CN207193953U - A kind of reinforced concrete tubular pile of outer rim - Google Patents

A kind of reinforced concrete tubular pile of outer rim Download PDF

Info

Publication number
CN207193953U
CN207193953U CN201720888004.7U CN201720888004U CN207193953U CN 207193953 U CN207193953 U CN 207193953U CN 201720888004 U CN201720888004 U CN 201720888004U CN 207193953 U CN207193953 U CN 207193953U
Authority
CN
China
Prior art keywords
partition panel
steel construction
construction partition
hole
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720888004.7U
Other languages
Chinese (zh)
Inventor
孟强
刘巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxiang Ninghua New Material Co.,Ltd.
Original Assignee
Ningxiang Ning Hua Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningxiang Ning Hua Building Materials Co Ltd filed Critical Ningxiang Ning Hua Building Materials Co Ltd
Priority to CN201720888004.7U priority Critical patent/CN207193953U/en
Application granted granted Critical
Publication of CN207193953U publication Critical patent/CN207193953U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of reinforced concrete tubular pile of outer rim, including concrete substrate and steel reinforcement cage, pouring molding has the cylindrical steel reinforcement cage consistent with concrete substrate size in the concrete substrate, and the steel construction partition panel that cross section is ring-type is arranged at intervals with the axial direction of pile tube, the steel construction partition panel outer rim is provided with the brim of a hat, and inside the brim of a hat is provided with the bracing piece pilot hole of annular arrangement and inserts and be welded with metal reinforcing bars middle;The reinforced hole of uniform ring arrangement is additionally provided with the steel construction partition panel on the inside of the bracing piece pilot hole in addition, reinforced hole on different steel construction partition panels is mutually corresponding, and be fitted with each reinforced hole a root long degree it is consistent with pile tube length run through reinforcing bar.The utility model technique is simple, easy to process, and assembling is easy, and can effectively increase the stability and intensity after pile tube shaping.

Description

A kind of reinforced concrete tubular pile of outer rim
Technical field
Engineering construction field is the utility model is related to, specifically a kind of reinforced concrete tubular pile of outer rim.
Background technology
In the existing Industrial and Civil Engineering pile foundation in China, largely prestressed concrete pipe pile or steel-pipe pile are used Pile foundation.This kind of pile for prestressed pipe has easily manufacture and assembly process and excellent mechanicalness as precast construction stake Can, it is mainly used in pile foundation engineering to improve ground and the bearing capacity on basis, simultaneously for being built in unstable soil layer or Soft Soil Layer On building and infrastructure projects.
And in terms of stress, it is stronger that the constuction loads on top can be delivered to depths bearing capacity by prestressed concrete pipe pile To improve the bearing capacity of foundation soil and compactness on soil layer or by the compacted reality of Soft Soil Layer.Thus prestressed concrete pipe pile is except work To can be also used for outside the common building material in the foundation engineering such as waterwork, industrial building, civil buildings and bridge field The antiskid of side slope and pattern foundation pit supporting structure or water proof, but its structure of the prestressed concrete pipe pile of traditional structure is excessively simple, is beating The pile end board being stressed directly in stake installation process is sheet steel plate, is connected with concrete structure by bonding way, and it is connected The position stress limit is smaller, easily bending deformation, and causing it to carry, tensile force scope is small, influences the overall steady of superstructure It is qualitative.
Utility model content
The technical problem that the utility model solves is to provide a kind of outer rim reinforced concrete tubular pile, above-mentioned to solve The shortcomings that in background technology.
The technical problem that the utility model solves is realized using following technical scheme:
A kind of reinforced concrete tubular pile of outer rim, including concrete substrate and steel reinforcement cage, pour in the concrete substrate Build and form the cylindrical steel reinforcement cage consistent with concrete substrate size, and cross section is arranged at intervals with the axial direction of pile tube For the steel construction partition panel of ring-type, the steel construction partition panel outer rim is provided with the brim of a hat for stretching out 20 ~ 50mm of concrete substrate, and Inside the brim of a hat is provided with the bracing piece pilot hole of annular arrangement, the bracing piece pilot hole is 50 ~ 60mm of aperture through hole, and Inserted in the lead to the hole site and be welded with that external diameter is consistent with through-hole aperture, length for 300 ~ 400mm metal reinforcing bars;Exist in addition The reinforced hole of uniform ring arrangement, different steel constructions are additionally provided with steel construction partition panel on the inside of the bracing piece pilot hole Reinforced hole on partition panel is mutually corresponding, and is fitted with each reinforced hole that a root long degree is consistent with pile tube length to be run through Reinforcing bar.
In the utility model, the steel construction partition panel is in plate body centre position and the reinforcing bar through steel construction partition panel Together, and whole steel construction partition panel abuts steel reinforcement cage inner side edge in inner side for the part soldering of cage.
In the utility model, the concrete substrate is poured for C80 high performance concretes and formed.
In the utility model, spacing that the adjacent steel construction partition panel is set up in the axle of pile tube for 800 ~ 2000mm。
In the utility model, the bracing piece pilot hole number set on the anchor ring of single steel construction partition panel is 6 ~ 8, And the fixed metal reinforcing bars that are welded in bracing piece pilot hole are then in body of rod centre position together with steel construction partition panel soldering.
In the utility model, the number of the reinforced hole set on the anchor ring of single steel construction partition panel is 12 ~ 15.
Beneficial effect:The utility model by setting reinforcement cage structure in concrete substrate, effectively increase pile tube into Stability and intensity after type, meanwhile, by setting steel construction partition panel in reinforcement cage structure and on steel construction partition panel Being provided with brim structure can effectively improve that to be connected aspect with concrete more cohesive, and be provided with steel on steel construction partition panel Muscle hole and bracing piece pilot hole, coordinate brim structure to improve the stability of steel construction partition panel and anti-shear performance, allow stake Body is durable in use, extends the service life of above-ground structures.
Brief description of the drawings
Fig. 1 is the cross-sectional detail figure of the utility model preferred embodiment.
Fig. 2 is the A-A faces schematic diagram in Fig. 1.
Wherein:1st, outer reinforcement cage wire side;2nd, concrete substrate;3rd, through reinforcing bar;4th, internal layer steel reinforcement cage wire side;5th, steel knot Structure partition panel;6th, metal reinforcing bars;7th, the steel construction partition panel the brim of a hat.
Embodiment
In order that technological means, creation characteristic, reached purpose and effect that the utility model is realized are easy to understand, under Face combines and is specifically illustrating, and the utility model is expanded on further.
Referring to the preferred embodiment of Fig. 1, Fig. 2 a kind of reinforced concrete tubular pile of outer rim, in the present embodiment, including mix Solidifying soil matrix body 2, the concrete substrate 2 is poured for C80 high performance concretes and formed, and steel reinforcement cage is cylindrical steel reinforcement cage, quilt It is cast in concrete substrate 2.In Fig. 1, the visible part of steel reinforcement cage is planar only showed only as outer reinforcement cage simultaneously Wire side 1 and internal layer steel reinforcement cage wire side 4, and the steel construction partition panel that cross section is ring-type is arranged at intervals with the axial direction of pile tube 5, and adjacent steel construction partition panel 5 is 1200mm in the spacing that the axle of pile tube is set up.Steel construction partition panel 5 is in plate body Between position together with the soldering of outer reinforcement cage wire side 1 through the steel reinforcement cage of steel construction partition panel 5, and whole steel construction cut-off Plate 5 is abutted against in inner side on internal layer steel reinforcement cage wire side 4, and whole steel construction partition panel 5 is additionally provided with stretching concrete in outer rim The width of matrix 2 is the 50mm the brim of a hat.
These spaced structures of steel construction partition panel 5 are consistent on pile tube, and 8 bracing piece dresses are provided with its anchor ring Distribution and 12 reinforced holes.Wherein, the aperture of the bracing piece pilot hole is 50mm, and it is 400mm to be fitted with a root long degree in it Metal reinforcing bars 6, the metal reinforcing bars 6 are in body of rod centre position together with the soldering of steel construction partition panel 5;And the reinforcing bar For hole forming on the inside of bracing piece pilot hole, the reinforced hole on different steel construction partition panels 5 is mutually corresponding, and in each reinforced hole Inside be fitted with a root long degree it is consistent with pile tube length run through reinforcing bar 3.
The advantages of general principle of the present utility model, principal character and the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model is also Various changes and modifications are had, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model Claimed scope is by appended claims and its equivalent thereof.

Claims (7)

1. a kind of reinforced concrete tubular pile of outer rim, including concrete substrate and steel reinforcement cage, it is characterised in that the concrete Pouring molding has the cylindrical steel reinforcement cage consistent with concrete substrate size in matrix, and is arranged at intervals in the axial direction of pile tube There is the steel construction partition panel that cross section is ring-type, the steel construction partition panel outer rim, which is provided with, stretches out 20 ~ 50mm of concrete substrate The brim of a hat, and inside the brim of a hat is provided with the bracing piece pilot hole of annular arrangement, the bracing piece pilot hole is 50 ~ 60mm of aperture Through hole, and insert in the lead to the hole site and be welded with that external diameter is consistent with through-hole aperture, the metal reinforcement that length is 300 ~ 400mm Bar;The reinforced hole of uniform ring arrangement is additionally provided with the steel construction partition panel on the inside of the bracing piece pilot hole in addition, no Reinforced hole on same steel construction partition panel is mutually corresponding, and a root long degree and pile tube length are fitted with each reinforced hole Consistent runs through reinforcing bar.
2. concrete tubular pile according to claim 1, it is characterised in that the concrete substrate is C80 high-performance coagulations Soil, which pours, to be formed.
3. concrete tubular pile according to claim 1, it is characterised in that the steel construction partition panel is in plate body centre position Together with the part soldering of the steel reinforcement cage through steel construction partition panel, and whole steel construction partition panel abuts steel reinforcement cage in inner side Inner side edge.
4. concrete tubular pile according to claim 1, it is characterised in that the adjacent steel construction partition panel is in pile tube The spacing that axle is set up is 800 ~ 2000mm.
5. concrete tubular pile according to claim 1, it is characterised in that set on the anchor ring of single steel construction partition panel Bracing piece pilot hole number is 6 ~ 8.
6. concrete tubular pile according to claim 1, it is characterised in that be welded fixed gold in the bracing piece pilot hole Belong to bracing piece then in body of rod centre position together with steel construction partition panel soldering.
7. concrete tubular pile according to claim 1, it is characterised in that set on the anchor ring of single steel construction partition panel The number of reinforced hole is 12 ~ 15.
CN201720888004.7U 2017-07-21 2017-07-21 A kind of reinforced concrete tubular pile of outer rim Active CN207193953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720888004.7U CN207193953U (en) 2017-07-21 2017-07-21 A kind of reinforced concrete tubular pile of outer rim

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720888004.7U CN207193953U (en) 2017-07-21 2017-07-21 A kind of reinforced concrete tubular pile of outer rim

Publications (1)

Publication Number Publication Date
CN207193953U true CN207193953U (en) 2018-04-06

Family

ID=61798078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720888004.7U Active CN207193953U (en) 2017-07-21 2017-07-21 A kind of reinforced concrete tubular pile of outer rim

Country Status (1)

Country Link
CN (1) CN207193953U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326899A (en) * 2017-07-21 2017-11-07 宁乡宁华建材有限公司 A kind of reinforced concrete tubular pile of outer rim

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326899A (en) * 2017-07-21 2017-11-07 宁乡宁华建材有限公司 A kind of reinforced concrete tubular pile of outer rim

Similar Documents

Publication Publication Date Title
CN107060210A (en) A kind of FRP combination dies net post and preparation method thereof
CN102071747A (en) Joint of square steel tube concrete column and reinforced concrete floor and production method thereof
CN208533868U (en) A kind of novel arrangement of reinforcement hollow steel pipe high-strength concrete column
CN206928519U (en) A kind of reinforced concrete combination post
CN207193953U (en) A kind of reinforced concrete tubular pile of outer rim
CN202090336U (en) Spirally-proceeding type steel tube concrete pile
CN105971196B (en) The embedded Concrete-Filled Square Steel Tube ring beam and construction column method of construction of masonry structure
CN101173728A (en) Thin walled pipe for concrete filling
CN201835278U (en) Prestressed high-strength concrete square pile
CN107326899A (en) A kind of reinforced concrete tubular pile of outer rim
CN201024422Y (en) Pretensioned prestressed concrete shaped tube pile
CN102051929A (en) Block masonry wall configured with steel ribs and manufacture method thereof
CN204059756U (en) The truss of a kind of pre-stressed steel pipe concrete purlin sheet and structure thereof
CN110485637A (en) A kind of high anti-seismic formula building bar cage of achievable fast pouring
CN207193966U (en) A kind of prestressed concrete pipe pile
CN206359882U (en) A kind of assembled solid steel tube constrains reinforced column squat pier
CN205530324U (en) Miniature stake of thin -walled cold -formed steel
CN214993788U (en) Assembled cement soil composite pile
CN210507502U (en) Prefabricated assembled concrete slab bed structure
CN207193949U (en) A kind of pile for prestressed pipe of convenient construction
CN106930307A (en) The foundation beam prefabricated board and its assembly construction method of a kind of replacement brick fetal membrane
CN204112858U (en) The prefabricated enclosure wall of a kind of prestressed concrete
CN208121961U (en) A kind of assembling frame corner node structure
CN205348170U (en) In dig method prestressed concrete pipe pile
CN102561315A (en) Linkage precast pile type underground diaphragm wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 41066 No.1, Jinwang Road, Jinyu industrial concentration zone, HuiLongPu Town, Ningxiang City, Changsha City, Hunan Province

Patentee after: Ningxiang Ninghua New Material Co.,Ltd.

Address before: 410600 group 11, Huatian village, HuiLongPu Town, Ningxiang County, Changsha City, Hunan Province

Patentee before: NINGXIANG NINGHUA BUILDING MATERIAL Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An outer edge reinforced concrete pipe pile

Effective date of registration: 20220830

Granted publication date: 20180406

Pledgee: Ningxiang Hunan rural commercial bank Limited by Share Ltd.

Pledgor: Ningxiang Ninghua New Material Co.,Ltd.

Registration number: Y2022980014091