CN204199279U - Prefabricated reinforced concrete anchor pole - Google Patents

Prefabricated reinforced concrete anchor pole Download PDF

Info

Publication number
CN204199279U
CN204199279U CN201420651128.XU CN201420651128U CN204199279U CN 204199279 U CN204199279 U CN 204199279U CN 201420651128 U CN201420651128 U CN 201420651128U CN 204199279 U CN204199279 U CN 204199279U
Authority
CN
China
Prior art keywords
anchor
reinforced concrete
anchor pole
prefabricated reinforced
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420651128.XU
Other languages
Chinese (zh)
Inventor
彭军
梁红涛
黄丽英
梁玫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Light Industry Nanning Design Engineering Co Ltd
Original Assignee
China Light Industry Nanning Design Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Light Industry Nanning Design Engineering Co Ltd filed Critical China Light Industry Nanning Design Engineering Co Ltd
Priority to CN201420651128.XU priority Critical patent/CN204199279U/en
Application granted granted Critical
Publication of CN204199279U publication Critical patent/CN204199279U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开一种预制钢筋混凝土锚杆,其特征在于:包括锚杆杆身、螺旋箍筋和预应力钢筋,锚杆杆身由混凝土制成,呈中空圆柱形,锚杆杆身上设有溢浆孔,锚杆杆身两端设有锚杆杆端接头,锚杆杆身内设有2N+2根预应力钢筋,螺旋箍筋缠绕在预应力钢筋上,本实用新型既能够达到用普通锚杆和土钉进行基坑支护时的同等安全性能,又能解决钻孔过程中孔内和表层土体塌落的问题。

The utility model discloses a prefabricated reinforced concrete anchor, which is characterized in that it comprises an anchor shaft, spiral stirrups and prestressed steel bars; Slurry overflow holes, the two ends of the anchor shaft are provided with anchor rod end joints, and 2N+2 prestressed steel bars are arranged in the anchor shaft body, and the spiral stirrups are wound on the prestressed steel bars. Anchor rods and soil nails have the same safety performance when supporting foundation pits, and can solve the problem of soil collapse in the hole and on the surface during the drilling process.

Description

预制钢筋混凝土锚杆Prefabricated Reinforced Concrete Anchor

技术领域 technical field

本实用新型属于建筑工程基坑支护的施工技术领域,具体为一种预制钢筋混凝土锚杆。 The utility model belongs to the technical field of construction engineering foundation pit support, in particular to a prefabricated reinforced concrete anchor rod.

背景技术 Background technique

目前,随着城市建设的迅速发展,城市用地越来越紧张,为了充分提高地下空间的利用率,高层建筑地下部分也不断增加,基坑也越来越大,越来越深。深基坑支护施工除了要求必须满足自身结构的安全、保证地下室施工安全顺利进行、确保周边环境与建筑物、道路管线的安全外,同时还必须实现施工对周边的环境影响最少,降低地下污染、降低造价的目的。普通锚杆和土钉墙支护均需要预先钻孔再放入钢筋最后灌浆,施工工序多。大量的实际工程施工情况表明,普通锚杆和土钉墙支护在松散的填土和粘土层预钻孔时,由于钻孔过程中需要往孔内不断注水,当水过多溢出孔外时会带出泥土并冲刷边坡表面,容易造成孔内和边坡表面土体塌落。孔内土体塌落不利于钢筋放置和灌浆,而边坡表面土体的塌落甚至会影响基坑的安全使用。 At present, with the rapid development of urban construction, urban land is becoming more and more tense. In order to fully improve the utilization rate of underground space, the underground part of high-rise buildings is also increasing, and the foundation pits are also getting bigger and deeper. In addition to the requirements of deep foundation pit support construction to meet the safety of its own structure, ensure the safe and smooth construction of the basement, and ensure the safety of the surrounding environment, buildings, and road pipelines, it must also achieve the least impact on the surrounding environment and reduce underground pollution. , The purpose of reducing the cost. Both ordinary anchor rods and soil nail wall support need to be pre-drilled and then put in steel bars and finally grouted, and there are many construction procedures. A large number of actual engineering construction conditions show that when the ordinary anchor rod and soil nail wall support are pre-drilled in loose fill and clay layers, due to the need to continuously inject water into the hole during the drilling process, when too much water overflows the hole It will bring out the soil and scour the surface of the slope, which will easily cause the soil in the hole and on the surface of the slope to collapse. The collapse of the soil in the hole is not conducive to the placement of steel bars and grouting, and the collapse of the soil on the slope surface may even affect the safe use of the foundation pit.

发明内容 Contents of the invention

本实用新型的目的是提供一种可以替代普通锚杆和土钉在松散土层进行基坑支护的预制钢筋混凝土锚杆,既能够达到用普通锚杆和土钉进行基坑支护时的同等安全性能,又能解决钻孔过程中孔内和表层土体塌落的问题。 The purpose of this utility model is to provide a prefabricated reinforced concrete anchor that can replace ordinary anchors and soil nails for foundation pit support in loose soil layers. With the same safety performance, it can solve the problem of soil collapse in the hole and on the surface during the drilling process.

本实用新型的技术方案是这样实现的: The technical scheme of the utility model is achieved in that:

一种预制钢筋混凝土锚杆,包括锚杆杆身、螺旋箍筋和预应力钢筋,锚杆杆身由混凝土制成,呈中空圆柱形,锚杆杆身上设有溢浆孔,锚杆杆身两端设有锚杆杆端接头,锚杆杆身内设有2N+2根预应力钢筋,螺旋箍筋缠绕在预应力钢筋上;压入土体一侧的锚杆杆端接头根据需要焊接有杆尖,可以更容易的压入土体。 A prefabricated reinforced concrete anchor, including an anchor shaft, spiral stirrups and prestressed steel bars, the anchor shaft is made of concrete, in the shape of a hollow cylinder, the anchor shaft is provided with a grout overflow hole, the anchor shaft There are anchor rod end joints at both ends, and 2N+2 prestressed steel bars are arranged in the anchor shaft, and the spiral stirrups are wound on the prestressed steel bars; the anchor rod end joints pressed into the soil body are welded as required The tip of the rod makes it easier to press into the soil.

所述的锚杆杆端接头由焊接连接端板和钢套箍组成,方便连接加长锚杆,以满足实际工程的不同支护长度的要求。 The bolt rod end joint is composed of a welded connection end plate and a steel collar, which is convenient for connecting an extended bolt to meet the requirements of different support lengths in actual projects.

所述的焊接连接端板上设置有预应力钢筋锚孔,锚孔位置与预应力钢筋的设置位置一致。 The prestressed reinforcement anchor hole is arranged on the welding connection end plate, and the position of the anchor hole is consistent with the setting position of the prestressed reinforcement.

所述的焊接连接端板上设置有预应力钢筋锚孔,其与预应力钢筋位置一致所述的钢套箍由钢板卷压成圆柱状,并焊合接缝,预制锚杆可以用钢套箍连接加长,以满足实际工程的不同支护长度的要求。 The prestressed steel anchor hole is set on the welding connection end plate, which is consistent with the position of the prestressed steel bar. The steel hoop is rolled and pressed into a cylindrical shape by a steel plate, and the seam is welded. The prefabricated anchor rod can use a steel sleeve The hoop connection is lengthened to meet the requirements of different support lengths in actual engineering.

锚杆杆身采用先张法离心混凝土制作工艺成形,长度模数为3米和6米,外径D=150mm,内径d=50mm,沿桩身纵向每隔500mm设有4个直径为20mm溢浆孔;预制钢筋混凝土锚杆抗拔力计算公式:Rt=0.8πd∑lifi,其中d为锚杆直径,li为预制锚进入各土层长度,fi为砂浆与各土层间粘结强度特征值。 The anchor shaft is formed by the pre-tensioned centrifugal concrete manufacturing process, the length modulus is 3 meters and 6 meters, the outer diameter D=150mm, the inner diameter d=50mm, and there are four overflow holes with a diameter of 20mm every 500mm along the longitudinal direction of the pile body. Grout holes; the formula for calculating the pullout force of prefabricated reinforced concrete anchors: Rt=0.8πd∑lifi, where d is the diameter of the anchor, li is the length of the prefabricated anchor entering each soil layer, and fi is the bond strength between the mortar and each soil layer value.

与现有技术相比,本实用新型的突出的特点和显著的进步是: Compared with the prior art, the outstanding features and remarkable progress of the present utility model are:

1、本实用新型的锚杆为混凝土预制构件,可在工厂批量生产,具体工程可根据实际需要批量订购,由于构件为预制构件,减少了现场的施工环节,施工速度较锚杆和土钉墙支护快。施工只需采用静压预制管桩的方法将预制锚杆压入土体,最后压力灌浆即可完成,其过程不向空外排水排土,故不会造成土体塌落,很好地解决了上述问题。 1. The anchor rod of the present utility model is a concrete prefabricated component, which can be produced in batches in the factory. The specific project can be ordered in batches according to actual needs. Since the component is a prefabricated component, the construction links on site are reduced, and the construction speed is faster than that of the anchor rod and soil nailing wall Fast support. The construction only needs to use the method of static pressure prefabricated pipe pile to press the prefabricated anchor rod into the soil, and finally the pressure grouting can be completed. The process does not drain the soil to the outside, so it will not cause the soil to collapse, which is a good solution the above problems.

2、由于采用静压桩的施工方法,该方法施工时会产生挤土效应,在松散土和非饱和填土中起到加密土体的作用,整个施工过程没有向外排土,很好地解决了普通锚杆和土钉墙支护时,钻孔塌孔和边坡土塌落的现象; 2. Due to the construction method of static pressure piles, this method will produce a soil squeezing effect during construction, which will play a role in compacting the soil in loose soil and unsaturated fill soil. The entire construction process does not discharge soil outward, which is very good It solves the phenomenon of borehole collapse and slope soil collapse when ordinary anchor rods and soil nail walls are supported;

3、预制钢筋混凝土锚杆由工厂生产,成本大大降低;配筋率很小,大大节约钢材;直径小而表面积大;单方混凝土的承载力很大;施工简单,技术难度低。 3. The prefabricated reinforced concrete anchor bolt is produced by the factory, which greatly reduces the cost; the reinforcement ratio is small, which greatly saves steel; the diameter is small and the surface area is large; the bearing capacity of unilateral concrete is large; the construction is simple and the technical difficulty is low.

4、相对于普通锚杆和土钉墙支护,没有钻孔的过程,整个施工过程一次静压成型,操作简单。由于不需要另设锚杆钢筋,从而为工程节省了孔内锚杆(土钉)的架立钢筋。 4. Compared with ordinary anchor rods and soil nail wall support, there is no drilling process, and the whole construction process is formed by static pressure at one time, and the operation is simple. Since there is no need to set up additional reinforcement for the anchor rod, the erection reinforcement for the anchor rod (soil nail) in the hole is saved for the project.

附图说明 Description of drawings

以下结合附图及实施例描述本实用新型预制钢筋混凝土锚杆。 The utility model prefabricated reinforced concrete anchor rod is described below in conjunction with accompanying drawing and embodiment.

图1是本实用新型预制钢筋混凝土锚杆结构示意图。 Fig. 1 is the structural schematic diagram of the prefabricated reinforced concrete anchor rod of the present utility model.

图2是本实用新型预制钢筋混凝土锚杆杆身配筋示意图。 Fig. 2 is a schematic diagram of reinforcement of the prefabricated reinforced concrete anchor rod body of the present invention.

图3是图2的右视图。 Fig. 3 is a right side view of Fig. 2 .

图中部件序号与名称: The serial number and name of the parts in the figure:

锚杆杆身1、锚杆杆端接头2、溢浆孔3、杆尖4、螺旋箍筋5、预应力钢筋6。 Anchor shaft 1, anchor rod end joint 2, overflow hole 3, rod tip 4, spiral stirrup 5, prestressed steel bar 6.

具体实施方式 Detailed ways

为了更加详细的介绍本实用新型,下面结合附图,对本实用新型做进一步说明。 In order to introduce the utility model in more detail, the utility model will be further described below in conjunction with the accompanying drawings.

如图所示,预制钢筋混凝土锚杆,包括锚杆杆身1、螺旋箍筋5和预应力钢筋6,锚杆杆身1由混凝土制成,呈中空圆柱形,锚杆杆身1上设有溢浆孔3,锚杆杆身1两端设有锚杆杆端接头2,锚杆杆身1内设有2N+2根预应力钢筋6,螺旋箍筋5缠绕在预应力钢筋6上。压入土体一侧的锚杆杆端接头2根据需要焊接有杆尖4,为了更容易的压入土体。所述的锚杆杆端接头2由焊接连接端板和钢套箍组成,钢套箍套接锚杆杆身1。所述的焊接连接端板上设置有预应力钢筋6锚孔,锚孔位置与预应力钢筋6的设置位置一致。所述的钢套箍由钢板卷压成圆柱状,并焊合接缝。 As shown in the figure, the prefabricated reinforced concrete anchor includes an anchor shaft 1, a spiral stirrup 5 and a prestressed steel bar 6. The anchor shaft 1 is made of concrete and has a hollow cylindrical shape. There are overflow holes 3, the two ends of the anchor shaft 1 are provided with anchor rod end joints 2, the anchor shaft 1 is equipped with 2N+2 prestressed steel bars 6, and the spiral stirrups 5 are wound on the prestressed steel bars 6 . The anchor rod end joint 2 pressed into the soil body side is welded with a rod tip 4 as required, in order to be pressed into the soil body more easily. The anchor rod end joint 2 is composed of a welded connection end plate and a steel ferrule, and the steel ferrule is sleeved on the anchor rod shaft 1 . The anchor holes of the prestressed steel bars 6 are arranged on the welding connection end plate, and the positions of the anchor holes are consistent with the setting positions of the prestressed steel bars 6 . The steel ferrule is rolled and pressed into a cylindrical shape by steel plates, and the seams are welded.

本实用新型的施工原理为:施工时采用静压预制管桩的方法将预制锚杆压入土体,用锚杆杆端接头2连接加长锚杆,满足工程的支护长度要求后,采用压力灌浆。在压力灌浆时,水泥浆充满预制锚杆后从溢浆孔3溢出到被加固土体中,硬化并加固预制锚杆周围松散土。 The construction principle of the utility model is as follows: during construction, the method of static pressure prefabricated pipe piles is used to press the prefabricated anchor rod into the soil, and the anchor rod rod end joint 2 is used to connect the lengthened anchor rod. grouting. During pressure grouting, the cement slurry is filled with the prefabricated anchor and overflows from the overflow hole 3 into the reinforced soil, hardening and reinforcing the loose soil around the prefabricated anchor.

Claims (5)

1. a prefabricated reinforced concrete anchor pole, it is characterized in that: comprise rock bolt shank (1), spiral stirrup (5) and prestressed reinforcement (6), described rock bolt shank (1) is made up of concrete, in hollow cylindrical, rock bolt shank (1) is provided with extravasating hole (3), rock bolt shank (1) two ends are provided with anchor pole rod ends (2), are provided with 2N+2 root prestressed reinforcement (6) in rock bolt shank (1), and spiral stirrup (5) is wrapped on prestressed reinforcement (6).
2. prefabricated reinforced concrete anchor pole according to claim 1, is characterized in that: anchor pole rod ends (2) is welded with bar point (4), makes it easily be pressed into the soil body.
3. prefabricated reinforced concrete anchor pole according to claim 1, is characterized in that: described anchor pole rod ends (2) is by being welded to connect end plate and steel hoop forms.
4. prefabricated reinforced concrete anchor pole according to claim 3, is characterized in that: described being welded to connect on end plate is provided with prestressed reinforcement (6) anchor hole, and anchor hole position is consistent with the setting position of prestressed reinforcement (6).
5. prefabricated reinforced concrete anchor pole according to claim 3, is characterized in that: described steel hoop is pressed into cylindric by roll of steel plate, and seam seam.
CN201420651128.XU 2014-11-04 2014-11-04 Prefabricated reinforced concrete anchor pole Expired - Lifetime CN204199279U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420651128.XU CN204199279U (en) 2014-11-04 2014-11-04 Prefabricated reinforced concrete anchor pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420651128.XU CN204199279U (en) 2014-11-04 2014-11-04 Prefabricated reinforced concrete anchor pole

Publications (1)

Publication Number Publication Date
CN204199279U true CN204199279U (en) 2015-03-11

Family

ID=52657254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420651128.XU Expired - Lifetime CN204199279U (en) 2014-11-04 2014-11-04 Prefabricated reinforced concrete anchor pole

Country Status (1)

Country Link
CN (1) CN204199279U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455996A (en) * 2020-05-29 2020-07-28 江苏景源万河环境科技有限公司 Prefabricated prestressed anchor rod with guide device and construction method
CN114108622A (en) * 2021-11-10 2022-03-01 陶德明 Assembled static pressure concrete anchor rod

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455996A (en) * 2020-05-29 2020-07-28 江苏景源万河环境科技有限公司 Prefabricated prestressed anchor rod with guide device and construction method
CN114108622A (en) * 2021-11-10 2022-03-01 陶德明 Assembled static pressure concrete anchor rod

Similar Documents

Publication Publication Date Title
CN104179174B (en) A kind of multiple holes grouting pipe shaped pile and pile making method thereof
CN203476347U (en) Preliminary bracing device for collapsible loess tunnel
CN103485349B (en) Prestressed anchor pipe structure and construction method of lime nail composite frame for strengthening weak soil slope
CN104762978B (en) A kind of anchor pole Gravity Retaining Wall for high slope rockmass and manufacture method
CN103510510B (en) A kind of enhancement mode long auger cast-with-pressure concrete pile and construction method
CN104452784B (en) Composite bolt pile used for slope strengthening and construction technique of composite bolt pile
CN103032080A (en) Support method of weak and broken surrounding rock tunnel
CN102071693A (en) Variable section cement-soil gravity type retaining wall and construction method thereof
CN211898463U (en) Reinforcing device using micro-steel piles combined with bolts
CN204023559U (en) A kind of multiple holes grouting pipe shaped pile
CN106149745A (en) A kind of truss type steel tube grouting pile basis and construction method thereof
CN104295112B (en) A kind of reinforced concrete post connects steel core concrete column syndeton and construction method
CN102605773A (en) Construction method of slip-casting expanded-base cast-in-situ bored pile and extruding-extending device thereof
CN204199279U (en) Prefabricated reinforced concrete anchor pole
CN105178355B (en) The stratum pre-reinforcement processing method of underground space construction
CN108677934A (en) The construction method of uplift pile and uplift pile
CN204530725U (en) A kind of anchor pole Gravity Retaining Wall for high slope rockmass
CN209818080U (en) Segmental assembled pipe shed pouring construction structure
CN204174955U (en) Reinforced concrete post connects steel core concrete column syndeton
CN103422869A (en) Jet grouting and anchoring comprehensive construction method of soft rock tunnel
CN103410529A (en) Tunnel supporting arch foot reinforced structure for soft surrounding rocks and construction method
CN204401602U (en) A kind of rigid-flexible composite support water stop RCP stake
CN202543908U (en) Extruding and enlarging device of slip casting enlarged cast-in-situ bored pile
CN201857608U (en) Synthetic pile
CN207047839U (en) A kind of pile for prestressed pipe stake bottom floating sealing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150311