋对接固定,使得各个墙列横向连接成整体的地下连续墙;而且,施工楼板时,无需像现有技术一样将墙面混凝土敲掉,而是拆掉封板,露出预留孔及预留孔内的连接钢筋,再将连接钢筋与楼板钢筋笼对接固定,浇捣楼板混凝土即可,楼板施工过程方便快捷,而且楼板与地下连续墙的连接牢固可靠,况且,在预埋钢板上焊接角钢,且将角钢锚固在楼板混凝土内,这样,就加固了楼板与地下连续墙的连接,提高其连接位置的抗剪强度。First of all, the main structure of the underground diaphragm wall, that is, each wall unit is prefabricated, and only the connecting parts are grouted on site. In this way, the amount of grouting on site is greatly reduced, so the concrete hardens quickly and the construction speed is greatly accelerated. Shorten the construction period; secondly, from the longitudinal direction, the prestressed steel bars will tension the concrete of multiple wall monomers and pile foundations of the same wall row in the longitudinal direction, which improves the lateral shear and longitudinal compressive bearing capacity of the wall row, and The prestressed steel bars and cement slurry in the prestressed hole form a longitudinal prestressed concrete connection column, while the non-prestressed steel reinforcement and cement slurry in a non-prestressed hole form a longitudinal non-prestressed concrete connection column, and the prestressed concrete connection column and The non-prestressed concrete connection column further strengthens multiple wall units and pile foundations into an integral wall row, further increasing its transverse shear and longitudinal compressive bearing capacity, which overcomes the gap between the wall units and the wall units. The technical problem that the longitudinal connection and the longitudinal connection between the continuous wall and the pile foundation cannot be realized; thirdly, through the joint reinforcement cage in the concrete joint, the horizontal reinforcement of the wall rows on the left and right sides is butt-fixed, so that each wall row is horizontally connected Integral continuous underground wall; moreover, when constructing the floor slab, it is not necessary to knock off the concrete on the wall as in the prior art, but remove the sealing plate to expose the reserved holes and the connecting steel bars in the reserved holes, and then install the connecting steel bars It is docked and fixed with the floor reinforcement cage, and the floor concrete can be poured and rammed. The floor construction process is convenient and fast, and the connection between the floor and the underground diaphragm wall is firm and reliable. Moreover, the angle steel is welded on the pre-embedded steel plate, and the angle steel is anchored in the floor concrete. In this way, the connection between the floor slab and the underground diaphragm wall is strengthened, and the shear strength of the connection position is improved.
附图说明Description of drawings
图1是本发明预制式地下连续墙及楼板的正视结构示意图。Fig. 1 is a schematic diagram of the front view of the prefabricated underground continuous wall and floor slab of the present invention.
图2是本发明预制式地下连续墙的墙单体的正视结构示意图。Fig. 2 is a schematic diagram of the front view of the wall unit of the prefabricated underground continuous wall of the present invention.
图3是本发明预制式地下连续墙的墙列的正剖视结构示意图。Fig. 3 is a frontal sectional structural schematic diagram of the wall row of the prefabricated underground continuous wall of the present invention.
图4是本发明预制式地下连续墙与楼板结合处的放大正剖视结构示意图。Fig. 4 is an enlarged frontal cross-sectional structural schematic diagram of the joint between the prefabricated underground continuous wall and the floor slab of the present invention.
图5是本发明预制式地下连续墙的俯视结构示意图。Fig. 5 is a top view structural diagram of the prefabricated underground continuous wall of the present invention.
图中所示1、墙单体,2、桩基,3、预应力孔,4、非预应力孔,5、横向钢筋,6、套管,7、预应力钢筋,8、非预应力钢筋,9、混凝土结合部,10、结合部钢筋笼,11、水平向凹槽,12、预留孔,13、预埋钢板,14、连接钢筋,15、封板,16、桩孔,17、安装槽,18、楼板,19、作业孔,20、角钢,21、水平向钢筋。As shown in the figure 1. Wall monomer, 2. Pile foundation, 3. Prestressed hole, 4. Non-prestressed hole, 5. Transverse reinforcement, 6. Sleeve, 7. Prestressed reinforcement, 8. Non-prestressed reinforcement , 9. Concrete joint, 10. Joint reinforcement cage, 11. Horizontal groove, 12. Reserved hole, 13. Embedded steel plate, 14. Connecting steel bar, 15. Sealing plate, 16. Pile hole, 17. Installation groove, 18, floor slab, 19, operation hole, 20, angle steel, 21, horizontally to reinforcing bar.
具体实施方式detailed description
下面结合附图和具体实施例对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
如图1、图2、图3、图4、图5所示,本发明预制式地下连续墙,它包括多个墙单体1和多根桩基2。每个墙单体1沿纵向贯穿有多个预应力孔3和多个非预应力孔4,每个墙单体1的横向钢筋5外凸出墙单体1的左右侧面。多个墙单体1纵向叠加形成一列墙列,每列墙列的全部墙单体1的预应力孔3内贯穿有一根带套管6的预应力钢筋7,预应力钢筋7的下端和套管6的下端均锚固在桩基2混凝土中,预应力钢筋7将该列墙列的全部墙单体1和桩基2张紧且预应力孔3内灌满水泥浆。每列墙列的全部墙单体1的非预应力孔4内贯穿有一根非预应力钢筋8且非预应力孔4内也灌满水泥浆。每两个相邻的墙列之间设有混凝土结合部9,混凝土结合部9内设有结合部钢筋笼10,结合部钢筋笼10与左右两侧的墙列的伸入混凝土结合部9的横向钢筋5对接固定。具体的说,位于混凝土结合部9左侧的墙列的每个墙单体1的右侧面凸出有横向钢筋5,该横向钢筋5与结合部钢筋笼10对接固定;位于混凝土结合部9右侧的墙列的每个墙单体1的左侧面凸出有横向钢筋5,该横向钢筋5与结合部钢筋笼10对接固定。每个墙单体1的内表面设有一个水平向凹槽11,水平向凹槽11槽底设有一排多个预留孔12和一块预埋钢板13。多个预留孔12水平排列成一排,预埋钢板13位于一排预留孔12的下方。每个预留孔12内设有与墙单体1钢筋笼对接固定的连接钢筋14。水平向凹槽11内螺接一块用于遮挡预埋钢板13和预留孔12的封板15。具体的说,水平向凹槽11的槽底预埋有带内螺纹孔的预埋件,螺钉穿过封板15的通孔旋入预埋件的内螺纹孔内。As shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5, the prefabricated underground continuous wall of the present invention includes a plurality of wall monomers 1 and a plurality of pile foundations 2. Each wall unit 1 runs through a plurality of prestressed holes 3 and a plurality of non-prestressed holes 4 in the longitudinal direction, and the transverse reinforcement 5 of each wall unit 1 protrudes from the left and right sides of the wall unit 1 . A plurality of wall monomers 1 are stacked vertically to form a wall row, and a prestressed steel bar 7 with a sleeve 6 runs through the prestressed hole 3 of all the wall monomers 1 in each wall row, and the lower end of the prestressed steel bar 7 and the sleeve The lower ends of the pipes 6 are all anchored in the concrete of the pile foundation 2, the prestressed steel bar 7 tensions all the wall monomers 1 and the pile foundation 2 of the row of walls, and the prestressed hole 3 is filled with cement slurry. A non-prestressed steel bar 8 runs through the non-prestressed holes 4 of all the wall monomers 1 of each row of walls, and the non-prestressed holes 4 are also filled with cement slurry. A concrete junction 9 is provided between every two adjacent wall rows, and a junction reinforcement cage 10 is provided in the concrete junction 9, and the junction reinforcement cage 10 and the wall rows on the left and right sides extend into the concrete junction 9. Horizontal reinforcing bars 5 are butt-jointed and fixed. Specifically, the right side of each wall unit 1 of the wall column on the left side of the concrete junction 9 protrudes from the transverse reinforcement 5, and the transverse reinforcement 5 is docked and fixed with the reinforcement cage 10 of the junction; A transverse steel bar 5 protrudes from the left side of each wall unit 1 of the right wall row, and the transverse steel bar 5 is docked and fixed with the reinforcement cage 10 at the junction. The inner surface of each wall unit 1 is provided with a horizontal groove 11 , and the bottom of the horizontal groove 11 is provided with a row of multiple reserved holes 12 and a pre-embedded steel plate 13 . A plurality of reserved holes 12 are horizontally arranged in a row, and the embedded steel plate 13 is located below the row of reserved holes 12 . Each reserved hole 12 is provided with a connecting steel bar 14 that is docked and fixed with the reinforcement cage of the wall unit 1 . A sealing plate 15 for covering the pre-embedded steel plate 13 and the reserved hole 12 is screwed in the groove 11 horizontally. Specifically, the bottom of the horizontal groove 11 is pre-embedded with an embedded part with an internal threaded hole, and the screw passes through the through hole of the sealing plate 15 and is screwed into the internal threaded hole of the embedded part.
