- Publication number
- CN110004919B CN110004919B CN201910360990.2A CN201910360990A CN110004919B CN 110004919 B CN110004919 B CN 110004919B CN 201910360990 A CN201910360990 A CN 201910360990A CN 110004919 B CN110004919 B CN 110004919B
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- construction
- enclosure
- pipeline
- arranging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Foundations (AREA)
Abstract
A foundation pit enclosure construction method used in a pipeline influence range comprises the following steps: respectively excavating deep grooves along the outer sides of two sides of a foundation pit to be excavated, wherein one side of each deep groove, which is far away from the foundation pit, is a slope; arranging fender posts in the deep groove at line gaps, arranging a pile top crown beam by taking the fender posts as supports, and reserving a steel bar joint at the bottom of the pile top crown beam; arranging a retaining wall on the surface of the slope; excavating foundation pits in layers, and arranging a retaining wall between every two retaining piles; and after the foundation pit is excavated, backfilling earthwork between the retaining wall and the enclosure wall. Through building retaining wall and enclosure wall, consolidated foundation ditch both sides earthwork, the quantity that sets up of foundation pile when reducing pile bolck crown beam construction makes the pipeline with can the foundation ditch enclosure setting of interaction, has avoided changing the original pipeline, has effectively reduced the engineering volume to easy operation can also effectually improve foundation ditch enclosure structure overall stability, can accelerate the construction progress, practices thrift construction cost, to resident's water, advantage such as little influence such as power consumption, gas communication.
Description
Technical Field
The invention relates to the technical field of foundation pit bracing, in particular to a foundation pit bracing construction method used in a pipeline influence range.
Background
With the development of rail transit construction in China, the proportion of subway engineering is larger and larger, pile foundation construction is particularly important in subway engineering, subway station construction is generally located in the center of a city, underground pipelines on the ground of the center of the city are complicated, pipelines are difficult to change and long in time span, and large machinery cannot play a role in the environment.
The traditional construction method is approximately a cast-in-situ bored pile construction method: pipeline excavation → pipeline relocation → pile foundation construction → structure construction → pipeline relocation. The existing foundation pit support method needs to densely arrange pile foundations, so that pipelines cannot penetrate through gaps between the pile foundations and need to be changed. The pipeline relocation construction period has large cost influence and large engineering quantity, and the pipeline relocation involves operations such as water, electricity, gas, communication and the like, so that the pipeline relocation construction period has large influence on the surrounding people and has more uncontrollable factors. Therefore, the technical scheme provides the foundation pit enclosure construction method which has larger distance between pile foundations and can be interactively arranged with the pipeline, and the original pipeline is prevented from being changed.
Disclosure of Invention
The invention aims to provide a foundation pit enclosure construction method used in a pipeline influence range, which can enlarge the distance between foundation piles during foundation pit enclosure, enable pipelines to be arranged between the foundation piles in an inserting mode and reduce pipeline relocation.
The invention provides a foundation pit enclosure construction method used in a pipeline influence range, which comprises the following steps:
And 2, arranging fender posts in the deep groove at the line clearance, arranging a pile top crown beam by taking the fender posts as supports, and reserving a steel bar joint at the bottom of the pile top crown beam.
And step 3, arranging a retaining wall on the surface of the slope.
And 4, excavating the foundation pit in a layered mode, and arranging a retaining wall between every two retaining piles.
And 5, after the foundation pit is excavated, backfilling earthwork between the retaining wall and the enclosure wall.
Preferably, the construction step in step 3 is as follows:
step 3.1, excavating a wall surface which forms an included angle with the enclosure pile in the vertical direction on the outer side of the enclosure pile, and arranging a reinforcing mesh on the wall surface;
step 3.2, nailing the reinforced soil nails into the earthwork perpendicular to the slope surface, and fixedly connecting the other ends of the reinforced soil nails with the reinforced net sheets;
and 3.3, spraying concrete on the reinforcing mesh.
Preferably, the construction method of the enclosure wall in the step 4 comprises the following steps:
step 4.1, a construction rib is arranged between every two adjacent fender piles on the same side of the foundation pit, the construction rib is of a net structure, and the construction rib is fixedly connected with the fender piles;
and 4.2, erecting formworks on two sides of the construction ribs, pouring concrete in the formworks, and removing the formworks after the concrete reaches the designed strength.
Preferably, the angle between the retaining wall in the step 3 and the vertical direction of the fender post is 15 degrees.
Preferably, the thickness of the sprayed concrete on the reinforcing mesh is 10 cm.
Preferably, the wall body of the enclosure wall extends into the earthwork at the bottom layer of the foundation pit by less than 1 m.
Preferably, the construction rib is fixedly connected with the reserved steel bar joint at the bottom of the crown beam.
Preferably, the construction bar is in two layers, two layers of reinforcing mesh being arranged opposite each other and both being fixed to the enclosure pile.
Compared with the prior art, the foundation pit enclosure construction method for the pipeline within the influence range has the following beneficial effects:
through building the retaining wall and the enclosure wall, the earthwork on two sides of the foundation pit is reinforced, the number of the foundation piles is reduced, the retaining wall and the enclosure wall can be arranged around the pipeline in a surrounding mode according to needs, the pipeline and the foundation pit enclosure can be arranged in an interactive mode, the change of the original pipeline is avoided, the engineering quantity is effectively reduced, the method is simple and easy to operate, the overall stability of the foundation pit enclosure structure can be effectively improved, the construction progress can be accelerated, the construction cost is saved, and the method has the advantages of being small in influence on water, electricity, gas communication and the like of residents.
Drawings
FIG. 1 is a schematic view of a foundation pit enclosure construction method for use within the pipeline influence range provided by the present invention.
FIG. 2 is a schematic view of a retaining wall used in a foundation pit support construction method within a pipeline influence range.
FIG. 3 is a top view of a retaining wall for a foundation pit support construction method within the pipeline influence range.
Description of the main Components
In the figure: 1. a crown beam; 2. reinforcing steel bar soil nails; 3. reinforcing mesh sheets; 4. a retaining wall; 5. an enclosure wall; 6. a slope surface; 7. a fender pile; 8. a pipeline; 9. and (5) constructing ribs.
Detailed Description
The present invention is described in detail below with reference to the attached drawing figures. As shown in the attached drawings 1 to 3, a foundation pit enclosure construction method used in a pipeline influence range comprises the following steps:
And 2, arranging a fender post 7 in the gap of the pipeline 8 in the deep groove, arranging a pile top crown beam 1 by taking the fender post 7 as a support, and reserving a steel bar joint at the bottom of the pile top crown beam 1.
And 3, paving a steel bar mesh 3 on the surface of the slope 6.
And 4, nailing the reinforced soil nails 2 into the earthwork along the direction vertical to the slope surface 6, and welding the other ends of the reinforced soil nails on the reinforced mesh 3.
And 5, spraying concrete on the reinforcing mesh 3.
And 6, arranging reinforcing steel bars between every two fender posts 7 on the same side of the foundation pit according to the horizontal direction and the vertical direction, and binding the crossed positions of the reinforcing steel bars by using iron wires to form a structural rib 9.
And 7, drilling holes at the opposite sides of every two guard piles 7 at the same side of the foundation pit, inserting reinforcing steel bars in the horizontal direction of the structural ribs 9 into the holes, and fixing the structural ribs 9 on the guard piles 7.
And 8, erecting formworks on two sides of the construction ribs 9, pouring concrete in the formworks, and removing the formworks after the concrete reaches the designed strength.
And 9, excavating the foundation pit in layers, arranging one enclosure wall 5 on each layer excavated in the foundation pit, welding the enclosure walls together through vertical reinforcing steel bars, welding the vertical reinforcing steel bars of the uppermost enclosure wall 5 with the reserved reinforcing steel bar joints at the bottom of the pile top crown beam 1, and penetrating the lowermost enclosure wall 5 into the soil below the bottom layer of the foundation pit by 1 meter.
And 10, after the foundation pit is excavated, backfilling earthwork between the retaining wall 4 and the enclosure wall 5.
According to the foundation pit enclosure construction method for the pipeline influence range, earth on two sides of a foundation pit is reinforced by building the retaining wall and the enclosure wall, the number of the foundation piles during pile top crown beam construction is effectively reduced, the retaining wall and the enclosure wall can be arranged around the pipeline in a surrounding mode according to needs, the pipeline and the foundation pit enclosure can be arranged in an interactive mode, the pipeline is prevented from being changed, the engineering quantity is effectively reduced, the method is simple and easy to operate, the overall stability of the foundation pit enclosure structure can be effectively improved, the construction progress can be accelerated, the construction cost is saved, and the method has the advantages of being small in influences on water, electricity and gas communication of residents and the like.
Claims (8)
1. A foundation pit support construction method used in a pipeline influence range is characterized by comprising the following steps:
step 1, respectively excavating deep grooves along the outer sides of two sides of a foundation pit to be excavated, excavating the deep grooves until pipelines (8) in the earthwork are exposed, and arranging a slope (6) at one side of the deep grooves, which is far away from the foundation pit;
step 2, arranging fender posts (7) in the deep groove at intervals of pipelines (8), arranging a pile top crown beam (1) by taking the fender posts (7) as supports, and reserving a steel bar joint at the bottom of the pile top crown beam (1);
step 3, arranging a retaining wall (4) on the surface of the slope (6);
step 4, excavating foundation pits in layers, and arranging a retaining wall (5) between every two retaining piles (7) at the same time;
and 5, after the foundation pit is excavated, backfilling earthwork between the retaining wall (4) and the enclosure wall (5).
