CN108119143A - A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain - Google Patents

A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain Download PDF

Info

Publication number
CN108119143A
CN108119143A CN201711383860.8A CN201711383860A CN108119143A CN 108119143 A CN108119143 A CN 108119143A CN 201711383860 A CN201711383860 A CN 201711383860A CN 108119143 A CN108119143 A CN 108119143A
Authority
CN
China
Prior art keywords
hole
inner ring
slip casting
concrete grout
grout cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711383860.8A
Other languages
Chinese (zh)
Other versions
CN108119143B (en
Inventor
赵延林
刘强
唐利明
谢森林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Chuxiang Construction Engineering Group Co.,Ltd.
Original Assignee
Hunan University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Science and Technology filed Critical Hunan University of Science and Technology
Priority to CN201711383860.8A priority Critical patent/CN108119143B/en
Publication of CN108119143A publication Critical patent/CN108119143A/en
Application granted granted Critical
Publication of CN108119143B publication Critical patent/CN108119143B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/04Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

Combine grouting method with chemical grout double-round curtain the invention discloses a kind of vertical shaft working surface cement-silicate biliquid, this method drills along inside and outside two circle of shaft face arrangement, two circle bore angles are different, the cementing waterglass dual slurry in inner ring injected hole, chemical grout is noted in the injected hole of outer ring, vertebra shape curtain is formed outside the borehole wall using two circle bored groutings and blocks water-bearing layer crack, this method can block more aqueous cracks, grouting amount is little, slip casting effect is good, is a kind of safe and reliable, good vertical shaft working surface slurry injection technique of slip casting effect.