本发明施工地下室外墙和楼板的方法,也就是利用本发明的预制式地下连续墙来施工地下室外墙和楼板的方法,它包括以下步骤:The method for constructing basement exterior walls and floor slabs of the present invention, that is, utilizing the prefabricated underground diaphragm wall of the present invention to construct the method for basement exterior walls and floor slabs, it comprises the following steps:
a、挖安装槽17并钻多个桩孔16,桩孔16位于安装槽17的槽底。a. Dig the installation groove 17 and drill a plurality of pile holes 16, the pile holes 16 are located at the bottom of the installation groove 17.
b、在每个桩孔16内插入桩基2钢筋笼和一根带套管6的预应力钢筋7,并向桩孔16注浆,这样,将预应力钢筋7及套管6均锚固在桩基2内,且预应力钢筋7下端形成锚固端。b, insert pile foundation 2 reinforcement cages and a prestressed steel bar 7 with casing 6 in each pile hole 16, and grout to pile hole 16, like this, prestressed steel bar 7 and casing 6 are all anchored in Inside the pile foundation 2, and the lower end of the prestressed steel bar 7 forms an anchor end.
c、将多个墙单体1纵向叠加成多个墙列并放入安装槽17内,每个墙列由多个墙单体1从下往上叠加而成,且将每个墙列下方的桩基2中锚固的预应力钢筋7及套管6穿过该墙列全部墙单体1的预应力孔3,再向每个墙列的全部墙单体1的非预应力孔4内插入非预应力钢筋8,然后向各个墙列的预应力孔3和非预应力孔4内注浆,带混凝土干硬后,张紧预应力钢筋7,这样,多个纵向叠加的墙单体1形成了整体的墙列。c. Stack multiple wall monomers 1 vertically into multiple wall columns and put them into the installation groove 17. Each wall column is formed by stacking multiple wall monomers 1 from bottom to top, and place the bottom of each wall column The prestressed steel bars 7 and sleeves 6 anchored in the pile foundation 2 pass through the prestressed holes 3 of all the wall monomers 1 of the wall row, and then enter the non-prestressed holes 4 of all the wall monomers 1 of each wall row Insert non-prestressed steel bars 8, and then grout into the prestressed holes 3 and non-prestressed holes 4 of each wall column. After the concrete is dry and hard, tension the prestressed steel bars 7. In this way, multiple vertically superimposed wall monomers 1 forms an integral wall column.
d、向每两个相邻墙列之间的间隙内插入结合部钢筋笼10,且墙列的各个墙单体1的侧面上凸出的横向钢筋5与结合部钢筋笼10对接固定,然后向间隙内注浆,使之形成墙列之间的混凝土结合部9,这样,多个墙列形成整体的地下连续墙。d. Insert the joint reinforcement cage 10 into the gap between every two adjacent wall columns, and the protruding transverse reinforcement 5 on the side of each wall monomer 1 of the wall column is docked and fixed with the joint reinforcement cage 10, and then Grout is injected into the gap to form a concrete junction 9 between the wall columns, so that a plurality of wall columns form an integral underground continuous wall.
e、在地下连续墙顶标高浇捣地下室顶层的楼板18混凝土,每个墙列最上方的一个墙单体1的钢筋笼的竖直向钢筋凸出该墙单体1的顶面,铺设地下室顶层楼板18即与地面标高的楼板18时,将该层楼板18的钢筋笼与墙列最上方墙单体1顶面上凸出的竖直向钢筋连接,并搭设模板,浇捣顶层的楼板18混凝土。在地下室顶层的楼板18上预留下挖和出土的作业孔19,该作业孔19在地下室结构施工完成后再补齐。e. Pour and tamp the floor slab 18 concrete on the top floor of the basement at the top elevation of the underground continuous wall, and the vertical reinforcement of the reinforcement cage of a wall monomer 1 at the top of each wall column protrudes from the top surface of the wall monomer 1, laying the basement When the top floor slab 18 is the floor slab 18 at the same level as the ground, connect the reinforcement cage of the floor slab 18 with the protruding vertical reinforcement on the top surface of the uppermost wall unit 1 of the wall row, and set up a formwork to pour the top floor slab 18 Concrete. On the floor slab 18 of the top floor of the basement, reserve the working hole 19 of digging and unearthed, and this working hole 19 will be filled up after the construction of the basement structure is completed.
f、多道地下连续墙构成基坑的边缘,下挖地下连续墙内的土体形成基坑。下挖地下连续墙内的土体直至下挖到下一层地下室楼板18的标高,卸掉该标高的墙单体1的封板15,使得墙单体1内表面的预留孔12和预埋钢板13露出,在预埋钢板13上焊接角钢20,再铺设该层楼板18的钢筋笼且将楼板18钢筋笼的水平向钢筋21伸入预留孔12与预留孔12中的连接钢筋14对接,再浇捣楼板18混凝土且将预留孔12注浆填实并将角钢20的横钢板也锚固在混凝土中,浇捣楼板18时,同样在楼板18上预留出继续下挖和出土的作业孔19。f. Multiple underground diaphragm walls form the edge of the foundation pit, and the soil in the underground diaphragm wall is dug down to form the foundation pit. Excavate the soil in the underground diaphragm wall until it reaches the level of the next basement floor 18, remove the sealing plate 15 of the wall unit 1 at this level, so that the reserved hole 12 on the inner surface of the wall unit 1 and the reserved The buried steel plate 13 is exposed, and the angle steel 20 is welded on the pre-embedded steel plate 13, and then the reinforcement cage of the floor 18 is laid, and the horizontal direction of the reinforcement cage of the floor 18 is extended to the reinforcement 21 into the reserved hole 12 and the connecting reinforcement in the reserved hole 12 14 docking, pouring and pounding the floor slab 18 concrete again and filling the reserved hole 12 with grout and anchoring the horizontal steel plate of the angle steel 20 in the concrete. Unearthed working hole 19.
g、重复步骤f,直至地下室的底层的楼板18施工完成,浇捣底层楼板18时,无需留作业孔19。g, repeat step f, until the construction of the floor slab 18 of the bottom of the basement is completed, when the floor slab 18 of the bottom floor is poured and rammed, there is no need to stay the operation hole 19.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410238500.9A CN104018518B (en) | 2014-05-30 | 2014-05-30 | The method of prefabricated diaphragm wall and construction outer wall of basement and floor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410238500.9A CN104018518B (en) | 2014-05-30 | 2014-05-30 | The method of prefabricated diaphragm wall and construction outer wall of basement and floor |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104018518A CN104018518A (en) | 2014-09-03 |
| CN104018518B true CN104018518B (en) | 2016-01-20 |
Family
ID=51435491
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410238500.9A Expired - Fee Related CN104018518B (en) | 2014-05-30 | 2014-05-30 | The method of prefabricated diaphragm wall and construction outer wall of basement and floor |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104018518B (en) |
Families Citing this family (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104895093B (en) * | 2015-06-11 | 2017-03-01 | 东南大学 | A kind of half coercion underground continuous wall and its construction method |
| CN104988904B (en) * | 2015-07-10 | 2017-04-12 | 浙江大学宁波理工学院 | Prestress frame continuous wall and construction method thereof |
| CN105040677B (en) * | 2015-08-12 | 2016-11-02 | 济南轨道交通集团有限公司 | Foundation ditch prefabricated pile and the method for attachment of cast-in-place overlapping inwall stirrup |
| CN105421338B (en) * | 2015-11-27 | 2024-08-09 | 上海市政工程设计研究总院(集团)有限公司 | Splicing structure for vertical connection of prefabricated underground continuous wall |
| CN105756075A (en) * | 2016-02-29 | 2016-07-13 | 山东电力工程咨询院有限公司 | Horizontal bearing combined foundation based on piles and underground continuous wall and method |
| CN105951880A (en) * | 2016-05-09 | 2016-09-21 | 江苏鸿基节能新技术股份有限公司 | Assembled underground structure of precast concrete planks and construction method thereof |
| CN108104112B (en) * | 2017-12-29 | 2019-09-24 | 章胜南 | A kind of underground wall body construction method based on the slurrying of original soil original position |
| CN109056702A (en) * | 2018-08-09 | 2018-12-21 | 安徽四建控股集团有限公司 | The construction method of coercion underground continuous wall |
| CN109653191A (en) * | 2018-12-12 | 2019-04-19 | 山东大学 | Prefabricated PC continuous underground wall structure and its construction method |
| CN110258526A (en) * | 2019-05-28 | 2019-09-20 | 广州穗岩土木科技股份有限公司 | The method of prefabricated diaphram wall and construct outer wall of basement and floor |
| CN110578413A (en) * | 2019-10-12 | 2019-12-17 | 北京中岩智泊科技有限公司 | A shaft type underground three-dimensional garage structure |
| CN111676896B (en) * | 2020-06-28 | 2025-07-22 | 中国水利水电第七工程局有限公司 | Prefabricated upright pile wall embankment protection structure and construction method thereof |
| CN113957880B (en) * | 2021-09-23 | 2023-02-14 | 江苏东合南岩土科技股份有限公司 | Construction method of steel-concrete underground continuous wall |
| CN114134933A (en) * | 2021-12-06 | 2022-03-04 | 上海建工一建集团有限公司 | Prefabricated shear wall reverse construction method |
| CN115478561B (en) * | 2022-07-26 | 2024-06-14 | 浙大宁波理工学院 | Construction method of assembled underground continuous wall |
| CN115305954A (en) * | 2022-08-25 | 2022-11-08 | 中建八局轨道交通建设有限公司 | Two-in-one reinforcing wall structure for underground structure and construction method thereof |
| CN116220020A (en) * | 2022-11-30 | 2023-06-06 | 上海建工二建集团有限公司 | Pile-column integrated structure and its vertically strengthened casing and construction method |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20060001203A (en) * | 2004-06-30 | 2006-01-06 | 박길석 | Underground continuous wall construction method and serrated plywood underground continuous wall structure |
| CN201121340Y (en) * | 2007-08-21 | 2008-09-24 | 同济大学 | Prestressed prefabricated underground diaphragm wall and its prefabricated blocks |
| CN101748749A (en) * | 2009-12-16 | 2010-06-23 | 中煤第三建设(集团)有限责任公司 | Prefabricated prestressing diaphragm wall and construction method thereof |
| CN102011410A (en) * | 2010-10-29 | 2011-04-13 | 广东省基础工程公司 | Prefabricated prestressed underground continuous wall and construction method thereof |
| CN102943486A (en) * | 2012-10-30 | 2013-02-27 | 福州市第三建筑工程公司 | A prefabricated pressed-in underground diaphragm wall and its construction method |
| CN103397660A (en) * | 2013-08-05 | 2013-11-20 | 中国建筑股份有限公司 | Underground construction constructed in assembled mode and construction method of underground construction |
| CN204000925U (en) * | 2014-05-30 | 2014-12-10 | 浙江大学宁波理工学院 | Prefabricated diaphragm wall |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008057184A (en) * | 2006-08-30 | 2008-03-13 | Ps Mitsubishi Construction Co Ltd | Method of constructing underground wall by using h-shaped pc pile |
-
2014
- 2014-05-30 CN CN201410238500.9A patent/CN104018518B/en not_active Expired - Fee Related
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20060001203A (en) * | 2004-06-30 | 2006-01-06 | 박길석 | Underground continuous wall construction method and serrated plywood underground continuous wall structure |
| CN201121340Y (en) * | 2007-08-21 | 2008-09-24 | 同济大学 | Prestressed prefabricated underground diaphragm wall and its prefabricated blocks |
| CN101748749A (en) * | 2009-12-16 | 2010-06-23 | 中煤第三建设(集团)有限责任公司 | Prefabricated prestressing diaphragm wall and construction method thereof |
| CN102011410A (en) * | 2010-10-29 | 2011-04-13 | 广东省基础工程公司 | Prefabricated prestressed underground continuous wall and construction method thereof |
| CN102943486A (en) * | 2012-10-30 | 2013-02-27 | 福州市第三建筑工程公司 | A prefabricated pressed-in underground diaphragm wall and its construction method |
| CN103397660A (en) * | 2013-08-05 | 2013-11-20 | 中国建筑股份有限公司 | Underground construction constructed in assembled mode and construction method of underground construction |
| CN204000925U (en) * | 2014-05-30 | 2014-12-10 | 浙江大学宁波理工学院 | Prefabricated diaphragm wall |
Non-Patent Citations (1)
| Title |
|---|
| 预制地下连续墙技术的研究与应用;王卫东等;《地下空间与工程学报》;20050831;第1卷(第4期);第569-573页 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104018518A (en) | 2014-09-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104018518A (en) | Prefabricated underground diaphragm wall and method for constructing outer basement wall and floor slabs | |
| CN205742213U (en) | Foundation pit supporting construction | |
| CN100585094C (en) | Construction method of circular deep foundation pit support | |
| CN105155551B (en) | Pressure compensation type foundation pit supporting structure and construction method | |
| CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
| CN105697021B (en) | The prefabricated tunnel and construction method in the shallow earthing riverbed of shield crossing | |
| CN114775352A (en) | A kind of widening structure and construction method of existing roadbed and embankment section near the river | |
| CN105525627B (en) | A kind of two-way anchor fixed board retaining wall and its construction method | |
| US20140026518A1 (en) | Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts | |
| CN103422510B (en) | Steel pipe frame type cofferdam structure and construction method | |
| CN104631440B (en) | A kind of existing large-section in-situ concrete pile strength core increases foundation pit supporting construction and constructional method | |
| CN110004991B (en) | Anti-floating system and construction method of underground structure based on convex wing foot plate | |
| CN104532957B (en) | Existing building sets up basement reversed construction method | |
| CN105951880A (en) | Assembled underground structure of precast concrete planks and construction method thereof | |
| CN104895089A (en) | Construction method of permanent retaining system characterized by joint work of basement floor slabs and retaining piles | |
| CN204000925U (en) | Prefabricated diaphragm wall | |
| CN114922195A (en) | A construction method for deep and large foundation pit in soft soil close to protection object | |
| CN110777850A (en) | Existing pipe gallery underground space and its supporting structure, construction method of supporting structure | |
| CN101793027B (en) | Core-grouted static pressure anchor rod pile | |
| CN108035379A (en) | A kind of pipe gallery and its construction method | |
| CN111305220A (en) | Concrete support and structural top plate combined building system based on permanent and temporary combination and construction method thereof | |
| CN202610808U (en) | Foundation Pit Supporting Structure Combined with Capping Pressure, Anchorage and Side Block | |
| CN105484270A (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit | |
| RU2390609C1 (en) | Method for erection of slab-pile foundation | |
| CN1333139C (en) | Column supported underground continuous wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160120 |