CN109056702A - The construction method of coercion underground continuous wall - Google Patents

The construction method of coercion underground continuous wall Download PDF

Info

Publication number
CN109056702A
CN109056702A CN201810904756.7A CN201810904756A CN109056702A CN 109056702 A CN109056702 A CN 109056702A CN 201810904756 A CN201810904756 A CN 201810904756A CN 109056702 A CN109056702 A CN 109056702A
Authority
CN
China
Prior art keywords
wall
panel unit
lifting
prefabricated panel
underground continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810904756.7A
Other languages
Chinese (zh)
Inventor
徐涛
陈树华
赵森翔
付玉海
王珂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Fourth Construction Holdings Group Co Ltd
Original Assignee
Anhui Fourth Construction Holdings Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Fourth Construction Holdings Group Co Ltd filed Critical Anhui Fourth Construction Holdings Group Co Ltd
Priority to CN201810904756.7A priority Critical patent/CN109056702A/en
Publication of CN109056702A publication Critical patent/CN109056702A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ

Abstract

The present invention provides a kind of construction method of coercion underground continuous wall.The method comprise the steps that (1) prefabricated panel unit, the prefabricated panel unit includes wallboard main body, is embedded with one group of pipeline being mutually communicated anyhow inside the wallboard main body;(2) it construction of guide wall: is constructed along diaphragm wall longitudinal axis position and leads wall, poured using cast-in-place concrete or armored concrete;(3) trenching construction;(4) prefabricated panel unit lifting: using lifting equipment by the slot held successfully in prefabricated wall panel element lifting in step (3), when lifting, the pipeline of adjacent prefabricated panel unit being mutually communicated anyhow interpenetrates;(5) reinforcing bar is inserted into inside the vertical duct of the prefabricated panel unit after lifting;(6) multipoint mode concreting is used, from casting concrete inside the vertical duct of prefabricated panel unit.The invention enables underground wall body stable structure, strong shock resistance and easy for construction.

Description

The construction method of coercion underground continuous wall
Technical field:
The present invention relates to a kind of construction methods of coercion underground continuous wall, belong to technical field of buildings.
Background technique:
Diaphram wall has the characteristics that the big rigidity of structure, globality, impermeability and durability are good, can be used as permanent earth-retaining Water blocking and load-carrying members.Coercion underground continuous wall can continuously hang wall section after grooving, without maintenance, speed of application Not only far faster than cast-in-place subterranean wall, the unstability of cell wall is also reduced, and can thoroughly eradicate connector and mud, wall is added to add The common quality defects such as sand, leakage muscle, loose, bulge, quicksand, thus be widely applied.
Coercion underground continuous wall: coercion underground continuous wall mostly uses cored slab at present, and both ends are designed to semicircle or ladder Connected in star forms a circular hole or hexagonal hole between adjacent two width wall after the completion of coercion underground continuous wall lifting, by this Slip casting is attached in hole.When due to docking, groove is easy to happen offset, inconsistent phenomenon occurs, leads to junction leakage problems. And slip casting filling is required in preformed hole, concrete coagulation needs the time, to extend the construction period.In addition, for hollow Board-like coercion underground continuous wall also has in such a way that joggle and casting concrete are attached, such as Chinese patent CN103835316 A devises three kinds of joint forms, inverted trapezoidal, diamond shape and cross.But such joggle root of joint is small, wall It is easy to happen relative rotation between body and biggish soil lateral pressure cannot be born, joint is easy cracking destruction, leads to junction Leakage.In order to make in hoisting process, coercion underground continuous wall concrete does not crack, and most of precast wall body all uses prestressing force Steel strand wires, tensioning process is post stretching, and plain concrete has all only been poured in preformed hole, is easy cracking, reduces underground company The water-proof function of continuous wall.
To solve the above-mentioned problems, Chinese patent application CN108118690A discloses a kind of prefabricated underground of integral hoisting formula Continuous wall construction and its prefabricated, including coercion underground continuous wall wall, the both ends correspondence of the coercion underground continuous wall wall are set There is joggle connector, the wall two sides at the coercion underground continuous wall docking are respectively equipped with water stopping trough, are equipped in the water stopping trough Water-swelling rubber water bar.
The structure of this sealing rod, it is with the passing of time perishable to be placed on underground, cannot play good effect, and joggle connector is applied After work, impact strength is weak, is easy to happen wall body vertical crack.
Summary of the invention:
The purpose of the present invention is providing a kind of construction method of coercion underground continuous wall in view of the above problems, so that underground Wall body structure is stablized, strong shock resistance and easy for construction.
Above-mentioned purpose is realized by following technical scheme:
The construction method of coercion underground continuous wall, this method comprises the following steps:
(1) prefabricated panel unit, the prefabricated panel unit include wallboard main body, and one group of cross is embedded with inside the wallboard main body The perpendicular pipeline being mutually communicated;
(2) it construction of guide wall: is constructed along diaphragm wall longitudinal axis position and leads wall, poured using cast-in-place concrete or armored concrete;
(3) deep gouge machine box cut section, straight line width after first corner width, by the way of continuous grooving trenching construction: are used;
(4) prefabricated panel unit lifting: the slot that will be held successfully in prefabricated wall panel element lifting in step (3) using lifting equipment In, when lifting, the pipeline of adjacent prefabricated panel unit being mutually communicated anyhow interpenetrates;
(5) reinforcing bar is inserted into inside the vertical duct of the prefabricated panel unit after lifting;
(6) multipoint mode concreting is used, from casting concrete inside the vertical duct of prefabricated panel unit.
The construction method of the coercion underground continuous wall, prefabricated panel unit as described in step (1) with a thickness of 200-800mm, the distance between two neighboring pipeline are 40-200mm, and the diameter of pipeline is the 1/3 of prefabricated panel element thickness.
The construction method of the coercion underground continuous wall, it is 1.2~1.5m that wall depth is led described in step (2), Top surface is above the ground level 10~15cm, it is described lead wall with a thickness of 100~200mm, inner wall surface should be vertical, and inner wall clear distance is diaphragm wall Design thickness adds 40~60mm, and it is horizontal to lead the holding of wall top face.
The construction method of the coercion underground continuous wall, in step (3) during trenching construction, the verticality control of slot section System is in 1/800, and bottom uniformly backfills rubble height at groove depth about projected depth 100-200mm and after the completion of slot section Degree is in 50-100mm.
The construction method of the coercion underground continuous wall, lifting described in step (4) is using longitudinal two o'clock lifting Mode.
The construction method of the coercion underground continuous wall, reinforcing bar described in step (5) use single diameter for pipeline The reinforcing bar or tendon of diameter 1/2-2/3, the diameter of tendon are the 1/2-2/3 of pipe diameter.
The construction method of the coercion underground continuous wall, the method for multipoint mode concreting described in step (6) It is to be poured simultaneously using each vertical duct.
The utility model has the advantages that
The present invention is embedded with one group of pipeline being mutually communicated anyhow, the prefabricated panel after lifting inside prefabricated panel unit Reinforcing bar is inserted into inside the vertical duct of unit;And multipoint mode concreting is used, in the vertical duct of prefabricated panel unit Face casting concrete.Prefabricated unit each in this way passes through the concrete poured and forms an entirety, inside the pipeline penetrated through anyhow The concrete grid for forming an entirety, along with the protection of prefabricated panel unit, so that wall overall structure is stablized, shock resistance Ability is strong and easy for construction.
Specific embodiment:
The construction method of coercion underground continuous wall, this method comprises the following steps:
(1) prefabricated panel unit, the prefabricated panel unit include wallboard main body, and one group of cross is embedded with inside the wallboard main body The perpendicular pipeline being mutually communicated;Prefabricated panel unit with a thickness of 200-800mm, the distance between two neighboring pipeline is 40- 200mm, the diameter of pipeline are the 1/3 of prefabricated panel element thickness.
(2) it construction of guide wall: is constructed along diaphragm wall longitudinal axis position and leads wall, poured using cast-in-place concrete or armored concrete It builds;Leading wall depth is 1.2~1.5m, and top surface is above the ground level 10~15cm, it is described lead wall with a thickness of 100~200mm, interior wall Face should be vertical, and inner wall clear distance is that diaphragm wall design thickness adds 40~60mm, and it is horizontal to lead the holding of wall top face.
(3) deep gouge machine box cut section, straight line width after first corner width, by the way of continuous grooving trenching construction: are used;At In slot work progress, the degree control of slot section is in 1/800, at groove depth about projected depth 100-200mm and in slot Bottom uniformly backfills rubble height in 50-100mm after section is completed.
(4) it prefabricated panel unit lifting: will be held successfully in prefabricated wall panel element lifting in step (3) using lifting equipment In slot, when lifting, the pipeline of adjacent prefabricated panel unit being mutually communicated anyhow interpenetrates;Lifting is using longitudinal two The mode of point lifting.
(5) reinforcing bar is inserted into inside the vertical duct of the prefabricated panel unit after lifting;Reinforcing bar use single diameter for The reinforcing bar or tendon of pipe diameter 1/2-2/3, the diameter of tendon are the 1/2-2/3 of pipe diameter.
(6) multipoint mode concreting is used, from casting concrete inside the vertical duct of prefabricated panel unit.Described The method of multipoint mode concreting is poured simultaneously using each vertical duct.
The present invention using the above scheme, is embedded with one group of pipeline being mutually communicated anyhow inside prefabricated panel unit, It lifts and is inserted into reinforcing bar inside the vertical duct of later prefabricated panel unit;And multipoint mode concreting is used, from dry wall Casting concrete inside the vertical duct of plate unit.Prefabricated unit each in this way passes through the concrete poured and forms an entirety, Anyhow the concrete grid that an entirety is formed inside the pipeline penetrated through, along with the protection of prefabricated panel unit, so that wall Overall structure is stablized, strong shock resistance and easy for construction.

Claims (7)

1. a kind of construction method of coercion underground continuous wall, it is characterized in that: this method comprises the following steps:
(1) prefabricated panel unit, the prefabricated panel unit include wallboard main body, and one group of cross is embedded with inside the wallboard main body The perpendicular pipeline being mutually communicated;
(2) it construction of guide wall: is constructed along diaphragm wall longitudinal axis position and leads wall, poured using cast-in-place concrete or armored concrete;
(3) deep gouge machine box cut section, straight line width after first corner width, by the way of continuous grooving trenching construction: are used;
(4) prefabricated panel unit lifting: the slot that will be held successfully in prefabricated wall panel element lifting in step (3) using lifting equipment In, when lifting, the pipeline of adjacent prefabricated panel unit being mutually communicated anyhow interpenetrates;
(5) reinforcing bar is inserted into inside the vertical duct of the prefabricated panel unit after lifting;
(6) multipoint mode concreting is used, from casting concrete inside the vertical duct of prefabricated panel unit.
2. the construction method of coercion underground continuous wall according to claim 1, it is characterized in that: as described in step (1) pre- Wall panel element processed with a thickness of 200-800mm, the distance between two neighboring pipeline is 40-200mm, and the diameter of pipeline is prefabricated The 1/3 of wall panel element thickness.
3. the construction method of coercion underground continuous wall according to claim 1, it is characterized in that: being led described in step (2) Wall depth is 1.2~1.5m, and top surface is above the ground level 10~15cm, it is described lead wall with a thickness of 100~200mm, inner wall surface is answered Vertically, inner wall clear distance is that diaphragm wall design thickness adds 40~60mm, and it is horizontal to lead the holding of wall top face.
4. the construction method of coercion underground continuous wall according to claim 1, it is characterized in that: trenching construction in step (3) In the process, the degree control of slot section is completed in 1/800 at groove depth about projected depth 100-200mm and in slot section Later bottom uniformly backfills rubble height in 50-100mm.
5. the construction method of coercion underground continuous wall according to claim 1, it is characterized in that: being hung described in step (4) Dress is by the way of longitudinal two o'clock lifting.
6. the construction method of coercion underground continuous wall according to claim 1, it is characterized in that: steel described in step (5) Muscle uses single diameter for the reinforcing bar of pipe diameter 1/2-2/3 or tendon, and the diameter of tendon is the 1/2- of pipe diameter 2/3。
7. the construction method of coercion underground continuous wall according to claim 1, it is characterized in that: more described in step (6) The method of point type concreting is poured simultaneously using each vertical duct.
CN201810904756.7A 2018-08-09 2018-08-09 The construction method of coercion underground continuous wall Pending CN109056702A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810904756.7A CN109056702A (en) 2018-08-09 2018-08-09 The construction method of coercion underground continuous wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810904756.7A CN109056702A (en) 2018-08-09 2018-08-09 The construction method of coercion underground continuous wall

Publications (1)

Publication Number Publication Date
CN109056702A true CN109056702A (en) 2018-12-21

Family

ID=64683151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810904756.7A Pending CN109056702A (en) 2018-08-09 2018-08-09 The construction method of coercion underground continuous wall

Country Status (1)

Country Link
CN (1) CN109056702A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605369A (en) * 2021-08-24 2021-11-05 中国建设基础设施有限公司 Underground continuous wall and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2388240Y (en) * 1999-09-29 2000-07-19 田文正 Improved partition plate
CN202830968U (en) * 2012-08-21 2013-03-27 浙江工业大学 Building blocks and prefabricated underground continuous wall
CN103835316A (en) * 2014-01-24 2014-06-04 中国建筑第八工程局有限公司 Connector structure of precast underground continuous wall and construction method
CN104018518A (en) * 2014-05-30 2014-09-03 浙江大学宁波理工学院 Prefabricated underground diaphragm wall and method for constructing outer basement wall and floor slabs

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2388240Y (en) * 1999-09-29 2000-07-19 田文正 Improved partition plate
CN202830968U (en) * 2012-08-21 2013-03-27 浙江工业大学 Building blocks and prefabricated underground continuous wall
CN103835316A (en) * 2014-01-24 2014-06-04 中国建筑第八工程局有限公司 Connector structure of precast underground continuous wall and construction method
CN104018518A (en) * 2014-05-30 2014-09-03 浙江大学宁波理工学院 Prefabricated underground diaphragm wall and method for constructing outer basement wall and floor slabs

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
谭正清 等: "《地基与基础工程施工》", 31 May 2016, 电子科技大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605369A (en) * 2021-08-24 2021-11-05 中国建设基础设施有限公司 Underground continuous wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN103572755B (en) Prestressed concrete prefabricated pile
CN109505229B (en) Stress balance and vibration-damping disaster-prevention high pier structure for high and steep side slope of highway and construction method
CN206189647U (en) Novel infilled wall brickwork drawknot muscle structure
CN104631512A (en) Post-cast strip beam and slab construction method adopting formwork hanging method
CN103953114B (en) Steel frame-reinforced masonry shear wall combinative structure and construction method thereof
CN105970916B (en) A kind of construction method of deep basal pit plain concrete diaphram wall
CN105951848A (en) Non-intermittent composite transfer structure for super-deep foundation pit support and construction method
CN105625298B (en) Using the continuous underground wall structure and its construction method of glass fiber-reinforced polymer lap joint sleeve milling
CN104746892B (en) Construction method that joist demolishes walls device and joist is demolished walls
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN106337391B (en) Maintenance construction method for large-area damage of bottom of high-pile wharf panel
CN107191001B (en) Tear down and build the strengthening of foundation construction method of house foundation
CN110792200A (en) Masonry construction method without post-picking and pipe wrapping structure thereof
CN100516378C (en) Method for supporting and protecting building foundation pit by employing transverse-diaphragm prestressing concrete pipe pile
CN203383508U (en) One-sided formwork body structure backing onto brick concrete retaining wall
CN106760851A (en) The construction method of the newly-increased Seismic Isolation of Isolation Layer of existing brick mix structure
CN103628575A (en) Large-altitude-difference variable-section concrete structure construction joint and construction method thereof
CN2921135Y (en) Special concrete crack induction strip for concrete construction joint
CN205152942U (en) Novel combination steel sheet pile and be applied to construction leading truck of this steel sheet pile
CN108118689B (en) Prefabricated underground diaphragm wall capable of being partially recycled, lifting appliance and construction method
CN109056702A (en) The construction method of coercion underground continuous wall
CN206487168U (en) A kind of rowlock wall bracing means
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN111535298A (en) Seepage-proofing construction method for underground diaphragm wall
CN106401276A (en) Construction method for wall column binding bars of frame type building block enclosing wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221