CN108661045A - A kind of prefabricated GFRP pipe concretes spliced pile - Google Patents

A kind of prefabricated GFRP pipe concretes spliced pile Download PDF

Info

Publication number
CN108661045A
CN108661045A CN201810802366.9A CN201810802366A CN108661045A CN 108661045 A CN108661045 A CN 108661045A CN 201810802366 A CN201810802366 A CN 201810802366A CN 108661045 A CN108661045 A CN 108661045A
Authority
CN
China
Prior art keywords
plate
connecting plate
gfrp
concrete
end connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810802366.9A
Other languages
Chinese (zh)
Other versions
CN108661045B (en
Inventor
王连广
陈百玲
张彦明
刘姝
王梓晴
倪磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeastern University China
Original Assignee
Northeastern University China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeastern University China filed Critical Northeastern University China
Priority to CN201810802366.9A priority Critical patent/CN108661045B/en
Publication of CN108661045A publication Critical patent/CN108661045A/en
Application granted granted Critical
Publication of CN108661045B publication Critical patent/CN108661045B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

一种预制GFRP管混凝土拼接桩,具有两种接桩方式,第一种为螺栓连接方式,第二种为卯榫连接方式。采用螺栓连接方式的桩体包括GFRP管体、预埋钢管、上端法兰板、下端法兰板、锚筋及螺栓,预埋钢管外周侧设有预留后浇混凝土区,螺栓设于上端法兰板上,螺孔设于下端法兰板上,螺孔与螺栓位置一一对应且位于预留后浇混凝土区的范围内。采用卯榫连接方式的桩体包括GFRP管体、上端连接板及下端连接板,上端连接板和下端连接板均设有若干楔形槽,楔形槽以板体圆心为中心呈辐射状分布,两个板体上的楔形槽位置一一对应,且楔形槽配装有双头楔形卯榫块。在GFRP管体内浇注有混凝土,且浇注混凝土前可以选择是否增设由纵筋和螺旋箍筋组成的钢筋笼。

A prefabricated GFRP pipe concrete splicing pile has two pile connection methods, the first is a bolt connection method, and the second is a mortise and tenon connection method. The pile body adopting the bolt connection method includes GFRP pipe body, pre-embedded steel pipe, upper flange plate, lower end flange plate, anchor bars and bolts. On the flange plate, screw holes are provided on the lower end flange plate, and the screw holes correspond to the positions of the bolts one by one and are located within the range of the reserved post-cast concrete area. The pile body adopting the mortise and tenon connection method includes a GFRP pipe body, an upper connecting plate and a lower connecting plate. Both the upper connecting plate and the lower connecting plate are provided with a number of wedge-shaped grooves. The wedge-shaped grooves are radially distributed around the center of the plate body. Two The positions of the wedge-shaped grooves on the plate body correspond one by one, and the wedge-shaped grooves are equipped with double-ended wedge-shaped mortise and tenon blocks. Concrete is poured in the GFRP pipe body, and before pouring concrete, you can choose whether to add a reinforcement cage composed of longitudinal bars and spiral stirrups.

Description

一种预制GFRP管混凝土拼接桩A prefabricated GFRP pipe concrete splicing pile

技术领域technical field

本发明属于土木工程施工技术领域,特别是涉及一种预制GFRP管混凝土拼接桩。The invention belongs to the technical field of civil engineering construction, in particular to a prefabricated GFRP pipe concrete splicing pile.

背景技术Background technique

目前,我国正在大规模修建高速铁路,铁路路基所面临的地质条件相对复杂,桩基础成为能够较好的满足复杂地质条件和使用荷载要求的基础之一。At present, my country is building high-speed railways on a large scale. The geological conditions faced by railway subgrades are relatively complex, and pile foundations have become one of the foundations that can better meet complex geological conditions and service load requirements.

预制桩基在很多大型建筑工程、桥梁、路基等工程中得到应用,依据预制桩制成材料的不同可分为预制混凝土桩、预制钢桩和预制木桩。实践证明,使用预制桩,每年都有很多桩需要修复或更换桩基。以美国为例,其每年用于修复和更换桩基的费用可达2亿美元左右。可见,使用混凝土桩、钢桩或木质桩将面临环境限制和高额维护费用的困难,特别是在强腐蚀土质中使用时,将面临由于腐蚀而带来的安全隐患和更高的维护费用。因此,研究开发一种承载力高、刚度大、抗震延性好、抗腐蚀性能优良的新型桩已经成为土木工程领域工程师们研究热点。Prefabricated pile foundations are used in many large-scale construction projects, bridges, roadbeds and other projects. According to the different materials of prefabricated piles, they can be divided into prefabricated concrete piles, prefabricated steel piles and prefabricated wood piles. Practice has proved that with the use of prefabricated piles, many piles need to be repaired or replaced every year. Taking the United States as an example, the annual cost for repairing and replacing pile foundations can reach about 200 million U.S. dollars. It can be seen that the use of concrete piles, steel piles or wooden piles will face the difficulties of environmental restrictions and high maintenance costs, especially when used in highly corrosive soils, it will face safety hazards and higher maintenance costs due to corrosion. Therefore, the research and development of a new type of pile with high bearing capacity, high rigidity, good seismic ductility, and excellent corrosion resistance has become a research hotspot for engineers in the field of civil engineering.

近几年,一种轻质、高强、耐腐性能极好的玻璃纤维增强聚合材料GFRP(GlassFiber Reinforced Polymer,简称GFRP)进入建筑市场,已经成为土木工程领域中的一种新型材料,而土木工程领域的技术人员对其产生了极大的兴趣,并尝试着将GFRP材料引入预制桩基,用于提高桩基的承载能力、抗震延性及耐腐蚀性,但是由于GFRP材料的特殊性(由于玻璃纤维和树脂构成),由GFRP材料制造的桩体为了满足长度需要,必须对桩体进行拼接,但GFRP材料因材料特殊性无法直接进行焊接连接,已经影响到了GFRP材料在预制桩基中的应用。In recent years, GFRP (Glass Fiber Reinforced Polymer, referred to as GFRP), a lightweight, high-strength, and excellent corrosion-resistant glass fiber reinforced polymer material, has entered the construction market and has become a new type of material in the field of civil engineering. Technical personnel in the field have generated great interest in it, and tried to introduce GFRP material into the prefabricated pile foundation to improve the bearing capacity, seismic ductility and corrosion resistance of the pile foundation, but due to the particularity of GFRP material (due to glass fiber and resin), the pile body made of GFRP material must be spliced to meet the length requirement, but the GFRP material cannot be directly welded and connected due to the special material, which has affected the application of GFRP material in prefabricated pile foundation .

发明内容Contents of the invention

针对现有技术存在的问题,本发明提供一种预制GFRP管混凝土拼接桩,有效克服了GFRP材料无法进行焊接连接的局限性,同时具有施工方便、操作简单、容易保证连接质量的特点。Aiming at the problems existing in the prior art, the present invention provides a prefabricated GFRP pipe-concrete splicing pile, which effectively overcomes the limitation that GFRP materials cannot be welded and connected, and has the characteristics of convenient construction, simple operation, and easy guarantee of connection quality.

为了实现上述目的,本发明采用如下技术方案:一种预制GFRP管混凝土拼接桩,包括GFRP管体、纵筋、螺旋箍筋、预埋钢管、上端法兰板、下端法兰板、锚筋及螺栓;所述纵筋与螺旋箍筋构成钢筋笼,钢筋笼内置于GFRP管体内;所述上端法兰板位于GFRP管体的顶端管口,所述下端法兰板位于GFRP管体的底端管口,在上端法兰板下表面及下端法兰板上表面均固定焊接有锚筋;所述预埋钢管固装在下端法兰板上表面,且锚筋位于预埋钢管内侧;所述预埋钢管外周侧设有预留后浇混凝土区;沿所述上端法兰板的板体周向固定焊接有若干均布设置的螺栓,且螺栓的螺杆部分朝上延伸至上端法兰板上方;沿所述下端法兰板的板体周向均布有若干螺孔,螺孔与螺栓的位置一一对应,且螺孔和螺栓位于预留后浇混凝土区的范围内;在所述上端法兰板与下端法兰板之间的GFRP管体内浇注有混凝土,所述纵筋、螺旋箍筋、预埋钢管及锚筋均封装于混凝土内。In order to achieve the above object, the present invention adopts the following technical scheme: a prefabricated GFRP pipe concrete splicing pile, including GFRP pipe body, longitudinal reinforcement, spiral stirrup, pre-embedded steel pipe, upper end flange plate, lower end flange plate, anchor bar and Bolts; the longitudinal reinforcement and the spiral stirrup form a reinforcement cage, and the reinforcement cage is built into the GFRP pipe body; the upper end flange plate is located at the top nozzle of the GFRP pipe body, and the lower end flange plate is located at the bottom end of the GFRP pipe body The nozzle is fixedly welded with anchor bars on the lower surface of the upper flange plate and the upper surface of the lower end flange plate; the pre-embedded steel pipe is fixed on the upper surface of the lower end flange plate, and the anchor bar is located inside the pre-embedded steel pipe; There is a reserved post-casting concrete area on the outer peripheral side of the pre-embedded steel pipe; a number of evenly distributed bolts are fixedly welded along the circumference of the upper flange plate, and the screw part of the bolt extends upward to the top of the upper flange plate ;A number of screw holes are uniformly distributed along the circumference of the lower flange plate, the screw holes correspond to the positions of the bolts one by one, and the screw holes and bolts are located within the reserved post-cast concrete area; on the upper end flange The GFRP pipe between the plate and the lower end flange plate is poured with concrete, and the longitudinal reinforcement, spiral stirrup, pre-embedded steel pipe and anchor reinforcement are all encapsulated in the concrete.

一种预制GFRP管混凝土拼接桩,包括GFRP管体、预埋钢管、上端法兰板、下端法兰板、锚筋及螺栓;所述上端法兰板位于GFRP管体的顶端管口,所述下端法兰板位于GFRP管体的底端管口,在上端法兰板下表面及下端法兰板上表面均固定焊接有锚筋;所述预埋钢管固装在下端法兰板上表面,且锚筋位于预埋钢管内侧;所述预埋钢管外周侧设有预留后浇混凝土区;沿所述上端法兰板的板体周向固定焊接有若干均布设置的螺栓,且螺栓的螺杆部分朝上延伸至上端法兰板上方;沿所述下端法兰板的板体周向均布有若干螺孔,螺孔与螺栓的位置一一对应,且螺孔和螺栓位于预留后浇混凝土区的范围内;在所述上端法兰板与下端法兰板之间的GFRP管体内浇注有混凝土,所述预埋钢管及锚筋均封装于混凝土内。A prefabricated GFRP pipe concrete splicing pile, comprising a GFRP pipe body, a pre-embedded steel pipe, an upper end flange plate, a lower end flange plate, anchor bars and bolts; the upper end flange plate is located at the top nozzle of the GFRP pipe body, and the The lower flange plate is located at the bottom nozzle of the GFRP pipe body, and anchor ribs are fixedly welded on the lower surface of the upper flange plate and the upper surface of the lower flange plate; the pre-embedded steel pipe is fixed on the upper surface of the lower flange plate, And the anchor bar is located inside the pre-embedded steel pipe; the outer peripheral side of the pre-embedded steel pipe is provided with a reserved post-casting concrete area; along the circumferential direction of the upper flange plate, a number of evenly distributed bolts are fixedly welded, and the bolts The screw part extends upwards to the top of the upper flange plate; there are several screw holes evenly distributed along the circumference of the lower flange plate, the screw holes correspond to the positions of the bolts one by one, and the screw holes and bolts are located in the reserved post-cast concrete Within the scope of the area; the GFRP pipe body between the upper end flange plate and the lower end flange plate is poured with concrete, and the pre-embedded steel pipes and anchor bars are encapsulated in the concrete.

