CN103334770A CN2013102300398A CN201310230039A CN103334770A CN 103334770 A CN103334770 A CN 103334770A CN 2013102300398 A CN2013102300398 A CN 2013102300398A CN 201310230039 A CN201310230039 A CN 201310230039A CN 103334770 A CN103334770 A CN 103334770A
Authority
CN
China
Prior art keywords
hole
slip casting
water
grouting
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102300398A
Other languages
Chinese (zh)
Other versions
CN103334770B (en
Inventor
黄金光
高广义
徐海庭
魏文杰
焦亮
孙国庆
金强国
邓川
石曲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN201310230039.8A priority Critical patent/CN103334770B/en
Publication of CN103334770A publication Critical patent/CN103334770A/en
Application granted granted Critical
Publication of CN103334770B publication Critical patent/CN103334770B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels, and relates to a tunnel construction method. The method has the following steps: adopting leading slip casting to reduce the tunnel water inflow, relieve the tunnel counter-slope draining pressure, and avoid the tunnel well flooding accidents; then drilling appropriately to drain to reduce the water pressure at the back of surrounding rocks, guarantee the tunnel structure and the construction safety, reduce the construction work amount and the work difficulty, control the slip casting quality better, reduce the extra inputting of drainage facilities, enable the economic effect to be more obvious, meanwhile reduce the mass groundwater loss caused by the tunnel construction and the damage to the environment due to the water bursting and discharging in the construction, and protect the ecological environment.

Description

A kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up
[technical field]
The present invention relates to a kind of method for tunnel construction, relate in particular to a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up.
[background technology]
Known, be directed to the rich water zone of fracture construction of the counter-slope tunnel ultra high water pressure of growing up at present, adopt the method for full section curtain-grouting water reinforcement and direct draining usually, excavate a hole that sluices from tunnel-side and divide construction technologies such as water step-down grouting behind shaft or drift lining water blockage method; And have at the subject matter of hydraulic pressure above the rich water tunnel construction existence of 6.3Mpa: 1, traditional curtain-grouting carries out shutoff with crack, super-pressure stratum, pressure is focused on outside the surrounding rock consolidation circle, tunnel structure will bear 6.3Mpa with upward pressure, structural stability can't ensure, and under so high water pressure, directly carry out the water blockoff mortar depositing construction and still belong to the first time, no successful experience is used for reference; 2, directly drainage passes through, the rich water section in tunnel is in the counter-slope location, drainage distance is long, the tunnel internal drainage is limited in one's ability, carry out the water yield for a long time and discharge water, the stratum water yield and hydraulic pressure do not have the decay sign, and take the directly mode of sluicing, the tunnel water yield will significantly surpass drainability, will cause the tunnel to flood well extremely easily; 3, divide water step-down grouting behind shaft or drift lining method from a tunnel-side excavation hole that sluices, because of hydraulic pressure up to 6.3Mpa, an excavation hole sluicing grouting behind shaft or drift lining slurries run off serious from a hole, can't guarantee the effect of slip casting.
[summary of the invention]
In order to overcome the deficiency of above-mentioned technology, the invention provides a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, the present invention takes pre-grouting to reduce the tunnel water yield, alleviates tunnel counter-slope discharge pressure, avoids the tunnel to flood the well accident and takes place; The suitable draining of holing then reduces country rock hydraulic pressure behind, guarantees tunnel structure and construction safety.
For realizing aforesaid goal of the invention, the present invention adopts technical scheme as described below:
A kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, described method specifically comprises the steps:
The first step, determine wall for grouting thickness and form, take full advantage of excavation in the construction and reserve laccolite, allow the two resist the effect of stratum hydraulic pressure, maximum grouting pressure jointly, being chosen in first section simultaneously lays injected hole the grouting mode of full section grouting and reinforcing is carried out slip casting, wall for grouting is arranged on and satisfies large type drill operation and require section on the high tunnel of 4m, and II~III level country rock wall for grouting thickness is 3m, and IV~V level country rock wall for grouting thickness is 4m;
Second step, carry out advance geologic prediction earlier before connecting step slip casting, adopt advance borehole to survey the front of tunnel heading strata condition, geological condition according to leading inspecting hole detection, face is carried out the subregion location, face cloth hole scope is divided into weak pool, base region and strong pool (weak pool water yield Q≤10m3/h, the base region water yield 10<Q≤30 m3/h, strong pool water yield Q>30 m3h); According to subregion water yield and geological condition, determine grouting and reinforcing circle and the spacing of wells then;
The 3rd step, connecting the step fixing collar determines according to the rock crusher degree of advance geologic drilling detecting, face is laid the whole hole of 5 circle slip castings, the whole hole of A circle injected hole is at 8m reinforcing scope external reinforcement circle, the whole hole of B circle slip casting is at 5m reinforcing scope external reinforcement circle, the whole hole of C circle slip casting is at 2m reinforcing scope external reinforcement circle, whole pitch of holes≤the 3.75mm of slip casting, wherein the whole hole of A circle injected hole is optimized choosing according to hole water burst and geological condition and does (joints development, breaking surrounding rock), suitably adjust slip casting eyelet step pitch for strong pool according to actual conditions, replenish and set up eyelet reinforcement slip casting; According to actual conditions, suitably reduce injected hole quantity in the construction of base region; Weak pool increases the boring step pitch, reduces the boring amount; During every circulation (containing wall for grouting, long 30m) excavation, determine to reserve 5~8m as ending the magmatic rock dish according to slip casting effect, wall rock condition;
The 4th step connected step and lays spilled water hole at face, and the grouting and reinforcing circle is avoided in the spilled water hole construction, and the perforate mileage is arranged on face rear 5~10m scope, and whole hole is positioned at the outer 2m of fixing collar scope;
The 5th step connected step face is implemented slip casting, during slip casting, adopted the slip casting local to divide, and the diagonal angle sluices and guides grouting mode, strengthens slip casting, spilled water hole space length; When the string slurry appears in spilled water hole, when being lower than ordinary Portland cement water glass biliquid slurry (C-S slurry) setting strength as if grouting pressure, adopt C-S slurry shutoff string slurry; After grouting pressure is higher than C-S slurry setting strength, and string slurry amount was carried out top water slip casting above 50% o'clock of injection rate by closing spilled water hole; Slip casting is opened spilled water hole immediately, as spilled water hole occurred by slip casting shutoff situation after finishing, and heavily sweeps spilled water hole immediately, descends the step mortar depositing construction again;
The 6th step connected after the step grouting with plunger finishes, and the drainage and step-down of holing is implemented tunnel excavation then.
The described a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, described advance borehole number is not less than 6.
The described a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, described wall for grouting adopts high performance concrete material to build.
The described a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, described spilled water hole respectively is provided with one on four jiaos on face respectively, be respectively upper right spilled water hole, bottom right spilled water hole, upper left spilled water hole, lower-left spilled water hole, be provided with tapping pipe in the spilled water hole, tapping pipe is provided with valve.
The described a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, described slip casting local is divided slip casting zone, upper left position, slip casting zone, position, lower-left, slip casting zone, position, bottom right, slip casting zone, upper right position.
The described a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, the average maximum suction slurry amount of described spilled water hole single hole is 20 m 3
Adopt aforesaid technical scheme, the present invention has superiority as described below:
A kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up of the present invention takes pre-grouting to reduce the tunnel water yield, alleviates tunnel counter-slope discharge pressure, avoids the tunnel to flood the well accident and takes place; The suitable draining of holing then reduces country rock hydraulic pressure behind, guarantees tunnel structure and construction safety; A kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up of the present invention has following beneficial effect:
1, spilled water hole and injected hole are arranged in the same working space, comparing the tradition employing sluices separately from a tunnel-side excavation sluicing hole, reduce construction operation engineering quantity and task difficulty, can grasp the slip casting situation in real time in the work progress, can control grouting quality preferably.
2, by pre-grouting, reduce the tunnel water yield, under the prerequisite that is no more than tunnel counter-slope drainability, by bore bleeder water, reduced country rock water burst pressure behind after slip casting is finished, guaranteed safety for tunnel engineering;
3, compare direct drainage and construction method; under the existing drainability in the counter-slope tunnel of growing up, just can directly construct; reduced the extra input of drainage; economic benefit is obvious; having reduced the tunnel simultaneously builds and causes underground water to run off in a large number; the discharging of construction water burst has been protected local ecological environment to environment damage.
[description of drawings]
Fig. 1 is side structure schematic diagram of the present invention;
Fig. 2 is the structural representation of face of the present invention;
In the drawings: 1, connect a batch reinforcing bar; 2, wall for grouting; 3, aqueduct; 4, gutter; 5, job platform; 6, upper right spilled water hole; 7, bottom right spilled water hole; 8, upper left spilled water hole; 9, lower-left spilled water hole; 10, slip casting zone, upper right position; 11, position, bottom right slip casting zone; 12, slip casting zone, upper left position; 13, position, lower-left slip casting zone; 14,8m reinforcing scope external reinforcement circle; 15,5m reinforcing scope external reinforcement circle.
[specific embodiment]
Can explain the present invention in more detail by the following examples, the present invention is not limited to the following examples;
1 ~ 2 described a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up by reference to the accompanying drawings, described method specifically comprises the steps:
The first step, determine wall for grouting 2 thickness and form, take full advantage of excavation in the construction and reserve laccolite, allow the two resist the effect of stratum hydraulic pressure, maximum grouting pressure jointly, being chosen in first section simultaneously lays injected hole the grouting mode of full section grouting and reinforcing is carried out slip casting, wall for grouting 2 is arranged on and satisfies large type drill operation and require section on the high tunnel of 4m, and II~III level country rock wall for grouting thickness is 3m, and IV~V level country rock wall for grouting 2 thickness are 4m;
Second step, carry out advance geologic prediction earlier before connecting step slip casting, adopt advance borehole to survey the front of tunnel heading strata condition, geological condition according to leading inspecting hole detection, face is carried out the subregion location, face cloth hole scope is divided into weak pool, base region and strong pool (weak pool water yield Q≤10m3/h, the base region water yield 10<Q≤30 m3/h, strong pool water yield Q>30 m3h); According to subregion water yield and geological condition, determine grouting and reinforcing circle and the spacing of wells then;
The 3rd step, connecting the step fixing collar determines according to the rock crusher degree of advance geologic drilling detecting, face is laid the whole hole of 5 circle slip castings, the whole hole of A circle injected hole is at 8m reinforcing scope external reinforcement circle 14, the whole hole of B circle slip casting is at 5m reinforcing scope external reinforcement circle 15, the whole hole of C circle slip casting is at 2m reinforcing scope external reinforcement circle, whole pitch of holes≤the 3.75mm of slip casting, wherein the whole hole of A circle injected hole is optimized choosing according to hole water burst and geological condition and does (joints development, breaking surrounding rock), suitably adjust slip casting eyelet step pitch for strong pool according to actual conditions, replenish and set up eyelet reinforcement slip casting; According to actual conditions, suitably reduce injected hole quantity in the construction of base region; Weak pool increases the boring step pitch, reduces the boring amount; During every circulation (containing wall for grouting, long 30m) excavation, determine to reserve 5~8m as ending the magmatic rock dish according to slip casting effect, wall rock condition;
The 4th step connected step and lays spilled water hole at face, and the grouting and reinforcing circle is avoided in the spilled water hole construction, and the perforate mileage is arranged on face rear 5~10m scope, and whole hole is positioned at the outer 2m of fixing collar scope;
The 5th step connected step face is implemented slip casting, during slip casting, adopted the slip casting local to divide, and the diagonal angle sluices and guides grouting mode, strengthens slip casting, spilled water hole space length; When the string slurry appears in spilled water hole, when being lower than ordinary Portland cement water glass biliquid slurry (C-S slurry) setting strength as if grouting pressure, adopt C-S slurry shutoff string slurry; After grouting pressure is higher than C-S slurry setting strength, and string slurry amount was carried out top water slip casting above 50% o'clock of injection rate by closing spilled water hole; Slip casting is opened spilled water hole immediately, as spilled water hole occurred by slip casting shutoff situation after finishing, and heavily sweeps spilled water hole immediately, descends the step mortar depositing construction again;
The 6th step connected after the step grouting with plunger finishes, and the drainage and step-down of holing is implemented tunnel excavation then.
The described a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, described advance borehole number is not less than 6.
The described a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, described wall for grouting adopts high performance concrete material to build.
The described a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, described spilled water hole respectively is provided with one on four jiaos on face respectively, be respectively upper right spilled water hole 6, bottom right spilled water hole 7, upper left spilled water hole 8, lower-left spilled water hole 9, be provided with tapping pipe in the spilled water hole, tapping pipe is provided with valve.
The described a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, described slip casting local is divided slip casting zone, upper left position 12, slip casting zone, position, lower-left 13, slip casting zone, position, bottom right 11, slip casting zone, upper right position 10.
The described a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, the average maximum suction slurry amount of described spilled water hole single hole is 20 m 3
Embodiment 1: Tianshan Mountains tunnel tunnel face DyK154+901 is positioned at the diorite location for high-pressure water-enriched section in the South Sinkiang Railway Tu Ku two wires, underground water electrode is grown, groundwater type is mainly lithology contact zones intermediary water, tax is stored in joint dense band, the wide tension joint, being ribbon distributes, influenced by geological conditions, structural environment, buried depth etc., underground water has that supply is abundant, hydraulic pressure is high, the water yield is big, sudden strong, characteristics such as decay is slow, the highest hydraulic pressure of actual measurement is predicted normal water yield 1.6 ten thousand m of prominent water burst section up to 6.3MPa 3/ d, maximum flooding quantity 3.2 ten thousand m that may occur 3/ d brings serious threat to safety for tunnel engineering, and on-the-spot is that example is constructed with 1 circulation in III level country rock location, and the concrete grammar of enforcement is:
1, wall for grouting construction:
When 1. excavation is near the precalculated position, according to the situation of leading big gun hole and excavation face, select reasonable wall for grouting 2 to perform the position, wall for grouting arranges thickness 3m, selects the anhydrous and less position of water burst in the construction, during if any water burst, aqueduct 3 then is set, concentrates ejectment to guarantee the quality of concreting.
2. stable for wall for grouting 2 expands wall for grouting 2 bottoms and digs 50cm, makes wall for grouting 2 embed basement rock.
3. install and connect batch reinforcing bar 1, adopt 2 row's circumferential distance 1.5m along wall for grouting 2 peripheries, array pitch 1.0 m, the Φ 25mm grouting rock bolt of long 2m embeds country rock 1m.
4. perform the long Φ 42mm conduit of peripheral pre-buried 1.5m in the process, behind wall for grouting 2 casting completes, carry out slip casting by conduit the crack between wall for grouting 2 and supporting is just sealed.
5. treat that concrete strength reaches 75% of design strength and begins later the mortar depositing construction of holing.
2, advance geologic inspecting hole
By leading inspecting hole, face is carried out " subregion location ", face cloth hole scope is divided into weak pool, base region and strong pool (weak pool water yield Q≤10m3/h, the base region water yield 10<Q≤30 m3/h, strong pool water yield Q>30 m3/h); According to subregion water yield and geological condition, determine rational grouting and reinforcing scope and the spacing of wells targetedly then.
3, be drilled with the slip casting spilled water hole
Before the slip casting, respectively be provided with a spilled water hole on four jiaos on face, be respectively upper right spilled water hole 6, bottom right spilled water hole 7, upper left spilled water hole 8, lower-left spilled water hole 9, the sealing valve is installed on the spilled water hole mouth of pipe, for reducing the interference in the construction, the grouting and reinforcing circle is avoided in the spilled water hole construction, and the perforate mileage is arranged on face rear 10m, and the perforate mileage is determined according to execution conditions in the scene; Whole hole is positioned at the outer 2m of fixing collar scope, closes the sealing valve after boring is finished.
4, grouting parameter: every circulation longitudinal reinforcement length 30m(contains wall for grouting 2), grout spreading range, transversely strengthening scope 8m, grout spreading range 2.5m, injection speed 5~110 L/min, final grouting pressure 6~8MPa, whole pitch of holes≤3.75m, grouting mode takes the protrusive segmenting slip casting in conjunction with hole-bottom slurry-injection, and injecting paste material adopts based on ordinary Portland cement list liquid slurry (being called for short the C slurry), joins and than W:C=(0.6~1): 1, ordinary Portland cement-water glass biliquid slurry (being called for short the C-S slurry) is auxilliary, join and than W:C=(0.8~1): 1, volume ratio C:S=1:(1~0.3), concentration of sodium silicate 30~35Be '.
5, slip casting is implemented in the subregion
Adopt the principle of " the slip casting local is divided, diagonal angle sluicing step-down ", when 12 slurries are annotated in slip casting zone in upper left position, open position, bottom right spilled water hole 7 hole and sluice; During to 13 slip castings of position, lower-left slip casting zone, open position, upper right spilled water hole 6 hole and sluice; During to 10 slip castings of upper right position slip casting zone, open position, lower-left spilled water hole 9 hole and sluice; During to 11 slip castings of position, bottom right slip casting zone, open position, upper left spilled water hole 8 hole and sluice, so hocket, the subregion grouting process is as follows:
1. measure unwrapping wire: make tunnel center line and normal, be arranged on the wall for grouting 2 according to scheme mesopore position and mark bore position with nailing, after rig is in place, measure the drilling rod direction, guarantee that the control of boring three-dimensional position matches substantially with design, guarantees grouting quality.
2. earlier open dark 2.8m with rig on job platform 5, the long Φ 108mm of fixed 3m orifice tube is installed in the boring of diameter of phi 130mm.
3. be drilled with Φ 90mm injected hole by orifice tube, get into 5m and come into effect the slip casting operation when dark.
4. according to the actual conditions in high-pressure water-enriched location, take the protrusive segmenting slip casting technology mortar depositing construction of holing, slip casting section length 5 ~ 10m.
5. do not run into more prominent water burst during section length if reach design in the boring procedure, then stop boring immediately and carry out slip casting.
When occurring the string slurry in the 6. slip casting process, when grouting pressure is lower than biliquid slurry setting strength, adopt biliquid slurry shutoff string slurry; Grouting pressure carries out top water slip casting by closing spilled water hole after being higher than biliquid slurry setting strength, and grouting pressure finishes slip casting after reaching design standard.
6, slip casting effect inspection and evaluation
The scene mainly checks analysis to stratum percolating water ability after the slip casting, determine that single hole water yield standard comes slip casting effect is evaluated, the weak link of selecting in the practice to occur is carried out borehole inspection, inspection eye quantity is 10% of injected hole, emphasis checks abnormal area, and inspection eye has or not the hole of collapsing, gushes mud; At high-pressure water-enriched joint, tunnel, middle Tianshan Mountains dense band technological characteristics of construction, to be drilled with spilled water hole after the slip casting and carry out drainage and step-down, the effect of slip casting is mainly shutoff water outlet crack, reduces water yield, allows a certain amount of infiltration in the digging process under safing situation; In conjunction with the tunnel counter-slope drainability of growing up, by reasonable analysis, namely reach slip casting effect in inspection eye water yield≤2.5 L/minm; For reducing the inlet well time, for the more complete relatively location of country rock, indivedual inspection eye water yields allow control in 5L/minm.On-the-spot inspection eye water yield after the circulation slip casting is measured, all less than 5L/m.min, satisfied the excavation requirement in the water yield of the whole hole of each inspection eye, and it is fast to be drilled with in the process drilling speed at inspection eye, no bit freezing phenomenon reaches the requirement of inspection effect standard.
Each section of table 1 inspection eye water outlet situation
7, slip casting finishes back bore bleeder water step-down
After slip casting is finished, be drilled with two spilled water hole draining pressure releases (left and right side is respectively established 1) at face rear 10m, relief hole longitudinal length consistent with slip casting length (30m), whole hole is positioned at the outer 2m of grouting and reinforcing scope; Prevent that country rock bears high hydraulic pressure behind in the range of grouting, the security risk when reducing excavation, relief hole is installed orifice tube and gate valve control displacement, install in the pressure release aperture simultaneously flexible pipe with draining through gutter 4 ejectments to interim sump.
8, slip casting section country rock excavation, supporting
Digging mode adopts upper and lower benching tunnelling method construction, the C25 concrete is sprayed in preliminary bracing, thick 23cm installs blind pipe during concrete in spray, and percolating water is concentrated by 4 carrying out ejectment through the gutter, arch 120 degree scopes are established φ 25 hollow bolts, abutment wall is established φ 22 grouting rock bolts, spacing 1.2m * 1m, length 2m, the tunnel loopful is installed I16 shaped steel arch, and the frame spacing is 1m.
Reduce the disturbance to country rock in the construction as far as possible, strengthen smooth blasting moulding control, guarantee slip casting laccolite hydraulic pressure resistance ability, guarantee construction safety, every cyclic advance control is in 2.0m, and excavation back face slurries spread condition is seen, country rock discloses the back and shows, all penetrating passages in the country rock are all effectively filled by slurries, and face has local crevice water seepage phenomenon, total yield 13 m 3About/h, water yield obviously reduces before than slip casting, can guarantee construction safety, produces a desired effect.
Part not in the detailed description of the invention is prior art.
The embodiment that selects for use in this article in order to disclose purpose of the present invention currently thinks to suit, and still, will be appreciated that the present invention is intended to comprise that all belong to all changes and the improvement of the embodiment in this design and the invention scope.

Claims (6)

1. the rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up, it is characterized in that: described method specifically comprises the steps:
The first step, determine wall for grouting (2) thickness and form, take full advantage of excavation in the construction and reserve laccolite, allow the two resist the effect of stratum hydraulic pressure, maximum grouting pressure jointly, being chosen in first section simultaneously lays injected hole the grouting mode of full section grouting and reinforcing is carried out slip casting, wall for grouting (2) is arranged on and satisfies large type drill operation and require section on the high tunnel of 4m, and II~III level country rock wall for grouting thickness is 3m, and IV~V level country rock wall for grouting (2) thickness is 4m;
Second step, carry out advance geologic prediction earlier before connecting step slip casting, adopt advance borehole to survey the front of tunnel heading strata condition, geological condition according to leading inspecting hole detection, face is carried out the subregion location, face cloth hole scope is divided into weak pool, base region and strong pool (weak pool water yield Q≤10m3/h, the base region water yield 10<Q≤30 m3/h, strong pool water yield Q>30 m3h); According to subregion water yield and geological condition, determine grouting and reinforcing circle and the spacing of wells then;
The 3rd step, connecting the step fixing collar determines according to the rock crusher degree of advance geologic drilling detecting, face is laid the whole hole of 5 circle slip castings, the whole hole of A circle injected hole is at 8m reinforcing scope external reinforcement circle (14), the whole hole of B circle slip casting is at 5m reinforcing scope external reinforcement circle (15), the whole hole of C circle slip casting is at 2m reinforcing scope external reinforcement circle, whole pitch of holes≤the 3.75mm of slip casting, wherein the whole hole of A circle injected hole is optimized choosing according to hole water burst and geological condition and does (joints development, breaking surrounding rock), suitably adjust slip casting eyelet step pitch for strong pool according to actual conditions, replenish and set up eyelet reinforcement slip casting; According to actual conditions, suitably reduce injected hole quantity in the construction of base region; Weak pool increases the boring step pitch, reduces the boring amount; During every circulation (containing wall for grouting, long 30m) excavation, determine to reserve 5~8m as ending the magmatic rock dish according to slip casting effect, wall rock condition;
The 4th step connected step and lays spilled water hole at face, and the grouting and reinforcing circle is avoided in the spilled water hole construction, and the perforate mileage is arranged on face rear 5~10m scope, and whole hole is positioned at the outer 2m of fixing collar scope;
The 5th step connected step face is implemented slip casting, during slip casting, adopted the slip casting local to divide, and the diagonal angle sluices and guides grouting mode, strengthens slip casting, spilled water hole space length; When the string slurry appears in spilled water hole, when being lower than ordinary Portland cement water glass biliquid slurry (C-S slurry) setting strength as if grouting pressure, adopt C-S slurry shutoff string slurry; After grouting pressure is higher than C-S slurry setting strength, and string slurry amount was carried out top water slip casting above 50% o'clock of injection rate by closing spilled water hole; Slip casting is opened spilled water hole immediately, as spilled water hole occurred by slip casting shutoff situation after finishing, and heavily sweeps spilled water hole immediately, descends the step mortar depositing construction again;
The 6th step connected after the step grouting with plunger finishes, and the drainage and step-down of holing is implemented tunnel excavation then.
2. a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up according to claim 1, it is characterized in that: described advance borehole number is not less than 6.
3. a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up according to claim 1, it is characterized in that: described wall for grouting (2) adopts high performance concrete material to build.
4. a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up according to claim 1, it is characterized in that: described spilled water hole respectively is provided with one on four jiaos on face respectively, be respectively upper right spilled water hole (6), bottom right spilled water hole (7), upper left spilled water hole (8), lower-left spilled water hole (9), be provided with tapping pipe in the spilled water hole, tapping pipe is provided with valve.
5. a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up according to claim 1, it is characterized in that: described slip casting local is divided slip casting zone, upper left position (12), slip casting zone, position, lower-left (13), slip casting zone, position, bottom right (11), slip casting zone, upper right position (10).
6. a kind of rich water zone of fracture of counter-slope tunnel ultra high water pressure job practices of growing up according to claim 1 is characterized in that: described spilled water hole single hole is average, and maximum to inhale the slurry amount be 20 m 3
CN201310230039.8A 2013-06-09 2013-06-09 One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method Active CN103334770B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310230039.8A CN103334770B (en) 2013-06-09 2013-06-09 One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310230039.8A CN103334770B (en) 2013-06-09 2013-06-09 One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method

Publications (2)

Publication Number Publication Date
CN103334770A true CN103334770A (en) 2013-10-02
CN103334770B CN103334770B (en) 2015-08-12

Family

ID=49242973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310230039.8A Active CN103334770B (en) 2013-06-09 2013-06-09 One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method

Country Status (1)

Country Link
CN (1) CN103334770B (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628916A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Excavation construction method of high-pressure water gushing tunnel
CN103742191A (en) * 2014-01-24 2014-04-23 中铁第一勘察设计院集团有限公司 Water-rich tunnel pilot long-distance large-diameter precipitation channel and construction method thereof
CN103982201A (en) * 2014-05-22 2014-08-13 北京中铁瑞威工程检测有限责任公司 Advanced detection, grouting reinforcement and excavation method of wide separation fracture of high-pressure water-rich tunnel
CN105781614A (en) * 2016-04-29 2016-07-20 广东华路交通科技有限公司 Novel visual operation highway tunnel side wall foot drainage system
CN106224001A (en) * 2016-09-21 2016-12-14 中国水利水电第十四工程局有限公司 Special protection device and preparation method is encircleed at the bottom of a kind of big cross section circular tunnel flow-passing surface
CN106436727A (en) * 2016-09-27 2017-02-22 中铁五局集团有限公司 Extreme geological tunnel portal construction method
CN107060821A (en) * 2017-03-24 2017-08-18 中铁十六局集团第五工程有限公司 A kind of many lithology method for protecting support of face
CN108590715A (en) * 2018-03-22 2018-09-28 重庆建工第七建筑工程有限责任公司 A kind of reserved laccolite tunneling boring radial grouting construction method in prominent water burst tunnel of tunneling
CN108678753A (en) * 2018-03-29 2018-10-19 中交路桥北方工程有限公司 Reverse-slope tunnel construction method
CN109184742A (en) * 2018-09-19 2019-01-11 中国水利水电第四工程局有限公司 A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN109519220A (en) * 2018-10-29 2019-03-26 中铁十二局集团有限公司 Karst area diversion tunnel is crushed rich water section grouting treatment method
CN110080784A (en) * 2019-05-14 2019-08-02 福建工程学院 A kind of tunnel excavation and reinforcement means passing through rich water arenaceous stratum
CN110905556A (en) * 2019-12-20 2020-03-24 山东科技大学 Novel efficient mixing alternating type double-hole sectional grouting method
CN112174572A (en) * 2020-08-14 2021-01-05 中铁十六局集团铁运工程有限公司 Composite material for adsorbing gas overflowing from tunnel face and construction method thereof
CN112796769A (en) * 2020-12-24 2021-05-14 中铁十八局集团第五工程有限公司 Construction method of water-rich weak surrounding rock stratum tunnel
CN113153364A (en) * 2021-03-16 2021-07-23 中铁四局集团第五工程有限公司 Water burst treatment method suitable for inclined well under steep water-rich rock stratum
CN113217036A (en) * 2021-06-23 2021-08-06 中交路桥华东工程有限公司 Post-grouting construction method for tunnel structure at water burst section of fault fracture zone
CN114294017A (en) * 2021-12-30 2022-04-08 中铁二十一局集团第五工程有限公司 Curtain grouting orifice pipe orientation method easy and convenient to operate

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761346A (en) * 2009-12-30 2010-06-30 中铁十二局集团第二工程有限公司 Method for constructing metamorphic rock confined water tunnel
JP4618740B2 (en) * 2007-11-30 2011-01-26 ケイコン株式会社 Tunnel structure consisting of a roadway for monitoring roads and a drainage channel for roadway tunnels
CN102278130A (en) * 2011-09-05 2011-12-14 中铁隧道集团有限公司 Process method for reinforcing and grouting of high-pressure water-rich solution cavity of tunnel
CN102787846A (en) * 2012-07-31 2012-11-21 中铁隧道集团有限公司 Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone
JP5163424B2 (en) * 2008-10-23 2013-03-13 株式会社大林組 Groundwater drainage structure and tunnel construction method having the drainage structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4618740B2 (en) * 2007-11-30 2011-01-26 ケイコン株式会社 Tunnel structure consisting of a roadway for monitoring roads and a drainage channel for roadway tunnels
JP5163424B2 (en) * 2008-10-23 2013-03-13 株式会社大林組 Groundwater drainage structure and tunnel construction method having the drainage structure
CN101761346A (en) * 2009-12-30 2010-06-30 中铁十二局集团第二工程有限公司 Method for constructing metamorphic rock confined water tunnel
CN102278130A (en) * 2011-09-05 2011-12-14 中铁隧道集团有限公司 Process method for reinforcing and grouting of high-pressure water-rich solution cavity of tunnel
CN102787846A (en) * 2012-07-31 2012-11-21 中铁隧道集团有限公司 Upper-blocking and lower-draining construction method for undersea tunnel fault fracture zone

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628916A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Excavation construction method of high-pressure water gushing tunnel
CN103742191A (en) * 2014-01-24 2014-04-23 中铁第一勘察设计院集团有限公司 Water-rich tunnel pilot long-distance large-diameter precipitation channel and construction method thereof
CN103982201A (en) * 2014-05-22 2014-08-13 北京中铁瑞威工程检测有限责任公司 Advanced detection, grouting reinforcement and excavation method of wide separation fracture of high-pressure water-rich tunnel
CN105781614A (en) * 2016-04-29 2016-07-20 广东华路交通科技有限公司 Novel visual operation highway tunnel side wall foot drainage system
CN106224001A (en) * 2016-09-21 2016-12-14 中国水利水电第十四工程局有限公司 Special protection device and preparation method is encircleed at the bottom of a kind of big cross section circular tunnel flow-passing surface
CN106436727A (en) * 2016-09-27 2017-02-22 中铁五局集团有限公司 Extreme geological tunnel portal construction method
CN107060821A (en) * 2017-03-24 2017-08-18 中铁十六局集团第五工程有限公司 A kind of many lithology method for protecting support of face
CN108590715A (en) * 2018-03-22 2018-09-28 重庆建工第七建筑工程有限责任公司 A kind of reserved laccolite tunneling boring radial grouting construction method in prominent water burst tunnel of tunneling
CN108678753B (en) * 2018-03-29 2019-11-08 中交路桥北方工程有限公司 Reverse-slope tunnel construction method
CN108678753A (en) * 2018-03-29 2018-10-19 中交路桥北方工程有限公司 Reverse-slope tunnel construction method
CN109184742A (en) * 2018-09-19 2019-01-11 中国水利水电第四工程局有限公司 A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN109519220A (en) * 2018-10-29 2019-03-26 中铁十二局集团有限公司 Karst area diversion tunnel is crushed rich water section grouting treatment method
CN110080784A (en) * 2019-05-14 2019-08-02 福建工程学院 A kind of tunnel excavation and reinforcement means passing through rich water arenaceous stratum
CN110080784B (en) * 2019-05-14 2021-03-30 福建工程学院 Tunnel excavation and reinforcement method for penetrating through water-rich sandy stratum
CN110905556A (en) * 2019-12-20 2020-03-24 山东科技大学 Novel efficient mixing alternating type double-hole sectional grouting method
CN110905556B (en) * 2019-12-20 2021-01-05 山东科技大学 Efficient mixing alternating type double-hole sectional grouting method
CN112174572A (en) * 2020-08-14 2021-01-05 中铁十六局集团铁运工程有限公司 Composite material for adsorbing gas overflowing from tunnel face and construction method thereof
CN112796769A (en) * 2020-12-24 2021-05-14 中铁十八局集团第五工程有限公司 Construction method of water-rich weak surrounding rock stratum tunnel
CN113153364A (en) * 2021-03-16 2021-07-23 中铁四局集团第五工程有限公司 Water burst treatment method suitable for inclined well under steep water-rich rock stratum
CN113153364B (en) * 2021-03-16 2023-05-23 中铁四局集团第五工程有限公司 Water inflow treatment method suitable for inclined shaft under steep water-rich rock stratum
CN113217036A (en) * 2021-06-23 2021-08-06 中交路桥华东工程有限公司 Post-grouting construction method for tunnel structure at water burst section of fault fracture zone
CN113217036B (en) * 2021-06-23 2023-09-12 中交路桥华东工程有限公司 Post grouting construction method for fault fracture tunnel structure with water flushing section
CN114294017A (en) * 2021-12-30 2022-04-08 中铁二十一局集团第五工程有限公司 Curtain grouting orifice pipe orientation method easy and convenient to operate

Also Published As

Publication number Publication date
CN103334770B (en) 2015-08-12

Similar Documents

Publication Publication Date Title
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN107762533B (en) A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN108915736B (en) Method for preventing and controlling water damage of roadway tunneling under strong water-rich and weak-cementation aquifer
CN106014201B (en) A kind of outer release hole safe construction technique of tunnel grouting curtain
CN109098733B (en) Rapid grouting reinforcement method for large-section tunnel in fracture zone rock stratum
CN102518470B (en) Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel
CN110685714B (en) Micro-step reserved core soil construction structure and method for shallow-buried bias tunnel under phyllite geology
CN107288657A (en) The weak cementing rock mass seepage failure area slip casting integrated control method of top of underground
CN101832142A (en) Tunnel information tracing accurate grouting method
CN105715296A (en) Blowing sand backfill and grouting construction method of tunnel crossing coal mine goaf
CN101709651A (en) Grouting water blocking method for undersea tunnel
CN110735653A (en) deep-hole retreating type grouting water plugging construction method for igneous rock water-rich fault
CN103835729A (en) Ground pre-grouting strengthening technology for deep long-distance roadway surrounding rock
CN108661650A (en) A kind of rich water magmatic body area depth pozo shaft construction method
CN111764863B (en) Method for blocking water gushing of high-pressure drilling hole in underground fault fracture zone
CN107725056A (en) One kind passes through silly stratum tunnel loopful quick grouting construction method in advance
CN113073983B (en) Enclosure type grouting construction method for submarine tunnel to penetrate through water-rich fault fracture zone
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN107339108B (en) The layer of sand location subway pipe shed construction method of underground water enrichment
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN109538216A (en) Pass through mined out and subsidence area constructing tunnel technique
CN108119143A (en) A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Huang Jinguang

Inventor after: Shi Qu

Inventor after: Wang Mingsheng

Inventor after: Gao Guangyi

Inventor after: Xu Haiting

Inventor after: Wei Wenjie

Inventor after: Jiao Liang

Inventor after: Sun Guoqing

Inventor after: Jin Qiangguo

Inventor after: Deng Chuan

Inventor before: Huang Jinguang

Inventor before: Gao Guangyi

Inventor before: Xu Haiting

Inventor before: Wei Wenjie

Inventor before: Jiao Liang

Inventor before: Sun Guoqing

Inventor before: Jin Qiangguo

Inventor before: Deng Chuan

Inventor before: Shi Qu

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HUANG JINGUANG GAO GUANGYI XU HAITING WEI WENJIE JIAO LIANG SUN GUOQING JIN QIANGGUO DENG CHUAN SHI QU TO: HUANG JINGUANG WANG MINGSHENG GAO GUANGYI XU HAITING WEI WENJIE JIAO LIANG SUN GUOQING JIN QIANGGUO DENG CHUAN SHI QU

C14 Grant of patent or utility model
GR01 Patent grant