Description

A kind of vertical shaft working surface cement soluble glass paste is combined with chemical grout double-round curtain Grouting method
Technical field
The present invention relates to a kind of ore deposits to build technical field of construction, more particularly to a kind of vertical shaft working surface cement soluble glass paste Combine grouting method with chemical grout double-round curtain.
Background technology
Shaft construction flood is to influence construction speed, the main factor of quality, in shaft construction according to different lithology, no Same water yield, different rock-layers fractured zones use different modes of harnessing the river.Bury relatively deep, hydrostatic pressure in deep packsand water-bearing layer Greatly, crack is tiny, is easily blocked by sediment deposition, and grouting serous fluid dilation angle is small, and particularly iron ore deep packsand water-bearing layer contains Ferriferous oxide is heavier, and the ferriferous oxide in crack easily departs from Si oxide and forms one layer of rust mud in fracture surface, in high pressure cement The lower delamination of slurries impact easily blocks crack, and mortar depositing construction difficulty increases.It is noted using single cement soluble glass paste individual pen hole The crack scope very little of closure is starched, slip casting terminates after recovering driving, influenced by sharp pounding is blown out, and makes former blocked in crack Possessed the cement of certain setting strength and cement-sodium silicate adhesive bond be quaked loose it is broken, it is easy to by water-bearing layer high pressure water flushing Go out crack, cause a large amount of water bursts of working face again, jeopardize construction safety;And it uses and uses single chemical grouting in working face When, cost can be far above the cost of cement or cement-water glass double grouting, and underground water can be polluted, for depth How portion packsand water-bearing layer finds a grouting method that can effectively block the underground water in front of vertical shaft working surface, is shaft building The engineering major issue to be solved.
The content of the invention
In order to solve the above technical problem, the present invention provides a kind of vertical shaft working surface cement soluble glass paste and chemical pulps Liquid double-round curtain combines grouting method, had reached not only effectively closure deep packsand water-bearing layer crack but also had reduced invalid grouting amount Purpose, solves that slip casting difficulty in packsand water-bearing layer is big, the technical barrier of slip casting effect difference.
The technical scheme is that:
A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain, and feature exists In to vertical shaft working surface arrangement double-round injected hole, inner ring hole cementing-waterglass biliquid slurry, the chemical slurry of cycle hole note.
Wherein, the inclination angle of the injected hole 9 of inner ring hole is less than the inclination angle of the injected hole 18 of cycle hole;
Along the equidistant installation inner ring orifice tube 12 of vertical circumferencial direction;
This method can block more aqueous cracks, and grouting amount is little, and slip casting effect is good, efficiently solves deep packsand Water-bearing layer crack is tiny, and grout spreading range is small, the big construction difficult problem of grouting pressure.
It is as follows:
(1) working face goes out the clear bottom of cash
The spoil of vertical shaft working surface 1 is removed into shaft bottom, and floating cash is cleaned out, will be risen on punching block to from working face 5~ 6m positions.
(2) rubble drainage layer is constructed
It carries out rubble drainage layer 2 on vertical shaft working surface 1 to construct, pre-buried two of the portion center steel pipe 8 that draws water, takes out in the wellbore Water center steel pipe 8 is embedded into rubble drainage layer 2, each built-in immersible pump 13 in two center steel pipes 8, then, in rubble Drainage layer two layers of 2 upper berth colour bar cloth 3 and one layer of malthoid 4, concrete grout cover 6 and rubble drainage layer 1 are separated.
(3) concrete grout cover is constructed
Concrete grout cover 6 is carried out on malthoid 4 to construct, and the thickness of concrete grout cover 6 is determined by calculation, according to note Pitch of holes is starched, determines the hole count of inner ring injected hole 9, determines position and the length of inner ring orifice tube 12, slip casting section height is determined, determines The inclination angle of inner ring injected hole 9 and outer ring injected hole 18, and ensure that the inclination angle of inner ring hole injected hole 9 is less than outer ring injected hole 18 Inclination angle, along the equidistant installation inner ring orifice tube 12 of vertical circumferencial direction, casting concrete grout cover 6.
(4) concrete grout cover pressure testing
After concrete grout cover 6 is poured into a mould 7 days, first pressure testing and secondary pressure testing are carried out to concrete grout cover 6.Secondary pressure testing After qualification, concrete grout cover 6 reaches requirement.
(4) drilling cramp and fixed drilling machine are installed
Matched somebody with somebody using down-the-hole drill 14Drill bit andDrilling rod bores injected hole, matches somebody with somebodyDrill bit punches, and installation is outer Orifice tube 5 is enclosed, down-the-hole drill 14 is fixed using drilling cramp 16, and sliding rail frame 15 is mounted on drilling cramp 16, and sliding rail frame 15 can the side of adjusting To, and 15 down-the-hole drill of sliding rail frame, 14 direction-adjustable and angle, drilling cramp 16 are fixed on using earth anchor 17 on concrete grout cover 6.
(5) injecting paste material is determined
Inner ring hole cementing-waterglass biliquid slurry, the chemical slurry of cycle hole note, the cement-sodium silicate double liquid It matches and is:Cement common 525#, waterglass concentration 40Be, modulus 2.8~3.1;It is described chemistry slurry for Lauxite with The mixture of acid curing agent, the formula of modified urea-formaldehyde resin is according to presetting period 3-5min of slurries or so, final setting time 15-20min or so, gel time are controlled primarily by Lauxite (A liquid) with the volume ratio of acid curing agent (B liquid), it is necessary to adopt With grouting pump (A according to a certain percentage:B=3:1~4:1) slip casting is carried out.It can be according to slurries in injecting cement paste during slip casting Diffusion situation adjust A in time:B liquid proportionals are to control the gel time of slurries.
(6) Internal and external cycle mortar depositing construction
Grouting pressure (taking 2 times of hydrostatic pressures) is determined, according to 6 pressure testing of concrete grout cover as a result, determining cement-water glass Glass dual slurry and Lauxite (A liquid) are designed and noted from the matched proportion density of acid curing agent (B liquid) and the single hole of different injecting paste materials Enter amount, the sequence of construction entirely to drill is:It first carries out inner ring hole drilling and visits water, if found have water to gush out, then inner ring hole drilling is simultaneously Using cement-sodium silicate double liquid slip casting, then to cycle hole drilling and chemical grouting, if slurries injection rate has reached design Injection rate, but grouting pressure is not reaching to when designing final grouting pressure, and slip casting terminates, sealing of hole.Entire slip casting process is using under segmentation Column is pressed into slip casting.
(8) slip casting effect is analyzed
To grouting pressure, flow, concentration of slurry in each hole section slip casting, the variation of water absorption is analyzed, judges to note Whether slurry construction is qualified.Behind inspection hole end hole, if any water burst, measurement hydraulic pressure, water are converted into big well yield, see big well kick Whether water is less than 2m3/ h, if the big well yield that inspection hole is computed out is respectively less than 2m3/ h, it is possible to think the slurry in crack Liquid filling is full, closely knit, can terminate slip casting.It finally carries out wellbore centre and visits water hole drilling, carry out spy water, be used to check slip casting effect Fruit.
The advantageous effect that the present invention generates the prior art is:
The present invention uses cement mortar slip casting difficulty big for packsand water-bearing layer, the situation of slip casting effect difference, it is proposed that A kind of vertical shaft working surface cement-sodium silicate double liquid liquid and chemical pulp mixing grouting method, to vertical shaft working surface arrangement double-round note Starch hole, inner ring hole cementing-waterglass biliquid slurry, the chemical slurry of cycle hole note.This method can block more aqueous cracks, Grouting amount is little, and slip casting effect is good, is a kind of safe and reliable, good vertical shaft working surface slurry injection technique of slip casting effect.
Description of the drawings
Fig. 1 is rubble drainage layer and concrete grout cover construction schematic diagram;
Fig. 2 is drilling cramp schematic diagram;
Fig. 3 is vertical shaft working surface cement soluble glass paste and chemical grout double-round curtain-grouting schematic diagram;
Fig. 4 is vertical aperture detail drawing;
In figure:1st, vertical shaft working surface, 2, rubble drainage layer, 3, two layers of colour bar cloth, 4, one layers of malthoid layer, 5, outer ring aperture Pipe, 6, concrete grout cover, 7, outer ring aperture, 8, center steel pipe, 9, inner ring injected hole, 10, inner ring aperture, 11, resin anchor, 12nd, inner ring orifice tube, 13, immersible pump, 14, down-the-hole drill, 15, sliding rail frame, 16, drilling cramp, 17, earth anchor, 18, outer ring injected hole, 19th, high-pressure ball valve.
Specific embodiment
(the skip bucket main shaft working face cement soluble glass paste of certain southern metallic ore in the following with reference to the drawings and specific embodiments It is embodiment with chemical grout double-round curtain-grouting) to the present invention, a kind of vertical shaft working surface cement soluble glass paste and chemical pulp Liquid double-round Curtain Grouting Method, makees the further explanation of concrete measure and implementation process.
The skip bucket main shaft packsand water-bearing layer pre grouting from the working face of certain southern metallic ore, skip bucket main shaft net diameter 6m, supporting Thickness 300mm, full depth 832m.In well depth, 606.1~679.5m sections are packsand water-bearing layer.
(1) working face goes out the clear bottom of cash
The spoil of vertical shaft working surface 1 is removed into shaft bottom, and floating cash is cleaned out, will be risen on punching block to from working face 5~ 6m positions.
(2) rubble drainage layer is constructed
The ore deposit skip bucket main shaft is has water burst working face, and since geologic information is not allowed, working face has opened partially aqueous layer, and Water yield reaches 100m3/h.In order to ensure concrete grout cover smoothly pours, progress rubble drainage layer 2 is applied on vertical shaft working surface 1 Work, 2 thickness of rubble drainage layer are 2.0m.Detailed process is:Pre-buried two of portion in the wellboreDraw water center steel pipe 8, The center steel pipe 8 that draws water is embedded into rubble drainage layer 2, each built-in 100m in two center steel pipes 8313 row of/h immersible pumps Water, a draining, one it is spare.Then, two layers of colour bar cloth 3 and one layer of malthoid 4 are spread from bottom to up in rubble drainage layer 2.
(3) concrete grout cover is constructed
Concrete grout cover 6 is carried out on malthoid 4 to construct, and the thickness of pad concrete grout cover 6 is determined by calculation, according to Slip casting pitch of holes determines the hole count of inner ring injected hole 9, determines position and the length of inner ring orifice tube 12, determines slip casting section height, really Determine the inclination angle of inner ring injected hole 9 and outer ring injected hole 18, and ensure that the inclination angle of inner ring hole injected hole 9 is less than outer ring injected hole 18 Inclination angle, along the equidistant installation inner ring orifice tube 12 of vertical circumferencial direction, casting concrete grout cover 6.
1) concrete grout cover thickness determines
Bn- grout cover thickness (m);
P0- final grouting pressure takes 2 times (MPa) of hydrostatic pressure;
[σ]-concrete allows compression strength (MPa), concrete set time 7 days, C40 concrete sevens day limit pressure resistance The 70%-90% for standard value, i.e. 28~36MPa are spent, consider 2 times of safety coefficients and is got the small value, [σ] value is 14MPa;
R is mineshaft diameter (m), takes 6.6m;
It is computed grout cover thickness BnFor 4.2m.
2) injected hole hole count and inner ring orifice tube determine
For drilling is enable to look for more cracks as far as possible, and crack grouting is abundant between making hole, and white area of not leaving blank, each hole exists Circle is fully handed over to form curtain in range of grouting, injected hole arrangement is preferably close and double-round is arranged, hole count calculates as follows:
Hole count N is calculated as follows:
N=π (γ -2A)/L
R-main hole driving diameter (m), main hole tunnel a diameter of 6.6m;
A-hole center is to the distance (m) on pit shaft periphery, and convenient for principle with drilling, inner ring hole takes 0.8m;Cycle hole abuts The borehole wall, A values are 0.3;
L-slip casting pitch of holes (m), inner ring pitch of holes take 0.98m, are computed, and hole count is 16;Outer ring pitch of holes takes 1.18m is computed, and hole count is 16.
Inner ring orifice tube 12 uses 108 × 4.5mm steel pipes, and 12 length 5m of inner ring orifice tube is embedded to coagulation using built-in type In native grout cover 6.
5 length 4m of outer ring orifice tube, is matched somebody with somebody using MKQJ120/40-HT types down-the-hole drill 14Bit bore.
3) slip casting section is high determines
It is integrated by aqueous layer thickness, the development degree of rock fracture and bore flooding quantity and determines that slip casting section is high.According to skip bucket The thickness and bore flooding quantity of main shaft packsand determine a height of 35m of slip casting section or so.35m or so, driving 30m or so are noted, is reserved The rock cap of 5m or so.
4) injected hole angle-determining
The high 35m of slip casting section, concrete grout cover 6 calculate as follows away from working face 6.2m, bore angle:
α=tan-1(S+A)/h
S-bottom hole exceeds the distance (m) beyond the base diameter of water-bearing layer, and inner ring hole takes 3.4m, cycle hole to take 5.7m;
A-drilling to concrete walling distance (m), inner ring hole takes 0.8m, cycle hole 0.3m;
The sum of h-concrete grout cover and slip casting section height (m), take 41.2m, be computed inner ring hole radial rake for 6 °, it is outer Collar aperture radial rake is 8.3 °.
5) inner ring orifice tube installation is fixed
In rubble drainage layer 2, by the design position of inner ring orifice tube 12, helped in well and beat two rows of resin anchors 11, adopted The upper/lower terminal of inner ring orifice tube 12 is fixed on mounted resin anchor 11 with the mode of welding, inner ring orifice tube 12 Between using reinforcing bar laterally, it is oblique be connected, all inner ring orifice tubes 12 is made to be linked to be an entirety.
6) casting concrete grout cover
Casting concrete grout cover 6, using C40 concrete, concrete grout cover 6 must exceed the former concrete built by laying bricks or stones More than borehole wall 0.5m.The construction of concrete grout cover 6 belongs to mass concrete construction, to prevent the mass concrete heat of hydration from cooling down Afterwards, volume of concrete is shunk, and makes to generate compared with big gap between grout cover 6 and the borehole wall, in concrete by cement consumption 6~ 8% admixture swelling agent, inner ring orifice tube 12 are embedded in concrete grout cover 6.
(4) concrete grout cover pressure testing
After concrete setting 7 days, concrete strength can reach the 70%~90% of standard value, to shorten downtime, one As selection concrete grout cover 6 solidify 7 days when start to concrete grout cover pressure testing.By 2 immersible pumps 13 from pre-buried center It proposes in steel pipe 8,4 cun of 10MPa high-pressure ball valves 19 are welded on center steel pipe 8 and open ball valve discharges water.At the beginning of concrete grout cover 6 Secondary pressure testing:4 cun of high-pressure ball valves 19 of slowly closing mix 6 pressure testing of concrete grout cover, 6 compression situation of observation concrete grout cover Solidifying soil grout cover 6 and concrete walling be no different shape and continue observation 8 it is small when, concrete grout cover and concrete walling still in During stable state, first pressure testing success.6 two pressure testings of concrete grout cover:6 two pressure testings of concrete grout cover try for high pressure Pressure, to 2 slip casting of rubble drainage layer and 6 compression situation of concrete grout cover is observed using 4 cun of high-pressure ball valves 19, notes weight ratio 1:1 Cement single slurry, observe water outlet status and concrete walling compression situation, after secondary pressure testing slip casting, former concrete walling Integral strength is further strengthened, and after secondary pressure testing qualification, concrete grout cover 6, which has confirmed that, reaches requirement.
(5) drilling cramp and fixed drilling machine are installed
Matched somebody with somebody using MKQJ120/40-HT down-the-hole drills 14Drill bit andDrilling rod bores injected hole, matches somebody with somebodyIt bores Head punching installation outer ring orifice tube 5, down-the-hole drill 14 are fixed using drilling cramp 16, and sliding rail frame 15 is fixed on drilling cramp 16, hidden hole drilling 14 direction-adjustable of machine and angle, drilling cramp 16 are fixed on using earth anchor 17 on concrete grout cover 6.Earth anchor 17 is swollen using 4 cement Swollen anchor pole, long 1.2~1.5m.4 anchor poles are arranged at every orifice tube rear.
(6) injecting paste material is determined
To vertical circumferential directions double-round injected hole, inner ring hole cementing-waterglass biliquid slurry, cycle hole note chemistry Slurry, the proportioning of the cement-sodium silicate double liquid are:Cement common 525#, waterglass concentration 40Be, modulus 2.8~ 3.1;Cement mortar and waterglass volume ratio are 1: 0.6.Changing concentration is needed in construction, the ratio of mud of cement mortar is 1:0.4~1: Between 0.5.
The master of the chemistry slurry is Lauxite and the mixture of acid curing agent, and the formula of modified urea-formaldehyde resin is pressed Presetting period 3-5min according to slurries or so, final setting time 15-20min or so, gel time is controlled primarily by Lauxite (A Liquid) with the volume ratio of acid curing agent (B liquid), it is necessary to using grouting pump (A according to a certain percentage:B=3:1~4:1) noted Slurry.During slip casting A can be adjusted in time in the in vivo diffusion situation of slip casting according to slurries:B liquid proportionals are to control slurries Gel time.
(7) Internal and external cycle mortar depositing construction
Grouting pressure (taking 2 times of hydrostatic pressures) is determined, according to 6 pressure testing of concrete grout cover as a result, determining cement-water glass Glass dual slurry and Lauxite (A liquid) are designed and noted from the matched proportion density of acid curing agent (B liquid) and the single hole of different injecting paste materials Enter amount, the sequence of construction entirely to drill is:It first carries out inner ring hole drilling and visits water, as found there is water to gush out, then drill to inner ring hole And cement-sodium silicate double liquid slip casting is used, then to cycle hole drilling and chemical grouting, set if slurries injection rate has reached Injection rate is counted, but grouting pressure is not reaching to when designing final grouting pressure, and slip casting terminates, sealing of hole.Entire slip casting process is using segmentation Following formula is pressed into slip casting.
1) grouting pressure
Final grouting pressure is generally higher than hydrostatic pressure, generally hydrostatic pressure p02 times.Final grouting pressure takes 8MPa.Slip casting pressure After power reaches final pressure, continue intravenous 10 minutes, then stop noting.
2) slurries injection rate
Slurries injection rate is roughly calculated according to dilation angle (5m) and rock fracture rate, and calculation formula is as follows:
R-grout spreading range (m);H-slip casting section is high (m);η-rock crack rate;The effective fill factor of β-slurries, Take 0.8;M-calculus rate takes 0.85;λ-slurries loss coefficient takes 1.2
3) grouting equipment
Selection 2TGZ-60/210 types are electronic, 2ZBQ-11.5/3 Pneumatic injection pulp grinders, set up on the working face punching block of shaft bottom flat The tablecloth puts grouting pump and mixer, the spice slip casting of shaft bottom scene.Cement, waterglass are transferred with well-bucket to working face.Use 3m3Hang Personnel and material above and below bucket.
(8) slip casting effect is analyzed
To grouting pressure, flow, concentration of slurry in each hole section slip casting, the variation of water absorption is analyzed, judges to note Whether slurry construction is qualified.Behind inspection hole end hole, if any water burst, measurement hydraulic pressure, water are converted into big well yield, see big well kick Whether water is less than 2m3/ h, if the big well yield that inspection hole is computed out is respectively less than 2m3/ h, it is possible to think the slurry in crack Liquid filling is full, closely knit, can terminate slip casting.It finally carries out wellbore centre and visits water hole drilling, carry out spy water, be used to check slip casting effect Fruit.
Grouting method is combined to Hunan gold with chemical grout double-round curtain using vertical shaft working surface cement soluble glass paste The skip bucket main shaft working face for belonging to ore deposit carries out grouting for water blocking.Partially aqueous layer, and water yield have been opened in grouting for water blocking leading face Up to 100m3/h.When working face uses single cement injection and cement-water glass double grouting, it is found that grouting pressure is big, note It is poor to starch effect, it is impossible to which when blocking underground water well, and using pure chemistry slurries slip casting, the cost for finding its slip casting is 3~5 times Single cement injection and cement-water glass double grouting cost, and chemical slurry will serious polluted underground water, no Beneficial to environmental protection.Combine grouting method with chemical grout double-round curtain using vertical shaft working surface cement soluble glass paste to construct Afterwards, the nearly 100m before working face water is harnessed the river by slip casting3/ h is reduced to 1.8m3/ h can save the rows such as the artificial, electricity charge by calculating Water rate is with more than 30 ten thousand yuan.Originally it is bright to not only reduce energy consumption, and provide reliable safety to the construction of deep shaft rock section It ensures, relieves flood and threatened caused by construction personnel, create good operating environment to underground construction personnel, achieve Good economic benefit and social benefit, have achieved the purpose that energy saving and environmentally friendly.Obtain good social and economic benefit.
Certainly, the above is the preferred embodiment of the present invention, it is noted that for the ordinary skill of the art For personnel, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications It is considered as protection scope of the present invention.

Claims (10)

1. a kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain, which is characterized in that Double-round injected hole, inner ring hole cementing-waterglass biliquid slurry, the chemical slurry of cycle hole note are arranged to vertical shaft working surface.
2. according to the method described in claim 1, it is characterized in that, the inclination angle of the injected hole (9) of inner ring hole is less than cycle hole Injected hole (18) inclination angle.
3. according to the method described in claim 1, its specific steps includes:
(1) working face goes out the clear bottom of cash;
(2) rubble drainage layer is constructed;
(3) concrete grout cover is constructed;
(4) concrete grout cover pressure testing;
(5) drilling cramp and fixed drilling machine are installed;
(6) injecting paste material is determined;
(7) Internal and external cycle mortar depositing construction;
(8) slip casting effect is analyzed.
4. according to the method described in claim 3, it is characterized in that,
Described (1) working face goes out the clear bottom of cash, and the spoil of vertical shaft working surface (1) is removed shaft bottom, and floating cash is cleaned out, It will be risen on punching block to from 5~6m of working face positions.
5. according to the method described in claim 3, it is characterized in that,
(2) rubble drainage layer construction is that rubble drainage layer (2) is carried out on vertical shaft working surface (1) and is constructed, in the wellbore Draw water in pre-buried two of portion center steel pipe (8), and the center steel pipe (8) that draws water is embedded into rubble drainage layer (2), two center steel pipes (8) each built-in immersible pump (13) in, then, in two layers of rubble drainage layer (2) upper berth colour bar cloth (3) and one layer of malthoid (4), Concrete grout cover (6) and rubble drainage layer (1) are separated.
6. according to the method described in claim 3, it is characterized in that,
(3) concrete grout cover construction is that concrete grout cover (6) is carried out on malthoid (4) and is constructed, true by calculating Determine the thickness of concrete grout cover (6), according to slip casting pitch of holes, determine the hole count of inner ring injected hole (9), determine inner ring orifice tube (12) position and length determine slip casting section height, determine the inclination angle of inner ring injected hole (9) and outer ring injected hole (18), and ensure The inclination angle of inner ring hole injected hole (9) is less than the inclination angle of outer ring injected hole (18), along the equidistant installation inner ring of vertical circumferencial direction Orifice tube (12), casting concrete grout cover (6).
7. according to the method described in claim 3, it is characterized in that,
(4) concrete grout cover pressure testing is, after concrete grout cover (6) is poured into a mould 7 days, to concrete grout cover (6) into The first pressure testing of row and secondary pressure testing;After secondary pressure testing qualification, concrete grout cover (6) reaches requirement.
8. according to the method described in claim 3, it is characterized in that,
Described (5) the installation drilling cramp and fixed drilling machine are to be matched somebody with somebody using down-the-hole drill (14)Drill bit andDrilling rod bores note Hole is starched, is matched somebody with somebodyDrill bit punches, and installation outer ring orifice tube (5), down-the-hole drill (14) is fixed using drilling cramp (16), sliding rail frame (15) it is mounted on drilling cramp (16), sliding rail frame (15) can adjust direction, and sliding rail frame (15) down-the-hole drill (14) direction-adjustable And angle, drilling cramp (16) are fixed on using earth anchor (17) on concrete grout cover (6).
9. according to the method described in claim 3, it is characterized in that,
(6) determine that injecting paste material is, inner ring hole cementing-waterglass biliquid slurry, the chemical slurry of cycle hole note, described The proportioning of cement-sodium silicate double liquid is:Cement common 525#, waterglass concentration 40Be, modulus 2.8~3.1;Describedization Slurry is learned as Lauxite and the mixture of acid curing agent, the volume of control Lauxite (A liquid) and acid curing agent (B liquid) Than, it is necessary to using grouting pump A according to a certain percentage:B=3:1~4:1 carries out slip casting.
10. according to the method described in claim 3, it is characterized in that,
Described (7) the Internal and external cycle mortar depositing construction is to determine grouting pressure, takes 2 times of hydrostatic pressures, is tried according to concrete grout cover 6 Pressure as a result, determining the matched proportion density and not of cement-sodium silicate double liquid and Lauxite (A liquid) and acid curing agent (B liquid) Single hole with injecting paste material designs injection rate, and the sequence of construction entirely to drill is:It first carries out inner ring hole drilling and visits water, as found have Water is gushed out, then inner ring hole drilling and use cement-sodium silicate double liquid slip casting, and then drill to cycle hole simultaneously chemical grouting, such as Pulp liquid injection rate has reached design injection rate, but grouting pressure is not reaching to when designing final grouting pressure, and slip casting terminates, sealing of hole; Entire slip casting process is using segmentation following formula press-in slip casting.
CN201711383860.8A 2017-12-20 2017-12-20 A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain Active CN108119143B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711383860.8A CN108119143B (en) 2017-12-20 2017-12-20 A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711383860.8A CN108119143B (en) 2017-12-20 2017-12-20 A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain

Publications (2)

Publication Number Publication Date
CN108119143A true CN108119143A (en) 2018-06-05
CN108119143B CN108119143B (en) 2019-11-15

Family

ID=62229601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711383860.8A Active CN108119143B (en) 2017-12-20 2017-12-20 A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain

Country Status (1)

Country Link
CN (1) CN108119143B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108915690A (en) * 2018-07-06 2018-11-30 中钢集团马鞍山矿山研究院有限公司 Prevent the new method of shaft wall water burst in the driving of vertical shaft water-bearing layer
CN109577989A (en) * 2018-12-13 2019-04-05 山东大学 A kind of novel deeps mines shaft wall structure and construction method
CN110439504A (en) * 2019-09-13 2019-11-12 鄂托克前旗长城三号矿业有限公司 A kind of granule rock water-bearing layer grouting water blocking method
CN111810232A (en) * 2020-07-08 2020-10-23 神华新疆能源有限责任公司 Method for intercepting diving aquifer punctiform vertical water guide channel curtain
CN111911193A (en) * 2020-07-26 2020-11-10 中铁二院工程集团有限责任公司 Underwater target point blocking railway tunnel deep shaft water inrush structure and construction method
CN113027462A (en) * 2021-05-06 2021-06-25 万宝矿产有限公司 Reinforcing method for vertical shaft penetrating through weak surrounding rock
CN113153212A (en) * 2021-04-30 2021-07-23 北京科技大学 Vertical shaft high-water-pressure stratum grouting device and construction method
CN113309522A (en) * 2021-06-19 2021-08-27 莱州汇金矿业投资有限公司 Construction method for pre-grouting water plugging concrete grout stop pad on working surface of kilometer vertical shaft

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101235632A (en) * 2007-12-28 2008-08-06 中国水电顾问集团中南勘测设计研究院 Grouting leak-stopping technique
CN101638987A (en) * 2009-07-24 2010-02-03 中铁二十一局集团有限公司 Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN101660415A (en) * 2009-09-08 2010-03-03 中煤第一建设公司特殊凿井处 Technology for constructing and stopping leakage of freezing borehole
CN102108869A (en) * 2010-12-30 2011-06-29 山东科技大学 Grout stop pad construction method for kilometer vertical shaft grouting for water control
CN202370525U (en) * 2011-12-28 2012-08-08 陕西煤业化工建设(集团)有限公司 Post grouting construction structure of shaft wall of weathering bed rock section of return air vertical shaft
CN103277120A (en) * 2013-06-19 2013-09-04 西安科技大学 Post-unfreezing water burst prevention method of non-full-depth freezing vertical shaft
CN103696775A (en) * 2013-12-20 2014-04-02 中煤第一建设有限公司 Large-stage-height multi-group water-containing layer segmented downward grouting method
CN104453913A (en) * 2014-12-19 2015-03-25 玉溪大红山矿业有限公司 Vertical shaft working face ahead pre-grouting method
CN106246188A (en) * 2016-10-18 2016-12-21 中国矿业大学 The system and method that the preventing and treating coal mine shaft lining shaft deformation of stratum settlement compatibility of deformation is destroyed
CN206571490U (en) * 2017-03-16 2017-10-20 河北钢铁集团矿业有限公司 The drainage bucket of water burst is administered in a kind of vertical shaft for mine construction
CN107642360A (en) * 2017-07-25 2018-01-30 彭峰 Tunneling boring front pre-grouting construction method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101235632A (en) * 2007-12-28 2008-08-06 中国水电顾问集团中南勘测设计研究院 Grouting leak-stopping technique
CN101638987A (en) * 2009-07-24 2010-02-03 中铁二十一局集团有限公司 Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN101660415A (en) * 2009-09-08 2010-03-03 中煤第一建设公司特殊凿井处 Technology for constructing and stopping leakage of freezing borehole
CN102108869A (en) * 2010-12-30 2011-06-29 山东科技大学 Grout stop pad construction method for kilometer vertical shaft grouting for water control
CN202370525U (en) * 2011-12-28 2012-08-08 陕西煤业化工建设(集团)有限公司 Post grouting construction structure of shaft wall of weathering bed rock section of return air vertical shaft
CN103277120A (en) * 2013-06-19 2013-09-04 西安科技大学 Post-unfreezing water burst prevention method of non-full-depth freezing vertical shaft
CN103696775A (en) * 2013-12-20 2014-04-02 中煤第一建设有限公司 Large-stage-height multi-group water-containing layer segmented downward grouting method
CN104453913A (en) * 2014-12-19 2015-03-25 玉溪大红山矿业有限公司 Vertical shaft working face ahead pre-grouting method
CN106246188A (en) * 2016-10-18 2016-12-21 中国矿业大学 The system and method that the preventing and treating coal mine shaft lining shaft deformation of stratum settlement compatibility of deformation is destroyed
CN206571490U (en) * 2017-03-16 2017-10-20 河北钢铁集团矿业有限公司 The drainage bucket of water burst is administered in a kind of vertical shaft for mine construction
CN107642360A (en) * 2017-07-25 2018-01-30 彭峰 Tunneling boring front pre-grouting construction method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
王档良等: "化学注浆治理巨厚表土层立井井壁漏水", 《水文地质工程地质》 *
王档良等: "在建矿井井壁渗漏水的地质成因分析与化学注浆治理", 《建井技术》 *
路兴义等: "千米立井注浆堵水施工", 《建井技术》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108915690A (en) * 2018-07-06 2018-11-30 中钢集团马鞍山矿山研究院有限公司 Prevent the new method of shaft wall water burst in the driving of vertical shaft water-bearing layer
CN109577989A (en) * 2018-12-13 2019-04-05 山东大学 A kind of novel deeps mines shaft wall structure and construction method
CN109577989B (en) * 2018-12-13 2020-08-25 山东大学 Novel deep mine shaft wall structure and construction method
CN110439504A (en) * 2019-09-13 2019-11-12 鄂托克前旗长城三号矿业有限公司 A kind of granule rock water-bearing layer grouting water blocking method
CN111810232A (en) * 2020-07-08 2020-10-23 神华新疆能源有限责任公司 Method for intercepting diving aquifer punctiform vertical water guide channel curtain
CN111911193A (en) * 2020-07-26 2020-11-10 中铁二院工程集团有限责任公司 Underwater target point blocking railway tunnel deep shaft water inrush structure and construction method
CN113153212A (en) * 2021-04-30 2021-07-23 北京科技大学 Vertical shaft high-water-pressure stratum grouting device and construction method
CN113027462A (en) * 2021-05-06 2021-06-25 万宝矿产有限公司 Reinforcing method for vertical shaft penetrating through weak surrounding rock
CN113027462B (en) * 2021-05-06 2023-11-24 万宝矿产有限公司 Reinforcing method for shaft penetrating through weak surrounding rock
CN113309522A (en) * 2021-06-19 2021-08-27 莱州汇金矿业投资有限公司 Construction method for pre-grouting water plugging concrete grout stop pad on working surface of kilometer vertical shaft
CN113309522B (en) * 2021-06-19 2022-11-04 莱州汇金矿业投资有限公司 Construction method for pre-grouting water plugging concrete grout stop pad on working surface of kilometer vertical shaft

Also Published As

Publication number Publication date
CN108119143B (en) 2019-11-15

Similar Documents

Publication Publication Date Title
CN108119143B (en) A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN108999634B (en) Surface drilling realizes that a hole of water damage prevention and treatment and surface settlement control is mostly used method
CN105201448B (en) Block water slip casting method for blocking in a kind of high-pressure high-flow water gushing channelway
CN104453913B (en) A kind of Shaft Stopes front pre-grouting method
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN108060908A (en) Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building
CN102705005B (en) Technology for plugging water bursting in mine by directional diversion grouting
CN104453946B (en) Advanced reinforcing construction method for building tunnel in soft surrounding rock
CN206667278U (en) Lava crack Tunnel gushing treatment constructing structure
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN106761835A (en) A kind of Karst Tunnel leak segmenting slip casting construction method
CN108661650A (en) A kind of rich water magmatic body area depth pozo shaft construction method
CN101498220B (en) Vertical shaft working surface artesian flow sand layer slurry protecting rotary spraying grouting process
CN103967507A (en) Curtain grouting process suitable for water-rich mine underground mining water plugging
CN102535472B (en) Pored-tube filling and high-pressure impacting extruding grouting method
CN111764863B (en) Method for blocking water gushing of high-pressure drilling hole in underground fault fracture zone
CN113374440B (en) Rapid plugging method and construction method for water burst channel of hidden collapse column
CN206616565U (en) Door font double-row pile and double high-pressed spin-spewing water-stopping curtain combined retaining structure
CN107191188A (en) The bad water-bearing layer positioning targeting slip casting Mine Shaft Lining of rock section, constructing device and method
CN102011591A (en) Grouting process for working surface of deep well
CN110965595A (en) Raft foundation building lifting reinforcement structure and method under corrosive geological environment
CN107217987A (en) Colliery flood administers well boring method
CN108797621A (en) A kind of water sealing structure and its construction method in rich water depth ovum gravel erratic boulder stratum front pre-grouting
CN114109442B (en) Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220107

Address after: 410000 No. 102, Xinmei Road, Tianxin District, Changsha City, Hunan Province

Patentee after: Hunan Chuxiang Construction Engineering Group Co.,Ltd.

Address before: 411201 No. 2 stone wharf, Yuhu District, Hunan, Xiangtan

Patentee before: HUNAN University OF SCIENCE AND TECHNOLOGY

TR01 Transfer of patent right