CN2673944Y - Prestressed pipe pile with large end filled with sand - Google Patents

Prestressed pipe pile with large end filled with sand Download PDF

Info

Publication number
CN2673944Y
CN2673944Y CN 200320127200 CN200320127200U CN2673944Y CN 2673944 Y CN2673944 Y CN 2673944Y CN 200320127200 CN200320127200 CN 200320127200 CN 200320127200 U CN200320127200 U CN 200320127200U CN 2673944 Y CN2673944 Y CN 2673944Y
Authority
CN
China
Prior art keywords
pile
sand
concrete
utility
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200320127200
Other languages
Chinese (zh)
Inventor
邹宗煊
邹洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Room 610 Danfei Factory Dormitory No 33 Xiangy
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200320127200 priority Critical patent/CN2673944Y/en
Application granted granted Critical
Publication of CN2673944Y publication Critical patent/CN2673944Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

As the same as prior art, a pre-stressed pipe pile with large end filled with sand of the utility model also comprises a pipe pile body with pre-stressed reinforced concrete, the utility model is characterized in that the end of the pipe pile is provided with another prefabricated pile large end made of reinforced concrete, or concrete, or steel, and the diameter of the pile large end is larger than the diameter of the pipe pile body by 8-40 cm; the pipe pile body is provided projecting concrete or reinforced concrete ribs with width of 5-25 cm and height of 5-20 cm every 1-7 m, the place between two ribs is filled with sand or grail, the cross-section of the rib is as a trapezoid, an isosceles trapezoid or a right angled trapezoid. Compared with prior art, the utility model has the obvious advantages of greatly improving the bearing capacity of single pile, decreasing pile numbers, reducing construction cost, promoting horizon curing, and improving horizon strength in the equal geological condition. The utility model is applicable for the construction foundation engineering in the soft soil foundation.

Description

Major part back-up sand pile for prestressed pipe
Utility model major part back-up sand pile for prestressed pipe relates to the civil construction field, relates in particular to the building foundation engineering field.
As everyone knows, in building foundation engineering, pile for prestressed pipe is low with cost, the duration is short, the construction plant is clean and be widely used.But existing pile for prestressed pipe its internal diameter, external diameter and wall thickness in same joint all equate from top to bottom, China's coastal cities multidigit is in estuary bay, be soft foundation, the soil layer collateral resistance is little, bearing capacity of single pile is not high, make pile shaft material intensity to make full use of and waste, cause the Foundation Design cost high.
The purpose of this utility model provides major part back-up sand pile for prestressed pipe, can improve bearing capacity of single pile significantly under equal geological conditions, pile shaft material intensity can be given full play to, thereby reduce the total amount of pile of building, reaches and reduces the Foundation Design cost.
The purpose of this utility model is achieved through the following technical solutions: major part back-up sand pile for prestressed pipe is the same with prior art, the tubulose pile body that all includes prestressed reinforced concrete, it is characterized in that: at pile tube stake end, the stake major part of prefabricated separately steel concrete or concrete or steel is arranged, and the stake diameter at butt end is greater than tubular pile body diameter 8-40cm; At tubular pile body, every 1-7m, concrete or the steel concrete rib of the wide 5-25cm of a protrusion, high 5-20cm arranged, two intercostal back-up sand or gravels, the cross section of rib are trapezoidal, isosceles trapezoid or right-angled trapezium; The soil compaction effect that causes of piling and discharge soil layer mesopore water pressure as early as possible can be provided with the vertical drainage hole of 1-10 diameter 0.5-3cm in rib.
The utility model compared with prior art has following conspicuous advantage: it can increase substantially bearing capacity of single pile under equal geological conditions, reduce the stake number, reduces construction costs, promotes soil layer to solidify, and improves soil layer intensity.The utility model is applicable to the building foundation engineering of soft foundation.
Description of drawings:
Fig. 1 is the generalized section of the utility model embodiment.
Fig. 2 is the floor map (a is the closing pile point, and c is an opening stake point) and the generalized section (b is the closing pile point, and d is an opening stake point) of steel concrete of the present utility model or concrete pile major part.
Fig. 3 is steel stake major part floor map of the present utility model (a) and generalized section (b).(1) is stake major part end plate among the figure, and (2) are the wing of putting more energy into, and (3) are ring.
An exemplary embodiments of the present utility model such as Fig. 1: produce required pile tube with ribbing (1) by pile tube manufactory earlier, (5) and the stake major part (6), treat to transport the job site to after intensity reaches, stake major part (6) is placed on the stake position, hang first segment pile tube (5) and stand on a major part (6) center, the all heap sands of stake, piling (or piling) limit, limit constantly adds sand, by managing rib (2) with abrasive band underground layer (9), (8), (7) in, form stake all back-up sand layers (3), first segment pile tube (5) is sink to ground, it is placed on it to hang the second pipe joint stake (1), and electric welding joins, and it squeezed into soil layer (9) again, (8) in until design elevation, like this, just finish the making construction of a major part back-up sand pile for prestressed pipe, the pressure pore water that pile sinking causes is discharged ground by the drain hole (4) in back-up sand layer (3) and the rib (2).Go round and begin again, finish the making and the construction of all required major part back-up sand pile for prestressed pipe.

Claims (1)

1. utility model major part back-up sand pile for prestressed pipe is the same with prior art, the tubulose pile body that all includes prestressed reinforced concrete, it is characterized in that: at pile tube stake end, the stake major part of prefabricated separately steel concrete or concrete or steel is arranged, and the stake diameter at butt end is greater than tubular pile body diameter 8-40cm; At tubular pile body, every 1-7m, concrete or the steel concrete rib of the wide 5-25cm of a protrusion, high 5-20cm arranged, two intercostal back-up sand or gravels, the cross section of rib are trapezoidal, isosceles trapezoid or right-angled trapezium.
CN 200320127200 2003-08-19 2003-11-28 Prestressed pipe pile with large end filled with sand Expired - Fee Related CN2673944Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200320127200 CN2673944Y (en) 2003-08-19 2003-11-28 Prestressed pipe pile with large end filled with sand

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN03209892.8 2003-08-19
CN03209892 2003-08-19
CN 200320127200 CN2673944Y (en) 2003-08-19 2003-11-28 Prestressed pipe pile with large end filled with sand

Publications (1)

Publication Number Publication Date
CN2673944Y true CN2673944Y (en) 2005-01-26

Family

ID=34523673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200320127200 Expired - Fee Related CN2673944Y (en) 2003-08-19 2003-11-28 Prestressed pipe pile with large end filled with sand

Country Status (1)

Country Link
CN (1) CN2673944Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101812838A (en) * 2010-04-27 2010-08-25 天津大学 Foundation reinforcement method based on curing agent and bucket foundation suction technique
CN102747724A (en) * 2011-04-19 2012-10-24 陈东曙 Sand-filled composite pile, pile forming device and pile forming method
CN103362122A (en) * 2012-04-04 2013-10-23 邹宗煊 High-bearing-capacity sand filling pipe pile with pile joints and manufacturing and construction method of pile
CN105649009A (en) * 2016-03-08 2016-06-08 同济大学 Rigid precast concrete pile with drainability
CN106013138A (en) * 2016-07-14 2016-10-12 苏义民 Pipe pile with incomplete ribs
CN110206014A (en) * 2019-03-27 2019-09-06 河海大学 Fill out sand tube stake Bridgehead by Blastig reinforced construction method and its structure
CN113266011A (en) * 2021-04-28 2021-08-17 李俊飞 Novel composite pile enclosure device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101812838A (en) * 2010-04-27 2010-08-25 天津大学 Foundation reinforcement method based on curing agent and bucket foundation suction technique
CN101812838B (en) * 2010-04-27 2011-08-10 天津大学 Foundation reinforcement method based on curing agent and bucket foundation suction technique
CN102747724A (en) * 2011-04-19 2012-10-24 陈东曙 Sand-filled composite pile, pile forming device and pile forming method
CN102747724B (en) * 2011-04-19 2015-12-02 陈东曙 A kind of piling method of back-up sand composite pile
CN103362122A (en) * 2012-04-04 2013-10-23 邹宗煊 High-bearing-capacity sand filling pipe pile with pile joints and manufacturing and construction method of pile
CN105649009A (en) * 2016-03-08 2016-06-08 同济大学 Rigid precast concrete pile with drainability
CN106013138A (en) * 2016-07-14 2016-10-12 苏义民 Pipe pile with incomplete ribs
CN110206014A (en) * 2019-03-27 2019-09-06 河海大学 Fill out sand tube stake Bridgehead by Blastig reinforced construction method and its structure
CN113266011A (en) * 2021-04-28 2021-08-17 李俊飞 Novel composite pile enclosure device

Similar Documents

Publication Publication Date Title
CN102505684A (en) Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof
CN103510510A (en) Reinforced long spiral drilling concrete grouting pile and construction method thereof
CN208219340U (en) A kind of new city road permeable pavement structure
CN108035423A (en) Potential energy pressurized rainwater drainage and storage system and method for sponge city
CN2673944Y (en) Prestressed pipe pile with large end filled with sand
CN105386610A (en) Protective construction method for natural-foundation ancient architectures at top of asymmetric deep foundation pit
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN105297717A (en) Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN206346221U (en) The left and right combined type piping lane built using the pavement underground space
CN204825867U (en) As composite pile structure of secretly digging garage stand
CN201411687Y (en) Corrugated plastic sleeve pipe granule grouting pile with hole
CN2667005Y (en) Prestressed pipe pile
CN203594023U (en) Enhanced type long auger drilling pressure-grouting concrete pile
CN103195077B (en) A kind of dam foundation reinforcement frame structure and stabilization of dam foundation method
CN108611948A (en) A kind of urban road permeable pavement structure
CN213867907U (en) Prefabricated expanded packing key type digging foundation for power transmission line
CN106939596A (en) A kind of cast-in-place slub type slurry drilled pile
CN203129163U (en) Reinforcing framework structure for dam foundation
CN113152446A (en) Multi-section type prestressed hollow pile and construction method thereof
CN111962632A (en) Rainwater sewer and construction method thereof
CN201943071U (en) Implantable steel tube anchor rod with stabs
CN206521667U (en) A kind of permeable pavement construction
CN205259175U (en) Lower part enlarges compound foundation pile of diameter section
CN200946270Y (en) Sinking pipe bottom-expanding pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ROOM 610, DANFEI FACTORY DORMITORY, NO. 33, XIANGY

Free format text: FORMER NAME OR ADDRESS: ROOM 603, NO. 7, LANE 15, XIUSHAN ROAD, XUHUI DISTRICT, SHANGHAI CITY, 200030

CP03 Change of name, title or address

Patentee address after: 350009, Zou Jiezhuan, dormitory 33, nitrogenous fertilizer plant, 610 elephant Road, Taijiang District, Fujian, Fuzhou

Patentee address before: 200030 room 7, No. 15, Lane 603, Sau Shan Road, Shanghai, Xuhui District

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee