CN109139052A - A kind of slip casting aperture apparatus and construction method based on high pressure deep hole grouting - Google Patents

A kind of slip casting aperture apparatus and construction method based on high pressure deep hole grouting Download PDF

Info

Publication number
CN109139052A
CN109139052A CN201811155700.2A CN201811155700A CN109139052A CN 109139052 A CN109139052 A CN 109139052A CN 201811155700 A CN201811155700 A CN 201811155700A CN 109139052 A CN109139052 A CN 109139052A
Authority
CN
China
Prior art keywords
casing
sleeve
group
high pressure
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811155700.2A
Other languages
Chinese (zh)
Other versions
CN109139052B (en
Inventor
刘结高
程爱民
翟恩发
孔皖军
郑根源
高银贵
尹宏昌
王宏伟
李全伦
史志国
国伟
常成林
赵少博
薛悟强
王印
吴寒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ordos Huaxing Energy Co Ltd
Huai Mine West Coal Mine Cci Capital Ltd
Original Assignee
Ordos Huaxing Energy Co Ltd
Huai Mine West Coal Mine Cci Capital Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ordos Huaxing Energy Co Ltd, Huai Mine West Coal Mine Cci Capital Ltd filed Critical Ordos Huaxing Energy Co Ltd
Priority to CN201811155700.2A priority Critical patent/CN109139052B/en
Publication of CN109139052A publication Critical patent/CN109139052A/en
Application granted granted Critical
Publication of CN109139052B publication Critical patent/CN109139052B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • E21D9/002Injection methods characterised by the chemical composition used

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Civil Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention provides a kind of slip casting aperture apparatus and construction method based on high pressure deep hole grouting, and slip casting aperture apparatus includes first sleeve, and first sleeve is arranged in the rock stratum around tunnel;For providing positioning and support;Second casing, the outer diameter of the second casing are less than the internal diameter of first sleeve;Second casing is arranged concentrically in first sleeve, and injected hole is equipped in the second casing;Short tube, short tube are connected to the left side of the second casing, and short tube is equipped with pressure gauge;Plug, plug are connected on the left of short tube, and spherical cavity is equipped in plug, is equipped with the second sluice valve in spherical cavity;The method that the present invention uses the construction of high pressure deep hole grouting carries out so that grouting with small pipe is synchronous while high pressure deep hole grouting;The method that high pressure deep hole grouting uses three-wheel slip casting simultaneously, ductule uses the construction method of class interval, so that water conductive fault is effectively administered.The invention enables water conductive fault improvement, the tomography duration shortens, project amount is less, expense is low, accuracy rate is high.

Description

A kind of slip casting aperture apparatus and construction method based on high pressure deep hole grouting
Technical field
The invention belongs to full section of tunnel slurry injection technique fields, and in particular to a kind of injected hole based on high pressure deep hole grouting Device and construction method.
Background technique
Full section of tunnel slurry injection technique is that poor different of the soil properties such as weak water rich strata, crushed zone was directed in Tunnel Engineering Normal section frequently with construction method, by carrying out the work that slip casting plays soil mass consolidation and waterproof to tunnel surrounding ductule of constructing With, at present during on-site construction, these methods tool that lithology observation method of comparison, testization method etc. is usually taken, but uses in the past There is the features such as project amount is big, costly, accuracy rate is low.
It is mainly mining under safe waterpressure of aquifer coal seam that coal master, which mines, at present, and it is about 1MPa, coal seam that seat earth, which bears Ordovician karst water pressure, It is about 40~60m with Ordovician karst water distance, since coal seam floor grey watery difficult to understand is strong and mature fault, safe working is by bottom plate ash difficult to understand The threat of water, national mine water inrush data show that 70% water inrush accident all occurs during tunnelling in recent years, tunnel Water inrush accident is especially easily sent out when encountering tomography conducting Ordovician karst water in the process.It is controlled using the tomography design method based on previous bottom plate admittedly Manage the two tomographies administer it is long in time limit, effect is undesirable, although certain tomography drops are only 3m, the fault hydraulic conductivity is strong, Preceding prospecting bit hole water yield is high, and meet head on the position back water outlet 25m that drills3/ h, execution conditions are poor, and band is administered to it in grieshoch position difficult to understand Great difficulty is carried out.
Accordingly, it is desirable to provide it is a kind of for the insufficient water conductive fault comprehensive treatment parallel construction system of the above-mentioned prior art and Construction method.
Summary of the invention
The purpose of the present invention is to provide a kind of water conductive fault comprehensive treatment parallel construction systems and construction method at least Tomography is long in time limit, effect is undesirable, project amount is big, expense to administer for the tomography design method based on solid bottom plate at present for solution Problem high, accuracy rate is low.
To achieve the goals above, the invention provides the following technical scheme:
A kind of slip casting aperture apparatus based on high pressure deep hole grouting, the slip casting aperture apparatus include,
First sleeve, the first sleeve are arranged in the rock stratum around tunnel;For providing positioning and support;
Second casing, the outer diameter of second casing are less than the internal diameter of the first sleeve;Second casing is set with one heart It sets in the first sleeve, injected hole is equipped in second casing;
Short tube, the short tube are connected to the left side of second casing, and the short tube is equipped with pressure gauge;
Plug, the plug are connected on the left of the short tube, are equipped with spherical cavity in the plug, in the spherical cavity Equipped with the second sluice valve.
A kind of slip casting aperture apparatus based on high pressure deep hole grouting as described above, it is preferable that the first sleeve and described the Two casings are circumferentially distributed multiple through-holes, flow out out of casing for slurries, form the entirety of sealing.
A kind of slip casting aperture apparatus based on high pressure deep hole grouting as described above, it is preferable that the length of second casing is big In the length of the first sleeve, the first sleeve is concordant with the left end of second casing to be arranged;The first sleeve and The screed of same thickness is equipped between second casing, between second casing and the injected hole.
A kind of slip casting aperture apparatus based on high pressure deep hole grouting as described above, it is preferable that the first sleeve left end connection There is first flange, second casing left end is connected with second flange, and the right end of the short tube is connected with third flange;Described One flange, the second flange and third flange abutting link together;The second flange is located at the first flange Between the third flange;
Preferably, the internal diameter of the short tube is identical as the internal diameter of second casing.
A kind of slip casting aperture apparatus based on high pressure deep hole grouting as described above, it is preferable that the short tube outer wall connection is equipped with Pressure-measuring pipe, the pressure-measuring pipe is interior to be equipped with the first gate valve, and the pressure-measuring pipe upper end is connected with pressure gauge;First gate valve is for connecting Lead to the pressure gauge and the short tube.
A kind of slip casting aperture apparatus based on high pressure deep hole grouting as described above, it is preferable that the injected hole has three groups, respectively For first group of injected hole, second group of injected hole and third group injected hole;Injected hole described in each group is along the surrounding of construction tunnel Be uniformly distributed, first group of injected hole is identical as the third group injected hole distribution mode, and with second group of the distribution Mode is different;
Preferably, first group of injected hole and third group injected hole and center line in roadway angle are 11~25 °, and hole depth is 43~56m;
More preferably, second group of injected hole and center line in roadway angle are 15~22 °, and hole depth is 57~62m.
A kind of construction method of the slip casting aperture apparatus based on high pressure deep hole grouting, the construction method include the following steps:
Step 1 determines drill construction technique program:
After drilling tool aperture drilling and tripping in first sleeve → note dual slurry sealing → pressure-bearing pass the test → drilling tool super hole cutter Into and the second casing of tripping in → note dual slurry sealing → pressure-bearing pass the test after → drilling tool super hole cutter proceeds to projected depth → observation Water, hydraulic pressure and the water temperature in the whole hole of water outlet drilling;
Step 2, tripping in first sleeve and the second casing are simultaneously fixed:
It is first crept into forward using drill bit A, then tripping in first sleeve, then infuses rapid hardening expansion hole sealing agent and carry out sealing;
It is first crept into forward using drill bit B, then the second casing of tripping in, note dual slurry carries out sealing;
Step 3, sealing inspection:
After first sleeve and the second casing sealing in step 2, using high pressure slurry pump respectively to first sleeve and second Casing carries out sealing quality examination, then is crept into drill bit C.
The construction method of slip casting aperture apparatus based on high pressure deep hole grouting as described above, it is preferable that in the step 1, institute Stating cement slurry and waterglass volume ratio in dual slurry is 1:1~1:0.6.
The construction method of slip casting aperture apparatus based on high pressure deep hole grouting as described above, it is preferable that in the step 2, envelope Admittedly slip casting strengthening material be P.O42.5 portland cement, water and 35~40 Baume degrees waterglass;
The drill bit A uses the drill bit of Φ 168mm, and the distance crept into forward is 6m;
The drill bit B uses the drill bit of Φ 127mm, and the distance crept into forward is 12m;
Cement slurry ratio of mud 1:1 in double slurries, cement slurry and waterglass volume ratio 1:0.6.
The construction method of slip casting aperture apparatus based on high pressure deep hole grouting as described above, it is preferable that in the step 2, note Slurry final pressure is 9MPa.
Compared with the immediate prior art, technical solution provided by the invention has following excellent effect:
The method that the present invention uses high pressure deep hole grouting and grouting with small pipe parallel construction, so that in high pressure deep hole grouting Grouting with small pipe is synchronous simultaneously carries out;The method that high pressure deep hole grouting uses three-wheel slip casting simultaneously, ductule use class interval Construction method so that water conductive fault is effectively administered.The invention enables water conductive fault administer the tomography duration shorten, work Journey amount is less, expense is low, accuracy rate is high.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present invention, and of the invention shows Examples and descriptions thereof are used to explain the present invention for meaning property, does not constitute improper limitations of the present invention.Wherein:
Fig. 1 is the high-pressure slip-casting hole aperture layout drawing of the embodiment of the present invention;
Fig. 2 is the high-pressure slip-casting hole floor map of the embodiment of the present invention;
Fig. 3 is the high-pressure slip-casting hole diagrammatic cross-section of the embodiment of the present invention;
Fig. 4 is the first and third wheel slip casting section effect diagram of the embodiment of the present invention;
Fig. 5 is the second wheel slip casting section effect diagram of the embodiment of the present invention;
Fig. 6 is the section deep hole grouting cloth hole overall effect schematic diagram of the embodiment of the present invention;
Fig. 7 is that the ductule s group of the embodiment of the present invention arranges sectional schematic diagram;
Fig. 8 is that the conduit q group of the embodiment of the present invention arranges sectional schematic diagram;
Fig. 9 is the ductule plan view of the embodiment of the present invention;
Figure 10 is the ductule section arrangement schematic diagram of the embodiment of the present invention;
Figure 11 is the ductule structural schematic diagram of the embodiment of the present invention.
In figure: 11, first sleeve;12, the second casing;13, injected hole;14, first flange;15, second flange;16, Three flanges;17, pressure gauge;18, the first gate valve;19, short tube;110, the second gate valve;111, the 4th flange;112, plug;21, One wheel Grouting Pipe;22, the second wheel Grouting Pipe;23, third round Grouting Pipe;31, tunnel;41, left side;42, right side;43, third lock Valve;44, reinforcing bar;51 screw threads;52, steel floral tube;53, tip;54, slurry outlet;S1, first group of conduit;S2, second group of conduit;s3, Third group conduit;S4, the 4th group of conduit;Q1, the 5th group of conduit;Q2, the 6th group of conduit;Q3, the 7th group of conduit;Q4, the 8th group Conduit.
Specific embodiment
The present invention will be described in detail below with reference to the accompanying drawings and embodiments.It should be noted that in the feelings not conflicted Under condition, the features in the embodiments and the embodiments of the present application be can be combined with each other.
In the description of the present invention, term " longitudinal direction ", " transverse direction ", "upper", "lower", "front", "rear", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "top", "bottom" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the present invention rather than require the present invention that must be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.Term used in the present invention " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, It may be a detachable connection;It can be directly connected, can also be indirectly connected by intermediate member, for the common of this field For technical staff, the concrete meaning of above-mentioned term can be understood as the case may be.
According to a particular embodiment of the invention, as shown in Figure 1, being 13 aperture layout drawing of high-pressure slip-casting hole of the invention, the Sleeve 11 internal diameter 146mm, length 5.5m, 12 internal diameter 108mm of first sleeve.Length 11m, center are injected hole 13;Pressure gauge The outflow of the water in pipeline can be can control on 17 with the pressure in display pipes, the second gate valve 110;112 left end of plug is connected with 4th flange 111 is convenient for other external pipelines.It is high-pressure slip-casting end view of the invention, high pressure injection as shown in Fig. 2 to 6 Slurry 13 mouthfuls of hole arrangement is divided into three-wheel, respectively, first round Grouting Pipe 21, the second wheel Grouting Pipe 22, third round Grouting Pipe 23, first Grouting Pipe 21 is taken turns as the arrangement of third round Grouting Pipe 23, the arrangement of the second wheel Grouting Pipe 22 and first round slip casting Pipe 21 and third round Grouting Pipe 23 are different.It is arranged in this way so that intensity of the tunnel 31 in tunneling process is guaranteed.It prevents The harm of water conductive fault bring.It is grouting with small pipe end view of the invention, ductule in the present invention as described in Fig. 7-11 Slip casting is divided into s and two big groups of q, and each big group is divided into 9 groups, i.e. first group of conduit s1 again;Second group of conduit s2;Third group conduit s3;4th group of conduit s4;5th group of conduit q1;6th group of conduit q2;7th group of conduit q3;8th group of conduit q4;9th group is led Pipe q5, s and q two organizes greatly spaced apart arrangement, so that its area coverage becomes wider, and bring effect is more obvious.Together When tunnel bottom be equipped with reinforcing bar 44, for providing support, ductule front end is equipped with tip 53, convenient for being more easily inserted into rock mass In, ductule is surrounded by slurry outlet 54.
According to a particular embodiment of the invention, a kind of water conductive fault comprehensive treatment parallel construction system, parallel construction system Including high pressure deep hole grouting system, high pressure deep hole grouting system is located in the rock mass of 31 outside surrounding of tunnel.High pressure deep hole grouting System includes 13 device of high pressure deep hole grouting hole, and 13 device of high pressure deep hole grouting hole includes first sleeve 11, and first sleeve 11 is set It sets in the rock stratum around tunnel 31.For providing positioning and support.
Grouting with small pipe system, grouting with small pipe system are located at high pressure deep hole grouting system memory, grouting with small pipe system It is connected to the inner wall in tunnel 31.
According to a particular embodiment of the invention, 13 device of high pressure deep hole grouting hole further includes first sleeve 12, first sleeve 12 outer diameter is less than the internal diameter of first sleeve 11.First sleeve 12 is arranged concentrically in first sleeve 11, is set in first sleeve 12 There is injected hole 13.Short tube 19, short tube 19 are connected to the left side of first sleeve 12, and short tube 19 is equipped with pressure gauge 17.Plug 112, Plug 112 is connected to 19 left side of short tube, and spherical cavity is equipped in plug 112, is equipped with the second gate valve 110 in spherical cavity.
According to a particular embodiment of the invention, the length of first sleeve 12 is greater than the length of first sleeve 11, first sleeve 11 concordant with the left end of first sleeve 12 are arranged.Between first sleeve 11 and first sleeve 12, first sleeve 12 and injected hole 13 Between be equipped with the screed of same thickness.First sleeve 11 and first sleeve 12 are circumferentially distributed multiple through-holes, for starching Liquid is flowed out out of casing, forms the entirety of sealing.
According to a particular embodiment of the invention, 11 left end of first sleeve is connected with first flange 14,12 left end of first sleeve It is connected with second flange 15, the right end of short tube 19 is connected with third flange 16.First flange 14, second flange 15 and third flange 16 are close to link together.Second flange 15 is between first flange 14 and third flange 16.The connection of 19 outer wall of short tube is equipped with Pressure-measuring pipe, pressure-measuring pipe is interior to be equipped with the first gate valve 18, and pressure-measuring pipe upper end is connected with pressure gauge 17.First gate valve 18 is for being connected to pressure Table 17 and short tube 19.
Preferably, the internal diameter of short tube 19 is identical as the internal diameter of first sleeve 12.
According to a particular embodiment of the invention, injected hole 13 has three groups, respectively first group of injected hole, second group of injected hole With third group injected hole.Surrounding of each group of injected hole 13 along construction tunnel 31 is uniformly distributed, first group of injected hole and third Group injected hole distribution mode is identical and different from the distribution mode of second group of injected hole.
Preferably, first group of injected hole and third group injected hole and 31 centerlines of tunnel be 11~25 ° (such as 11 °, 12 °, 13 °, 14 °, 15 °, 18 °, 20 °, 22 °, 25 °), hole depth be 43~56m (such as 43m, 45m, 46m, 48m, 49m, 52m, 53m、55m、56m)。
More preferably, second group of injected hole 13 and 31 centerlines of tunnel be 15~22 ° (such as 15 °, 16 °, 17 °, 18 °, 19 °, 20 °, 21 °, 22 °), hole depth is 57~62m (such as 57m, 58m, 59m, 60m, 61m, 62m).
According to a particular embodiment of the invention, grouting with small pipe system includes grouting with small pipe aperture apparatus, grouting with small pipe Aperture apparatus includes,
S group ductule, s group ductule are arranged in the surrounding in tunnel 31, and one end of s group ductule is from 31 inner wall of tunnel to four Week extends to the other end.
Q group ductule, q group ductule and s group ductule interval are arranged, and the length of q group ductule is greater than s group ductule Length.
Aqueduct, aqueduct are located at the lower part of the left side 41 in tunnel 31, the right side of the opening direction of aqueduct towards tunnel 31 42。
According to a particular embodiment of the invention, s group ductule include s1 group ductule, s2 group ductule, s3 group ductule, S4 group ductule, s5 group ductule, s6 group ductule, s7 group ductule, s8 group ductule and s9 group ductule.S1 group ductule One end be connected at the left side 41 in tunnel 31, one end of s2 group ductule is connected to the left side 41 in tunnel 31 and the top in tunnel 31 Encircle junction.One end of s5 group ductule is connected to the crown junction of tunnel 31 right side 42 and tunnel 31.S3 group ductule and S4 group ductule is evenly distributed between s2 group ductule and s5 group ductule.One end of s6 group ductule is connected to tunnel 31 At right side 42.S7 group ductule to s9 group ductule is uniformly arranged on 31 bottom of tunnel.
Q group ductule include q1 group ductule, q2 group ductule, q3 group ductule, q4 group ductule, q5 group ductule, Q6 group ductule, q7 group ductule, q8 group ductule and q9 group ductule.One end of q1 group ductule is connected to the left side in tunnel 31 The bottom junction of side 41 and tunnel 31.One end of q7 group ductule is connected to the right side 42 in tunnel 31 and the bottom in tunnel 31 is handed over Meet place.Q8 group ductule and q9 group ductule are arranged perpendicular to the bottom in tunnel 31.Q4 group ductule is connected to the arch in tunnel 31 The highest point in portion.Q2 group ductule is located between s1 group ductule and s2 group ductule.Q3 group ductule is located at s2 group ductule Between s3 group ductule.Q5 group ductule is located between s4 group ductule and s5 group ductule.Q6 group ductule is located at s5 group Between ductule and s6 group ductule.
Aqueduct is connected on U-shaped canopy leg, is connected with one section of exposed pipe, the internal diameter of exposed pipe and aqueduct on the right side of aqueduct It is identical, ring flange is connected on the right side of exposed pipe.
S group ductule and q group ductule are extended towards 31 tunneling direction of tunnel in country rock with 60~90 ° of inclination angles.
S group ductule and q group ductule are the steel floral tube 52 of one end sealing, and the other end of steel floral tube 52 is equipped with screw thread 51, the sealed end of steel floral tube 52 is in coniform, for creeping into rock mass.The surrounding of steel floral tube 52 offers through-hole, is used for pulp.
It is also connected with water guide gate valve on the right side of aqueduct, for controlling the opening and closing of water flow.
Preferably, the liftoff spacing of aqueduct is not less than 300mm.
A kind of construction method of water conductive fault comprehensive treatment parallel construction system, construction method include the following steps:
Step 1, high pressure deep hole grouting:
Step 11, drill construction technique program is determined:
After drilling tool aperture drilling, tripping in first sleeve 11 → note dual slurry sealing → pressure-bearing pass the test → drilling tool super hole cutter After into, tripping in first sleeve 12 → note dual slurry sealing → pressure-bearing pass the test → drilling tool super hole cutter proceeds to projected depth → observation Water, hydraulic pressure and the water temperature in the whole hole of water outlet drilling.
Step 12, it tripping in first sleeve 11 and first sleeve 12 and is fixed:
6m, tripping in first sleeve 11 are crept into using Φ 168mm drill bit, note rapid hardening expansion hole sealing agent carries out sealing, cement slurry Ratio of mud 1:1, cement slurry and waterglass volume ratio 1:0.6.
12m, tripping in first sleeve 12 are crept into using Φ 127mm drill bit, note dual slurry carries out sealing, the cement slurry ratio of mud 1: 1, cement slurry and waterglass volume ratio 1:0.6.
Step 13, sealing inspection:
By the first sleeve 11 in step 12 and after 12 sealing of first sleeve 8 hours, first sleeve is done with high pressure slurry pump 11 and second set of pressure-bearing sealing quality examination, into first sleeve 11, water filling, aperture pressure are stablized 30 minutes up to 3Mpa, with aperture And the not permeable leak in periphery is qualification, otherwise again slip casting sealing until qualified.Into first sleeve 12, water filling, aperture pressure reach 5Mpa stablizes 30 minutes, is qualification with the not permeable leak in aperture and periphery, otherwise again slip casting sealing until qualified.First sleeve 12 After sealing passed examination, the voltage-controlled Water gate valve of 108mm high is installed with the drill bit C of Φ 75mm and is drilled into design hole depth.
Step 2, grouting with small pipe:
Step 21, ductule is chosen:
Ductule synchronous construction when deep hole grouting drilling is constructed in tunnel 31, ductule are not less than 1.5m, and material is 1 cun of Φ Steel floral tube 52, steel pipe exposed junction is threaded 51, surrounding should open up uniform through-hole.
Step 22, ductule is installed:
Two groups of ductules of s group ductule and q group ductule are staggeredly constructed in tunnel 31, and every group of spacing 4m can be according to scene Actual conditions arrangement group number, general arrangement group number should cover entire construction area.A, two groups of b each 9 holes, with 60~90 ° of inclination angles It is squeezed into country rock towards driving front.It squeezes into after country rock, slip casting can be carried out to ductule.
Step 23, aqueduct is installed:
Aqueduct is securely taken root on U-shaped canopy leg, so that the exposed 200mm of aqueduct, revealed section need welding flange, from Ground spacing is not less than 300mm, to install control Water gate valve.Installing for aqueduct is not limited to design position, according to practical water outlet It installs position.
Step 3, high pressure deep hole grouting and grouting with small pipe parallel construction:
While high pressure deep hole grouting, grouting with small pipe is constructed while being carried out.
According to a particular embodiment of the invention, in step 11, cement slurry and waterglass volume ratio are 1:1~1 in dual slurry: 0.6。
In step 12, the slip casting strengthening material of sealing is the water of P.O42.5 portland cement, water and 35~40 Baume degrees Glass.
In step 12, final grouting pressure 9MPa.
According to a particular embodiment of the invention, in step 22, in grouting with small pipe, grouting pressure is not less than 6MPa.
There are two aqueducts in step 23, and distance is 800mm between two pipes.
According to a particular embodiment of the invention, the present invention is controlled according to the geology and hydrogeological parameter of Tang Jia meeting mine The checking computations of range are managed, safe impermeable layer thickness calculation formula and 31 water-resisting floor of digging laneway are pacified as follows for the checking computations for the treatment of range Full water pressure calculation formula is as follows for the geology and hydrogeological parameter and 31 design parameter of tunnel, exploitation of Tang Jia meeting mine:
Safe impermeable layer thickness calculation formula:
The safe impermeable layer thickness of t-, m in formula;
31 baseplate width of the tunnel L-, L=5.5m;
The average severe of γ-water-resisting floor, γ=0.025MN/m3
KpThe average tensile strength of water-resisting floor, Kp=1.0MPa;
The head pressure that p- water-resisting floor is born, p=1.1MPa.
Calculate to obtain t=4.05m.
The safe hydraulic pressure of 31 water-resisting floor of digging laneway
In formula, the safe hydraulic pressure that p- water-resisting floor is able to bear, MPa;
T- impermeable layer thickness, t=12m;
31 width of the tunnel L-, L=5.5m;
The average severe of γ-water-resisting floor, 0.025MN/m3
KpThe average tensile strength of water-resisting floor, Kp=1.0MPa
Calculate to obtain p=9.82MPa.
When delimiting 31 border 12m reinforcing scope of tunnel, the minimum impermeable layer thickness between 31 bottom plate of tunnel and ash difficult to understand is about For 12m, it is much larger than safe impermeable layer thickness 4.05m;Working face Ordovician karst water pressure is up to 1.1MPa, is much smaller than safe hydraulic pressure 9.82MPa, therefore the treatment range delimited is reasonable.
Meanwhile the present invention also provides drilling construction parameter lists, it is as shown in table 1 below:
1 drilling construction parameter list of table
In short, the method that the present invention uses high pressure deep hole grouting and grouting with small pipe parallel construction, so that in high pressure deep hole Grouting with small pipe is synchronous while slip casting carries out;The method that high pressure deep hole grouting uses three-wheel slip casting simultaneously, ductule, which uses, to be divided The staggered construction method of group, so that water conductive fault is effectively administered.So that water conductive fault administer the tomography duration shorten, engineering Measure that less, expense is low, accuracy rate is high.
The above description is only a preferred embodiment of the present invention, is not intended to restrict the invention, for those skilled in the art For member, the invention may be variously modified and varied.All within the spirits and principles of the present invention, it is made it is any modification, Equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of slip casting aperture apparatus based on high pressure deep hole grouting, which is characterized in that the slip casting aperture apparatus includes,
First sleeve, the first sleeve are arranged in the rock stratum around tunnel;For providing positioning and support;
Second casing, the outer diameter of second casing are less than the internal diameter of the first sleeve;Second casing is arranged concentrically on In the first sleeve, injected hole is equipped in second casing;
Short tube, the short tube are connected to the left side of second casing, and the short tube is equipped with pressure gauge;
Plug, the plug are connected on the left of the short tube, and spherical cavity is equipped in the plug, is equipped in the spherical cavity Second sluice valve.
2. a kind of slip casting aperture apparatus based on high pressure deep hole grouting as described in claim 1, which is characterized in that the first set Pipe and second casing are circumferentially distributed multiple through-holes, flow out out of casing for slurries, form the entirety of sealing.
3. a kind of slip casting aperture apparatus based on high pressure deep hole grouting as described in claim 1, which is characterized in that described second set The length of pipe is greater than the length of the first sleeve, and the first sleeve is concordant with the left end of second casing to be arranged;It is described The mortar of same thickness is equipped between first sleeve and second casing, between second casing and the injected hole Layer.
4. a kind of slip casting aperture apparatus based on high pressure deep hole grouting as described in claim 1, which is characterized in that the first set Pipe left end is connected with first flange, and second casing left end is connected with second flange, and the right end of the short tube is connected with third Flange;The first flange, the second flange and third flange abutting link together;The second flange is located at institute It states between first flange and the third flange;
Preferably, the internal diameter of the short tube is identical as the internal diameter of second casing.
5. a kind of slip casting aperture apparatus based on high pressure deep hole grouting as described in claim 1, which is characterized in that outside the short tube Wall connection is equipped with pressure-measuring pipe, is equipped with the first gate valve in the pressure-measuring pipe, the pressure-measuring pipe upper end is connected with pressure gauge;Described first Gate valve is for being connected to the pressure gauge and the short tube.
6. a kind of slip casting aperture apparatus based on high pressure deep hole grouting as described in claim 1, which is characterized in that the injected hole There are three groups, respectively first group of injected hole, second group of injected hole and third group injected hole;Injected hole described in each group is along construction The surrounding in tunnel is uniformly distributed, and first group of injected hole is identical as the third group injected hole distribution mode, and with described Two groups of distribution mode is different;
Preferably, first group of injected hole and third group injected hole and center line in roadway angle are 11~25 °, hole depth is 43~ 56m;
More preferably, second group of injected hole and center line in roadway angle are 15~22 °, and hole depth is 57~62m.
7. a kind of construction method of the slip casting aperture apparatus based on high pressure deep hole grouting as described in claim 1~6 is any, special Sign is that the construction method includes the following steps:
Step 1 determines drill construction technique program:
Drilling tool aperture drilling and tripping in first sleeve → note dual slurry sealing → pressure-bearing pass the test after → drilling tool aperture drilling simultaneously After the second casing of tripping in → note dual slurry sealing → pressure-bearing pass the test → drilling tool super hole cutter proceeds to the water outlet of projected depth → observation Water, hydraulic pressure and the water temperature in the whole hole of drilling;
Step 2, tripping in first sleeve and the second casing are simultaneously fixed:
It is first crept into forward using drill bit A, then tripping in first sleeve, then infuses rapid hardening expansion hole sealing agent and carry out sealing;
It is first crept into forward using drill bit B, then the second casing of tripping in, note dual slurry carries out sealing;
Step 3, sealing inspection:
After first sleeve and the second casing sealing in step 2, using high pressure slurry pump respectively to first sleeve and the second casing Sealing quality examination is carried out, then is crept into drill bit C.
8. the construction method of the slip casting aperture apparatus based on high pressure deep hole grouting as claimed in claim 7, which is characterized in that described In step 1, cement slurry and waterglass volume ratio are 1:1~1:0.6 in the dual slurry.
9. the construction method of the slip casting aperture apparatus based on high pressure deep hole grouting as claimed in claim 7, which is characterized in that described In step 2, the slip casting strengthening material of sealing is the waterglass of P.O42.5 portland cement, water and 35~40 Baume degrees;
The drill bit A uses the drill bit of Φ 168mm, and the distance crept into forward is 6m;
The drill bit B uses the drill bit of Φ 127mm, and the distance crept into forward is 12m;
Cement slurry ratio of mud 1:1 in double slurries, cement slurry and waterglass volume ratio 1:0.6.
10. the construction method of the slip casting aperture apparatus based on high pressure deep hole grouting as claimed in claim 7, which is characterized in that institute It states in step 2, final grouting pressure 9MPa.
CN201811155700.2A 2018-09-30 2018-09-30 Grouting hole device based on high-pressure deep hole grouting and construction method Active CN109139052B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811155700.2A CN109139052B (en) 2018-09-30 2018-09-30 Grouting hole device based on high-pressure deep hole grouting and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811155700.2A CN109139052B (en) 2018-09-30 2018-09-30 Grouting hole device based on high-pressure deep hole grouting and construction method

Publications (2)

Publication Number Publication Date
CN109139052A true CN109139052A (en) 2019-01-04
CN109139052B CN109139052B (en) 2023-12-15

Family

ID=64814043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811155700.2A Active CN109139052B (en) 2018-09-30 2018-09-30 Grouting hole device based on high-pressure deep hole grouting and construction method

Country Status (1)

Country Link
CN (1) CN109139052B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109681240A (en) * 2019-01-30 2019-04-26 中铁二院工程集团有限责任公司 Tunnel-liner water pressure monitoring system osmometer mounting device and installation method
CN109973098A (en) * 2019-01-08 2019-07-05 中铁二院工程集团有限责任公司 A kind of goaf grouting reinforcing caving zone drilling construction method
CN110424973A (en) * 2019-07-30 2019-11-08 济南重工股份有限公司 A kind of balancing earth-pressure shielding machine deslagging water system and its installation method
CN110454200A (en) * 2019-09-06 2019-11-15 贵州桥梁建设集团有限责任公司 A kind of double-walled grouting with small pipe device and its construction method
CN111894513A (en) * 2020-08-05 2020-11-06 淮南矿业(集团)有限责任公司 Underground layering reinforcing method for badly-closed drill hole
CN112195908A (en) * 2020-10-12 2021-01-08 湖南捷和建筑工程有限公司 Foundation drilling and grouting reinforcement method suitable for construction in narrow space
CN113404512A (en) * 2021-07-05 2021-09-17 淮北市平远软岩支护工程技术有限公司 Roadway construction method for fault fracture zone containing water

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH459900A (en) * 1966-07-07 1968-07-15 Atlas Copco Ab Method for producing a tie rod in the ground, and device for carrying out the method
CN102080552A (en) * 2010-12-14 2011-06-01 山东大学 Underground double liquid grouting process and underground double liquid grouting machine thereof
CN106014201A (en) * 2016-07-12 2016-10-12 山东大学 Process for safely constructing release hole outside grouting curtain of tunnel
CN207177933U (en) * 2016-11-23 2018-04-03 中国电建集团华东勘测设计研究院有限公司 A kind of advanced plugging structure of high-pressure high-flow underground water
CN209195430U (en) * 2018-09-30 2019-08-02 淮矿西部煤矿投资管理有限公司 A kind of slip casting aperture apparatus based on high pressure deep hole grouting

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH459900A (en) * 1966-07-07 1968-07-15 Atlas Copco Ab Method for producing a tie rod in the ground, and device for carrying out the method
CN102080552A (en) * 2010-12-14 2011-06-01 山东大学 Underground double liquid grouting process and underground double liquid grouting machine thereof
CN106014201A (en) * 2016-07-12 2016-10-12 山东大学 Process for safely constructing release hole outside grouting curtain of tunnel
CN207177933U (en) * 2016-11-23 2018-04-03 中国电建集团华东勘测设计研究院有限公司 A kind of advanced plugging structure of high-pressure high-flow underground water
CN209195430U (en) * 2018-09-30 2019-08-02 淮矿西部煤矿投资管理有限公司 A kind of slip casting aperture apparatus based on high pressure deep hole grouting

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109973098A (en) * 2019-01-08 2019-07-05 中铁二院工程集团有限责任公司 A kind of goaf grouting reinforcing caving zone drilling construction method
CN109681240A (en) * 2019-01-30 2019-04-26 中铁二院工程集团有限责任公司 Tunnel-liner water pressure monitoring system osmometer mounting device and installation method
CN109681240B (en) * 2019-01-30 2024-03-12 中铁二院工程集团有限责任公司 Device and method for installing osmometer of tunnel lining water pressure monitoring system
CN110424973A (en) * 2019-07-30 2019-11-08 济南重工股份有限公司 A kind of balancing earth-pressure shielding machine deslagging water system and its installation method
CN110454200A (en) * 2019-09-06 2019-11-15 贵州桥梁建设集团有限责任公司 A kind of double-walled grouting with small pipe device and its construction method
CN111894513A (en) * 2020-08-05 2020-11-06 淮南矿业(集团)有限责任公司 Underground layering reinforcing method for badly-closed drill hole
CN112195908A (en) * 2020-10-12 2021-01-08 湖南捷和建筑工程有限公司 Foundation drilling and grouting reinforcement method suitable for construction in narrow space
CN113404512A (en) * 2021-07-05 2021-09-17 淮北市平远软岩支护工程技术有限公司 Roadway construction method for fault fracture zone containing water

Also Published As

Publication number Publication date
CN109139052B (en) 2023-12-15

Similar Documents

Publication Publication Date Title
CN109139052A (en) A kind of slip casting aperture apparatus and construction method based on high pressure deep hole grouting
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN107288657B (en) The weak cementing rock mass seepage failure area slip casting integrated control method of top of underground
CN103510964B (en) A kind of method when using shield formula TBM to construct to beans gravel rockfill grouting
CN106014201B (en) A kind of outer release hole safe construction technique of tunnel grouting curtain
CN107389898A (en) Dynamic current Flooding in Borehole consolidation grouting Diffusion Law visual Simulation experimental provision and method
CN106703692A (en) Method using surface orientation bedding drilling grouting to reinforce laminar limestone
CN107060834A (en) Grout injection control technique is oozed in drainage slowly under back rich water broken condition
CN101525881B (en) Structure of karst strata pile holes protecting wall and method for constructing pile holes
CN103603689A (en) Curtain grouting construction method for treating mined-out areas
CN104790419B (en) A kind of dewatering construction method suitable for rich water mobile sand layer tunnel
CN103334770A (en) Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN105888673B (en) The operating method of deep hole modeling pipe high-pressure slip-casting explosion-protection equipment in soft rich water country rock
CN106761852A (en) Wide area coal petrography deep hole pressure-bearing microexplosion grouting water blocking method under water
CN107119669A (en) For shield, the pre-pouring grout consolidated subsoil method in house is worn in side in water-rich sand layer
CN105863648B (en) A kind of tunneling is shallow to cover large-section tunnel construction method
CN108915736A (en) The water damage control method of digging laneway under the strong weak cementing water-bearing layer of rich water
CN104373128A (en) Advance precipitation construction method of oversized-section double-side lower pilot tunnels of water-rich tunnel
CN105909259B (en) Existing shield tunnel pipe curtain construction settlement control system and method are closely worn down
CN109322699A (en) Pollution isolation blocking technology under a kind of mine
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN106320354A (en) Anti-seepage construction method for karst cave development stratum under overburden
CN105909265B (en) Pass through the anti-protuberance retrusive deep hole grouting system and method for existing shield tunnel
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant