CN208088282U - Prestressing force shaped steel support pile - Google Patents

Prestressing force shaped steel support pile Download PDF

Info

Publication number
CN208088282U
CN208088282U CN201820486880.1U CN201820486880U CN208088282U CN 208088282 U CN208088282 U CN 208088282U CN 201820486880 U CN201820486880 U CN 201820486880U CN 208088282 U CN208088282 U CN 208088282U
Authority
CN
China
Prior art keywords
shaped steel
support pile
prestressing force
pile
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820486880.1U
Other languages
Chinese (zh)
Inventor
陈家冬
周曙东
汪小健
吴亮
别小勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Foundation Engineering Co Ltd
Original Assignee
Jiangsu Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Foundation Engineering Co Ltd filed Critical Jiangsu Foundation Engineering Co Ltd
Priority to CN201820486880.1U priority Critical patent/CN208088282U/en
Application granted granted Critical
Publication of CN208088282U publication Critical patent/CN208088282U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of prestressing force shaped steel support pile, support pile includes at least one supporting construction, and the supporting construction includes the shaped steel that cross section is H-type;Along the length direction of the shaped steel, and it is fixedly installed casing on the outside of the shaped steel one side, steel strand wires are set in described sleeve pipe, billet sealing is additionally provided in the upper end of described sleeve pipe;The steel strand wires have fixing end and free end, the bottom Joint of the fixing end and described sleeve pipe;Anchorage is installed on the billet;The free end of the steel strand wires sequentially passes through the billet and anchorage stretches out outside described sleeve pipe.Shaped steel support pile stress is spread, and is obtained eccentric external force to reduce the lateral deformation of shaped steel supporting, is facilitated Structural Engineering to construct, it is not necessary to inner support or anchor pole be arranged to reduce lateral deformation, need not also anchor pole be arranged and destroy water stop curtain structure;After foundation pit backfills, then shaped steel and steel sheet pile recycling are extracted, can be recycled, energy conservation and environmental protection.

