CN103628916A - Excavation construction method of high-pressure water gushing tunnel - Google Patents

Excavation construction method of high-pressure water gushing tunnel Download PDF

Info

Publication number
CN103628916A
CN103628916A CN201310633550.2A CN201310633550A CN103628916A CN 103628916 A CN103628916 A CN 103628916A CN 201310633550 A CN201310633550 A CN 201310633550A CN 103628916 A CN103628916 A CN 103628916A
Authority
CN
China
Prior art keywords
tunnel
water
construction
face
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310633550.2A
Other languages
Chinese (zh)
Inventor
翟向宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 13th Bureau Group Co Ltd
Original Assignee
China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 13th Bureau Group Co Ltd filed Critical China Railway 13th Bureau Group Co Ltd
Priority to CN201310633550.2A priority Critical patent/CN103628916A/en
Publication of CN103628916A publication Critical patent/CN103628916A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses an excavation construction method of a high-pressure water gushing tunnel, and relates to a water-rich tunnel excavation method which is capable of realizing safe and rapid construction aiming at a rapid transition high-pressure water gushing section of a water gushing tunnel. The excavation construction method comprises the following steps of (1) determination of the position of a water gushing source: preliminarily determining the direction and the position of a front water source on a tunnel face which is subjected to water gushing according to an advanced detection method; (2) water pressure releasing by selecting a construction method of locally advancing or rounding a pilot tunnel position. The excavation construction method disclosed by the invention is suitable for the construction of a large-section high-pressure water gushing tunnel, the water pressure is released through reasonable measure of locally rounding and advancing a pilot tunnel during the construction of the high-pressure water gushing tunnel, the influence on excavation construction of high-pressure water gushing is effectively reduced, the problem that procedures of drilling, charging, blasting and the like during an excavating and blasting process are difficult to carry out is solved, the normal operation of the construction is ensured, the operation is simple and easy, and other cost is not increased.

Description

The excavation construction method in a kind of water gushing out with high pressure tunnel
Technical field:
The invention belongs to construction of tunnel technical field, particularly the excavation construction method in a kind of water gushing out with high pressure tunnel.
Background technology:
In water gushing out with high pressure constructing tunnel process, it is larger that water gushing out with high pressure has a strong impact in face construction drill, powder charge process impact, even occurs holing, the operation such as powder charge.
Summary of the invention:
Object of the present invention is just to overcome above-mentioned the deficiencies in the prior art, and provides the excavation construction method in a kind of water gushing out with high pressure tunnel, the method can effectively alleviate the impact of water gushing out with high pressure on face construction, thereby guarantee to construct, normally carries out.
As above design, technical scheme of the present invention is: the excavation construction method in a kind of water gushing out with high pressure tunnel, is characterized in that: comprise the steps:
1. determine water burst source position: at the tunnel tunnel face that water burst occurs, by the method for forward probe, tentatively determine water source, the place ahead direction, position;
2. select the construction method pressure release power of in advance local or the pilot tunnel position of detouring; When water burst is only present in a side of current face, at current face, can carry out leading little pilot tunnel construction, when little pilot tunnel is constructed to high pressure water burst position, water gushing out with high pressure discharges in little pilot tunnel, and then carrying out former face excavation, according to going out, water burst situation is staggered carries out two parts; When water yield larger, and while all there is water gushing out with high pressure in all positions of current face, can step back in current face position to the anhydrous construction section construction pilot tunnel that detours, when water burst appears in little pilot tunnel, after former face water burst is discharged, carry out face construction, two parts are selected installation opportunity according to water outlet situation.
Construction method of the present invention is simple to operation, does not increase other costs, has effectively reduced the impact of water gushing out with high pressure on excavation construction, has solved the difficulty of the operations such as boring in excavation blasting process, powder charge, explosion, has guaranteed normally carrying out of construction.
The specific embodiment:
The excavation construction method in water gushing out with high pressure tunnel, comprises the steps:
1. determine water burst source position: the method for carrying out forward probe by TSP or leading inspecting hole at the tunnel tunnel face that water burst occurs is tentatively determined water source, the place ahead direction, position;
2. select the construction method pressure release power of in advance local or the pilot tunnel position of detouring.When water burst is only present in a side of current face, at current face, can carry out leading little pilot tunnel construction, when little pilot tunnel is constructed to high pressure water burst position, water gushing out with high pressure discharges in little pilot tunnel, and then carrying out former face excavation, according to going out, water burst situation is staggered carries out two parts; When water yield larger, and while all there is water gushing out with high pressure in all positions of current face, can step back in current face position to the anhydrous construction section construction pilot tunnel that detours, when water burst appears in little pilot tunnel, after former face water burst is discharged, carry out face construction, two parts are selected installation opportunity according to water outlet situation.
The present invention is a kind of rich water tunnel excavation method that realizes safety quick construction for water burst tunnel fast transition water gushing out with high pressure paragraph, simple to operation, does not increase other costs, can effectively reduce the impact of water gushing out with high pressure on excavation construction.

Claims (1)

1. the excavation construction method in water gushing out with high pressure tunnel, is characterized in that: comprise the steps:
1. determine water burst source position: at the tunnel tunnel face that water burst occurs, by the method for forward probe, tentatively determine water source, the place ahead direction, position;
2. select the construction method pressure release power of in advance local or the pilot tunnel position of detouring; When water burst is only present in a side of current face, at current face, can carry out leading little pilot tunnel construction, when little pilot tunnel is constructed to high pressure water burst position, water gushing out with high pressure discharges in little pilot tunnel, and then carrying out former face excavation, according to going out, water burst situation is staggered carries out two parts; When water yield larger, and while all there is water gushing out with high pressure in all positions of current face, can step back in current face position to the anhydrous construction section construction pilot tunnel that detours, when water burst appears in little pilot tunnel, after former face water burst is discharged, carry out face construction, two parts are selected installation opportunity according to water outlet situation.
CN201310633550.2A 2013-11-28 2013-11-28 Excavation construction method of high-pressure water gushing tunnel Pending CN103628916A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310633550.2A CN103628916A (en) 2013-11-28 2013-11-28 Excavation construction method of high-pressure water gushing tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310633550.2A CN103628916A (en) 2013-11-28 2013-11-28 Excavation construction method of high-pressure water gushing tunnel

Publications (1)

Publication Number Publication Date
CN103628916A true CN103628916A (en) 2014-03-12

Family

ID=50210330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310633550.2A Pending CN103628916A (en) 2013-11-28 2013-11-28 Excavation construction method of high-pressure water gushing tunnel

Country Status (1)

Country Link
CN (1) CN103628916A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213922A (en) * 2014-08-19 2014-12-17 西安建筑科技大学 Stability augmentation short step construction method for advanced water drainage of lower guide pit in tunnel passing water-rich strata
CN105545312A (en) * 2015-12-23 2016-05-04 中国水电建设集团十五工程局有限公司 Water burst pretreatment method adopted before tunnel face excavation
CN107229812A (en) * 2017-07-31 2017-10-03 中国水利水电第七工程局成都水电建设工程有限公司 A kind of high hydraulic pressure Karst Tunnel lining cutting water pressure calculation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922302A (en) * 2010-08-30 2010-12-22 中铁第四勘察设计院集团有限公司 Fault processing method of high pressure water enrichment area
CN202560319U (en) * 2012-04-01 2012-11-28 中铁十二局集团第二工程有限公司 Tunnel drainage and pressure reduction structure
CN103306683A (en) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 Construction method for comprehensive precipitation in hole in deep-buried tunnel excavation process
CN103334770A (en) * 2013-06-09 2013-10-02 中铁隧道集团有限公司 Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN103628915A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Dewatering and drainage method for large-section water-rich saturation fine-silt tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922302A (en) * 2010-08-30 2010-12-22 中铁第四勘察设计院集团有限公司 Fault processing method of high pressure water enrichment area
CN202560319U (en) * 2012-04-01 2012-11-28 中铁十二局集团第二工程有限公司 Tunnel drainage and pressure reduction structure
CN103334770A (en) * 2013-06-09 2013-10-02 中铁隧道集团有限公司 Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN103306683A (en) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 Construction method for comprehensive precipitation in hole in deep-buried tunnel excavation process
CN103628915A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Dewatering and drainage method for large-section water-rich saturation fine-silt tunnel

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213922A (en) * 2014-08-19 2014-12-17 西安建筑科技大学 Stability augmentation short step construction method for advanced water drainage of lower guide pit in tunnel passing water-rich strata
CN105545312A (en) * 2015-12-23 2016-05-04 中国水电建设集团十五工程局有限公司 Water burst pretreatment method adopted before tunnel face excavation
CN107229812A (en) * 2017-07-31 2017-10-03 中国水利水电第七工程局成都水电建设工程有限公司 A kind of high hydraulic pressure Karst Tunnel lining cutting water pressure calculation method
CN107229812B (en) * 2017-07-31 2020-08-28 中国水利水电第七工程局成都水电建设工程有限公司 Method for calculating water pressure of lining of high-water-pressure karst tunnel

Similar Documents

Publication Publication Date Title
US20180187547A1 (en) Longwall mine construction method n00
CN102644476B (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN110195580B (en) Gas-liquid two-phase combined coal bed permeability increasing method
CN103628916A (en) Excavation construction method of high-pressure water gushing tunnel
CN101644166A (en) Method for extracting gas from high gas low permeability coal seam by punching, slotting, pressure releasing, and permeability increasing
CN102635388A (en) Interaction permeability-increasing method of pre-splitting blasting and hydraulic cracking of coal seam
WO2016019826A1 (en) Freezing cross-cut coal cutting method based on hydraulic seam-cutting
CN102966372A (en) Slotting induced-flow pressure-relief anti-reflection method for complicated seam
CN105736040A (en) Method for pumping and exhausting gas of coal beds in front of parallel adit and main cave by means of parallel adit drilling construction
WO2012115803A3 (en) Improved method of replacing an underground pipe
WO2013062871A3 (en) Horizontal borehole mining system and method
CN101581232A (en) Method and device for pre-pumping coal body gas by concussion fracture of high-pressure gas
CN104912588B (en) Spalling permeability increasing method for rapid excavation of underground seam gateway
CN103233742A (en) Treatment measure of bad geological section for long distance pipeline coal conveying
CN104264709B (en) The high thin dike excavation method of a kind of Hydraulic and Hydro-Power Engineering underground chamber
CN211144502U (en) Cavitation water jet auxiliary rock breaking TBM cutter head for extremely hard rock
CN203430571U (en) Arrangement structure of three-tunnel tunneling micro-shock sensor
CN110905528A (en) Method for repairing rock burst dangerous roadway by strong disturbance and segmentation
CN104847349A (en) Coal and rock mass freeze thawing water injection fracturing weakening system and method thereof
CN104612644A (en) Gas phase fracturing and fast gas extraction method for low permeability coal bed
CN103670497A (en) Gas treatment method used when tunneled underground coal mine roadway is communicated with abandoned roadway
CN204163731U (en) Novelly dig hard rock tunnel development machine
CN203961987U (en) The full section cutterhead of mining rock gangway speedy drivage machine
CN103982184B (en) Underground mine oper cylinler caved stopes falls the directed landing control method of ore
CN103063091B (en) Deep-buried tunnel full-section millisecond blasting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140312