一种预制GFRP管混凝土拼接桩,包括GFRP管体、纵筋、螺旋箍筋、上端连接板及下端连接板;所述纵筋与螺旋箍筋构成钢筋笼,钢筋笼内置于GFRP管体内;所述上端连接板位于GFRP管体的顶端管口,所述下端连接板位于GFRP管体的底端管口,在上端连接板下表面及下端连接板上表面均固定焊接有锚筋;在所述上端连接板上表面沿周向分布有若干楔形槽,在下端连接板下表面沿周向也分布有若干楔形槽,且若干楔形槽以板体圆心为中心呈辐射状分布,上端连接板与下端连接板上的楔形槽的位置一一对应;所述楔形槽配装有双头楔形卯榫块;在所述上端连接板与下端连接板之间的GFRP管体内浇注有混凝土,所述纵筋、螺旋箍筋及锚筋均封装于混凝土内。A prefabricated GFRP pipe concrete splicing pile, comprising a GFRP pipe body, a longitudinal bar, a spiral stirrup, an upper end connecting plate and a lower end connecting plate; the longitudinal bar and the spiral stirrup form a reinforcement cage, and the reinforcement cage is built into the GFRP pipe body; The upper connecting plate is located at the top nozzle of the GFRP pipe body, the lower connecting plate is located at the bottom nozzle of the GFRP pipe body, and the lower surface of the upper connecting plate and the upper surface of the lower connecting plate are fixedly welded with anchor ribs; There are several wedge-shaped grooves distributed along the circumferential direction on the upper surface of the upper connecting plate, and several wedge-shaped grooves are distributed along the circumferential direction on the lower surface of the lower connecting plate, and the several wedge-shaped grooves are radially distributed with the center of the plate body as the center. The upper connecting plate and the lower end The positions of the wedge-shaped grooves on the connecting plate are in one-to-one correspondence; the wedge-shaped grooves are equipped with double-ended wedge-shaped mortise and tenon blocks; concrete is poured in the GFRP pipe between the upper end connecting plate and the lower end connecting plate, and the longitudinal reinforcement , Spiral stirrups and anchor bars are encapsulated in concrete.

一种预制GFRP管混凝土拼接桩,包括GFRP管体、上端连接板及下端连接板;所述上端连接板位于GFRP管体的顶端管口,所述下端连接板位于GFRP管体的底端管口,在上端连接板下表面及下端连接板上表面均固定焊接有锚筋;在所述上端连接板上表面沿周向分布有若干楔形槽,在下端连接板下表面沿周向也分布有若干楔形槽,且若干楔形槽以板体圆心为中心呈辐射状分布,上端连接板与下端连接板上的楔形槽的位置一一对应;所述楔形槽配装有双头楔形卯榫块;在所述上端连接板与下端连接板之间的GFRP管体内浇注有混凝土,所述锚筋封装于混凝土内。A prefabricated GFRP pipe concrete splicing pile, comprising a GFRP pipe body, an upper end connection plate and a lower end connection plate; the upper end connection plate is located at the top nozzle of the GFRP pipe body, and the lower end connection plate is located at the bottom end nozzle of the GFRP pipe body , both the lower surface of the upper connecting plate and the upper surface of the lower connecting plate are fixedly welded with anchor ribs; there are several wedge-shaped grooves distributed along the circumferential direction on the upper surface of the upper connecting plate, and some wedge-shaped grooves are also distributed along the circumferential direction on the lower surface of the lower connecting plate. Wedge-shaped grooves, and several wedge-shaped grooves are radially distributed with the center of the plate body as the center, and the positions of the wedge-shaped grooves on the upper connecting plate and the lower connecting plate correspond one-to-one; the wedge-shaped grooves are equipped with double-ended wedge-shaped mortise and tenon blocks; Concrete is poured into the GFRP pipe between the upper connecting plate and the lower connecting plate, and the anchor bars are encapsulated in the concrete.

本发明的有益效果:Beneficial effects of the present invention:

本发明的预制GFRP管混凝土拼接桩,有效克服了GFRP材料无法进行焊接连接的局限性,,同时具有施工方便、操作简单、容易保证连接质量的特点。The prefabricated GFRP pipe concrete splicing pile of the present invention effectively overcomes the limitation that GFRP materials cannot be welded and connected, and has the characteristics of convenient construction, simple operation, and easy guarantee of connection quality.

附图说明Description of drawings

图1为本发明的预制GFRP管混凝土拼接桩(有钢筋笼且桩体螺栓连接)结构示意图;Fig. 1 is the structural representation of prefabricated GFRP pipe-concrete splicing pile (there is reinforcing cage and pile body bolt connection) of the present invention;

图2为本发明的预制GFRP管混凝土拼接桩(无钢筋笼且桩体螺栓连接)结构示意图;Fig. 2 is the structural representation of the prefabricated GFRP pipe concrete splicing pile (without reinforcement cage and pile body bolt connection) of the present invention;

图3为本发明的预制GFRP管混凝土拼接桩(有钢筋笼且桩体卯榫连接)结构示意图;Fig. 3 is the structural representation of the prefabricated GFRP pipe-concrete splicing pile of the present invention (with reinforcement cage and pile body mortise and tenon connection);

图4为本发明的预制GFRP管混凝土拼接桩(无钢筋笼且桩体卯榫连接)结构示意图;Fig. 4 is the structural representation of the prefabricated GFRP pipe concrete splicing pile (without reinforcement cage and pile body mortise and tenon connection) of the present invention;

图5为上端法兰板的结构示意图;Fig. 5 is the structural representation of upper end flange plate;

图6为下端法兰板的结构示意图;Fig. 6 is a structural schematic diagram of the lower end flange plate;

图7为上端连接板的结构示意图;Fig. 7 is a schematic structural view of the upper connecting plate;

图8为下端连接板的结构示意图;Fig. 8 is a structural schematic diagram of the lower connecting plate;

图9为上端连接板与下端连接板进行卯榫连接后的结构示意图;Fig. 9 is a schematic diagram of the structure after the upper connecting plate and the lower connecting plate are connected by mortise and tenon;

图10为双头楔形卯榫块的结构示意图;Fig. 10 is a structural schematic diagram of a double-ended wedge-shaped mortise and tenon block;

图中,1—GFRP管体,2—纵筋,3—螺旋箍筋,4—预埋钢管,5—上端法兰板,6—下端法兰板,7—锚筋,8—螺栓,9—预留后浇混凝土区,10—螺孔,11—混凝土,12—上端连接板,13—下端连接板,14—楔形槽,15—双头楔形卯榫块。In the figure, 1—GFRP pipe body, 2—longitudinal reinforcement, 3—spiral stirrup, 4—embedded steel pipe, 5—upper end flange plate, 6—lower end flange plate, 7—anchor reinforcement, 8—bolt, 9 —Reserved post-pouring concrete area, 10—screw hole, 11—concrete, 12—upper connecting plate, 13—lower connecting plate, 14—wedge-shaped groove, 15—double-ended wedge-shaped mortise and tenon block.

具体实施方式Detailed ways

下面结合附图和具体实施例对本发明做进一步的详细说明。The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

如图1所示,一种预制GFRP管混凝土拼接桩,包括GFRP管体1、纵筋2、螺旋箍筋3、预埋钢管4、上端法兰板5(如图5所示)、下端法兰板6(如图6所示)、锚筋7及螺栓8;所述纵筋2与螺旋箍筋3构成钢筋笼,钢筋笼内置于GFRP管体1内;所述上端法兰板5位于GFRP管体1的顶端管口,所述下端法兰板6位于GFRP管体1的底端管口,在上端法兰板5下表面及下端法兰板6上表面均固定焊接有锚筋7;所述预埋钢管4固装在下端法兰板6上表面,且锚筋7位于预埋钢管4内侧;所述预埋钢管4外周侧设有预留后浇混凝土区9;沿所述上端法兰板5的板体周向固定焊接有若干均布设置的螺栓8,且螺栓8的螺杆部分朝上延伸至上端法兰板5上方;沿所述下端法兰板6的板体周向均布有若干螺孔10,螺孔10与螺栓8的位置一一对应,且螺孔10和螺栓8位于预留后浇混凝土区9的范围内;在所述上端法兰板5与下端法兰板6之间的GFRP管体1内浇注有混凝土11,所述纵筋2、螺旋箍筋3、预埋钢管4及锚筋7均封装于混凝土11内。As shown in Figure 1, a prefabricated GFRP pipe concrete splicing pile includes GFRP pipe body 1, longitudinal reinforcement 2, spiral stirrup 3, pre-embedded steel pipe 4, upper end flange plate 5 (as shown in Figure 5), lower end method Blue plate 6 (as shown in Figure 6), anchor bars 7 and bolts 8; the longitudinal bars 2 and spiral stirrups 3 form a reinforcement cage, and the reinforcement cage is built in the GFRP pipe body 1; the upper end flange plate 5 is located The top nozzle of the GFRP pipe body 1, the lower end flange plate 6 is located at the bottom end nozzle of the GFRP pipe body 1, the lower surface of the upper end flange plate 5 and the upper surface of the lower end flange plate 6 are fixedly welded with anchor ribs 7 The pre-embedded steel pipe 4 is fixed on the upper surface of the lower flange plate 6, and the anchor bar 7 is located inside the pre-embedded steel pipe 4; the outer peripheral side of the pre-embedded steel pipe 4 is provided with a reserved post-cast concrete area 9; along the The plate body circumferential direction of the upper end flange plate 5 is fixedly welded with some evenly distributed bolts 8, and the screw part of the bolts 8 extends upward to the top of the upper end flange plate 5; There are a number of screw holes 10, the screw holes 10 correspond to the positions of the bolts 8 one by one, and the screw holes 10 and the bolts 8 are located in the range of the reserved post-cast concrete area 9; the upper flange plate 5 and the lower flange The GFRP pipe body 1 between the plates 6 is poured with concrete 11 , and the longitudinal reinforcement 2 , spiral stirrup 3 , pre-embedded steel pipe 4 and anchor reinforcement 7 are all encapsulated in the concrete 11 .

如图2所示,一种预制GFRP管混凝土拼接桩,包括GFRP管体1、预埋钢管4、上端法兰板5(如图5所示)、下端法兰板6(如图6所示)、锚筋7及螺栓8;所述上端法兰板5位于GFRP管体1的顶端管口,所述下端法兰板6位于GFRP管体1的底端管口,在上端法兰板5下表面及下端法兰板6上表面均固定焊接有锚筋7;所述预埋钢管4固装在下端法兰板6上表面,且锚筋7位于预埋钢管4内侧;所述预埋钢管4外周侧设有预留后浇混凝土区9;沿所述上端法兰板5的板体周向固定焊接有若干均布设置的螺栓8,且螺栓8的螺杆部分朝上延伸至上端法兰板5上方;沿所述下端法兰板6的板体周向均布有若干螺孔10,螺孔10与螺栓8的位置一一对应,且螺孔10和螺栓8位于预留后浇混凝土区9的范围内;在所述上端法兰板5与下端法兰板6之间的GFRP管体1内浇注有混凝土11,所述预埋钢管4及锚筋7均封装于混凝土11内。As shown in Figure 2, a prefabricated GFRP pipe concrete splicing pile includes a GFRP pipe body 1, an embedded steel pipe 4, an upper end flange plate 5 (as shown in Figure 5), and a lower end flange plate 6 (as shown in Figure 6 ), anchor bars 7 and bolts 8; the upper end flange plate 5 is located at the top nozzle of the GFRP pipe body 1, the lower end flange plate 6 is located at the bottom end nozzle of the GFRP pipe body 1, and the upper end flange plate 5 Both the lower surface and the upper surface of the lower flange plate 6 are fixedly welded with anchor ribs 7; The outer peripheral side of the steel pipe 4 is provided with a reserved post-cast concrete area 9; a number of evenly distributed bolts 8 are fixedly welded along the circumference of the upper flange plate 5, and the screw parts of the bolts 8 extend upward to the upper end. Above the blue plate 5; there are several screw holes 10 evenly distributed along the circumference of the lower flange plate 6, the screw holes 10 correspond to the positions of the bolts 8 one by one, and the screw holes 10 and the bolts 8 are located in the reserved post-casting concrete area 9; concrete 11 is poured in the GFRP pipe body 1 between the upper end flange plate 5 and the lower end flange plate 6, and the pre-embedded steel pipe 4 and the anchor bars 7 are encapsulated in the concrete 11.

如图3所示,一种预制GFRP管混凝土拼接桩,包括GFRP管体1、纵筋2、螺旋箍筋3、上端连接板12(如图7所示)及下端连接板13(如图8所示);所述纵筋2与螺旋箍筋3构成钢筋笼,钢筋笼内置于GFRP管体1内;所述上端连接板12位于GFRP管体1的顶端管口,所述下端连接板13位于GFRP管体1的底端管口,在上端连接板12下表面及下端连接板13上表面均固定焊接有锚筋7;在所述上端连接板12上表面沿周向分布有若干楔形槽14,在下端连接板13下表面沿周向也分布有若干楔形槽14,且若干楔形槽14以板体圆心为中心呈辐射状分布,上端连接板12与下端连接板13上的楔形槽14的位置一一对应(如图9所示);所述楔形槽14配装有双头楔形卯榫块15(如图10所示);在所述上端连接板12与下端连接板13之间的GFRP管体1内浇注有混凝土11,所述纵筋2、螺旋箍筋3及锚筋7均封装于混凝土11内。As shown in Figure 3, a prefabricated GFRP pipe concrete splicing pile includes a GFRP pipe body 1, a longitudinal bar 2, a spiral stirrup 3, an upper connecting plate 12 (as shown in Figure 7) and a lower connecting plate 13 (as shown in Figure 8 shown); the longitudinal bar 2 and the spiral stirrup 3 form a reinforcement cage, and the reinforcement cage is built in the GFRP pipe body 1; the upper end connecting plate 12 is located at the top nozzle of the GFRP pipe body 1, and the lower end connecting plate 13 Located at the bottom nozzle of the GFRP pipe body 1, anchor ribs 7 are fixedly welded on the lower surface of the upper connecting plate 12 and the upper surface of the lower connecting plate 13; on the upper surface of the upper connecting plate 12, there are several wedge-shaped grooves distributed along the circumferential direction 14. A number of wedge-shaped grooves 14 are also distributed along the circumferential direction on the lower surface of the lower connecting plate 13, and several wedge-shaped grooves 14 are radially distributed with the center of the plate body as the center. The upper connecting plate 12 and the wedge-shaped grooves 14 on the lower connecting plate 13 The positions correspond to each other (as shown in Figure 9); the wedge-shaped groove 14 is equipped with a double-ended wedge-shaped mortise and tenon block 15 (as shown in Figure 10); between the upper end connecting plate 12 and the lower end connecting plate 13 Concrete 11 is poured into the GFRP pipe body 1, and the longitudinal reinforcement 2, the spiral stirrup 3 and the anchor reinforcement 7 are all encapsulated in the concrete 11.

如图4所示,一种预制GFRP管混凝土拼接桩,包括GFRP管体1、上端连接板12(如图7所示)及下端连接板13(如图8所示);所述上端连接板12位于GFRP管体1的顶端管口,所述下端连接板13位于GFRP管体1的底端管口,在上端连接板12下表面及下端连接板13上表面均固定焊接有锚筋7;在所述上端连接板12上表面沿周向分布有若干楔形槽14,在下端连接板13下表面沿周向也分布有若干楔形槽14,且若干楔形槽14以板体圆心为中心呈辐射状分布,上端连接板12与下端连接板13上的楔形槽14的位置一一对应(如图9所示);所述楔形槽14配装有双头楔形卯榫块15(如图10所示);在所述上端连接板12与下端连接板13之间的GFRP管体1内浇注有混凝土11,所述锚筋7封装于混凝土11内。As shown in Figure 4, a kind of prefabricated GFRP pipe concrete splicing pile comprises GFRP pipe body 1, upper end connecting plate 12 (as shown in Figure 7) and lower end connecting plate 13 (as shown in Figure 8); described upper end connecting plate 12 is located at the top nozzle of the GFRP pipe body 1, the lower end connecting plate 13 is located at the bottom end nozzle of the GFRP pipe body 1, and the lower surface of the upper connecting plate 12 and the upper surface of the lower connecting plate 13 are fixedly welded with anchor ribs 7; Several wedge-shaped grooves 14 are distributed along the circumferential direction on the upper surface of the upper connecting plate 12, and several wedge-shaped grooves 14 are also distributed along the circumferential direction on the lower surface of the lower connecting plate 13, and several wedge-shaped grooves 14 are radiating around the center of the plate body. The position of the wedge-shaped groove 14 on the upper end connecting plate 12 and the lower end connecting plate 13 corresponds one by one (as shown in Figure 9); the wedge-shaped groove 14 is equipped with a double-ended wedge-shaped mortise and tenon block 15 (as shown in Figure 10 shown); concrete 11 is poured in the GFRP pipe body 1 between the upper end connecting plate 12 and the lower end connecting plate 13, and the anchor bar 7 is encapsulated in the concrete 11.