Description

Prestressing force shaped steel support pile
Technical field
The utility model belongs to building field, more particularly to a kind of prestressing force shaped steel support pile and its construction method.
Background technology
Pattern foundation pit supporting structure is to ensure construction of underground structure construction and protection foundation pit safety of surrounding environment, branch being taken in foundation pit walls Gear, the safeguard measure reinforced.It is each compared with deep or without slope condition pattern foundation pit supporting structure generally use when excavating in foundation pit supporting project The supporting type of kind support pile.The pattern of support pile generally uses bored concrete pile, precast concrete pile, common shaped steel, steel plate at present The supportings such as stake.
In some base pit engineerings, when soil lateral pressure is larger, support pile can be larger lateral to generating on the inside of foundation pit Displacement, when support pile horizontal displacement results in the safety problems such as road cracking, pipeline failure to a certain extent.In order to reduce supporting The horizontal displacement of stake needs to arrange that horizontal direction inner support is deformed to withstand support pile into foundation pit;Or the water of soil layer is squeezed into setting Put down to anchor pole hold support pile to reduce the horizontal lateral displacement of support pile.
Usual base pit engineering belongs to temporary support structures, and then backfill is discarded after underground engineering construction.
For the supporting construction using bored concrete pile, precast concrete pile pattern, after foundation pit backfills, support pile is left in ground It is discarded in lower soil layer, construction material wastes and forms underground obstacle very much.
For the pattern that the support pile of common shaped steel, steel sheet pile is combined with inner support, since foundation pit structure construction area has The presence of intensive inner support rod piece reduces construction efficiency.In some engineerings, inner support is due to installation error or structure construction When slight impact cause inner support to fail, deep pit monitor is affected;
For the pattern that the support pile of common shaped steel, steel sheet pile is combined with anchor pole, anchor pole stretches into outer one segment length of soil layer in hole Pulling force could be provided, anchor pole usually is out land red-line and is unsatisfactory for urban construction prescribed requirement;In addition, being needed when anchor bolt construction Position trepanning is to be lost material among steel sheet pile;
Mixing pile construction method is inserted into for common shaped steel, mixing pile is acted on as water-stop curtain, and anchor pole is usually placed in Soil layer then is put in from mixing pile central bore among two shaped steel, is destroyed the disadvantage is that part is caused to stir pile water stopping curtain.
Utility model content
The technical problems to be solved in the utility model is to provide one kind after foundation pit backfills, then extracts shaped steel and steel sheet pile Recycling can be recycled, energy-saving and environment-friendly prestressing force shaped steel support pile.
In order to solve the above technical problems, the technical solution adopted in the utility model is, the prestressing force shaped steel support pile, including It includes the shaped steel that cross section is H-type to have at least one supporting construction, the supporting construction;Along the length direction of the shaped steel, And it is fixedly installed casing on the outside of the shaped steel one side, steel strand wires are set in described sleeve pipe, in the upper of described sleeve pipe End is additionally provided with billet sealing;The steel strand wires have fixing end and free end, the bottom of the fixing end and described sleeve pipe Joint;Anchorage is installed on the billet;The free end of the steel strand wires sequentially passes through the billet and anchorage stretches out Outside described sleeve pipe.
Prestressing force shaped steel support pile using the above structure, especially in the feelings using billet, anchorage and steel strand wires Under condition so that shaped steel support pile stress is spread, and is obtained eccentric external force to reduce the lateral deformation of shaped steel supporting, is facilitated structure Engineering construction, it is not necessary to inner support or anchor pole are set to reduce lateral deformation, need not anchor pole also be set and destroys water stop curtain structure; After foundation pit backfills, then shaped steel and steel sheet pile recycling are extracted, can be recycled, energy conservation and environmental protection.
Preferably, on billet through the circular hole smaller on anchorage described in boring ratio;Stress is more advantageous to be spread.
The prestressing force shaped steel support pile further includes having steel plate pile body, and the steel plate pile body is by several continuously arranged supportings Stake is constituted, and the tapered plane that the support pile is connected both sides by wide plane is constituted, and adjacent two support piles are connected by narrow plane Together;The outside of the shaped steel another side constitutes supporting unit with the wide planar inner Joint of the support pile, adjacent There is support pile between two supporting units.
Preferably, there are three supporting construction altogether for the prestressing force shaped steel support pile.
Preferably, which further includes having stirring pile body, and the supporting construction is inlaid in the stirring In pile body.
Preferably, supporting construction equidistantly distributed in the mixing pile body.
Another technical problem to be solved in the utility model is to provide a kind of construction using prestressing force shaped steel support pile Method, this approach includes the following steps:
(1)Use mixing pile for water-stop curtain, interpolation prestressing force shaped steel is as supporting construction, shaped steel length 12m:
(2)Positioning, opens mixing pile groove at unwrapping wire;
(3)Using mixing pile machine construction mixing pile;
(4)Prestressing force shaped steel is inserted into using vibration hammer in 6 hours after every secondary mixing pile construction;
(5)Start earth excavation after whole mixing piles and shaped steel supporting construction;
(6)First layer earth excavation starts construction shaped steel prestress wire tensioning and locks to 2m depths;
(7)Earth excavation to setting bottom of foundation ditch and start the construction of underground civil engineering structure;
(8)Underground Construction finishes and backfills underground external wall and the soil layer of supporting construction;
(9)Steel strand wires are cut off, the pre-applied force of shaped steel steel strand wires is discharged, remove prestressed anchor;
(10)Supporting shaped steel is transferred to by root using vibration hammer;
(11)The hole for extracting shaped steel fills i.e. completion prestressing force shaped steel support engineering using injection cement grout.
Description of the drawings
It is further described below in conjunction with the accompanying drawings with the embodiment of the utility model:
Fig. 1 is the structural schematic diagram of the utility model prestressing force shaped steel support pile;
Fig. 2 is the overlooking structure diagram of the shaped steel of Fig. 1;
Fig. 3 is the structural schematic diagram of the prestressing force shaped steel support pile of the utility model embodiment 1;
Fig. 4 is the stereogram of Fig. 3;
Fig. 5 is the structural schematic diagram of the prestressing force shaped steel support pile of the utility model embodiment 2;
Fig. 6 is the stereogram of Fig. 5;
Fig. 7 is the installation effect figure of the prestressing force shaped steel support pile in Fig. 1;
Wherein:1- supporting construction;2- shaped steel;3- casings;4- steel strand wires;401- fixing ends;The free ends 402-;5- steel pads Plate;6- fixes steel pipe point;7- anchorages;8- steel plate pile bodies;801- support piles;802- wide planes;803- tapered planes;804- is narrow flat Face;9- supporting units;10- stirs pile body.
Specific implementation mode
As shown in Figure 1, 2, it is the prestressing force shaped steel support pile of the utility model, includes at least one supporting construction 1, institute It includes the shaped steel 2 that cross section is H-type to state supporting construction;Along the length direction of the shaped steel 2, and positioned at the shaped steel one side Outside is fixedly installed casing 3, and steel strand wires 4 are set in described sleeve pipe 3, and billet 5 is additionally provided in the upper end of described sleeve pipe 3 Sealing;The steel strand wires 4 have fixing end 401 and free end 402, the fixing end 401 and the bottom of described sleeve pipe 3 mutually solid It connects, i.e., at the position of fixed steel pipe point 6;Anchorage 7 is installed on the billet 5;The free end 402 of the steel strand wires 4 according to Secondary that the billet 5 and anchorage 7 is passed through to stretch out outside described sleeve pipe 3, Fig. 7 is the installation effect figure of prestressing force shaped steel support pile, institute State on billet 5 through the circular hole smaller on anchorage described in boring ratio 7.
In 2 outside processing and fabricating of shaped steel:2 bottom end of shaped steel is welded and fixed steel pipe, and diameter of steel tube 20mm ~ 50mm → along the shaped steel wing Edge welds rectangle casing → sleeve bottom and makes loose-leaf → steel strand, and steel strand wires reserve 500mm or so length at top;Using Shaped steel is inserted into soil layer set depth by vibration hammer;When foundation pit soil layer is excavated to 2.0m ~ 3.0m, shaped steel is under soil lateral pressure effect Start to generate moderate finite deformation into foundation pit;Setting billet and anchorage at the top of shaped steel to reserving steel strand wires, with jack pair steel Twisted wire tensioning simultaneously locks, and applies prestressing force to shaped steel, is equivalent to and applies eccentric force to shaped steel, there are one to the bias on the outside of foundation pit Torque reduces shaped steel to the displacement on the inside of foundation pit;Continue to excavate soil layer to foundation pit setting absolute altitude.
It is the one such structure of prestressing force shaped steel support pile in the utility model embodiment 1, it as shown in Figure 3,4, should Prestressing force shaped steel support pile further includes having steel plate pile body 8, and the steel plate pile body 8 is by several 801 structures of continuously arranged support pile At the tapered plane 803 that the support pile 801 is connected both sides by wide plane 802 is constituted, and adjacent two support piles 801 are by narrow Plane 804 links together;The outside of the shaped steel another side and the 802 inside Joint structure of wide plane of the support pile 801 At supporting unit 9, there is support pile 801 between adjacent two supporting units 9;In the present embodiment 1, the prestressing force shaped steel supporting There are three supporting construction 1 altogether for stake.
As different from Example 1, as shown in Figure 5,6, the prestressing force shaped steel support pile in embodiment 2 further includes having stirring Pile body 10, is prestressing force shaped steel support pile another structure therein, and the supporting construction 1 is inlaid in the stirring pile body 10 It is interior, the equidistantly distributed in the stirring pile body 10 of the supporting construction 1.
The construction method of prestressing force shaped steel support pile in above-described embodiment 2, this approach includes the following steps:
(1)Use mixing pile for water-stop curtain, interpolation prestressing force shaped steel is as supporting construction, shaped steel length 12m:
(2)Positioning, opens mixing pile groove at unwrapping wire;
(3)Using mixing pile machine construction mixing pile;
(4)Prestressing force shaped steel is inserted into using vibration hammer in 6 hours after every secondary mixing pile construction;
(5)Start earth excavation after whole mixing piles and shaped steel supporting construction;
(6)First layer earth excavation starts construction shaped steel prestress wire tensioning and locks to 2m depths;
(7)Earth excavation to setting bottom of foundation ditch and start the construction of underground civil engineering structure;
(8)Underground Construction finishes and backfills underground external wall and the soil layer of supporting construction;
(9)Steel strand wires are cut off, the pre-applied force of shaped steel steel strand wires is discharged, remove prestressed anchor;
(10)Supporting shaped steel is transferred to by root using vibration hammer;
(11)The hole for extracting shaped steel fills i.e. completion prestressing force shaped steel support engineering using injection cement grout.
The basic principles and main features and advantage of the utility model have been shown and described above.The technical staff of the industry It should be appreciated that the present utility model is not limited to the above embodiments, the above embodiments and description only describe this The principle of utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model also has various change And improvement, as dimensionally become larger or become smaller or material on change, these changes and improvements both fall within claimed The scope of the utility model in.The protection scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1. a kind of prestressing force shaped steel support pile, which is characterized in that include at least one supporting construction, the supporting construction includes It is the shaped steel of H-type to have cross section;Along the length direction of the shaped steel, and set is fixedly installed on the outside of the shaped steel one side It manages, steel strand wires is set in described sleeve pipe, billet sealing is additionally provided in the upper end of described sleeve pipe;The steel strand wires have solid The bottom Joint of fixed end and free end, the fixing end and described sleeve pipe;Anchorage is installed on the billet;The steel twists The free end of line sequentially passes through the billet and anchorage stretches out outside described sleeve pipe.
2. prestressing force shaped steel support pile according to claim 1, which is characterized in that penetrate boring ratio institute on the billet State the circular hole smaller on anchorage.
3. prestressing force shaped steel support pile according to claim 1 or 2, which is characterized in that the prestressing force shaped steel support pile is also Include steel plate pile body, the steel plate pile body is made of several continuously arranged support piles, and the support pile is connected by wide plane The tapered plane for connecing both sides is constituted, and adjacent two support piles are linked together by narrow plane;The outside of the shaped steel another side Supporting unit is constituted with the wide planar inner Joint of the support pile, has support pile between adjacent two supporting units.
4. prestressing force shaped steel support pile according to claim 3, which is characterized in that the prestressing force shaped steel support pile shares three A supporting construction.
5. prestressing force shaped steel support pile according to claim 1 or 2, which is characterized in that the prestressing force shaped steel support pile is also Include stirring pile body, the supporting construction is inlaid in the mixing pile body.
6. prestressing force shaped steel support pile according to claim 5, which is characterized in that the supporting construction is in the mixing pile Internal equidistantly distributed.
CN201820486880.1U 2018-04-08 2018-04-08 Prestressing force shaped steel support pile Active CN208088282U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820486880.1U CN208088282U (en) 2018-04-08 2018-04-08 Prestressing force shaped steel support pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820486880.1U CN208088282U (en) 2018-04-08 2018-04-08 Prestressing force shaped steel support pile

Publications (1)

Publication Number Publication Date
CN208088282U true CN208088282U (en) 2018-11-13

Family

ID=64058267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820486880.1U Active CN208088282U (en) 2018-04-08 2018-04-08 Prestressing force shaped steel support pile

Country Status (1)

Country Link
CN (1) CN208088282U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277798A (en) * 2018-04-08 2018-07-13 江苏地基工程有限公司 Prestressing force shaped steel support pile and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277798A (en) * 2018-04-08 2018-07-13 江苏地基工程有限公司 Prestressing force shaped steel support pile and its construction method

Similar Documents

Publication Publication Date Title
CN105840207B (en) Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body
CN205742213U (en) Foundation pit supporting construction
CN108677924B (en) Double-row miniature steel pipe pile grouting wall-forming partition structure and method
CN112983541A (en) Repair and treatment method suitable for deep tunnel inverted arch damage
CN201538975U (en) Seepage-proofing joint of underground continuous wall
CN101575859B (en) Anti-seepage joint of underground continuous walls and construction method thereof
CN111119198A (en) A reinforced structure that is used for SMW worker method stake to strut system
CN110055973B (en) Foundation pit enclosure structure under high-speed railway bridge with limited construction space and water stopping method
CN103147444A (en) Foundation pit enclosure structure capable of realizing supporting while excavating and foundation pit excavating method
CN113137235B (en) Construction method of high-ground-stress soft rock extrusion large-deformation tunnel
CN108277798A (en) Prestressing force shaped steel support pile and its construction method
CN208088282U (en) Prestressing force shaped steel support pile
CN113235638A (en) Construction method of composite pile foundation with long pile and short pile integrated
CN105840209B (en) Construction method for controlling deformation of anchor pile in tunnel body section
KR100313721B1 (en) Method for designing synthetic underground retaining wall by temporary soil protection structure and working process of underground retaining wall of structure
CN114622574B (en) Water-rich throwing filling deep foundation pit water interception excavation supporting method and supporting device
CN110792085A (en) Pipe-jacking working pit supporting method
CN115717397A (en) Larsen steel sheet pile and prestressed anchor cable combined supporting construction method
CN203373753U (en) Pile anchor retaining wall concrete anchor cable top beam structure of foundation ditches
CN212642730U (en) Collapsible loess area tunnel passes people's air defense structure
CN211395698U (en) Stiff core curtain pile and dado stake anchor combined supporting construction
CN110318419B (en) Construction method of one-lining door opening support of underpass type pipe gallery
CN203096746U (en) Reinforced rib soil restraining composite supporting structure
CN217999598U (en) Joint stratum large-span tunnel pilot tunnel subsection step excavation supporting construction in advance
CN217556961U (en) Expanding shell type prestressed anchor rod and spray anchor combined supporting structure for vertical shaft deep foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant