CN107060821A - A kind of many lithology method for protecting support of face - Google Patents

A kind of many lithology method for protecting support of face Download PDF

Info

Publication number
CN107060821A
CN107060821A CN201710182023.2A CN201710182023A CN107060821A CN 107060821 A CN107060821 A CN 107060821A CN 201710182023 A CN201710182023 A CN 201710182023A CN 107060821 A CN107060821 A CN 107060821A
Authority
CN
China
Prior art keywords
grouting
slip casting
face
hole
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710182023.2A
Other languages
Chinese (zh)
Inventor
王传宗
刘春辉
何旭东
谭朝阳
林少军
雷保珂
杨洪飞
邱桂文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201710182023.2A priority Critical patent/CN107060821A/en
Publication of CN107060821A publication Critical patent/CN107060821A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

It is closely knit to the backfill of face back-pressure first with Tunnel slag the invention discloses a kind of many lithology method for protecting support of face, and part injecting treatment is backfilled to back-pressure using the ductules of Φ 42;Then, the empty slag of cleaning face, and set the grouting rock bolts of two row Φ 25, anchor pole leakage part be connected with wall for grouting, and it is closely knit to backfill the filling of body remainder to back-pressure using sandbag, after the completion of formwork erection pump concrete pour into a mould wall for grouting;Then geology inspecting hole is carried out to face, and adjusts grouting program;Front pre-grouting construction is then carried out, slip casting effect inspection is carried out, unqualified injected hole need to carry out after-teeming slurry;Finally, carry out setting up pipe canopy.In summary, the present invention is simple in construction, and tunneltron canopy and anchor pole position, size design are reasonable;The design of the present invention is with strong points, can solve face arch slip casting leakiness phenomenon;The consolidation effect of the present invention is good, effectively less many nonconformity contact band sections can excavate risk.

Description

A kind of many lithology method for protecting support of face
Technical field
The present invention relates to tunnel excavation technical field, it particularly relates to a kind of many lithology method for protecting support of face.
Background technology
The general design using front pre-grouting of many nonconformity contact belt construction designs in tunnel in the market, it is this Method reinforcing scope is that slip casting effect is undesirable above 3~8 meters of tunnel excavation border, vault, and excavation easily vault occurs and collapsed again Side, huge risk is brought for production.
The content of the invention
For the above-mentioned technical problem in correlation technique, the present invention proposes a kind of many lithology method for protecting support of face, can Overcome the above-mentioned deficiency of prior art.
To realize above-mentioned technical purpose, the technical proposal of the invention is realized in this way:
A kind of many lithology method for protecting support of face, comprise the following steps:
S1:Many nonconformities are contacted with band face in advance pre-process and slip casting, is specifically included:
S1.1:It is closely knit to the backfill of tunnel tunnel face back-pressure using Tunnel slag, and part is backfilled to back-pressure using the ductules of Φ 42 Carry out injecting treatment;
S1.2:Wall for grouting is poured into a mould, is specifically included:
S1.2.1:The empty slag of face is cleared up, and sets above vault the grouting rock bolts of two row Φ 25, and the grouting rock bolts of Φ 25 is outer Leakage part is connected with wall for grouting;
S1.2.2:The filling of body remainder is backfilled to back-pressure using sandbag closely knit;
S1.2.3:With formwork erection pump concrete cast wall for grouting after filling is closely knit;
S1.2.4:Plash is set on the outside of formwork erection pump, the water of face is led to outside plash pump drainage to hole;
S1.3:Face geological condition is analyzed, and grouting program is adjusted according to geological condition;
S1.4:According to the grouting program after adjustment, front pre-grouting construction is carried out, the grouting mode of pre-pouring grout construction is protrusive It is segmented front pre-grouting and drilling rod retrusive grouting and reinforcing;
S1.5:After the completion of all injected holes all slip casting of front pre-grouting construction, slip casting effect is checked, and to underproof slip casting Hole carries out after-teeming slurry;
S2:Bimetallic tube canopy, and slip casting are set to face arch after the completion of step S1, is specifically included:
S2.1:Bimetallic tube canopy is set up to face arch after the completion of face front pre-grouting, first layer pipe canopy angle is 15 °, the angle of second layer pipe canopy is 20 °, 30 meters of the total length of each layer of pipe canopy, two layers of pipe canopy level interval 1m, pipe canopy orifice ring Cloth hole in the range of the centering 40cm into spacing, 140 ° of vault, outer 3~5 ° of limb;
S2.2:Slip casting is carried out to bimetallic tube canopy.
Further, the spacing of the ductules of Φ 42 is 1.5 × 1.5 meters in step S1.1, is laid in blossom type, every Φ 42 Ductule length is 5 meters;The slurries of slip casting are cement grouts, and the ratio of mud of the cement grout is 1:1, the pressure of slip casting is 0.3~0.5 MPa.
Further, in step S1.2.1, the anchor pole length of the described grouting rock bolts of Φ 25 is 3.5 meters, and spacing is 1 × 1 meter, And the leakage that the anchor pole is connected with wall for grouting is partially larger than equal to 1 meter.
Further, in step S1.2.3, the concrete for pouring wall for grouting is C30 concrete, the thickness of the wall for grouting For 3.0m, the thickness of the wall for grouting insertion country rock is more than or equal to 50cm.
Further, step S1.3 is specifically:Horizontal advance geologic inspecting hole is carried out to face, according to earth's surface inspecting hole and Upper circulation inspecting hole and bored grouting situation analysis face geological condition, grouting design is adjusted according to geological condition, is such as found empty Chamber need to first carry out slip casting backfill.
Further, in step S1.4, the drilling machine in front pre-grouting construction uses special geological drilling rig, rig The gradient of climbing is less than or equal to 25 °, and drilling rod uses self-advancing type drilling rod, and the average length of drilling rod is 25m, body of rod φ external diameter 110mm, Bored grouting order uses ecto-entad, and the principle in hole is jumped at interval from bottom to top, per 1~2, septum secundum hole hole, along excavation contour line It is distributed by axial radiation shape.
It is preferred that, the section length principle of segmentation front pre-grouting is:In boring procedure without collapse hole and water 0~ 10m3Section length is 10m, 10~30m of slight collapse hole and water during/h3Section length is 5m during/h, and collapse hole is serious and water is big In 30m3Stop creeping into and starting slip casting immediately during/h;During slip casting, when slip casting for a period of time, it is a certain amount of when, if pressure Reach that design final pressure then terminates slip casting;Or during slip casting, pressure is gradually increasing, flow is gradually reduced, when grouting pressure reaches Design pressure is simultaneously stablized after 10min, you can terminate the hole slip casting;If grouting amount reaches a certain amount of, pressure does not still rise, Two fluid grouting measure can be taken to terminate the slip casting to the hole.
Further, in step S1.5, when slip casting effect inspection uses inspecting hole inspection technique, grouting pressure-grouting amount-slip casting Half interval contour inspection technique and sound wave inspection technique.
Further, in step S2.1, pipe canopy body of rod outer surface uses the T-shaped helicitic texture steel pipe of total length and steel floral tube, bar Body outer diameter is φ 76mm, wall thickness 10mm, per pole body long 6m or 8m, is connected between bar segment using adapter sleeve, while every layer Pipe canopy from positive integer label is used in order from left to right, and what it is marked as even numbers is colored steel pipe, and what it is marked as odd number is steel pipe, pipe canopy Colored steel pipe is first set during construction, then sets steel pipe, flower steel pipe tube wall punching, cloth hole uses blossom type, and aperture is 10~16mm, hole Spacing is 15cm.
Further, in step S2.2:The order slip casting from arch springing in anhydrous location during tube shed grouting, injection speed according to Depending on injected hole water yield size, until pressure flow terminates slip casting when reaching requirement, gate valve is closed at the end of slip casting, unloaded Pulp-inlet pipe, into subsequent cycle.
Beneficial effects of the present invention:The present invention is simple in construction, and tunneltron canopy and anchor pole position, size design are reasonable; The design of the present invention is with strong points, can solve face arch slip casting leakiness phenomenon;The consolidation effect of the present invention is good, Effectively less many nonconformity contact band sections it can excavate risk.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to institute in embodiment The accompanying drawing needed to use is briefly described, it should be apparent that, drawings in the following description are only some implementations of the present invention Example, for those of ordinary skill in the art, on the premise of not paying creative work, can also be obtained according to these accompanying drawings Obtain other accompanying drawings.
Fig. 1 is the construction schematic diagram of face described according to embodiments of the present invention;
Fig. 2 is the structural representation of the wall for grouting part of the present invention;
Fig. 3 is the vertical section schematic diagram of the wall for grouting part of the present invention;
Fig. 4 is the pipe roof construction technological process of the present invention;
Fig. 5 is the schematic diagram of pipe canopy part of the present invention;
In figure:1st, tunnel;2nd, bimetallic tube canopy;3rd, rig operations platform;4th, wall for grouting;5th, self-advancing type drilling rod;6th, the mortar anchors of Φ 25 Bar;7th, tunnel excavation contour line;8th, wall for grouting contour line.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, the every other embodiment that those of ordinary skill in the art are obtained belongs to what the present invention was protected Scope.
As Figure 1-5, the described many lithology method for protecting support of a kind of face according to embodiments of the present invention, including following step Suddenly:
S1:Many nonconformities are contacted with band face in advance pre-process and slip casting, is specifically included:
S1.1:It is closely knit to the backfill of tunnel tunnel face back-pressure using the hole slag in tunnel 1, and using the ductules of Φ 42 to back-pressure backfill portion Divide and carry out injecting treatment;
S1.2:Wall for grouting 4 is poured into a mould, is specifically included:
S1.2.1:The empty slag of face is cleared up, and sets above vault the grouting rock bolts 6 of two row Φ 25, and the grouting rock bolts 6 of Φ 25 Leakage part is connected with wall for grouting 4;
S1.2.2:The filling of body remainder is backfilled to back-pressure using sandbag closely knit;
S1.2.3:With formwork erection pump concrete cast wall for grouting 4 after filling is closely knit;
S1.2.4:Plash is set on the outside of formwork erection pump, the water of face is led to outside plash pump drainage to hole;
S1.3:Face geological condition is analyzed, and grouting program is adjusted according to geological condition;
S1.4:According to the grouting program after adjustment, front pre-grouting construction is carried out, the grouting mode of pre-pouring grout construction is protrusive It is segmented front pre-grouting and drilling rod retrusive grouting and reinforcing;
S1.5:After the completion of all injected holes all slip casting of front pre-grouting construction, slip casting effect is checked, and to underproof slip casting Hole carries out after-teeming slurry;
S2:Bimetallic tube canopy, and slip casting are set to face arch after the completion of step S1, is specifically included:
S2.1:Bimetallic tube canopy 2 is set up to face arch after the completion of face front pre-grouting, first layer pipe canopy angle is 15 °, the angle of second layer pipe canopy is 20 °, 30 meters of the total length of each layer of pipe canopy, two layers of pipe canopy level interval 1m, pipe canopy orifice ring Cloth hole in the range of the centering 40cm into spacing, 140 ° of vault, outer 3~5 ° of limb;
S2.2:Slip casting is carried out to bimetallic tube canopy 2.
In one embodiment, the spacing of the ductules of Φ 42 is 1.5 × 1.5 meters in step S1.1, is laid in blossom type, The every ductule length of Φ 42 is 5 meters;The slurries of slip casting are cement grouts, and the ratio of mud of the cement grout is 1:1, slip casting Pressure is 0.3~0.5 MPa.
In one embodiment, in step S1.2.1, the anchor pole length of the described grouting rock bolts of Φ 25 is 3.5 meters, spacing It is 1 × 1 meter, and the leakage that the anchor pole is connected with wall for grouting is partially larger than equal to 1 meter.
In one embodiment, in step S1.2.3, the concrete for pouring wall for grouting is C30 concrete, tunnel excavation It is wall for grouting between contour line 7 and wall for grouting contour line 8, the thickness of the wall for grouting is 3.0m, and the wall for grouting is embedded in country rock Thickness be more than or equal to 50cm.
In one embodiment, step S1.3 is specifically:Horizontal advance geologic inspecting hole is carried out to face, according to earth's surface Inspecting hole and upper circulation inspecting hole and bored grouting situation analysis face geological condition, grouting design is adjusted according to geological condition, Such as find that cavity need to first carry out slip casting backfill.
In one embodiment, in step S1.4, the drilling machine in front pre-grouting construction uses special geology Rig, described geological drilling rig is erected on rig operations platform 3, and the gradient of rig climbing is less than or equal to 25 °, and drilling rod is used certainly Enter formula drilling rod 5, the average length of drilling rod is 25m, and body of rod φ external diameter 110mm, bored grouting order uses ecto-entad, from it is lower to The principle in hole is jumped at upper interval, per 1~2, septum secundum hole hole, is distributed along excavation contour line by axial radiation shape, wherein, segmentation is advanced The section length principle of pre-pouring grout is:Without collapse hole and water in 0~10m in boring procedure3Section length is 10m during/h, gently 10~30m of micro- collapse hole and water3Section length is 5m during/h, and collapse hole is serious and water is more than 30m3Stop drilling immediately simultaneously during/h Start slip casting;During slip casting, when slip casting for a period of time, it is a certain amount of when, if pressure reach design final pressure if terminate slip casting;Or During slip casting, pressure is gradually increasing, and flow is gradually reduced, after grouting pressure reaches design pressure and stable 10min, you can Terminate the hole slip casting;If grouting amount reaches a certain amount of, pressure does not still rise, and two fluid grouting measure can be taken to terminate to this The slip casting in hole.
In one embodiment, in step S1.5, slip casting effect inspection uses inspecting hole inspection technique, grouting pressure-slip casting Amount-slip casting time graph inspection technique and sound wave inspection technique.
In one embodiment, in step S2.1, pipe canopy body of rod outer surface uses the T-shaped helicitic texture steel pipe of total length and steel Floral tube, body of rod outer diameter is φ 76mm, wall thickness 10mm, per pole body long 6m or 8m, is connected between bar segment using adapter sleeve, together When every layer of pipe canopy from positive integer label is used in order from left to right, what it is marked as even numbers is colored steel pipe, and what it is marked as odd number is steel Pipe, first sets colored steel pipe during pipe roof construction, then sets steel pipe, the tube wall punching of flower steel pipe, and cloth hole uses blossom type, and aperture is 10~ 16mm, pitch of holes is 15cm.
In one embodiment, in step S2.2:The order slip casting from arch springing, slip casting in anhydrous location during tube shed grouting Depending on speed is according to injected hole water yield size, until pressure flow terminates slip casting when reaching requirement, by gate valve at the end of slip casting Close, pulp-inlet pipe is unloaded, into subsequent cycle.
Understand for convenience the present invention above-mentioned technical proposal, below by way of in specifically used mode to the present invention it is above-mentioned Technical scheme is described in detail.
When specifically used, face back-pressure is backfilled first with Tunnel slag closely knit, and use the ductules pair of Φ 42 Back-pressure backfills part injecting treatment;Then, the empty slag of cleaning face, and set above vault the grouting rock bolts of two row Φ 25, anchor Bar leakage part be connected with wall for grouting, and it is closely knit to backfill the filling of body remainder to back-pressure using sandbag, after the completion of formwork erection pumping mix Must not have in solidifying soil cast wall for grouting, wall for grouting and set plash on the outside of steel arch-shelf, anchor pole, steel pipe etc., template, by the water of face Lead to outside plash pump drainage to hole, prevent water logging to the wall for grouting poured into a mould, wall for grouting must be poured into a mould continuously;Then to face Geology inspecting hole is carried out, and adjusts grouting program;Front pre-grouting construction is then carried out, after all injected holes all terminate, is carried out Slip casting effect checks that unqualified injected hole need to carry out after-teeming slurry;Finally, carry out setting up pipe canopy, the specific size of pipe canopy can basis Field condition is adjusted.
In summary, the present invention is simple in construction, and tunneltron canopy and anchor pole position, size design are reasonable;The present invention's Design is with strong points, can solve face arch slip casting leakiness phenomenon;The consolidation effect of the present invention is good, can be effective The less many nonconformity contact band sections in ground excavate risk.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention God is with principle, and any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (10)

1. a kind of many lithology method for protecting support of face, it is characterised in that comprise the following steps:
S1:Many nonconformities are contacted with band face in advance pre-process and slip casting, is specifically included:
S1.1:It is closely knit to the backfill of tunnel tunnel face back-pressure using Tunnel slag, and part is backfilled to back-pressure using the ductules of Φ 42 Carry out injecting treatment;
S1.2:Wall for grouting is poured into a mould, is specifically included:
S1.2.1:The empty slag of face is cleared up, and sets above vault the grouting rock bolts of two row Φ 25, and the grouting rock bolts of the Φ 25 Leakage part be connected with wall for grouting;
S1.2.2:The remainder filling backfilled using sandbag to back-pressure is closely knit;
S1.2.3:With formwork erection pump concrete cast wall for grouting after filling is closely knit;
S1.2.4:Plash is set on the outside of formwork erection pump, the water of face is led to outside plash pump drainage to hole;
S1.3:Face geological condition is analyzed, and grouting program is adjusted according to geological condition;
S1.4:According to the grouting program after adjustment, front pre-grouting construction is carried out, the grouting mode of pre-pouring grout construction is protrusive It is segmented front pre-grouting and drilling rod retrusive grouting and reinforcing;
S1.5:After the completion of all injected holes all slip casting of front pre-grouting construction, slip casting effect is checked, and to underproof slip casting Hole carries out after-teeming slurry;
S2:Bimetallic tube canopy, and slip casting are set to face arch after the completion of step S1, is specifically included:
S2.1:Bimetallic tube canopy, first layer pipe canopy angle are set up to face arch after the completion of the construction of face front pre-grouting For 15 °, the angle of second layer pipe canopy is 20 °, 30 meters of the total length of each layer of pipe canopy, and the level interval between two layers of pipe canopy is 1m.Cloth hole in the range of pipe canopy orifice ring centering 40cm into spacing, 140 ° of vault, outer limb is 3~5 °;
S2.2:Slip casting is carried out to bimetallic tube canopy.
2. many lithology method for protecting support of a kind of face according to claim 1, it is characterised in that Φ 42 is small in step S1.1 The spacing of conduit is 1.5 × 1.5 meters, is laid in blossom type, and the every ductule length of Φ 42 is 5 meters;The slurries of slip casting are cement Slurries, the ratio of mud of the cement grout is 1:1, the pressure of slip casting is 0.3~0.5 MPa.
3. many lithology method for protecting support of a kind of face according to claim 1, it is characterised in that in step S1.2.1, institute The anchor pole length for the grouting rock bolts of Φ 25 stated is 3.5 meters, and spacing is 1 × 1 meter, and the leakage part that the anchor pole is connected with wall for grouting More than or equal to 1 meter.
4. many lithology method for protecting support of a kind of face according to claim 1, it is characterised in that in step S1.2.3, pour The concrete for building wall for grouting is C30 concrete, and the thickness of the wall for grouting is 3.0m, and the thickness of the wall for grouting insertion country rock is big In equal to 50cm.
5. many lithology method for protecting support of a kind of face according to claim 1, it is characterised in that step S1.3 is specifically: Horizontal advance geologic inspecting hole is carried out to face, according to earth's surface inspecting hole and upper circulation inspecting hole and bored grouting situation analysis area Face geological condition, grouting design is adjusted according to geological condition, such as finds that cavity need to first carry out slip casting backfill.
6. many lithology method for protecting support of a kind of face according to claim 1, it is characterised in that in step S1.4, in advance Drilling machine during pre-pouring grout is constructed uses special geological drilling rig, and the gradient of rig climbing is less than or equal to 25 °, and drilling rod is used certainly Enter formula drilling rod, the average length of drilling rod is 25m, and external diameter of rod body 110mm, bored grouting order uses ecto-entad, from bottom to top The principle in hole is jumped at interval, per 1~2, septum secundum hole hole, is distributed along excavation contour line by axial radiation shape.
7. many lithology method for protecting support of a kind of face according to claim 6, it is characterised in that segmentation front pre-grouting Section length principle is:Without collapse hole and water in 0~10m in boring procedure3During/h section length be 10m, slight collapse hole and 10~30m of water3Section length is 5m during/h, and collapse hole is serious and water is more than 30m3Stop creeping into and starting slip casting immediately during/h; During slip casting, when slip casting for a period of time, it is a certain amount of when, if pressure reach design final pressure if terminate slip casting;Or slip casting process In, pressure is gradually increasing, and flow is gradually reduced, after grouting pressure reaches design pressure and stable 10min, you can terminate the hole Slip casting;If grouting amount reaches a certain amount of, pressure does not still rise, and two fluid grouting measure can be taken to terminate the note to the hole Slurry.
8. many lithology method for protecting support of a kind of face according to claim 1, it is characterised in that in step S1.5, slip casting Effect inspection uses inspecting hole inspection technique, grouting pressure-grouting amount-slip casting time graph inspection technique and sound wave inspection technique.
9. many lithology method for protecting support of a kind of face according to claim 1, it is characterised in that in step S2.1, pipe canopy Body of rod outer surface uses the T-shaped helicitic texture steel pipe of total length and steel floral tube, and body of rod outer diameter is φ 76mm, wall thickness 10mm, is often saved It is connected between the body of rod long 6m or 8m, bar segment using adapter sleeve, while every layer of pipe boron steel pipe from using positive integer in order from left to right Label, what it is marked as even numbers is colored steel pipe, and what it is marked as odd number is steel pipe, colored steel pipe is first set during pipe roof construction, then set steel Pipe, flower steel pipe tube wall punching, cloth hole uses blossom type, and aperture is 10~16mm, and pitch of holes is 15cm.
10. many lithology method for protecting support of a kind of face according to claim 1, it is characterised in that in step S2.2:Pipe canopy The order slip casting from arch springing in anhydrous location during slip casting, depending on injection speed is according to injected hole water yield size, until pressure current Amount terminates slip casting when reaching requirement, closes gate valve at the end of slip casting, unloads pulp-inlet pipe, into subsequent cycle.
CN201710182023.2A 2017-03-24 2017-03-24 A kind of many lithology method for protecting support of face Pending CN107060821A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710182023.2A CN107060821A (en) 2017-03-24 2017-03-24 A kind of many lithology method for protecting support of face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710182023.2A CN107060821A (en) 2017-03-24 2017-03-24 A kind of many lithology method for protecting support of face

Publications (1)

Publication Number Publication Date
CN107060821A true CN107060821A (en) 2017-08-18

Family

ID=59618483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710182023.2A Pending CN107060821A (en) 2017-03-24 2017-03-24 A kind of many lithology method for protecting support of face

Country Status (1)

Country Link
CN (1) CN107060821A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725056A (en) * 2017-10-13 2018-02-23 中铁五局集团有限公司 One kind passes through silly stratum tunnel loopful quick grouting construction method in advance
CN108547639A (en) * 2018-03-13 2018-09-18 北京市政路桥股份有限公司 Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN108798718A (en) * 2018-07-09 2018-11-13 中铁十七局集团第四工程有限公司 Subsequent grouting method is held before tunnel
CN114109442A (en) * 2021-10-18 2022-03-01 中铁十局集团第一工程有限公司 Tunnel karst broken zone collapse half-section curtain forward grouting reinforcement treatment method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798931A (en) * 2010-03-12 2010-08-11 中铁隧道集团有限公司 Construction technology method of large-scale lead pipe roofs of tunnels and underground engineering without workshops
CN101994513A (en) * 2010-10-30 2011-03-30 中铁十二局集团第二工程有限公司 Method for constructing tunnel by finishing full section curtain grouting from upper-half section
CN103256060A (en) * 2013-05-18 2013-08-21 中铁十六局集团有限公司 Moisture rich and weak mylonite large section tunnel surrounding rock consolidation and excavation method
CN103334770A (en) * 2013-06-09 2013-10-02 中铁隧道集团有限公司 Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
KR20140044172A (en) * 2012-10-04 2014-04-14 한국철도기술연구원 Method for constructing underground structure of railroad using steel pipe roof of two-side semicircle arch type and apparatus for pressing guidance pipe
CN105041325A (en) * 2015-07-13 2015-11-11 长沙理工大学 Construction method of high-tension water-rich extra-large-section weak breccia tunnel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798931A (en) * 2010-03-12 2010-08-11 中铁隧道集团有限公司 Construction technology method of large-scale lead pipe roofs of tunnels and underground engineering without workshops
CN101994513A (en) * 2010-10-30 2011-03-30 中铁十二局集团第二工程有限公司 Method for constructing tunnel by finishing full section curtain grouting from upper-half section
KR20140044172A (en) * 2012-10-04 2014-04-14 한국철도기술연구원 Method for constructing underground structure of railroad using steel pipe roof of two-side semicircle arch type and apparatus for pressing guidance pipe
CN103256060A (en) * 2013-05-18 2013-08-21 中铁十六局集团有限公司 Moisture rich and weak mylonite large section tunnel surrounding rock consolidation and excavation method
CN103334770A (en) * 2013-06-09 2013-10-02 中铁隧道集团有限公司 Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN105041325A (en) * 2015-07-13 2015-11-11 长沙理工大学 Construction method of high-tension water-rich extra-large-section weak breccia tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李国平: "隧道超前帷幕注浆施工技术", 《文摘版:工程技术》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725056A (en) * 2017-10-13 2018-02-23 中铁五局集团有限公司 One kind passes through silly stratum tunnel loopful quick grouting construction method in advance
CN108547639A (en) * 2018-03-13 2018-09-18 北京市政路桥股份有限公司 Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN108547639B (en) * 2018-03-13 2019-12-03 北京市政路桥股份有限公司 Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN108798718A (en) * 2018-07-09 2018-11-13 中铁十七局集团第四工程有限公司 Subsequent grouting method is held before tunnel
CN108798718B (en) * 2018-07-09 2020-11-10 中铁十七局集团第四工程有限公司 Tunnel front-bearing subsequent grouting method
CN114109442A (en) * 2021-10-18 2022-03-01 中铁十局集团第一工程有限公司 Tunnel karst broken zone collapse half-section curtain forward grouting reinforcement treatment method
CN114109442B (en) * 2021-10-18 2024-02-09 中铁十局集团第一工程有限公司 Tunnel karst crushing belt sliding collapse half-section curtain progressive grouting reinforcement treatment method

Similar Documents

Publication Publication Date Title
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN110359921A (en) Wear the construction method of building in a kind of shield short distance side
CN107288657B (en) The weak cementing rock mass seepage failure area slip casting integrated control method of top of underground
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN108119143B (en) A kind of vertical shaft working surface cement soluble glass paste combines grouting method with chemical grout double-round curtain
CN106320354B (en) The Seepage method on solution cavity development stratum under coating
CN109098733B (en) Rapid grouting reinforcement method for large-section tunnel in fracture zone rock stratum
CN109083649B (en) It is applicable in the water-rich sand layer pre-grouting reinforcement means of complicated urban environment subway tunnel
CN105840207A (en) Cross shallow buried bias pressure loose accumulation body large-span tunnel comprehensive entrance structure construction method
CN111119940B (en) Grouting construction treatment method
CN107060821A (en) A kind of many lithology method for protecting support of face
CN110469332B (en) Advanced support consolidation method for tunnel penetrating through debris flow accumulation body
CN207331673U (en) Sleeve valve pipe horizontal grouting construction device
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN111810198A (en) Tunnel earth surface directional large-caliber deep hole grouting device and grouting method
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN211081894U (en) Water-rich stratum tunnel is precipitation structure in coordination
CN109139018A (en) The method for tunnel construction and system that deep hole sleeve valve barrel grouting is combined with horizontal jet grouting
CN105731978A (en) Grouting slurry for reinforcing tunnel face of jacking culvert of fine-sand layer and grouting method
CN114934502A (en) Underground diaphragm wall protection groove structure of water-rich sand layer and construction method
CN107178077A (en) Overburden layer grouting and reinforcing structure and its design method on a kind of karst area solution cavity
CN208564582U (en) One kind closing on river shield launching end stratum consolidation device
CN203161250U (en) Deep hole grouting reinforcing system for tunnel
CN103343534A (en) Closed precipitation method for foundation pit construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Ma Dong

Inventor after: Lei Baoke

Inventor after: Yang Hongfei

Inventor after: Qiu Guiwen

Inventor after: Wang Chuanzong

Inventor after: Liu Chunhui

Inventor after: Lv Zhijun

Inventor after: Lv Xiuhua

Inventor after: Wang Langfeng

Inventor after: He Xudong

Inventor after: Tan Chaoyang

Inventor after: Lin Shaojun

Inventor before: Wang Chuanzong

Inventor before: Liu Chunhui

Inventor before: He Xudong

Inventor before: Tan Chaoyang

Inventor before: Lin Shaojun

Inventor before: Lei Baoke

Inventor before: Yang Hongfei

Inventor before: Qiu Guiwen

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170810

Address after: 064000 Hebei province Tangshan City Fengrun District Guanghua Road No. 2

Applicant after: China Railway Sixteen Bureau Group Fifth Engineering Company Limited

Applicant after: China Railway Construction Engineering Bureau No.16 Group Corp., Ltd.

Address before: 064000 Hebei province Tangshan City Fengrun District Guanghua Road No. 2

Applicant before: China Railway Sixteen Bureau Group Fifth Engineering Company Limited

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818

RJ01 Rejection of invention patent application after publication