下面结合附图说明本发明的接桩过程:Below in conjunction with accompanying drawing, pile-connecting process of the present invention is illustrated:

实施例一:采用螺栓连接方式的预制GFRP管混凝土拼接桩Example 1: Prefabricated GFRP pipe-concrete splicing piles using bolt connection

当第一根预制桩沉桩结束后,需要连接第二根预制桩,首先将第二根预制桩吊起,使第二根预制桩下端法兰板6上的螺孔10对准第一根预制桩上端法兰板5上的螺栓8,然后缓慢控制第二根预制桩下落,使螺栓8的螺杆部分从螺孔10中穿过,直到第二根预制桩下端法兰板6与第一根预制桩上端法兰板5紧密贴合在一起,然后在螺杆上安装螺母进行锁紧,最后在预留后浇混凝土区9浇注上速凝混凝土,通过后浇的速凝混凝土将位于预留后浇混凝土区9内的螺栓及螺母全部封装,等到预留后浇混凝土区9的速凝混凝土达到设计强度后,就可以继续沉桩作业了。When the first prefabricated pile is finished, the second prefabricated pile needs to be connected. First, the second prefabricated pile is hoisted so that the screw hole 10 on the flange plate 6 at the lower end of the second prefabricated pile is aligned with the first prefabricated pile. Bolt 8 on the flange plate 5 at the upper end of the prefabricated pile, and then slowly control the falling of the second prefabricated pile, so that the screw part of the bolt 8 passes through the screw hole 10 until the flange plate 6 at the lower end of the second prefabricated pile is connected to the first The flange plate 5 at the upper end of the root prefabricated pile is tightly fitted together, and then a nut is installed on the screw rod for locking, and finally quick-setting concrete is poured in the reserved post-cast concrete area 9, and the post-cast quick-setting concrete will be located in the reserved post-cast concrete area 9. The bolts and nuts in the post-cast concrete area 9 are all encapsulated, and after the quick-setting concrete in the reserved post-cast concrete area 9 reaches the design strength, the pile sinking operation can be continued.

实施例二:采用卯榫连接方式的预制GFRP管混凝土拼接桩Example 2: Prefabricated GFRP pipe concrete splicing piles using mortise and tenon connection

当第一根预制桩沉桩结束后,需要连接第二根预制桩,首先将第二根预制桩吊起,使第二根预制桩下端连接板13上的楔形槽14对准第一根预制桩上端连接板12上的楔形槽14,然后缓慢控制第二根预制桩下落,直到第二根预制桩下端连接板13与第一根预制桩上端连接板12紧密贴合在一起,然后将双头楔形卯榫块15插入扣合在一起的楔形槽14内,利用双头楔形卯榫块15将第二根预制桩下端连接板13与第一根预制桩上端连接板12固连在一起,之后就可以继续沉桩作业了。After the first prefabricated pile sinking is completed, the second prefabricated pile needs to be connected. First, the second prefabricated pile is hoisted so that the wedge-shaped groove 14 on the connecting plate 13 at the lower end of the second prefabricated pile is aligned with the first prefabricated pile. the wedge-shaped groove 14 on the pile upper connecting plate 12, and then slowly control the second prefabricated pile to fall until the second prefabricated pile lower connecting plate 13 and the first prefabricated pile upper connecting plate 12 are tightly fitted together, and then the double The head wedge-shaped mortise and tenon block 15 is inserted into the wedge-shaped groove 14 that is buckled together, and the double-headed wedge-shaped mortise and tenon block 15 is used to firmly connect the lower end connecting plate 13 of the second prefabricated pile with the upper end connecting plate 12 of the first prefabricated pile. After that, the pile sinking operation can be continued.

实施例中的方案并非用以限制本发明的专利保护范围,凡未脱离本发明所为的等效实施或变更,均包含于本案的专利范围中。The solutions in the embodiments are not intended to limit the scope of patent protection of the present invention, and all equivalent implementations or changes that do not deviate from the present invention are included in the patent scope of this case.

Claims (4)

1. a kind of prefabricated GFRP pipe concretes spliced pile, it is characterised in that:Including GFRP tube bodies, vertical muscle, tie hoop, pre-buried steel Pipe, upper flanges plate, lower end flanged plate, dowel and bolt;The vertical muscle constitutes steel reinforcement cage with tie hoop, and steel reinforcement cage is built in In GFRP tube bodies;The upper flanges plate is located at the top nozzle of GFRP tube bodies, and the lower end flanged plate is located at GFRP tube bodies Bottom end nozzle is fixedly welded with dowel in upper flanges plate lower surface and lower end flanged plate upper surface;The embedded steel tube is solid Mounted in lower end flanged plate upper surface, and dowel is located on the inside of embedded steel tube;The embedded steel tube peripheral side is mixed equipped with being poured after reserving The areas Ning Tu;Several bolts being uniformly arranged, and the threaded shank of bolt are welded with along the plate body of the upper flanges plate is circumferentially fixed Divide and extends to upward above upper flanges plate;Plate body along the lower end flanged plate is circumferentially evenly equipped with several screw holes, screw hole and spiral shell The position of bolt corresponds, and screw hole and bolt are located in the range of reserved rear pouring concrete area;The upper flanges plate with Concrete is cast in GFRP tube bodies between the flanged plate of lower end, the vertical muscle, tie hoop, embedded steel tube and dowel encapsulate In in concrete.
2. a kind of prefabricated GFRP pipe concretes spliced pile, it is characterised in that:Including GFRP tube bodies, embedded steel tube, upper flanges plate, Lower end flanged plate, dowel and bolt;The upper flanges plate is located at the top nozzle of GFRP tube bodies, and the lower end flanged plate is located at The bottom end nozzle of GFRP tube bodies is fixedly welded with dowel in upper flanges plate lower surface and lower end flanged plate upper surface;It is described Embedded steel tube is packed in lower end flanged plate upper surface, and dowel is located on the inside of embedded steel tube;The embedded steel tube peripheral side is equipped with Pouring concrete area after reserved;Several bolts being uniformly arranged, and spiral shell are welded with along the plate body of the upper flanges plate is circumferentially fixed The screw portion of bolt is extended to upward above upper flanges plate;Plate body along the lower end flanged plate is circumferentially evenly equipped with several spiral shells The position of hole, screw hole and bolt corresponds, and screw hole and bolt are located in the range of reserved rear pouring concrete area;On described Concrete is cast in GFRP tube bodies between end flanges plate and lower end flanged plate, the embedded steel tube and dowel are packaged in mixed In solidifying soil.
3. a kind of prefabricated GFRP pipe concretes spliced pile, it is characterised in that:Connect including GFRP tube bodies, vertical muscle, tie hoop, upper end Fishplate bar and lower end connecting plate;The vertical muscle constitutes steel reinforcement cage with tie hoop, and steel reinforcement cage is built in GFRP tube bodies;The upper end Connecting plate is located at the top nozzle of GFRP tube bodies, and the lower end connecting plate is located at the bottom end nozzle of GFRP tube bodies, is connected in upper end Plate lower surface and lower end connecting plate upper surface are fixedly welded with dowel;Have upper end connecting plate upper surface is circumferentially distributed Several wedge grooves are circumferentially also distributed in lower end connecting plate lower surface in several wedge grooves, and several wedge grooves are with the plate body center of circle Centered on be radially distributed, the position of the wedge groove on upper end connecting plate and lower end connecting plate corresponds;The wedge groove It is fitted with double end wedge shape mortise and tenon block;It is cast with coagulation in GFRP tube bodies between the upper end connecting plate and lower end connecting plate Soil, the vertical muscle, tie hoop and dowel are packaged in concrete.
4. a kind of prefabricated GFRP pipe concretes spliced pile, it is characterised in that:It is connected including GFRP tube bodies, upper end connecting plate and lower end Plate;The upper end connecting plate is located at the top nozzle of GFRP tube bodies, and the lower end connecting plate is located at the bottom end nozzle of GFRP tube bodies, It is fixedly welded with dowel in upper end connecting plate lower surface and lower end connecting plate upper surface;On upper end connecting plate upper surface edge It is circumferentially distributed to have several wedge grooves, several wedge grooves, and several wedge grooves is circumferentially also distributed in lower end connecting plate lower surface It is radially distributed centered on the plate body center of circle, upper end connecting plate and the position of the wedge groove on the connecting plate of lower end correspond; The wedge groove is fitted with double end wedge shape mortise and tenon block;It is poured in GFRP tube bodies between the upper end connecting plate and lower end connecting plate It is marked with concrete, the dowel is packaged in concrete.
CN201810802366.9A 2018-07-20 2018-07-20 A kind of prefabricated GFRP tube concrete splicing pile Active CN108661045B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810802366.9A CN108661045B (en) 2018-07-20 2018-07-20 A kind of prefabricated GFRP tube concrete splicing pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810802366.9A CN108661045B (en) 2018-07-20 2018-07-20 A kind of prefabricated GFRP tube concrete splicing pile

Publications (2)

Publication Number Publication Date
CN108661045A true CN108661045A (en) 2018-10-16
CN108661045B CN108661045B (en) 2023-11-24

Family

ID=63788452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810802366.9A Active CN108661045B (en) 2018-07-20 2018-07-20 A kind of prefabricated GFRP tube concrete splicing pile

Country Status (1)

Country Link
CN (1) CN108661045B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797909A (en) * 2019-02-22 2019-05-24 南京工程学院 A kind of assembled FRP pipe concrete-FRP spiral winding concrete combination column
CN114775349A (en) * 2022-03-23 2022-07-22 中铁七局集团第二工程有限公司 Prefabricated UHPC pipe confined concrete overhead roadbed pile plate structure and construction process

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1417352A (en) * 1973-02-02 1975-12-10 Pynford Ltd Foundations
GB0106658D0 (en) * 2001-03-16 2001-05-09 Ingram Hilton S Method of forming foundations for a building
EP1559847A1 (en) * 1998-02-09 2005-08-03 VSL International AG Tensioning element for the manufacturing of an anchoring
CN201527380U (en) * 2009-10-26 2010-07-14 中国十七冶建设有限公司 Self-tightening type pulling fixture for puling resistance by single pile
CN101812842A (en) * 2010-04-22 2010-08-25 霍宏斌 Tensionless filling pile structure
CN201695391U (en) * 2009-11-10 2011-01-05 宁波海港工程有限公司 Tubular pile flange type joint and splicing tool thereof
CN201794312U (en) * 2010-09-28 2011-04-13 香港华艺设计顾问(深圳)有限公司 Column foot positioning device for precast concrete column
CN102199919A (en) * 2011-06-03 2011-09-28 广东三和管桩有限公司 Prestressed concrete pipe pile anticorrosion joint
CN102704465A (en) * 2012-05-25 2012-10-03 中利建设集团有限公司 FRP (fiber reinforce plastic) fiber cloth winding pile and manufacturing method thereof
CN102704471A (en) * 2012-05-22 2012-10-03 张俊峰 Prestress solid concrete preformed pile
CN203200771U (en) * 2013-01-30 2013-09-18 苏州工业园区设计研究院股份有限公司 Connection structure for pile extension top and bearing platform
CN203213102U (en) * 2013-03-27 2013-09-25 周兆弟 Butt-joint member of prestressed concrete pipe pile
CN103628474A (en) * 2012-08-27 2014-03-12 上海中技桩业股份有限公司 Manufacturing method for connecting hollow prestressed square piles by using bolts
CN103758115A (en) * 2014-01-16 2014-04-30 南京工业大学 Composite material fold line-shaped plate connecting structure
CN204059345U (en) * 2014-09-10 2014-12-31 安徽省交通建设有限责任公司 Preformed pile casing method syndeton
CN105862856A (en) * 2016-05-18 2016-08-17 江苏鼎达建筑新技术有限公司 Reinforced concrete support pile and pile splicing structure thereof
CN106638586A (en) * 2016-12-01 2017-05-10 周兆弟 Precast pile butt joint and connecting structure
CN106677205A (en) * 2016-11-11 2017-05-17 重庆大学 Fabricated special-shaped steel pipe pile combined retaining wall
CN106836212A (en) * 2017-03-29 2017-06-13 安徽理工大学 A kind of pile extension end plate and pile extension technology
CN206337559U (en) * 2016-12-19 2017-07-18 天津市天友建筑设计股份有限公司 A kind of prefabricated pile mechanical connecting structure
CN107190741A (en) * 2017-07-19 2017-09-22 绍兴文理学院 Prefabricated pile and its construction method is inscribed in a kind of mortise and tenon type
CN107724384A (en) * 2017-11-24 2018-02-23 华中科技大学 A kind of stake and stake attachment structure and its construction method
CN208650041U (en) * 2018-07-20 2019-03-26 东北大学 A kind of prefabricated GFRP pipe concrete spliced pile

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1417352A (en) * 1973-02-02 1975-12-10 Pynford Ltd Foundations
EP1559847A1 (en) * 1998-02-09 2005-08-03 VSL International AG Tensioning element for the manufacturing of an anchoring
GB0106658D0 (en) * 2001-03-16 2001-05-09 Ingram Hilton S Method of forming foundations for a building
CN201527380U (en) * 2009-10-26 2010-07-14 中国十七冶建设有限公司 Self-tightening type pulling fixture for puling resistance by single pile
CN201695391U (en) * 2009-11-10 2011-01-05 宁波海港工程有限公司 Tubular pile flange type joint and splicing tool thereof
CN101812842A (en) * 2010-04-22 2010-08-25 霍宏斌 Tensionless filling pile structure
CN201794312U (en) * 2010-09-28 2011-04-13 香港华艺设计顾问(深圳)有限公司 Column foot positioning device for precast concrete column
CN102199919A (en) * 2011-06-03 2011-09-28 广东三和管桩有限公司 Prestressed concrete pipe pile anticorrosion joint
CN102704471A (en) * 2012-05-22 2012-10-03 张俊峰 Prestress solid concrete preformed pile
CN102704465A (en) * 2012-05-25 2012-10-03 中利建设集团有限公司 FRP (fiber reinforce plastic) fiber cloth winding pile and manufacturing method thereof
CN103628474A (en) * 2012-08-27 2014-03-12 上海中技桩业股份有限公司 Manufacturing method for connecting hollow prestressed square piles by using bolts
CN203200771U (en) * 2013-01-30 2013-09-18 苏州工业园区设计研究院股份有限公司 Connection structure for pile extension top and bearing platform
CN203213102U (en) * 2013-03-27 2013-09-25 周兆弟 Butt-joint member of prestressed concrete pipe pile
CN103758115A (en) * 2014-01-16 2014-04-30 南京工业大学 Composite material fold line-shaped plate connecting structure
CN204059345U (en) * 2014-09-10 2014-12-31 安徽省交通建设有限责任公司 Preformed pile casing method syndeton
CN105862856A (en) * 2016-05-18 2016-08-17 江苏鼎达建筑新技术有限公司 Reinforced concrete support pile and pile splicing structure thereof
CN106677205A (en) * 2016-11-11 2017-05-17 重庆大学 Fabricated special-shaped steel pipe pile combined retaining wall
CN106638586A (en) * 2016-12-01 2017-05-10 周兆弟 Precast pile butt joint and connecting structure
CN206337559U (en) * 2016-12-19 2017-07-18 天津市天友建筑设计股份有限公司 A kind of prefabricated pile mechanical connecting structure
CN106836212A (en) * 2017-03-29 2017-06-13 安徽理工大学 A kind of pile extension end plate and pile extension technology
CN107190741A (en) * 2017-07-19 2017-09-22 绍兴文理学院 Prefabricated pile and its construction method is inscribed in a kind of mortise and tenon type
CN107724384A (en) * 2017-11-24 2018-02-23 华中科技大学 A kind of stake and stake attachment structure and its construction method
CN208650041U (en) * 2018-07-20 2019-03-26 东北大学 A kind of prefabricated GFRP pipe concrete spliced pile

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周玉石: "基坑围护中的预制拼装钢筋混凝土构件 选型及应用技术研究", 《建筑施工》, vol. 40, no. 6, pages 904 - 909 *
张霓;王连广;韩华锋;: "GFRP管混凝土柱的GFRP管拼接方法", 哈尔滨工业大学学报, no. 10, pages 70 - 75 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797909A (en) * 2019-02-22 2019-05-24 南京工程学院 A kind of assembled FRP pipe concrete-FRP spiral winding concrete combination column
CN109797909B (en) * 2019-02-22 2021-05-04 南京工程学院 A prefabricated FRP tubular concrete-FRP spiral coil concrete composite column
CN114775349A (en) * 2022-03-23 2022-07-22 中铁七局集团第二工程有限公司 Prefabricated UHPC pipe confined concrete overhead roadbed pile plate structure and construction process

Also Published As

Publication number Publication date
CN108661045B (en) 2023-11-24

Similar Documents

Publication Publication Date Title
CN108505433B (en) Pier structure and construction method thereof
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN209637778U (en) Deng the ruggedized construction for vcehicular tunnel inverted arch
AT517959B1 (en) Foundation for a wind turbine
AT517958A4 (en) Foundation for a wind turbine
CN105804255B (en) Precast concrete beam and composite steel tube concrete column assembling structure and its construction method
CN108643219B (en) A prefabricated transmission line bolt static pressure micro pile foundation and its construction method
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN209669688U (en) A kind of half assembled thin-wall piers
CN208650041U (en) A kind of prefabricated GFRP pipe concrete spliced pile
CN108625359B (en) A prefabricated GFRP tube concrete hollow spliced pile
CN108661045A (en) A kind of prefabricated GFRP pipe concretes spliced pile
CN104153463B (en) Assembled integrated frame system and construction method thereof
CN206486819U (en) A kind of stable support body system for ensureing continuous beam cantilever casting construction
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN109989339B (en) A prefabricated segmental pier and its application in bridge construction
CN104594343B (en) A kind of assembled stake and its construction method
CN212801168U (en) Single-column pier bridge concreties antidumping reinforced structure
CN109184741A (en) A kind of high-bearing capacity shield tunnel segment joint structure
CN108797320A (en) A kind of the UHPC pipes-concrete prefabricated assembling combination bridge pier and its construction method of spigot-and-socket joint
CN105839851B (en) Using the construction method for the prefabricated frame trestle that segmentation connection is formed
CN109722984B (en) A semi-assembled thin-walled bridge pier and its assembly method
CN112112180A (en) Connecting system of assembled combined pier and bearing platform and construction method thereof
CN208563359U (en) A prefabricated PHC pipe pile and its connection structure with the bearing platform flange
CN112458908B (en) Construction method for steel hoops of pier anti-seismic facility in two-step accurate-in-place mode

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant