CN203161250U - Deep hole grouting reinforcing system for tunnel - Google Patents

Deep hole grouting reinforcing system for tunnel Download PDF

Info

Publication number
CN203161250U
CN203161250U CN 201320105906 CN201320105906U CN203161250U CN 203161250 U CN203161250 U CN 203161250U CN 201320105906 CN201320105906 CN 201320105906 CN 201320105906 U CN201320105906 U CN 201320105906U CN 203161250 U CN203161250 U CN 203161250U
Authority
CN
China
Prior art keywords
sleeve valve
valve pipe
tunnel
row
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320105906
Other languages
Chinese (zh)
Inventor
刘治宝
徐冬青
杨金有
徐高山
马杰
庞前凤
周兵役
刘恒东
姚义
孙敏筠
王盛印
张利
王全利
罗维彩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
China Railway 22nd Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
China Railway 22nd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd, China Railway 22nd Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
Priority to CN 201320105906 priority Critical patent/CN203161250U/en
Application granted granted Critical
Publication of CN203161250U publication Critical patent/CN203161250U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model discloses a deep hole grouting reinforcing system for a tunnel, which is characterized by comprising sleeve valve pipes, wherein the sleeve valve pipes are arranged in an arch stratum of the tunnel within 180 degrees and distributed in eight rows; grouting reinforcing layers of the sleeve valve pipes are beyond a primary support structure of the tunnel within 2m; and the circumferential distances of the far ends and row distances of the sleeve valve pipes are 0.8m. The sleeve valve pipes are phi 48*3.2mm plastic sleeve valve pipes. The deep hole grouting sleeve valve pipes are distributed to form four circulations. With the adoption of phi 48 hard PVC (polyvinyl chloride) pipes, the system can bear the maximum pressure of greater than 3.0Mpa, and the sleeve valve pipes are distributed reasonably to reinforce the tunnel, so that the construction safety of buildings, structures and the tunnel around a project is ensured.

Description

Tunnel deep hole grouting hardened system
Technical field
The utility model relates to a kind of tunnel deep hole grouting hardened system.
Background technology
Along with the development in city, in order to alleviate the crowded of aboveground space, the underground space is adding great development.In the city, geological conditions is complicated and changeable, and the above and below ground construction of structures is intricate, and is very responsive to the stratum sedimentation reaction.In the process of subway and the development of other underground engineering construction, tending to run into the situation that need pass through the above and below ground construction of structures, how to guarantee the safety of engineering periphery construction of structures and constructing tunnel, is the main difficult problem that construction faces.
The utility model content
Technical problem to be solved in the utility model provides a kind of tunnel deep hole grouting hardened system, has solved tunnel reinforcement, has guaranteed the problem of the construction of structures of engineering periphery and safety for tunnel engineering.
Technical problem to be solved in the utility model is achieved through the following technical solutions:
A kind of tunnel deep hole grouting hardened system is characterized in that: comprise sleeve valve pipe, described sleeve valve pipe is located at the 180 ° of scopes in stratum, arch, tunnel, and sleeve valve pipe is laid 8 rows altogether, and sleeve valve pipe grouting and reinforcing layer thickness is that the tunnel just props up the outer 2m scope of structure;
Described sleeve valve pipe far-end circumferential distance, row's spacing are 0.8m.
Described sleeve valve pipe adopts φ 48mm * 3.2mm plastics sleeve valve pipe.
Described first row's sleeve valve pipe is 12 ° horizontal by angle; Described second row's sleeve valve pipe is horizontal by 15 ° of angles; Described the 3rd row's sleeve valve pipe is horizontal by 18 ° of angles; Described the 4th row's sleeve valve pipe is horizontal by 22 ° of angles; Described the 5th row's sleeve valve pipe is horizontal by 28 ° of angles; Described the 6th row's sleeve valve pipe is horizontal by 35 ° of angles; Described the 7th row's sleeve valve pipe is horizontal by 45 ° of angles; Described the 8th row's sleeve valve pipe is horizontal by 59 ° of angles.
Described deep hole grouting sleeve valve pipe is laid four circulations altogether.
The utility model with respect to the beneficial effect of prior art is:
The slip casting of sleeve valve pipe is after slurries are through the grouting pump pressurization, enter Grouting Pipe by tube connector, gather sleeve valve pipe slip casting pipeline section, then by sleeve valve pipe, under pressure, pressurized slurries will produce along earth formation and fill, infiltration, densification, splitting is flowed, slurries form induration in the stratum, thereby reach the increase formation strength, reduce the purpose of stratum permeability, native system adopts Φ 48 hard PVC pipes, the maximum pressure that can bear is greater than 3.0Mpa, and by the reasonably laying of sleeve valve pipe, to tunnel reinforcement, guarantee engineering periphery construction of structures and safety for tunnel engineering.
Description of drawings
Fig. 1 is the utility model structural representation
Fig. 2 reinforces sectional side elevation for the utility model deep hole grouting
Among the figure: 1-tunnel, 2-sleeve valve pipe grouting and reinforcing layer, 3-first row's sleeve valve pipe, 4-the 8th row's sleeve valve pipe, 5-sleeve valve pipe, 6-wall for grouting
The specific embodiment
Shown in Fig. 1-2, a kind of tunnel deep hole grouting hardened system is characterized in that: comprise sleeve valve pipe, described sleeve valve pipe is located at the 180 ° of scopes in stratum, arch, tunnel, and sleeve valve pipe is laid 8 rows altogether, and sleeve valve pipe grouting and reinforcing layer thickness is that the tunnel just props up the outer 2m scope of structure;
Described sleeve valve pipe far-end circumferential distance, row's spacing are 0.8m.
Described sleeve valve pipe adopts φ 48mm * 3.2mm plastics sleeve valve pipe, adopts sleeve valve pipe retrusive grouting construction process.
Described first row's sleeve valve pipe is 12 ° horizontal by angle; Described second row's sleeve valve pipe is horizontal by 15 ° of angles; Described the 3rd row's sleeve valve pipe is horizontal by 18 ° of angles; Described the 4th row's sleeve valve pipe is horizontal by 22 ° of angles; Described the 5th row's sleeve valve pipe is horizontal by 28 ° of angles; Described the 6th row's sleeve valve pipe is horizontal by 35 ° of angles; Described the 7th row's sleeve valve pipe is horizontal by 45 ° of angles; Described the 8th row's sleeve valve pipe is horizontal by 59 ° of angles.
Described deep hole grouting sleeve valve pipe is laid four circulations altogether, and it is 10.25 meters that the every circulation of deep hole grouting performs length, excavates 8.25 meters, stays 2 meters as the wall for grouting of next circulation construction.
Slurries adopt single liquid cement paste, water/binder ratio be 1: 1,0.8: 1 two kinds.
The face shutoff is all carried out in each circulation, and face is only starched shutoff and adopted C25 linked network sprayed mortar, concrete thickness 300mm, and steel mesh reinforcement adopts φ 6.5@150 * 150mm.
Sleeve valve pipe grouting construction method is as follows:
1. setting-out location: mark at face by the basic point coordinate with total powerstation earlier that the 1.5m line is as location cloth point coordinates XY axle on tunnel center line, the springing line, again by these coordinate point, the method that adopts backguy and tape measure to measure is made boring position, hole.
2. rig boring:
1) boring vertical plane error≤5cm, bore angle≤± 1 degree, drilling depth 0.5~1.0m.
2) rig in place after, should make drilling machine platform smooth firm, before spudding in, utilize level gauge to make bore angle, and when creeping into 2m and after whenever add a joint drilling rod and all need proofread and correct the rig leveling.
3) in the boulder bed for preventing the hole of collapsing of holing, adopt sleeve pipe follow-up boring, finish boring after, install Grouting Pipe after, sleeve pipe is extracted.
4) for guaranteeing drilling quality, should note: 1. when boring, guarantee that rotating speed is even; 2. when changing drilling rod, drilling rod promotes should keep vertical with putting down, in order to avoid reaming.
5) after boring reaches projected depth, carry out borehole log.
3. install sleeve valve pipe
Insert sleeve valve pipe after boring finishes immediately, pipe is connected by the street corner of screw thread by every joint 3m, and pipe end adds the stifle sealing, and pipe seal is reliable.After the every joint of sleeve valve pipe connects, transfer to successively in the boring, at the bottom of the hole, guarantee as far as possible when transferring that the center of sleeve valve pipe overlaps with drill center.The upper end that guarantees sleeve valve pipe exposes face 10~20cm, entangles firm with pullover again, prevents that foreign material from entering in the pipe.
4. clear hole
Sleeve valve pipe installs plug, and to injecting clear water in the pipe, according to scene excessive slurry hole length (30cm/ section), whether segmentation inspection sleeve valve pipe slurry discharging hole is unimpeded.
5. notes sleeve shell material
Sleeve shell material is generally based on swell soil, cement is auxilliary the composition, is mainly used in sealing the annulus between sleeve valve pipe and the borehole wall, and slurries flee hither and thither when preventing from being in the milk, under the effect of rubber sleeve and stop grouting plug, force in the grout compartment scope and to squeeze broken sleeve shell material (being open loop) and enter the stratum.
The quality of sleeve shell material cast is to guarantee that slip casting is the key that guarantees the slip casting success or not, and its requirement can press off filler and carry out horizontal slip casting under certain pressure, can stop slurries to flow out the face of land along hole wall or tube wall when high-pressure slip-casting again.Sleeve shell material requires its fragility higher, and shrinkage is little, and mechanical strength is suitable, and the slurry that namely will prevent from going here and there is taken into account open loop again.
Mortar depositing construction is as follows:
Adopt KBY-70/16 type grouting pump that the slip casting operation is carried out on the stratum.Grouting mode adopts the retrusive segmenting slip casting, namely carries out slip casting by the outside segmentation of nose end in Grouting Pipe, each slip casting segment length 0.4~0.5m, has annotated this section after, retreat again and pour down one section, finish until the slip casting of full hole.Carry out detailed slip casting record in the slip casting process.
Slip casting employing water/binder ratio is single liquid cement paste of 1: 1,0.8: 1.According to on-the-spot slip casting test effect grouting serous fluid and proportioning are suitably adjusted.
1) pipe and two plug pipe connect and are put into sleeve valve pipe bottom in the slurry;
2) slurry output end of pipe top and grouting pump is connected in the slip casting, and the centre is connected to pressure meter;
3) by mixer preparation cement paste, the cement paste for preparing is injected in the plastic containers;
4) the slurry end that advances of grouting pump is put in the cement paste;
5) open hydraulic grouting pump and carry out slip casting, opening the gray scale of pouring water is 1: 1, enriching to 0.8 progressively in the mortar depositing construction: 1;
6) after grouting pressure reaches 0.8MPa and injection rate≤2L/min, keep more than 5 minutes, outer the pulling out of pipe in the slip casting carried out next section slip casting, every section length control of extracting is in 50cm.
For prevent that slurries from solidifying in the pipe in slip casting, the slurries in container all are injected into sleeve valve Guan Zhonghou, need pipe in the slip casting is washed.Method is that the slurry end that advances of hydraulic grouting pump is put in the container that the people fills clear water, and sleeve valve pipe is injected clear water, and the volume of injection equals the volume of the long-pending and hydraulic grouting pump turnover laitance coating pipe of slip casting interior tube body.
2. grouting sequence
Outer endless tube behind the endless tube in adopting is earlier jumped the method in hole at interval and is holed and slip casting.
3. clear hole
After each slip casting is finished, carry out immediately cleaning in the hole, the cleaning hose pipe is inserted the bottom of sleeve valve pipe, be pressed into clear water, water base of putting back to until the aperture is clean, moves up and down water pipe repeatedly at flushing process Chinese medicine, after the cement paste that pipe is interior is rinsed well, be convenient to follow-up slip casting and carry out.
Check situation according to slip casting effect, need carry out secondary grouting, can carry out second compensation slip casting according to grouting mode first.
4. the monitoring measure during slip casting
In the slip casting process, monitor the sedimentation situation of ground and piping lane closely, the trend as finding that ground or piping lane are lifted on having stops slip casting immediately.
5. slip casting requirement
The mortar depositing construction parameter will be tested affirmation according to the stratum actual conditions, and constantly improves adjustment in the construction at the scene, and in the slip casting process, in conjunction with the grouting pressure situation of change, on-the-spot dynamically the adjustment optimized grouting parameter.According to engineering experience in the past, in conjunction with the sand-pebble layer characteristic, preset grouting parameter and see the following form.

Claims (5)

1. tunnel deep hole grouting hardened system is characterized in that: comprise sleeve valve pipe, described sleeve valve pipe is located at the 180 ° of scopes in stratum, arch, tunnel, and sleeve valve pipe is laid 8 rows altogether, and sleeve valve pipe grouting and reinforcing layer thickness is that the tunnel just props up the outer 2m scope of structure.
2. tunnel as claimed in claim 1 deep hole grouting hardened system, it is characterized in that: described sleeve valve pipe far-end circumferential distance, row's spacing are 0.8m.
3. tunnel as claimed in claim 1 deep hole grouting hardened system, it is characterized in that: described sleeve valve pipe adopts φ 48mm * 3.2mm plastics sleeve valve pipe.
4. tunnel as claimed in claim 1 deep hole grouting hardened system, it is characterized in that: described first row's sleeve valve pipe is 12 ° horizontal by angle; Described second row's sleeve valve pipe is horizontal by 15 ° of angles; Described the 3rd row's sleeve valve pipe is horizontal by 18 ° of angles; Described the 4th row's sleeve valve pipe is horizontal by 22 ° of angles; Described the 5th row's sleeve valve pipe is horizontal by 28 ° of angles; Described the 6th row's sleeve valve pipe is horizontal by 35 ° of angles; Described the 7th row's sleeve valve pipe is horizontal by 45 ° of angles; Described the 8th row's sleeve valve pipe is horizontal by 59 ° of angles.
5. tunnel as claimed in claim 1 deep hole grouting hardened system, it is characterized in that: described deep hole grouting sleeve valve pipe is laid four circulations altogether.
CN 201320105906 2013-03-08 2013-03-08 Deep hole grouting reinforcing system for tunnel Expired - Fee Related CN203161250U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320105906 CN203161250U (en) 2013-03-08 2013-03-08 Deep hole grouting reinforcing system for tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320105906 CN203161250U (en) 2013-03-08 2013-03-08 Deep hole grouting reinforcing system for tunnel

Publications (1)

Publication Number Publication Date
CN203161250U true CN203161250U (en) 2013-08-28

Family

ID=49022442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320105906 Expired - Fee Related CN203161250U (en) 2013-03-08 2013-03-08 Deep hole grouting reinforcing system for tunnel

Country Status (1)

Country Link
CN (1) CN203161250U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104405410A (en) * 2014-12-04 2015-03-11 海南大学 Construction structure and construction method for strengthening stratum at end of shield tunnel
CN104790982A (en) * 2015-04-09 2015-07-22 深圳市永鑫建筑工程集团有限公司 Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN105909265A (en) * 2016-06-12 2016-08-31 中铁十九局集团轨道交通工程有限公司 Heaving-prevention retrusive deep-hole grouting system and method for passing through existing shield tunnel
CN109139051A (en) * 2018-09-28 2019-01-04 中铁二十二局集团轨道工程有限公司 A kind of tunnel grouting structure and construction

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104405410A (en) * 2014-12-04 2015-03-11 海南大学 Construction structure and construction method for strengthening stratum at end of shield tunnel
CN104790982A (en) * 2015-04-09 2015-07-22 深圳市永鑫建筑工程集团有限公司 Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN104790982B (en) * 2015-04-09 2018-08-14 深圳市永鑫建筑工程集团有限公司 Casing material for ultra-deep hole grouting of underground excavated tunnel
CN105909265A (en) * 2016-06-12 2016-08-31 中铁十九局集团轨道交通工程有限公司 Heaving-prevention retrusive deep-hole grouting system and method for passing through existing shield tunnel
CN105909265B (en) * 2016-06-12 2018-02-09 中铁十九局集团轨道交通工程有限公司 Pass through the anti-protuberance retrusive deep hole grouting system and method for existing shield tunnel
CN109139051A (en) * 2018-09-28 2019-01-04 中铁二十二局集团轨道工程有限公司 A kind of tunnel grouting structure and construction

Similar Documents

Publication Publication Date Title
CN102943466B (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN204112308U (en) A kind of simple and easy sleeve valve grouting device based on bowlder stone, Thief zone coefficient stratum
CN106320354B (en) The Seepage method on solution cavity development stratum under coating
CN108951612A (en) A kind of subway tunnel shield end reinforcement means
CN101525881B (en) Structure of karst strata pile holes protecting wall and method for constructing pile holes
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN103266614A (en) Sublevel retreating type two-fluid composite grouting construction method for deep foundation pit of sandy gravel stratum
CN108252719B (en) Plastic flow modeling shape red clay layer construction method is worn under a kind of urban shallow tunnel
CN104631438B (en) Long auger guncreting uplift pile construction method
CN110331992A (en) A kind of hole daguanpeng construction method
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN203161250U (en) Deep hole grouting reinforcing system for tunnel
CN203361143U (en) Combination structure of high-pressure jet grouting pile and prestressed pipe pile
CN110409510A (en) A kind of interlocking pile and ground-connecting-wall seam crossing water sealing structure
CN111810198A (en) Tunnel earth surface directional large-caliber deep hole grouting device and grouting method
CN104790982B (en) Casing material for ultra-deep hole grouting of underground excavated tunnel
CN106013078A (en) Construction method for strong permeable ground layer strengthened curtain structure
CN107060821A (en) A kind of many lithology method for protecting support of face
CN105731978A (en) Grouting slurry for reinforcing tunnel face of jacking culvert of fine-sand layer and grouting method
CN102995647B (en) Underground water control method used for grouting and seepage insulation of pile hole
CN102817361B (en) Double bushing top cover for broken rock curtain grouting and construction method of double bushing top cover
CN110409511A (en) A kind of interlocking pile and ground-connecting-wall seam crossing water-stopping method
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
CN203769805U (en) Grouting blowout prevention system for eliminating underwater shield liquefied soil layer
CN105040705A (en) Ground foundation treatment construction technology under multi-karst-cave geological conditions

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130828