JP2001348886A - Building foundation construction method in weak ground - Google Patents

Building foundation construction method in weak ground

Info

Publication number
JP2001348886A
JP2001348886A JP2000171714A JP2000171714A JP2001348886A JP 2001348886 A JP2001348886 A JP 2001348886A JP 2000171714 A JP2000171714 A JP 2000171714A JP 2000171714 A JP2000171714 A JP 2000171714A JP 2001348886 A JP2001348886 A JP 2001348886A
Authority
JP
Japan
Prior art keywords
ground
footing
soft ground
concrete
soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000171714A
Other languages
Japanese (ja)
Other versions
JP4502343B2 (en
Inventor
Toshio Ono
俊夫 大野
Ikuo Matsunaga
郁夫 松永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okumura Corp
Original Assignee
Okumura Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okumura Corp filed Critical Okumura Corp
Priority to JP2000171714A priority Critical patent/JP4502343B2/en
Publication of JP2001348886A publication Critical patent/JP2001348886A/en
Application granted granted Critical
Publication of JP4502343B2 publication Critical patent/JP4502343B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To prevent the uneven settlement of concrete placed on the ground surface of the soft ground so as not to interfere with the use of a building and the ground surface. SOLUTION: A foundation pile 3 is driven into the hard ground 2 in a lower layer from the soft ground 1 so that depth D from the ground surface 1a of the soft ground 1 to an upper face 4a of a footing 4 provided at the upper end 3a of the foundation pile is the predicted ground settlement or more. The footing 4 is provided at the upper end 3a of the foundation pile 3, and a column 5 is erected on the footing 4. The concrete 6 is placed on the ground surface 1a of the soft ground 1 excluding the upper part of the footing 4, and a buried space 7 above the footing 4 is filled with a removable embedded material 8.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、海岸や海、河川、
沼などを埋め立てた軟弱な地盤の上に建物を建てる場合
の軟弱地盤における建物基礎工法に関する。
TECHNICAL FIELD The present invention relates to a seashore, a sea, a river,
The present invention relates to a foundation method for building on soft ground when building a building on soft ground in which a swamp or the like has been reclaimed.

【0002】[0002]

【従来の技術】従来、埋立地などの軟弱地盤(水を含ん
でいる地盤)上に建物を建てる場合は、図5に示すよう
に先ず軟弱地盤1から下層の硬質地盤(支持地盤)2ま
で軟弱地盤1内に杭3を打設し、杭3の上端3aにコン
クリートのフーチング4を設け、フーチング4上に柱5
を立設し、地表に露出している軟弱地盤1およびフーチ
ング4を覆うように土間コンクリート6を打設して建物
の基礎を構築し、この基礎の上に建物を建てている。
2. Description of the Related Art Conventionally, when a building is built on soft ground (ground containing water) such as a landfill, first, as shown in FIG. 5, from a soft ground 1 to a lower hard ground (supporting ground) 2 as shown in FIG. A pile 3 is placed in the soft ground 1, a concrete footing 4 is provided on an upper end 3 a of the pile 3, and a pillar 5 is placed on the footing 4.
Is erected, and a concrete foundation 6 is cast to cover the soft ground 1 and the footing 4 exposed on the surface of the ground, thereby constructing the foundation of the building, and the building is constructed on this foundation.

【0003】[0003]

【発明が解決しようとする課題】このような場合、図6
に示すように軟弱地盤1は経時的に圧密沈下を起こす。
例えば竣工後1年で約25cm、沈下がほぼ収束する6
年後で約90cmである。すると土間コンクリート6
は、軟弱地盤1の圧密沈下に応じてその表面は沈下しな
いフーチング4の部分と、沈下する軟弱地盤1の部分と
によって連続的な凹凸が生じ、建物と地表面との間に隙
間が生じたり地表面が使用できなくなる。そのため、地
表面に波打ち状の凹凸が生じた場合は、波打った土間コ
ンクリート6を撤去し、新たに土間コンクリートを打設
しなければならなかった。
In such a case, FIG.
As shown in the figure, the soft ground 1 undergoes consolidation settlement over time.
For example, about 25 cm one year after completion, subsidence almost converges6
About 90 cm later. Then, concrete 6
The surface of the footing 4 where the surface does not sink in response to the consolidation settlement of the soft ground 1 and the part of the soft ground 1 which sinks form continuous irregularities, and a gap may be formed between the building and the ground surface. The ground surface becomes unusable. Therefore, when wavy irregularities occur on the ground surface, the wavy interstitial concrete 6 has to be removed and new interstitial concrete has to be poured.

【0004】本発明は前記のような点に鑑みて開発され
たものであり、その目的とするところは、軟弱地盤の地
表面に打設したコンクリートの不等沈下を防止でき、地
表面の使用に支障をきたすことのない軟弱地盤における
建物基礎工法を提供することにある。
[0004] The present invention has been developed in view of the above-mentioned points, and an object of the present invention is to prevent uneven settlement of concrete poured on the ground surface of soft ground, and to use the ground surface. It is an object of the present invention to provide a building foundation method on soft ground which does not cause troubles.

【0005】[0005]

【課題を解決するための手段】本発明は、上記の目的を
有効に達成するために、次のような構成にしてある。す
なわち、請求項1記載の本発明の軟弱地盤における建物
基礎工は、軟弱地盤の地表面から基礎杭の上端に設ける
フーチングの上面までの深さが、将来予想される地盤沈
下量以上となるように、前記軟弱地盤から下層の硬質地
盤に基礎杭を打設し、この基礎杭の上端にフーチングを
設けて、このフーチングの上に柱を立設し、かつ、フー
チングの上方を除く前記軟弱地盤の地表面にコンクリー
トを打設し、さらにフーチングの上方の埋設空間を除去
可能な埋め込み材で埋めることを特徴とする構成であ
る。
SUMMARY OF THE INVENTION The present invention has the following configuration in order to effectively achieve the above object. That is, the building foundation in the soft ground according to the first aspect of the present invention is configured such that the depth from the ground surface of the soft ground to the upper surface of the footing provided at the upper end of the foundation pile is equal to or more than the ground subsidence expected in the future. A foundation pile is cast from the soft ground to a lower hard ground, a footing is provided at the upper end of the foundation pile, a pillar is erected on the footing, and the soft ground except above the footing is provided. The concrete structure is cast on the ground surface and the buried space above the footing is buried with a removable burying material.

【0006】請求項2記載の本発明の軟弱地盤における
建物基礎工法は、軟弱地盤の地表面から基礎杭の上端に
設けるフーチングの上面までの深さが、将来予想される
地盤沈下量以上となるように、適宜間隔を以って各基礎
杭を前記軟弱地盤から下層の硬質地盤に打設し、かつ各
基礎杭の上端にフーチングを設け、かつ、各フーチング
を繋ぐ地中梁を設け、さらに所望の前記フーチングの上
に柱を立設し、かつ、各フーチングおよび各地中梁の上
方を除く前記軟弱地盤の地表面にコンクリートを打設
し、さらにフーチングおよび各地中梁の上方の埋設空間
を除去可能な埋め込み材で埋めることを特徴とする構成
である。
According to a second aspect of the present invention, a depth of a soft ground from a ground surface of the soft ground to an upper surface of a footing provided at an upper end of a foundation pile is equal to or greater than a ground subsidence expected in the future. In this way, each foundation pile is cast from the soft ground to the lower hard ground with appropriate intervals, and a footing is provided at the upper end of each foundation pile, and an underground beam connecting each footing is provided, Pillars are erected on the desired footing, and concrete is cast on the ground surface of the soft ground except above each footing and each center beam, and further buried space above the footing and each center beam. This is a configuration characterized by filling with a removable embedding material.

【0007】[0007]

【発明の実施の形態】以下、本発明の実施の形態を図に
基づいて説明する。なお、図中符号は前記説明と同一箇
所については便宜上同一符号を使用する。
Embodiments of the present invention will be described below with reference to the drawings. In the drawings, the same reference numerals are used for the same parts as described above for convenience.

【0008】図1、図2は本発明の軟弱地盤における建
物基礎工法を示す説明図であって、この建物基礎工法
は、例えば海などの埋立地において、土砂などで埋め立
てた軟弱地盤1の地表面1aから基礎杭3の上端3aに
設けるフーチング4の上面4aまでの深さDが、将来予
想される地盤沈下量以上となるように、前記軟弱地盤1
から下層の硬質地盤2に基礎杭3を打設して基礎杭3の
上端3aにフーチング4を設ける。
FIG. 1 and FIG. 2 are explanatory views showing a foundation method for a building on soft ground according to the present invention. This method is based on, for example, the ground of a soft ground 1 reclaimed with earth and sand in a landfill such as the sea. The soft ground 1 is set so that the depth D from the surface 1a to the upper surface 4a of the footing 4 provided at the upper end 3a of the foundation pile 3 is equal to or greater than the amount of ground subsidence expected in the future.
From above, a foundation pile 3 is driven into the lower hard ground 2, and a footing 4 is provided on the upper end 3 a of the foundation pile 3.

【0009】そしてフーチング4の上には建設する建物
の柱5を立設する。さらに、フーチング4の上方の埋設
空間7を除く前記軟弱地盤1の地表面1aにはコンクリ
ート6を打設して覆い、前記埋設空間7は砂や小さなブ
ロックなどを除去可能に少し固めた埋め込み材8で埋め
る。埋め込み材8の表面8aは、コンクリート6の表面
6aと面一にする。
On the footing 4, a pillar 5 of a building to be constructed is erected. Further, concrete 6 is cast and covered on the ground surface 1a of the soft ground 1 except for the buried space 7 above the footing 4, and the buried space 7 is a buried material that is slightly hardened so that sand, small blocks, etc. can be removed. Fill with 8. The surface 8a of the embedding material 8 is flush with the surface 6a of the concrete 6.

【0010】このようにして構築した建物基礎において
は、日時の経過とともに徐々に軟弱地盤1は圧密沈下
し、この沈下に伴って軟弱地盤1の地表面1aを覆うコ
ンクリート6も沈下する。しかし、コンクリート6は前
記のようにフーチング4の上方を除く軟弱地盤1の地表
面1aに設けてあるため、軟弱地盤1とともには沈下し
ない埋め込み材8は軟弱地盤1およびコンクリート6の
沈下した分だけコンクリート6の表面6aよりも上に露
出する。そのため、この露出した埋め込み材8はスコッ
プなどで除去して、沈下したコンクリート6の表面6a
と削りとった埋め込み材8の削り表面8b(図2参照)
とが面一になるようにする。
In the building foundation constructed in this manner, the soft ground 1 gradually consolidates and sinks as time passes, and the concrete 6 covering the ground surface 1a of the soft ground 1 also sinks with the settlement. However, since the concrete 6 is provided on the ground surface 1a of the soft ground 1 except for the area above the footing 4 as described above, the embedding material 8 that does not sink together with the soft ground 1 has an amount corresponding to the sinking of the soft ground 1 and the concrete 6. It is exposed above the surface 6a of the concrete 6. Therefore, the exposed embedded material 8 is removed with a scoop or the like, and the surface 6a of the sinking concrete 6 is removed.
And the shaved surface 8b of the embedded material 8 (see FIG. 2)
And the same.

【0011】このように軟弱地盤1の地表面1aを覆う
コンクリート6は、従来のようにフーチング4の上に重
なって設けられていないため、軟弱地盤1の沈下にとも
なって全体が略均一に沈下し、波打ち状の凹凸になるこ
とがない。
As described above, since the concrete 6 covering the ground surface 1a of the soft ground 1 is not provided so as to overlap the footing 4 as in the prior art, the whole of the soft ground 1 sinks substantially uniformly as the soft ground 1 sinks. However, no wavy irregularities are formed.

【0012】次に図3、図4は本発明の軟弱地盤におけ
る建物基礎工法を示す他の例の説明図であって、この軟
弱地盤における建物基礎工法は、前記の例と同様に軟弱
地盤1の地表面1aから基礎杭3の上端3aに設けるフ
ーチング4の上面4aまでの深さDが、将来予想される
地盤沈下量以上となるように、適宜間隔を以って各基礎
杭3を前記軟弱地盤1から下層の硬質地盤2に打設し、
各基礎杭3の上端3aにフーチング4を設ける.そして
各フーチング4の間には、それぞれの地中梁9を設けて
連結する。所望のフーチング4の上には柱5を立設し、
各フーチング4および各地中梁9の上方の埋設空間7、
10を除く前記軟弱地盤1の地表面1aにコンクリート
6を打設する。さらにフーチング4および各地中梁9の
上方の埋設空間7,10は、前記した除去可能な埋め込
み材8で埋める。各埋設空間7,10に埋め込んだ埋め
込み材8の表面8aは、コンクリート6の表面6aと面
一になるようにする。
FIGS. 3 and 4 are explanatory views of another example of the foundation method for building on soft ground according to the present invention. The foundation method for building on soft ground is similar to that of the above-described example. Each of the foundation piles 3 is appropriately spaced from each other so that the depth D from the ground surface 1a to the upper surface 4a of the footing 4 provided at the upper end 3a of the foundation pile 3 is equal to or greater than the amount of ground subsidence expected in the future. Driving from soft ground 1 to lower hard ground 2
A footing 4 is provided at the upper end 3a of each foundation pile 3. Underground beams 9 are provided and connected between the footings 4. A pillar 5 is erected on the desired footing 4,
A buried space 7 above each footing 4 and a central beam 9
Concrete 6 is cast on the ground surface 1 a of the soft ground 1 except for the surface 10. Further, the burying spaces 7 and 10 above the footing 4 and the central beam 9 are filled with the removable filling material 8 described above. The surface 8 a of the embedding material 8 embedded in each of the embedding spaces 7 and 10 is made to be flush with the surface 6 a of the concrete 6.

【0013】この例においても前記で説明したのと同様
に日時の経過とともに徐々に軟弱地盤1は圧密沈下し、
この沈下に伴って軟弱地盤1の地表面1aを覆うコンク
リート6も沈下する。しかし、コンクリート6は前記の
ようにフーチング4および地中梁9の上方を除く軟弱地
盤1の地表面1aに打設してあるため、沈下しない埋め
込み材8は軟弱地盤1およびコンクリート6の沈下した
分だけコンクリート6の表面6aより上に露出する。こ
の露出した埋め込み材8を除去することによって、沈下
したコンクリート6の表面6aは削りとった埋め込み材
8の削り表面(図示省略)と面一にすることができる。
In this example, as described above, the soft ground 1 gradually consolidates and sinks as time passes.
With this settlement, the concrete 6 covering the ground surface 1a of the soft ground 1 also sinks. However, since the concrete 6 is cast on the ground surface 1a of the soft ground 1 excluding the footing 4 and the underground beam 9 as described above, the embedded material 8 that does not sink does not sink in the soft ground 1 and the concrete 6. It is exposed above the surface 6a of the concrete 6 by an amount. By removing the exposed embedding material 8, the surface 6 a of the sinking concrete 6 can be flush with the shaved surface (not shown) of the shaved embedding material 8.

【0014】したがってコンクリート6は、従来のよう
にフーチング4および地中梁9の上に重なって設けられ
ていないため、軟弱地盤1が沈下しても全体が略均一に
降下して波打ち状の凹凸を生じることがない。
Therefore, since the concrete 6 is not provided so as to overlap the footing 4 and the underground beam 9 as in the prior art, even if the soft ground 1 sinks, the whole of the concrete 6 descends substantially uniformly, and the wavy irregularities are formed. Does not occur.

【0015】[0015]

【発明の効果】以上、前記の説明でも明らかなように本
発明の軟弱地盤における建物基礎工法では、軟弱地盤の
圧密沈下に伴って軟弱地盤の地表面に打設したコンクリ
ートも略均一に沈下し、フーチングの上の埋め込み材を
取除いてコンクリートの表面と埋め込み材の表面を面一
とすることにより、コンクリートの表面である地表面を
平坦に保つことができ、この基礎の上に建設した建物
や、地表面の使用に支障をきたすといったことがない。
As is apparent from the above description, in the foundation method for building on soft ground according to the present invention, concrete poured on the ground surface of soft ground substantially sinks with consolidation of soft ground. By removing the embedding material on the footing and making the surface of the concrete and the surface of the embedding material flush, the ground surface, which is the concrete surface, can be kept flat, and the building constructed on this foundation And there is no hindrance to the use of the ground surface.

【0016】また、地中に設けたフーチングを地中梁で
繋いだ建物の基礎においても、本発明の軟弱地盤におけ
る建物基礎工法により、前記効果と同様の効果を得るこ
とができる。
The same effect as described above can also be obtained in the foundation of a building in which footings provided in the ground are connected by underground beams by the method of building foundation on soft ground according to the present invention.

【0017】[0017]

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の軟弱地盤における建物基礎工法による
竣工直後の状態を示す説明図である。
FIG. 1 is an explanatory diagram showing a state immediately after completion by a building foundation method on soft ground according to the present invention.

【図2】本発明の軟弱地盤における建物基礎工法による
所定期間経過後の状態を示す説明図である。
FIG. 2 is an explanatory diagram showing a state after a lapse of a predetermined period by a building foundation method on soft ground according to the present invention.

【図3】本発明の軟弱地盤における建物基礎工法による
他の例の竣工直後の状態を示す説明図である。
FIG. 3 is an explanatory diagram showing a state immediately after completion of another example of a building foundation method on soft ground according to the present invention.

【図4】本発明の軟弱地盤における建物基礎工法による
他の例の平面視の説明図である。
FIG. 4 is an explanatory plan view of another example of the building foundation method on soft ground according to the present invention.

【図5】従来の軟弱地盤における建物基礎工法による竣
工直後の状態を示す説明図である。
FIG. 5 is an explanatory diagram showing a state immediately after completion by a conventional building foundation method on soft ground.

【図6】従来の軟弱地盤における建物基礎工法による所
定期間経過後の状態を示す説明図である。
FIG. 6 is an explanatory diagram showing a state after a lapse of a predetermined period by a conventional building foundation method on soft ground.

【符号の説明】[Explanation of symbols]

1 軟弱地盤 1a 地表面 2 硬質地盤 3 基礎杭 3a 上端 4 フーチング 4a 上面 D 深さ 5 柱 6 コンクリート 7 埋設空間 8 埋め込み材 9 地中梁 10 埋設空間 DESCRIPTION OF SYMBOLS 1 Soft ground 1a Ground surface 2 Hard ground 3 Foundation pile 3a Upper end 4 Footing 4a Upper surface D Depth 5 Column 6 Concrete 7 Embedded space 8 Embedded material 9 Underground beam 10 Embedded space

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 軟弱地盤の地表面から基礎杭の上端に設
けるフーチングの上面までの深さが、将来予想される地
盤沈下量以上となるように、前記軟弱地盤から下層の硬
質地盤に基礎杭を打設し、この基礎杭の上端にフーチン
グを設けて、このフーチングの上に柱を立設し、かつ、
フーチングの上方を除く前記軟弱地盤の地表面にコンク
リートを打設し、さらにフーチングの上方の埋設空間を
除去可能な埋め込み材で埋めることを特徴とする軟弱地
盤における建物基礎工法。
1. A method of mounting a foundation pile from a soft ground to a lower hard ground so that a depth from a ground surface of the soft ground to an upper surface of a footing provided at an upper end of the foundation pile is equal to or greater than a ground subsidence expected in the future. And a footing is provided at the upper end of the foundation pile, a pillar is erected on the footing, and
A foundation method for a building on soft ground, wherein concrete is cast on the ground surface of the soft ground except above the footing, and the buried space above the footing is filled with a removable embedding material.
【請求項2】 軟弱地盤の地表面から基礎杭の上端に設
けるフーチングの上面までの深さが、将来予想される地
盤沈下量以上となるように、適宜間隔を以って各基礎杭
を前記軟弱地盤から下層の硬質地盤に打設し、かつ各基
礎杭の上端にフーチングを設け、かつ、各フーチングを
繋ぐ地中梁を設け、さらに所望の前記フーチングの上に
柱を立設し、かつ、各フーチングおよび各地中梁の上方
を除く前記軟弱地盤の地表面にコンクリートを打設し、
さらにフーチングおよび各地中梁の上方の埋設空間を除
去可能な埋め込み材で埋めることを特徴とする軟弱地盤
における建物基礎工法。
2. The method according to claim 1, wherein a depth from a ground surface of the soft ground to an upper surface of a footing provided at an upper end of the foundation pile is equal to or more than a land subsidence expected in the future. Driving from soft ground to lower hard ground, and providing a footing at the upper end of each foundation pile, and providing an underground beam connecting each footing, further erecting a column on the desired footing, and , Concrete is poured on the ground surface of the soft ground except for each footing and the upper part of the central beam,
Furthermore, a foundation method for building on soft ground, characterized by filling the footing and the buried space above the central beam with a removable buried material.
JP2000171714A 2000-06-08 2000-06-08 Building foundation method in soft ground Expired - Fee Related JP4502343B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000171714A JP4502343B2 (en) 2000-06-08 2000-06-08 Building foundation method in soft ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000171714A JP4502343B2 (en) 2000-06-08 2000-06-08 Building foundation method in soft ground

Publications (2)

Publication Number Publication Date
JP2001348886A true JP2001348886A (en) 2001-12-21
JP4502343B2 JP4502343B2 (en) 2010-07-14

Family

ID=18674230

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000171714A Expired - Fee Related JP4502343B2 (en) 2000-06-08 2000-06-08 Building foundation method in soft ground

Country Status (1)

Country Link
JP (1) JP4502343B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006233512A (en) * 2005-02-23 2006-09-07 Muto Hideo Foundation structure of column base, its construction method, its design method and its recording medium
JP2008285948A (en) * 2007-05-21 2008-11-27 Toyota Motor Corp Building
JP2011043029A (en) * 2009-08-24 2011-03-03 Kumagai Gumi Co Ltd Building
MD4096C1 (en) * 2009-06-01 2011-09-30 Институт Энергетики Академии Наук Молдовы Portable foundation device
CN113326635A (en) * 2021-06-23 2021-08-31 中建七局交通建设有限公司 Soft foundation treatment depth prediction method for solving uneven settlement of bridge head

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5143283B2 (en) * 1971-12-17 1976-11-20
JPS62124110U (en) * 1986-01-29 1987-08-06

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5143283B2 (en) * 1971-12-17 1976-11-20
JPS62124110U (en) * 1986-01-29 1987-08-06

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006233512A (en) * 2005-02-23 2006-09-07 Muto Hideo Foundation structure of column base, its construction method, its design method and its recording medium
JP2008285948A (en) * 2007-05-21 2008-11-27 Toyota Motor Corp Building
MD4096C1 (en) * 2009-06-01 2011-09-30 Институт Энергетики Академии Наук Молдовы Portable foundation device
JP2011043029A (en) * 2009-08-24 2011-03-03 Kumagai Gumi Co Ltd Building
CN113326635A (en) * 2021-06-23 2021-08-31 中建七局交通建设有限公司 Soft foundation treatment depth prediction method for solving uneven settlement of bridge head

Also Published As

Publication number Publication date
JP4502343B2 (en) 2010-07-14

Similar Documents

Publication Publication Date Title
JP2001348886A (en) Building foundation construction method in weak ground
JP4410572B2 (en) Construction method of revetment for landfill
JP2814898B2 (en) Underground storage facility
JP2927727B2 (en) Construction method of underground structure
GB2300009A (en) Foundations for poor soils
JP7115923B2 (en) Foundation structure reinforcement method and foundation structure reinforcement structure
JPH03247801A (en) Method for road construction
JPS621930A (en) Foundation structure of underground structure
JPS58127822A (en) Liquefaction preventive structure of foundation ground
JP3297096B2 (en) Seawall material
JPH0375705B2 (en)
JPS6367328A (en) Construction of high-floor type tank foundation
JP2003278173A (en) Construction method of underground structure
JPH0726569A (en) Pile foundation construction method for structure exposed to partial earth pressure
JP3401282B2 (en) Construction method of soil between unit type buildings
JPH1025732A (en) Method of foundation-pile construction in liquefied ground
JPH05230842A (en) Construction method of underground structure
JP2933546B2 (en) Basement construction method and lower frame material used in the construction method
JPH10266240A (en) Work execution method of manhole, and manhole
JPH06212648A (en) Foundation construction
JPH08302649A (en) Reclaimed ground forming construction method
JPH0439535B2 (en)
JPS61211423A (en) Refilling method of excavated trench
JPH06346465A (en) Foundation structure and its construction
JPH11140881A (en) Penetration method for caisson foundation

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060904

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080819

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090804

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090909

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100330

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100419

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4502343

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130430

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees