CN205348170U - In dig method prestressed concrete pipe pile - Google Patents

In dig method prestressed concrete pipe pile Download PDF

Info

Publication number
CN205348170U
CN205348170U CN201620015903.1U CN201620015903U CN205348170U CN 205348170 U CN205348170 U CN 205348170U CN 201620015903 U CN201620015903 U CN 201620015903U CN 205348170 U CN205348170 U CN 205348170U
Authority
CN
China
Prior art keywords
prestressing steel
concrete
utility
model
install
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620015903.1U
Other languages
Chinese (zh)
Inventor
邢国华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weihai Zhongheng Pipe Fitting Co Ltd
Original Assignee
Weihai Zhongheng Pipe Fitting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weihai Zhongheng Pipe Fitting Co Ltd filed Critical Weihai Zhongheng Pipe Fitting Co Ltd
Priority to CN201620015903.1U priority Critical patent/CN205348170U/en
Application granted granted Critical
Publication of CN205348170U publication Critical patent/CN205348170U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

(B, ) the utility model relates to a fields such as city high -rise building, high dynamic load's high -speed railway and abutment basis, the utility model is realized through the follow technical scheme: in dig method prestressed concrete pipe pile constitutes characterized by by prestressing steel and concrete: install prestressing steel below the end cover, install a core prestressing steel again in prestressing steel's inside, install the spiral muscle in prestressing steel's outside, have the concrete in the pouring of the inside of prestressing steel and spiral muscle, install the stake point in prestressing steel's bottom and manage, owing to the utility model discloses a be the structure of end cover, prestressing steel and spiral muscle, deposit concrete tubular pile like this, just can play hinder split, operation requirement such as anticorrosive, impervious, reinforcing, antidetonation, long service life. (B, )

Description

Middle pick method prestressed concrete pipe pile
Technical field
The present invention relates to the fields such as urban skyscraper, the high-speed railway of high dynamic load and abutment basis.
Background technology
It is known that, high-speed railway is currently a flourish industry, pick method pile tube in its abutment base growth, it it is a highly desirable product, its prospect is immeasurable, city middle-high building, and the application of current PHC pile tube is almost blank, middle pick method pile tube is exactly these prefabricated components filled in the blanks undoubtedly, and its prospect is fine.
Utility model content
The purpose of this utility model is to solve above-mentioned problem, and a kind of technique provided is simple, anticorrosion, impervious, penetration capacity strong, the middle pick method prestressed concrete pipe pile of antidetonation, long service life.
This utility model is achieved in that middle pick method prestressed concrete pipe pile, it is made up of deformed bar and concrete, it is characterized in that: be mounted below deformed bar at end cap, a core deformed bar is installed again in the inside of deformed bar, in the outside of deformed bar, spiral bar is installed, it is cast with concrete in the inside of deformed bar and spiral bar, in the bottom of deformed bar, pile top pipe is installed.
The concrete being stirred is poured in mould after plugging and pounding closely knit molding by this utility model, enters steam curing.
The beneficial effects of the utility model are in that: what adopt due to this utility model is the structure of end cap, deformed bar and spiral bar, so pours into a mould concrete tubular pile, just can play resistance split, anticorrosion, impervious, enhancing, antidetonation, the instructions for use such as long service life.
Accompanying drawing explanation
Fig. 1 is sectional view of the present utility model.
Fig. 2 is Fig. 1 " A-A " sectional view.
In figure, each label declaration is as follows:
1, end cap, 2, deformed bar, 3, stake core deformed bar, 4, spiral bar, 5, concrete, 6, stone, 7, pile top pipe.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in more detail.
This utility model is dug method prestressed concrete pipe pile, its manufacturing process strictly operates by technological specification, reinforcing bar adopts full-automatic fixed-length cutting machine blanking, steel reinforcement cage adopts full-automatic roll welding to become cage, undertaken steel reinforcement cage assembling, stretch-draw concrete adopts full-automatic computer dispensing, then pours in mould by concrete, after plugging and pounding vibratory compaction molding, entering the steaming maintenance of steam-cured pond, after a few hours, the demoulding enters back into high temperature steam curing.
It is 800 millimeters that the steel plate that end cap 1 of the present utility model adopts thickness to be 20 millimeters is processed into diameter, the deformed bar 2 that 6 diameters are 30 millimeters is welded on below end cap 1, the stake core deformed bar 3 that 6 diameters are 20 millimeters is welded on below end cap 1, the spiral bar 4 that diameter is 12 millimeters is welded on above deformed bar 2, the stone that stone 6 selects diameter to be 16 millimeters, concrete 5 adopts strength grade to be not less than the portland cement of 42.5, admixture (breeze and levigate sand or silica flour), sand, rubble and what high efficiency water reducing agent was made into by corresponding proportion, the steel plate processing and fabricating that pile top pipe 8 selects thickness to be 16 millimeters, its effect is easily accessible in soil property exactly.
After the concrete 5 being stirred is poured in mould molding by centrifugation by this utility model, entering room temperature steam curing, after a few hours, the demoulding enters back into high temperature steam curing.The instructions for uses such as prestress high intensity concrete with stake point pile tube just can play anticorrosion, impervious, penetration capacity strong, antidetonation, long service life.
Middle pick method refers to pick base expanding and base expanding construction method in prefabricated pile basis, this new and high technology is based on the advanced construction technology of international popular, simultaneously energy-conserving and environment-protective, pile material is damaged less, reduce casting, reduce the soil compaction on neighboring buildings and affect, pile foundation industry is caused to show great attention to widely, the particularly skyscraper in city, this engineering method can meet the pile foundation of high resistance to plucking requirement.And it is not matched in the prefabricated pile of this engineering method so far specially, only use PHC pile tube alternative, and the joint form of the extraction-resistant behavior of PHC stake and stake all fails to fully meet middle pick method requirement, this project is with regard to this problem, work out the pile tube giving full play to middle pick method advantage, make this class pile foundation engineering method and tubing, be suitable for urban skyscraper demand, be also suitable for the requirement on the high-speed railway of high dynamic load, abutment basis.
In sum, this utility model bearing power increase, easy construction is reliable, can in different area uses.

Claims (1)

1. pick method prestressed concrete pipe pile in a kind, it is made up of deformed bar and concrete, it is characterized in that: be mounted below deformed bar at end cap, a core deformed bar is installed again in the inside of deformed bar, in the outside of deformed bar, spiral bar is installed, it is cast with concrete in the inside of deformed bar and spiral bar, in the bottom of deformed bar, pile top pipe is installed.
CN201620015903.1U 2016-01-10 2016-01-10 In dig method prestressed concrete pipe pile Active CN205348170U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620015903.1U CN205348170U (en) 2016-01-10 2016-01-10 In dig method prestressed concrete pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620015903.1U CN205348170U (en) 2016-01-10 2016-01-10 In dig method prestressed concrete pipe pile

Publications (1)

Publication Number Publication Date
CN205348170U true CN205348170U (en) 2016-06-29

Family

ID=56174815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620015903.1U Active CN205348170U (en) 2016-01-10 2016-01-10 In dig method prestressed concrete pipe pile

Country Status (1)

Country Link
CN (1) CN205348170U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113373948A (en) * 2021-05-18 2021-09-10 上海工程技术大学 Protective structure for repairing unstable expansive soil slope and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113373948A (en) * 2021-05-18 2021-09-10 上海工程技术大学 Protective structure for repairing unstable expansive soil slope and construction method thereof

Similar Documents

Publication Publication Date Title
CN102383418B (en) Anti-seismic prefabricated concrete solid square pile and production method thereof
CN103867019B (en) Assembling external prestressing RPC wind power tower
CN203755778U (en) Assembly external pre-stress reactive powder concrete wind power tower
CN201843129U (en) Ribbed concrete composite pile core pipe
CN101544022B (en) Preparation method for preformed hole fender pile
CN202519664U (en) High tensile reinforcement reinforced prestressed UHPC (Ultra High Performance Concrete) thin-wall tubular pile component
CN107060210A (en) A kind of FRP combination dies net post and preparation method thereof
CN106437034A (en) Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN102121246A (en) Toughening prestressed centrifugal concrete pile
CN104005407A (en) Partially prestressed concrete structure foundation pile
CN101936004A (en) Precast expanding pile as well as construction method and construction mechanical equipment thereof
CN201943070U (en) Toughened type prestress centrifugal concrete pile
CN205348170U (en) In dig method prestressed concrete pipe pile
CN108411909A (en) A kind of high intensity can drain prefabricating composite pile
CN111321732A (en) Composite foundation bearing structure for placing precast pile in high-pressure jet grouting pile
CN201024422Y (en) Pretensioned prestressed concrete shaped tube pile
CN207469438U (en) A kind of prefabricated open tubular column
CN205530324U (en) Cold-formed thin-wall section steel micro pile
CN205576904U (en) Prestressing force high -strength concrete area stake point tubular pile
CN202247861U (en) Anti-seismic prefabricated concrete solid square pile
CN210031776U (en) Prefabricated RPC tubular pile structure of flute formula type
CN207193953U (en) A kind of reinforced concrete tubular pile of outer rim
CN208563314U (en) A kind of high intensity can drain prefabricating composite pile
CN207003738U (en) A kind of prefabricated steel faced wall with stirrup
CN207193949U (en) A kind of pile for prestressed pipe of convenient construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Prestressed concrete pipe pile with middle excavation method

Effective date of registration: 20220627

Granted publication date: 20160629

Pledgee: Weihai Wendeng sub branch of China Postal Savings Bank Co.,Ltd.

Pledgor: WEIHAI ZHONGCHENG PIPE FITTING CO.,LTD.

Registration number: Y2022980009133