CN205984135U - Pre -buried formula marker post - Google Patents
Pre -buried formula marker post Download PDFInfo
- Publication number
- CN205984135U CN205984135U CN201620948803.4U CN201620948803U CN205984135U CN 205984135 U CN205984135 U CN 205984135U CN 201620948803 U CN201620948803 U CN 201620948803U CN 205984135 U CN205984135 U CN 205984135U
- Authority
- CN
- China
- Prior art keywords
- pile body
- utility
- model
- wall
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model relates to a pre -buried formula marker post, it includes the pile body, set up at the pile cover at last pile body top, set up slot on last pile body outer wall, set up at base plate bottom the last pile body and the round hole A of setting on the pile body above the base plate, be provided with the inserted block in the slot, the utility model discloses still include pile body down, the pile body top is provided with the inner skleeve and sets up the round hole B on inner skleeve section of thick bamboo wall down, inner skleeve urceolus wall cooperatees with last pile body inner wall. The utility model discloses the pile body can only be used on the thin soil layer to the mode that the pile body combines about thick soil layer can use, through burying the base plate, can make marker post more firm, and the warning label language mode that adopts the picture peg to change can satisfy more use occasions simultaneously, and is very convenient.
Description
Technical field
This utility model is related to a kind of built-in type marker peg.
Background technology
Developing rapidly with modern city, comprehensive pipeline species sharply increases, and for urban, all kinds of integrated pipes
Line is embedded in underground in a large number, safeguards for convenience, protects all kinds of underground utilities, in the inscription of the direct label information in urban road ground
Board, and can only be by burying underground utilities marker peg on the yielding ground such as urban afforestation and arable land;Conventional underground utilities mark
Due to single function it is impossible to recycling, and embedded process is complicated for stake, thin soil layer bury insecure, and often right
Urban afforestation causes certain destruction.
Utility model content
The purpose of this utility model is that offer is a kind of fills built-in type marker peg that is firm, being suitable for varying environment.
This utility model is achieved through the following technical solutions:
A kind of built-in type marker peg, it includes pile body, the pile cover being arranged on pile body top, is arranged on pile body outer wall
On slot, be arranged on the base plate of pile body bottom and be arranged on circular hole A on the pile body above base plate, described insert
It is provided with inserted block in groove.
Furtherly, this utility model also includes lower pile body, and lower pile body top is provided with inner sleeve and is arranged on interior
Circular hole B on sleeve wall, described inner sleeve outer tube wall is matched with upper pile body inwall.
After technique scheme, the beneficial effects of the utility model are:
The mode that this utility model can be combined using upper and lower pile body in thick soil stratum, only can use pile body in thin soil layer, lead to
Cross burial base plate, marker peg can be made more firm, by the way of plate replacing, once burying can be multiple for caution slogan simultaneously
Use, more use occasions can be met, very convenient.
Brief description
Fig. 1 is structural representation one of the present utility model.
Fig. 2 is structural representation two of the present utility model.
Fig. 3 is the structural representation of inserted block in this utility model.
Wherein, pile body, 2 times pile bodies, 3 pile covers, 4 slots, 5 base plates, 6 circular hole A, 7 inner sleeves, 8 circular hole B, 9 inserted blocks on 1.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in further detail.
As Figure 1-3, a kind of built-in type marker peg, it includes pile body 1 and lower pile body 2, and upper pile body 1 includes setting
Put the pile cover 3 at upper pile body 1 top, the slot 4 on the pile body outer wall being arranged on below pile cover 3, be arranged on pile body 1 bottom
Base plate 5 and be arranged on the circular hole A6 on the pile body of base plate 5 top;Lower pile body 2 includes being arranged on lower pile body 2 top
And the inner sleeve 7 matching with upper pile body 1 inwall and the circular hole B8 being arranged on inner sleeve 7 barrel.Setting in described slot 4
There is the inserted block 9 indicating different caveat, inserted block 9 is on four faces being arranged on upper pile body 1 by the way of the insertion of side, permissible
Difference according to use occasion or the difference of service condition, change inserted block 9 as needed.
In the present embodiment, both can above pile body 1 be used alone it is also possible to upper pile body 1 and lower pile body 2 use simultaneously.When making
With place sandy soils thicker when, inner sleeve can be inserted in upper pile body, by mutually corresponding circular hole A6 and circular hole B8, use spiral shell
Upper pile body 1 and lower pile body 2 are secured together by bolt, can bury deeper position, make marker peg firm during burial;Work as place to use
It is impossible to excavate deeper pre-buried hole when sandy soils are relatively thin, using upper pile body 1, it is provided with base plate 5 due on upper pile body 1, bury
When pile body bottom can be made more firm, increased fastness.
The above embodiment is only preferred embodiment of the present utility model, and the not feasible enforcement of this utility model
Exhaustive.For persons skilled in the art, on the premise of without departing substantially from this utility model principle and spirit, it is made
Any obvious change going out, all should be contemplated as falling with claims of the present utility model.
Claims (2)
1. a kind of built-in type marker peg, is characterised by:It includes pile body(1), be arranged on pile body(1)The pile cover at top(3)、
It is arranged on pile body(1)Slot on outer wall(4), be arranged on pile body(1)The base plate of bottom(5), and be arranged on pedestal
Plate(5)Circular hole A on the pile body of top(6), described slot(4)Inside it is provided with inserted block(9).
2. a kind of built-in type marker peg according to claim 1, is characterised by:It also includes lower pile body(2), lower pile
Body(2)Top is provided with inner sleeve(7)Be arranged on inner sleeve(7)Circular hole B on barrel(8), described inner sleeve(7)Outer tube wall
With upper pile body(1)Inwall matches.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620948803.4U CN205984135U (en) | 2016-08-26 | 2016-08-26 | Pre -buried formula marker post |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620948803.4U CN205984135U (en) | 2016-08-26 | 2016-08-26 | Pre -buried formula marker post |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205984135U true CN205984135U (en) | 2017-02-22 |
Family
ID=58036453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620948803.4U Expired - Fee Related CN205984135U (en) | 2016-08-26 | 2016-08-26 | Pre -buried formula marker post |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205984135U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107460838A (en) * | 2017-09-12 | 2017-12-12 | 汤始建华建材(苏州)有限公司 | A kind of non-newtonian liquid fender pile |
-
2016
- 2016-08-26 CN CN201620948803.4U patent/CN205984135U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107460838A (en) * | 2017-09-12 | 2017-12-12 | 汤始建华建材(苏州)有限公司 | A kind of non-newtonian liquid fender pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101838984B (en) | Afforestation ecological fabric reinforcing method and structure | |
US9074387B2 (en) | Portable tombstone | |
CN205984135U (en) | Pre -buried formula marker post | |
Thornton et al. | The Bronze Age Towers at Bat, Sultanate of Oman: Research by the Bat Archaeological Project, 27-12 | |
CN204228155U (en) | A kind of shallow-depth-excavation tunnel construction land tenure table settlement monitoring point buries structure underground | |
Schmidt | The 2003 Campaign at Göbekli Tepe (Southeastern Turkey) | |
CN206743827U (en) | A kind of packaging desert planting spade | |
Crummy | The Roman Theatre at Colchester | |
CN213716355U (en) | Marking device for forestry vegetation investigation | |
CN203908538U (en) | Combined measuring device for stratum deformation | |
CN210238468U (en) | Geodetic surveying equipment for multi-source data parallel-site observation | |
KR200395027Y1 (en) | Auxiliary mark column for marking of cable tube under the ground | |
CN205645091U (en) | Arrow point sign | |
Thomas | The Society’s 1962 excavations: the henge at Castilly, Lanivet | |
CN105442618B (en) | Accessible vertical type foundation pit supporting construction in hole | |
Campbell | Surveyors, topography, and definitions of landholding in ancient Rome | |
CN216647703U (en) | Many topography signboard base | |
Wilson et al. | Roman Britain in 1962 | |
CN105672744A (en) | Simulated city cemetery | |
CN206210257U (en) | A kind of sand table hub internal structure | |
CN107190703A (en) | A kind of new landscape ecological bank protection and its construction method | |
CN205827810U (en) | A kind of underground pipeline warning stake | |
JP2006275996A (en) | Plastic pole for indicating position of measuring stake | |
CN210402965U (en) | Boundary point for land management | |
Brennan | RODOLFO LANCIANI AND THE SOUTHWEST QUIRINAL: FROM EXCAVATION TO THE FORMA URBIS ROMAE |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170222 Termination date: 20200826 |