CN205259175U - Lower part enlarges compound foundation pile of diameter section - Google Patents

Lower part enlarges compound foundation pile of diameter section Download PDF

Info

Publication number
CN205259175U
CN205259175U CN201520851596.6U CN201520851596U CN205259175U CN 205259175 U CN205259175 U CN 205259175U CN 201520851596 U CN201520851596 U CN 201520851596U CN 205259175 U CN205259175 U CN 205259175U
Authority
CN
China
Prior art keywords
pile
concrete pile
diameter section
precast concrete
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520851596.6U
Other languages
Chinese (zh)
Inventor
周同和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gao Mengqi
Liang Yuansen
Xue Songsen
Original Assignee
周同和
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 周同和 filed Critical 周同和
Priority to CN201520851596.6U priority Critical patent/CN205259175U/en
Application granted granted Critical
Publication of CN205259175U publication Critical patent/CN205259175U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a lower part enlarges compound foundation pile of diameter section, should compound the foundation pile and include the precast concrete pile body, the lower part outside of the precast concrete pile body is equipped with the bored concrete pile. The utility model discloses a lower part enlarges the section pile foundation to be compared with the pile body of single diameter with length, and its pile foundation bearing capacity improves a lot, can guarantee that the stake is long shorter under the prerequisite that satisfies the requirement of design bearing capacity, and improves the pile foundation side and hinder and hold the performance ability that hinders.

Description

A kind of bottom enlarged diameter section composite foundation pile
Technical field
The utility model belongs to foundation engineering technical field, is specifically related to a kind of bottom enlarged diameter section composite foundation pile.
Background technology
Along with the development of building trade, construction scope increases day by day, and the additional load of ground is increasing,, high-rise building high-rise for part, subsoil and composite foundation can not meet ground requirement for bearing capacity, and under this condition, pile foundation is a kind of base form generally adopting. While there is the soft layers such as super thick miscellaneous fill, weak soil, liquefying soil and collapsible soil for top, some areas bases, pile foundation is general adopts the negative friction that adds timber pile length and offset soft layer, and a stake type generally adopts cast-in-situ bored pile. Bored pile construction operation is:
(1) plant equipment and material enter job site;
(2) measure of pile position setting-out;
(3) bury casing underground;
(4) the in place and pore-forming of rig;
(5) clear hole, lifting steel reinforcement cage;
(6) conduit, concrete perfusion are installed;
(7) remove casing, cut pile crown;
(8) pile body detects.
Generally use although above-mentioned technique is existing, in thicker soft layer, use the following problem that still exists:
1) exist on top thicklyer banket, when the soil layer such as weak soil, the negative friction that its consolidation settlement produces produces considerable influence to bearing capacity of pile foundation. When pile foundation size design, need to deduct the impact of negative friction, stake footpath, stake appearance should increase, and cause waste.
2) filling pile construction has higher requirements to filling concrete process, and filling process should ensure continuously, otherwise be prone to pile breaking phenomenon.
Summary of the invention
The purpose of this utility model has been to provide a kind of easily bottom enlarged diameter section composite foundation pile of generation negative friction soil layer such as the thicker miscellaneous fill in top, weak soil, collapsible soil and liquefiable soil layer that is applicable to.
Based on above-mentioned purpose, the utility model is taked following technical scheme: a kind of bottom enlarged diameter section composite foundation pile, comprise precast concrete pile body, and the lower outside of described precast concrete pile body is provided with bored concrete pile.
Described bored concrete pile comprises cylindrical circular stake body and the conic tube being connected with stake body top, the equal diameters of the bottom surface diameter of conic tube and stake body, and stake body and conic tube are integrative-structure, and the bus of conic tube and the angle of center line are not more than 12 °.
The top of described bored concrete pile, the outside of precast concrete pile body are provided with Friction-Reducing Coating, weaken the coating of negative friction, negative friction composite foundation pile being produced for reducing weak soil layer.
Described precast concrete pile body is pile for prestressed pipe or square pile, the preferred PHC pile tube of pile for prestressed pipe or PRC pile tube.
The curing materials of described bored concrete pile is one or more in cement mortar, cement mortar, soil cement, concrete and grouting material.
Sharpest edges of the present utility model are: under aforementioned soil layer condition, compared with the pile body of the single diameter of same length, the bearing capacity of pile foundation of composite pile foundation of the present invention is higher, and, meet under the prerequisite of design bearing capacity requirement in guarantee, realize stake long shorter, the capability development of pile foundation side resistance simultaneously and end resistance is higher, is particularly suited for being applied to the thicker miscellaneous fill in top, weak soil, collapsible soil and liquefiable soil layer etc. and easily produces negative friction soil layer. Compared with prior art, this uses novel technique effect to be specially:
1) composite foundation pile adopts the bored concrete pile in precast concrete pile body and outside, its underpart to be composited, the precast concrete pile body wherein adopting is prefabricated components, after insertion without taking-up, man-hour can significantly be shortened, bored concrete pile and the precast concrete pile body in outside, its underpart are combined closely, composite foundation pile entirety presents the large version in stake footpath, Zhuan Jing little bottom, top, can better play the effect that increases bottom pile bearing capacity;
2) filling pile structure adopts the version of cylindrical circular stake body and the conic tube being connected with stake body top, make to form between composite foundation pile top and bottom the transition of taper nature, the performance that be conducive to reduce top pile-side negative friction, increases bottom pile bearing capacity, also saves bored concrete pile material simultaneously;
3) be provided with Friction-Reducing Coating at the external wall of precast concrete pile, its object can effectively reduce negative friction, thereby further reduces top pile-side negative friction, increase pile bearing capacity;
4) while construction, method is simple, feasibility is high, and the soil layer below soft layer carries out mechanical hole reaming, can ensure that stake footpath is less within the scope of soft layer, for the formation of composite foundation pile is laid a solid foundation; In addition, produce before intensity at the curing materials of perfusion, adopt inserted mode construction to implant precast concrete pile body, this is compared with prefabricated pile of field by using static pressure, hammering construction, the former intensity is higher, and is not easy to occur because being pressed into, squeezing into phenomenons such as producing cracking, damage.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model construction procedure (1);
Fig. 3 is the structural representation of the utility model construction procedure (2);
Fig. 4 is the structural representation of the utility model construction procedure (3);
Fig. 5 is the structural representation of the utility model construction procedure (4).
Detailed description of the invention
A kind of bottom enlarged diameter section composite foundation pile as shown in Figure 1, comprises precast concrete pile body 1, and precast concrete pile body is PHC pile tube. Precast concrete pile body 1 top is positioned at weak soil layer 4, and bottom is positioned at better soil layer 5, and the outside that the bottom of precast concrete pile body 1 is positioned at better soil layer 5 is provided with bored concrete pile 3. Bored concrete pile 3 comprises cylindrical circular stake body 31 and the conic tube 31 being connected with stake body 32 tops, the equal diameters of the bottom surface diameter of conic tube 31 and stake body 32, and stake body 32 and conic tube 31 are integrative-structure, and the bus of conic tube 31 and the angle of center line are 12 °. The top of bored concrete pile 3, the outside of precast concrete pile body 1 are provided with Friction-Reducing Coating 2.
Its construction method, comprises the following steps:
(1) rig pore-forming or manual pore-forming, aperture 800mm, as shown in Figure 2;
(2) below 4, better in soil layer 5 scopes, carry out mechanical hole reaming at soft layer, as shown in Figure 3; Soft layer 4 is in miscellaneous fill, weak soil, collapsible soil or liquefiable soil layer; Reaming aperture is 1200mm, and when reaming construction, the angle between hole wall and the axis in hole of aperture increase section is not more than 12 °;
(3) in hole, pour into curing materials, as shown in Figure 4, curing materials is concrete, can also be cement mortar, cement mortar, soil cement or grouting material;
(4) produce before intensity at the curing materials of step (3) perfusion, implant precast concrete pile body; Implanting before precast concrete pile body, on precast concrete pile body top, the pile body outside that is positioned at weak soil layer applies one deck Friction-Reducing Coating, negative friction composite foundation pile being produced for reducing weak soil layer. The length that Friction-Reducing Coating applies equals the degree of depth of soft layer. As shown in Figure 5.

Claims (5)

1. a bottom enlarged diameter section composite foundation pile, is characterized in that, comprises precast concrete pile body, and the lower outside of described precast concrete pile body is provided with bored concrete pile; Described bored concrete pile comprises cylindrical circular stake body and the conic tube being connected with stake body top, the equal diameters of the bottom surface diameter of conic tube and stake body, and stake body and conic tube are integrative-structure, and the bus of conic tube and the angle of center line are not more than 12 °.
2. bottom as claimed in claim 1 enlarged diameter section composite foundation pile, is characterized in that, the top of described bored concrete pile, the outside of precast concrete pile body are provided with Friction-Reducing Coating.
3. bottom as claimed in claim 2 enlarged diameter section composite foundation pile, is characterized in that, described precast concrete pile body is pile for prestressed pipe or square pile.
4. bottom as claimed in claim 3 enlarged diameter section composite foundation pile, is characterized in that, described pile for prestressed pipe is PHC pile tube or PRC pile tube.
5. bottom as claimed in claim 2 enlarged diameter section composite foundation pile, is characterized in that, the curing materials of described bored concrete pile is one or more in cement mortar, cement mortar, soil cement, concrete and grouting material.
CN201520851596.6U 2015-10-30 2015-10-30 Lower part enlarges compound foundation pile of diameter section Active CN205259175U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520851596.6U CN205259175U (en) 2015-10-30 2015-10-30 Lower part enlarges compound foundation pile of diameter section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520851596.6U CN205259175U (en) 2015-10-30 2015-10-30 Lower part enlarges compound foundation pile of diameter section

Publications (1)

Publication Number Publication Date
CN205259175U true CN205259175U (en) 2016-05-25

Family

ID=56000713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520851596.6U Active CN205259175U (en) 2015-10-30 2015-10-30 Lower part enlarges compound foundation pile of diameter section

Country Status (1)

Country Link
CN (1) CN205259175U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297717A (en) * 2015-10-30 2016-02-03 周同和 Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297717A (en) * 2015-10-30 2016-02-03 周同和 Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile

Similar Documents

Publication Publication Date Title
CN103321244B (en) Sand foundation existing building sets up the construction method of basement
CN105297717A (en) Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN105649073A (en) Static root drilling type construction method for planting piles
CN101608452A (en) The bottom-connected reinforced concrete open caisson water-washed sinking job practices
CN106480878A (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN207659986U (en) A kind of building or structures foundation stabilization underpin pier
CN111254909B (en) Construction process of composite pile foundation of soft soil area foundation
CN203270584U (en) One-way intercepting grouting head for grouting
CN205259175U (en) Lower part enlarges compound foundation pile of diameter section
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN103911986B (en) A kind of construction method combining strike-on steel pipe pile
CN201857608U (en) Synthetic pile
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN213867907U (en) Prefabricated expanded packing key type digging foundation for power transmission line
CN212801508U (en) Grouting spiral steel pile for foundation stabilization
CN212270943U (en) Prefabricated assembled steel concrete combined supporting pile
CN204199279U (en) Prefabricated reinforced concrete anchor pole
CN209603166U (en) A kind of shaft tower screw pile
CN203174586U (en) Concrete pipe pile for reinforcing railway soft soil foundation
CN202247856U (en) Earth borrowing annular pile for foundation treatment and underground foundation
CN102051877B (en) Prefabricated squeezing-expanding pile and construction method thereof
CN111877327A (en) Grouting spiral steel pile for foundation stabilization and pile planting method thereof
CN206495202U (en) A kind of top expansion type cement-soil composite pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Liang Yuansen

Inventor after: Song Hongguang

Inventor after: Zhang Tianmin

Inventor after: Qu Dong

Inventor after: Shen Shihong

Inventor after: Liang Yunfei

Inventor after: Kong Jin

Inventor after: Yang Xiangyang

Inventor after: Chen Dai

Inventor after: Zhao Changle

Inventor after: Wang Xiang

Inventor after: Xue Songsen

Inventor after: Zhou Tonghe

Inventor after: Liu Hui

Inventor after: Zhang Baogui

Inventor after: Wang Huilong

Inventor after: Wang Liuyang

Inventor after: Gao Mengqi

Inventor after: Liu Xiao

Inventor before: Zhou Tonghe

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170314

Address after: 450000 Zhengzhou Urban Construction Group Investment Co., Ltd., Huashan Road, Henan, No. 92,

Patentee after: Liang Yuansen

Patentee after: Song Hongguang

Patentee after: Zhang Tianmin

Patentee after: Qu Dong

Patentee after: Shen Shihong

Patentee after: Liang Yunfei

Patentee after: Kong Jin

Patentee after: Yang Xiangyang

Patentee after: Chen Dai

Patentee after: Zhao Changle

Patentee after: Wang Xiang

Patentee after: Xue Songsen

Patentee after: Zhou Tonghe

Patentee after: Liu Hui

Patentee after: Zhang Baogui

Patentee after: Wang Huilong

Patentee after: Wang Liuyang

Patentee after: Gao Mengqi

Patentee after: Liu Xiao

Address before: 450002 Henan Province, Zhengzhou Cultural Road, room 50, No. 113

Patentee before: Zhou Tonghe