CN205984135U CN201620948803.4U CN201620948803U CN205984135U CN 205984135 U CN205984135 U CN 205984135U CN 201620948803 U CN201620948803 U CN 201620948803U CN 205984135 U CN205984135 U CN 205984135U
Authority
CN
China
Prior art keywords
pile body
utility
model
wall
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620948803.4U
Other languages
Chinese (zh)
Inventor
黑士光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Emperor Electric Power Equipment Co Ltd
Original Assignee
Hebei Emperor Electric Power Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Emperor Electric Power Equipment Co Ltd filed Critical Hebei Emperor Electric Power Equipment Co Ltd
Priority to CN201620948803.4U priority Critical patent/CN205984135U/en
Application granted granted Critical
Publication of CN205984135U publication Critical patent/CN205984135U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a pre -buried formula marker post, it includes the pile body, set up at the pile cover at last pile body top, set up slot on last pile body outer wall, set up at base plate bottom the last pile body and the round hole A of setting on the pile body above the base plate, be provided with the inserted block in the slot, the utility model discloses still include pile body down, the pile body top is provided with the inner skleeve and sets up the round hole B on inner skleeve section of thick bamboo wall down, inner skleeve urceolus wall cooperatees with last pile body inner wall. The utility model discloses the pile body can only be used on the thin soil layer to the mode that the pile body combines about thick soil layer can use, through burying the base plate, can make marker post more firm, and the warning label language mode that adopts the picture peg to change can satisfy more use occasions simultaneously, and is very convenient.

Description

A kind of built-in type marker peg
Technical field
This utility model is related to a kind of built-in type marker peg.
Background technology
Developing rapidly with modern city, comprehensive pipeline species sharply increases, and for urban, all kinds of integrated pipes Line is embedded in underground in a large number, safeguards for convenience, protects all kinds of underground utilities, in the inscription of the direct label information in urban road ground Board, and can only be by burying underground utilities marker peg on the yielding ground such as urban afforestation and arable land;Conventional underground utilities mark Due to single function it is impossible to recycling, and embedded process is complicated for stake, thin soil layer bury insecure, and often right Urban afforestation causes certain destruction.
Utility model content
The purpose of this utility model is that offer is a kind of fills built-in type marker peg that is firm, being suitable for varying environment.
This utility model is achieved through the following technical solutions:
A kind of built-in type marker peg, it includes pile body, the pile cover being arranged on pile body top, is arranged on pile body outer wall On slot, be arranged on the base plate of pile body bottom and be arranged on circular hole A on the pile body above base plate, described insert It is provided with inserted block in groove.
Furtherly, this utility model also includes lower pile body, and lower pile body top is provided with inner sleeve and is arranged on interior Circular hole B on sleeve wall, described inner sleeve outer tube wall is matched with upper pile body inwall.
After technique scheme, the beneficial effects of the utility model are:
The mode that this utility model can be combined using upper and lower pile body in thick soil stratum, only can use pile body in thin soil layer, lead to Cross burial base plate, marker peg can be made more firm, by the way of plate replacing, once burying can be multiple for caution slogan simultaneously Use, more use occasions can be met, very convenient.
Brief description
Fig. 1 is structural representation one of the present utility model.
Fig. 2 is structural representation two of the present utility model.
Fig. 3 is the structural representation of inserted block in this utility model.
Wherein, pile body, 2 times pile bodies, 3 pile covers, 4 slots, 5 base plates, 6 circular hole A, 7 inner sleeves, 8 circular hole B, 9 inserted blocks on 1.
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in further detail.
As Figure 1-3, a kind of built-in type marker peg, it includes pile body 1 and lower pile body 2, and upper pile body 1 includes setting Put the pile cover 3 at upper pile body 1 top, the slot 4 on the pile body outer wall being arranged on below pile cover 3, be arranged on pile body 1 bottom Base plate 5 and be arranged on the circular hole A6 on the pile body of base plate 5 top;Lower pile body 2 includes being arranged on lower pile body 2 top And the inner sleeve 7 matching with upper pile body 1 inwall and the circular hole B8 being arranged on inner sleeve 7 barrel.Setting in described slot 4 There is the inserted block 9 indicating different caveat, inserted block 9 is on four faces being arranged on upper pile body 1 by the way of the insertion of side, permissible Difference according to use occasion or the difference of service condition, change inserted block 9 as needed.
In the present embodiment, both can above pile body 1 be used alone it is also possible to upper pile body 1 and lower pile body 2 use simultaneously.When making With place sandy soils thicker when, inner sleeve can be inserted in upper pile body, by mutually corresponding circular hole A6 and circular hole B8, use spiral shell Upper pile body 1 and lower pile body 2 are secured together by bolt, can bury deeper position, make marker peg firm during burial;Work as place to use It is impossible to excavate deeper pre-buried hole when sandy soils are relatively thin, using upper pile body 1, it is provided with base plate 5 due on upper pile body 1, bury When pile body bottom can be made more firm, increased fastness.
The above embodiment is only preferred embodiment of the present utility model, and the not feasible enforcement of this utility model Exhaustive.For persons skilled in the art, on the premise of without departing substantially from this utility model principle and spirit, it is made Any obvious change going out, all should be contemplated as falling with claims of the present utility model.

Claims (2)

1. a kind of built-in type marker peg, is characterised by:It includes pile body(1), be arranged on pile body(1)The pile cover at top(3)、 It is arranged on pile body(1)Slot on outer wall(4), be arranged on pile body(1)The base plate of bottom(5), and be arranged on pedestal Plate(5)Circular hole A on the pile body of top(6), described slot(4)Inside it is provided with inserted block(9).
2. a kind of built-in type marker peg according to claim 1, is characterised by:It also includes lower pile body(2), lower pile Body(2)Top is provided with inner sleeve(7)Be arranged on inner sleeve(7)Circular hole B on barrel(8), described inner sleeve(7)Outer tube wall With upper pile body(1)Inwall matches.
CN201620948803.4U 2016-08-26 2016-08-26 Pre -buried formula marker post Expired - Fee Related CN205984135U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620948803.4U CN205984135U (en) 2016-08-26 2016-08-26 Pre -buried formula marker post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620948803.4U CN205984135U (en) 2016-08-26 2016-08-26 Pre -buried formula marker post

Publications (1)

Publication Number Publication Date
CN205984135U true CN205984135U (en) 2017-02-22

Family

ID=58036453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620948803.4U Expired - Fee Related CN205984135U (en) 2016-08-26 2016-08-26 Pre -buried formula marker post

Country Status (1)

Country Link
CN (1) CN205984135U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107460838A (en) * 2017-09-12 2017-12-12 汤始建华建材(苏州)有限公司 A kind of non-newtonian liquid fender pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107460838A (en) * 2017-09-12 2017-12-12 汤始建华建材(苏州)有限公司 A kind of non-newtonian liquid fender pile

Similar Documents

Publication Publication Date Title
CN101838984B (en) Afforestation ecological fabric reinforcing method and structure
US9074387B2 (en) Portable tombstone
CN205984135U (en) Pre -buried formula marker post
Thornton et al. The Bronze Age Towers at Bat, Sultanate of Oman: Research by the Bat Archaeological Project, 27-12
CN204228155U (en) A kind of shallow-depth-excavation tunnel construction land tenure table settlement monitoring point buries structure underground
Schmidt The 2003 Campaign at Göbekli Tepe (Southeastern Turkey)
CN206743827U (en) A kind of packaging desert planting spade
Crummy The Roman Theatre at Colchester
CN213716355U (en) Marking device for forestry vegetation investigation
CN203908538U (en) Combined measuring device for stratum deformation
CN210238468U (en) Geodetic surveying equipment for multi-source data parallel-site observation
KR200395027Y1 (en) Auxiliary mark column for marking of cable tube under the ground
CN205645091U (en) Arrow point sign
Thomas The Society’s 1962 excavations: the henge at Castilly, Lanivet
CN105442618B (en) Accessible vertical type foundation pit supporting construction in hole
Campbell Surveyors, topography, and definitions of landholding in ancient Rome
CN216647703U (en) Many topography signboard base
Wilson et al. Roman Britain in 1962
CN105672744A (en) Simulated city cemetery
CN206210257U (en) A kind of sand table hub internal structure
CN107190703A (en) A kind of new landscape ecological bank protection and its construction method
CN205827810U (en) A kind of underground pipeline warning stake
JP2006275996A (en) Plastic pole for indicating position of measuring stake
CN210402965U (en) Boundary point for land management
Brennan RODOLFO LANCIANI AND THE SOUTHWEST QUIRINAL: FROM EXCAVATION TO THE FORMA URBIS ROMAE

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222

Termination date: 20200826