2. The method of claim 1 for the construction of a foundation pit enclosure within the influence of the pipeline, wherein the method comprises the following steps: the construction step of the step 3 is as follows:
step 3.1, arranging a steel bar mesh (3) on the slope;
step 3.2, the reinforced soil nails (2) are nailed into the earthwork along the direction vertical to the slope surface (6), and the other end of the reinforced soil nails is fixedly connected with the reinforced net piece (3);
and 3.3, spraying concrete on the reinforcing mesh (3).
3. The method of claim 1 for the construction of a foundation pit enclosure within the influence of the pipeline, wherein the method comprises the following steps: the construction method of the enclosure wall (5) in the step 4 comprises the following steps:
step 4.1, a construction rib (9) is arranged between every two adjacent fender posts (7) on the same side of the foundation pit, the construction rib (9) is of a net structure, and the construction rib (9) is fixedly connected with the fender posts (7);
and 4.2, erecting formworks on two sides of the construction ribs (9), pouring concrete in the formworks, and removing the formworks after the concrete reaches the designed strength.
4. A method of constructing a foundation pit enclosure for use within the reach of a pipeline according to claim 1 or 2, characterized in that: and 3, forming an included angle of 15 degrees between the retaining wall and the fender post in the vertical direction.
5. The method of claim 2 for the construction of a foundation pit enclosure within the influence of the pipeline, wherein: the thickness of the concrete sprayed on the reinforcing mesh (3) is 10 cm.
6. A method of constructing a foundation pit enclosure for use within the reach of a pipeline according to claim 1 or 3, wherein: the wall body of the enclosure wall (5) extends into the earthwork at the bottom layer of the foundation pit for less than 1 m.
7. A method of constructing a foundation pit enclosure for use within the reach of a pipeline according to claim 3, wherein: the structural rib (9) is fixedly connected with a reserved steel bar joint at the bottom of the crown beam (1).
8. A method of constructing a foundation pit enclosure for use within the reach of a pipeline according to claim 3, wherein: the two layers of the construction ribs (9) are arranged oppositely and are fixed on the fender post (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910360990.2A CN110004919B (en) | 2019-04-30 | 2019-04-30 | Foundation pit enclosure construction method used in pipeline influence range |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910360990.2A CN110004919B (en) | 2019-04-30 | 2019-04-30 | Foundation pit enclosure construction method used in pipeline influence range |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110004919A CN110004919A (en) | 2019-07-12 |
CN110004919B true CN110004919B (en) | 2020-11-17 |
Family
ID=67175222
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910360990.2A Active CN110004919B (en) | 2019-04-30 | 2019-04-30 | Foundation pit enclosure construction method used in pipeline influence range |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110004919B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110528531A (en) * | 2019-07-31 | 2019-12-03 | 浙江杭海城际铁路有限公司 | A method of it utilizes and does close to foundation pit enclosure stake to excavation pit fender post |
CN111485559A (en) * | 2020-05-08 | 2020-08-04 | 合肥市市政设计研究总院有限公司 | Cut road pipeline moving and changing and foundation pit supporting and protecting conversion structure and construction method |
CN111622233A (en) * | 2020-05-29 | 2020-09-04 | 中铁大桥局第七工程有限公司 | Foundation pit support device |
CN112127370A (en) * | 2020-09-11 | 2020-12-25 | 中铁十一局集团有限公司 | Reverse plugging method for non-construction fender post part of main body fender structure of station |
CN113585272B (en) * | 2021-07-29 | 2022-03-08 | 中铁一局集团(广州)建设工程有限公司 | Pile repairing construction method for pipeline influence position by reverse construction method |
CN115030136B (en) * | 2022-06-15 | 2024-07-12 | 中铁十一局集团有限公司 | Construction method for pipeline crossing underground continuous wall of foundation pit area |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090090742A (en) * | 2008-02-22 | 2009-08-26 | 삼성물산 주식회사 | Bottom-up construction method of underground structure using permanent strut |
KR20100068597A (en) * | 2008-12-15 | 2010-06-24 | 유진지오 주식회사 | A shoring method using arch plate pile and h-pile |
CN106120799A (en) * | 2016-06-27 | 2016-11-16 | 中铁第四勘察设计院集团有限公司 | Underground utilities are exempted to change across foundation ditch and are moved construction method |
CN207919565U (en) * | 2018-03-06 | 2018-09-28 | 中铁十一局集团城市轨道工程有限公司 | MJS composite steel tube pile soil-baffling structures suitable for ultra-deep foundation pit |
CN108951653A (en) * | 2018-08-10 | 2018-12-07 | 济南城建集团有限公司 | A kind of foundation pit campshed supporting inter-pile soil reinforcement means |
CN109371980A (en) * | 2018-11-28 | 2019-02-22 | 深圳市市政工程总公司 | The inverse Extra-Deep Foundation Pit construction method for making to combine with Percussion Piles of spray anchor |
-
2019
- 2019-04-30 CN CN201910360990.2A patent/CN110004919B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090090742A (en) * | 2008-02-22 | 2009-08-26 | 삼성물산 주식회사 | Bottom-up construction method of underground structure using permanent strut |
KR20100068597A (en) * | 2008-12-15 | 2010-06-24 | 유진지오 주식회사 | A shoring method using arch plate pile and h-pile |
CN106120799A (en) * | 2016-06-27 | 2016-11-16 | 中铁第四勘察设计院集团有限公司 | Underground utilities are exempted to change across foundation ditch and are moved construction method |
CN207919565U (en) * | 2018-03-06 | 2018-09-28 | 中铁十一局集团城市轨道工程有限公司 | MJS composite steel tube pile soil-baffling structures suitable for ultra-deep foundation pit |
CN108951653A (en) * | 2018-08-10 | 2018-12-07 | 济南城建集团有限公司 | A kind of foundation pit campshed supporting inter-pile soil reinforcement means |
CN109371980A (en) * | 2018-11-28 | 2019-02-22 | 深圳市市政工程总公司 | The inverse Extra-Deep Foundation Pit construction method for making to combine with Percussion Piles of spray anchor |
Non-Patent Citations (1)
Title |
---|
新型桩间超薄模筑混凝土单边支模逆作法施工技术;陈益等;《施工技术》;20181215;第47卷(第23期);第36-38页 * |
Also Published As
Publication number | Publication date |
---|---|
CN110004919A (en) | 2019-07-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110004919B (en) | Foundation pit enclosure construction method used in pipeline influence range | |
CN108868778B (en) | Non-excavation construction method for large underground structure | |
CN105464686B (en) | Multi-layer underground space curtain posture excavating construction method and supporting construction under existing facility | |
CN112127900B (en) | Construction method for hidden half-wall and half-arch protection structure of exposed arch of shallow-buried bias tunnel penetrating through accumulation body | |
CN103422501B (en) | Anti-floating anchor rod structure in sand seam geology and construction method thereof | |
CN105464134B (en) | Multi-layer underground space is along inverse combining construction method and supporting construction under existing facility | |
CN105756091B (en) | A kind of Metro station excavation construction method of control adjacent building composition deformation | |
CN103938634B (en) | A kind of deep foundation pit supporting structure and construction method | |
CN111593739A (en) | Cement mixing pile enclosure wall-profile steel cantilever type combined support | |
CN216041201U (en) | Earlier prop and dig double-deck diagonal bracing foundation ditch enclosure system afterwards | |
CN113235613B (en) | Method for excavating and supporting newly-built foundation pit by utilizing adjacent existing guard piles | |
CN107326932B (en) | Quasi-semi-reverse construction method for underground garage | |
CN201077988Y (en) | Hidden beam-column type prestressing force earth nail wall | |
CN110616719B (en) | Quick construction method for U-shaped groove of upper-span existing culvert | |
CN108035360A (en) | A kind of method for pattern foundation pit supporting structure | |
CN209941754U (en) | High-voltage power pipe culvert in-situ protection structure | |
CN208763446U (en) | Increase the supporting construction for building the underground space under a kind of existing building group | |
CN206337566U (en) | Foundation ditch vertical prestressing anchor pole supporting construction | |
CN113202106B (en) | Deep foundation pit excavation method | |
CN212001126U (en) | Concrete support and structure top plate combined building system based on permanent-temporary combination | |
WO2022205075A1 (en) | Jet grouting pipe curtain supporting method and system by using large-span short-distance underground excavation to under-penetrate existing underground structure | |
CN113653064A (en) | Front-support rear-pull type foundation pit enclosure system and construction method thereof | |
TW201741529A (en) | Method for constructing advanced pavement for preventing construction site collapse before construction of diaphragm wall in which support piles are first established and grid beams are welded to tops of the piles for supporting grouting and forming of a concrete pavement thereon | |
CN111733830B (en) | Super high-rise building foundation pit bearing and enclosing system | |
CN110258621B (en) | Assembled retaining wall convenient to quick construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |